SlideShare a Scribd company logo
1 of 4
RESUME
Name : Komsan Kanyakhiew
Age : 45
Sex : Male
Nationality : Thai
Religion : Buddhism
Language spoken : Thai, English, and Chinese
Present Address : 39/195 Moo 4 T. Tupma
Muang, Rayong, 21000
Contact Address : 39/195 Moo 4 T. Tupma
Muang,Rayong,21000
(081) 4296291
komsanka@gmail.com
Education : Certificate of Vocational Electrical Power
Khonkaen Technical College, Khonkaen
GPA. 2.84
: Diploma of Vocational, Electrical Power
Technology
Udonthani Technical College, Udonthani,
GPA. 3.54
: Bachelor degree of Occupational Health and
Safety
Sukhothai Thammathirat University
Summary qualification : Total more fifteen (20) years working
experience in High Voltage Substation Power Generation System, Steam
Boiler. Chiller and air condition system Water Plant Control System , Air
compressor system, Also involve in Preventive maintenance of Switchgear,
Motor Control Center High & Low voltage motor, Overhead cranes, PLC.
Control system ( Mitsubishi ) (S7-300 SIEMENS)
Off shore experience 7 years and Rig Electrician 5 years
Other Skills : Computer Literate, Microsoft word / Excel,
Knowledge in Instrumentation SCADA system, MMI system, Program PM
MAXIMO, ERP SAP
Experience : Rig Electrician
Sapurakencana drilling Asia LTD(Rig
Tender T-12)
21 September 2012 – Up to Present
Responsibility : Total preventive maintenance &
troubleshooting electrical system at Tender Rig T-12 such as Diesel
Generator 6X2000 KVA, UPS ,Battery charger system , VFD for TDS(LTI),
Draw work. Mud pump system ,
Instrument system so Flow ,level , Pressure, Fire & Gas detector system ,
Gai-Tronic phone system, HVAC system, Electronic Drilling system, Electrical
crane system , Anchor winch , Fresh water maker,
Experience : Advance E&I Technician
B.E.S Energy Resources ( Offshore Chevron
Thailand)
25 September 2010- 25 September 2012
Responsibility : Total preventive maintenance &
troubleshooting electrical system at Chevron Thailand Benchamas field such
as Gas turbine Generator , Gas Generator Diesel Generator, UPS ,Battery
charger system , Medium & Low Volts Switch gear HVAC system ,MCC ,
Lighting and Navigation Aid system, Gai-Tronic Phone, Instrument system
whole plant
Experience : Electrical Utility & Instrument Senior
Supervisor
G-Steel Public Company Limited, Rayong,
Thailand.
4 January 1999 – 10 September 2010
Responsibility : Total preventive maintenance &
troubleshooting for main transformer 3x130 MV 23OKV/33KV equip by gas
insulated switchgear which are supply to Electrical Arc Furnace & Hot
Rolling Mill & Auxiliaries. Online with 175 MVA Thyristor Control Reactor &
185 MVA High Harmonic Filter. This system is back up By 3 units of
Emergency Generators (1250 KVA each) with fully automatic
start during power failure. All status monitor by SCADA system.
Also responsible for preventive maintenance 6,6KV & low voltage motors
control center instrumentation using in Water Treatment Plant & Air
compressor system there are operate and monitor by MMI system. And
Responsible to preventive maintenance Overhead crane 32 units maximum
load 220 tons and Lighting system whole plant. All Protection Relay &
Circuit Breaker of substation and distribution schedule annual testing Oil
transformer annual analysis, Battery back up system. Also responsibility to
preventive maintenance air condition system whole plant, schedule plan
man power and assign job follow up maintenance program. Create practice
or procedure follow up manual all machine responsible for training
subordinate. Experience PLC program Mitshubishi (A-series and FXseries)
Siemens (S7-300) can be create or apply for development program also
experience to use Program maintenance control (MAXIMO,ERP,SAP) so to
work with safety committee for risk assessment all job responsible.
Experience : Operation & Maintenance Technician
Bangkok Polyester Company Limited,
Rayong
December 1997- December 1998
Responsibility : Responsible for preventive maintenance &
operation combination Gas Turbine Generator (11KV, 8MVA ) Series to
18MVA,11KV/22KV Transformer Which synchronized to PEA, 115KV/22KV
Transformer including Steam Boiler Supply to Absorption Chiller, 730 Ton,
Instrument of COGEN
Waste Water Control System.
Experience : Electrical Technician
TFM Packaging Film Company Limited,
Rayong
May 1996 - November 1997
Responsibility : Preventive maintenance on 18 MVA,
115KV/22KV transformer Switchgear, Overhead cranes, Motor drive system (
Somer & Vecter), PLC system. (Mitsubishi) Basic instrumentation yard
facilities in the whole plant
Absorption Chiller & Boiler system.
Experience : Industrial Electrician
Continental Engineering Corporation
Taiwan, Republic of China
February 1994 - February 1996
Responsibility : Maintenance & troubleshooting Steam
Boiler for fabrication of cement block Mold motor, lighting system,
overhead crane.
Training Crouse : Electrical High voltage TOSHIBA 10-12 May
1999
Power Harmonic Chulalongkorn University 18-20 Sep 2002
Intouch Basic training Sagitate (Thailand) 14-17
June 2004
SCADA System for Industrial Thai-German
Institute 29-31 Aug 2005
Safety for supervisor level NPC 25-26 February
2008
SIMETIC MANAGER Step 7 & WINCC Flexible OF
SIEMENS 60 Hr. by Ministry of Industry
TDS-8SA/1000 Top Drive system electrical cause
at NOV Singapore on 23-27 March 2015
Expect salary Negotiation

More Related Content

What's hot

IRJET- Speed Control and Minimization of Torque Ripples in BLDC Motor usi...
IRJET-  	  Speed Control and Minimization of Torque Ripples in BLDC Motor usi...IRJET-  	  Speed Control and Minimization of Torque Ripples in BLDC Motor usi...
IRJET- Speed Control and Minimization of Torque Ripples in BLDC Motor usi...IRJET Journal
 
ASYNCHRONOUS DRIVE CONTROL OF A TRACTION VEHICLE USING TCMS SYSTEM
ASYNCHRONOUS DRIVE CONTROL OF A TRACTION VEHICLE USING TCMS SYSTEMASYNCHRONOUS DRIVE CONTROL OF A TRACTION VEHICLE USING TCMS SYSTEM
ASYNCHRONOUS DRIVE CONTROL OF A TRACTION VEHICLE USING TCMS SYSTEMIAEME Publication
 
EVS-04-12e.pdf
EVS-04-12e.pdfEVS-04-12e.pdf
EVS-04-12e.pdfInstansi
 
Chapter 53
Chapter 53Chapter 53
Chapter 53mcfalltj
 
Kulekhani-1 hydropower project, Nepal
Kulekhani-1 hydropower project, NepalKulekhani-1 hydropower project, Nepal
Kulekhani-1 hydropower project, NepalHari Bhusal
 
induction motor protection system
induction motor protection systeminduction motor protection system
induction motor protection systemAmey Kulkarni
 
EVE-07-14e.pdf
EVE-07-14e.pdfEVE-07-14e.pdf
EVE-07-14e.pdfInstansi
 
Servo mechanism and control system
Servo mechanism and control systemServo mechanism and control system
Servo mechanism and control systemOmkar Lokhande
 
Control systems project report (180501008)(180501016)(180501018)(180501020)
Control systems project report (180501008)(180501016)(180501018)(180501020)Control systems project report (180501008)(180501016)(180501018)(180501020)
Control systems project report (180501008)(180501016)(180501018)(180501020)khang31
 
IRJET- Speed Control of Induction Motor using Hybrid PID Fuzzy Controller
IRJET- Speed Control of Induction Motor using Hybrid PID Fuzzy ControllerIRJET- Speed Control of Induction Motor using Hybrid PID Fuzzy Controller
IRJET- Speed Control of Induction Motor using Hybrid PID Fuzzy ControllerIRJET Journal
 
Electronic Control Unit(ECU)
Electronic Control Unit(ECU)Electronic Control Unit(ECU)
Electronic Control Unit(ECU)Ankul Gupta
 
multi devices universal charger
multi devices universal charger multi devices universal charger
multi devices universal charger roney dewan
 
Dynamic Modeling of Pump Drive System utilizing Simulink/MATLAB Program
Dynamic Modeling of Pump Drive System utilizing Simulink/MATLAB ProgramDynamic Modeling of Pump Drive System utilizing Simulink/MATLAB Program
Dynamic Modeling of Pump Drive System utilizing Simulink/MATLAB ProgramIRJET Journal
 
PLC Applications for speed control of induction motor through VFD
PLC Applications for speed control of induction motor through VFDPLC Applications for speed control of induction motor through VFD
PLC Applications for speed control of induction motor through VFDIRJET Journal
 
Automatic bottle filling system using microcontroller
Automatic bottle filling system using microcontrollerAutomatic bottle filling system using microcontroller
Automatic bottle filling system using microcontrollerShubham Patel
 
Acm training for maintenance and operation personnel in wind farms
Acm   training for maintenance and operation personnel in wind farmsAcm   training for maintenance and operation personnel in wind farms
Acm training for maintenance and operation personnel in wind farmsJose SanLeandro
 
Engine control module(ecm)
Engine control module(ecm)Engine control module(ecm)
Engine control module(ecm)Vijay G
 

What's hot (19)

IRJET- Speed Control and Minimization of Torque Ripples in BLDC Motor usi...
IRJET-  	  Speed Control and Minimization of Torque Ripples in BLDC Motor usi...IRJET-  	  Speed Control and Minimization of Torque Ripples in BLDC Motor usi...
IRJET- Speed Control and Minimization of Torque Ripples in BLDC Motor usi...
 
ASYNCHRONOUS DRIVE CONTROL OF A TRACTION VEHICLE USING TCMS SYSTEM
ASYNCHRONOUS DRIVE CONTROL OF A TRACTION VEHICLE USING TCMS SYSTEMASYNCHRONOUS DRIVE CONTROL OF A TRACTION VEHICLE USING TCMS SYSTEM
ASYNCHRONOUS DRIVE CONTROL OF A TRACTION VEHICLE USING TCMS SYSTEM
 
EVS-04-12e.pdf
EVS-04-12e.pdfEVS-04-12e.pdf
EVS-04-12e.pdf
 
Chapter 53
Chapter 53Chapter 53
Chapter 53
 
Kulekhani-1 hydropower project, Nepal
Kulekhani-1 hydropower project, NepalKulekhani-1 hydropower project, Nepal
Kulekhani-1 hydropower project, Nepal
 
induction motor protection system
induction motor protection systeminduction motor protection system
induction motor protection system
 
EVE-07-14e.pdf
EVE-07-14e.pdfEVE-07-14e.pdf
EVE-07-14e.pdf
 
Servo mechanism and control system
Servo mechanism and control systemServo mechanism and control system
Servo mechanism and control system
 
Control systems project report (180501008)(180501016)(180501018)(180501020)
Control systems project report (180501008)(180501016)(180501018)(180501020)Control systems project report (180501008)(180501016)(180501018)(180501020)
Control systems project report (180501008)(180501016)(180501018)(180501020)
 
IRJET- Speed Control of Induction Motor using Hybrid PID Fuzzy Controller
IRJET- Speed Control of Induction Motor using Hybrid PID Fuzzy ControllerIRJET- Speed Control of Induction Motor using Hybrid PID Fuzzy Controller
IRJET- Speed Control of Induction Motor using Hybrid PID Fuzzy Controller
 
Electronic Control Unit(ECU)
Electronic Control Unit(ECU)Electronic Control Unit(ECU)
Electronic Control Unit(ECU)
 
multi devices universal charger
multi devices universal charger multi devices universal charger
multi devices universal charger
 
Dynamic Modeling of Pump Drive System utilizing Simulink/MATLAB Program
Dynamic Modeling of Pump Drive System utilizing Simulink/MATLAB ProgramDynamic Modeling of Pump Drive System utilizing Simulink/MATLAB Program
Dynamic Modeling of Pump Drive System utilizing Simulink/MATLAB Program
 
PLC Applications for speed control of induction motor through VFD
PLC Applications for speed control of induction motor through VFDPLC Applications for speed control of induction motor through VFD
PLC Applications for speed control of induction motor through VFD
 
Automatic bottle filling system using microcontroller
Automatic bottle filling system using microcontrollerAutomatic bottle filling system using microcontroller
Automatic bottle filling system using microcontroller
 
CV Ahmed Elsayad
CV Ahmed ElsayadCV Ahmed Elsayad
CV Ahmed Elsayad
 
Power window
Power windowPower window
Power window
 
Acm training for maintenance and operation personnel in wind farms
Acm   training for maintenance and operation personnel in wind farmsAcm   training for maintenance and operation personnel in wind farms
Acm training for maintenance and operation personnel in wind farms
 
Engine control module(ecm)
Engine control module(ecm)Engine control module(ecm)
Engine control module(ecm)
 

Viewers also liked

Pipeline & Nonpipeline Processor
Pipeline & Nonpipeline ProcessorPipeline & Nonpipeline Processor
Pipeline & Nonpipeline ProcessorSmit Shah
 
Pulseguard A5 Brochure_Layout 1
Pulseguard A5 Brochure_Layout 1Pulseguard A5 Brochure_Layout 1
Pulseguard A5 Brochure_Layout 1Kate Farmer
 
Primer acercamiento a la participación en Facebook
Primer acercamiento a la participación en FacebookPrimer acercamiento a la participación en Facebook
Primer acercamiento a la participación en FacebookUniversidad de Buenos Aires
 
Révision I - Introduction
Révision I - IntroductionRévision I - Introduction
Révision I - IntroductionPierrot Caron
 
NUANCES OF DELIVERY
NUANCES OF DELIVERYNUANCES OF DELIVERY
NUANCES OF DELIVERYSmit Shah
 
Lap winding for AC machine
Lap winding for AC machineLap winding for AC machine
Lap winding for AC machineSmit Shah
 
AC Supply system, Comparison Between AC-DC System, Advantage HV transmission
AC Supply system, Comparison Between AC-DC System, Advantage HV transmissionAC Supply system, Comparison Between AC-DC System, Advantage HV transmission
AC Supply system, Comparison Between AC-DC System, Advantage HV transmissionSmit Shah
 
RESUME Phoonsak Rieamrat_2016
RESUME Phoonsak Rieamrat_2016RESUME Phoonsak Rieamrat_2016
RESUME Phoonsak Rieamrat_2016Phoonsak Rieamrat
 

Viewers also liked (17)

Pipeline & Nonpipeline Processor
Pipeline & Nonpipeline ProcessorPipeline & Nonpipeline Processor
Pipeline & Nonpipeline Processor
 
Pulseguard A5 Brochure_Layout 1
Pulseguard A5 Brochure_Layout 1Pulseguard A5 Brochure_Layout 1
Pulseguard A5 Brochure_Layout 1
 
Primer acercamiento a la participación en Facebook
Primer acercamiento a la participación en FacebookPrimer acercamiento a la participación en Facebook
Primer acercamiento a la participación en Facebook
 
Révision I - Introduction
Révision I - IntroductionRévision I - Introduction
Révision I - Introduction
 
How to use hootsuit by ella
How to use hootsuit by ellaHow to use hootsuit by ella
How to use hootsuit by ella
 
NUANCES OF DELIVERY
NUANCES OF DELIVERYNUANCES OF DELIVERY
NUANCES OF DELIVERY
 
Lap winding for AC machine
Lap winding for AC machineLap winding for AC machine
Lap winding for AC machine
 
Final Project Report
Final Project ReportFinal Project Report
Final Project Report
 
AC Supply system, Comparison Between AC-DC System, Advantage HV transmission
AC Supply system, Comparison Between AC-DC System, Advantage HV transmissionAC Supply system, Comparison Between AC-DC System, Advantage HV transmission
AC Supply system, Comparison Between AC-DC System, Advantage HV transmission
 
Arintra_Resume2016
Arintra_Resume2016Arintra_Resume2016
Arintra_Resume2016
 
Sumpun Paungplub Resume
Sumpun Paungplub ResumeSumpun Paungplub Resume
Sumpun Paungplub Resume
 
Mongkon-Resume_MKK
Mongkon-Resume_MKKMongkon-Resume_MKK
Mongkon-Resume_MKK
 
resume CV
resume CVresume CV
resume CV
 
Resume parinya
Resume  parinyaResume  parinya
Resume parinya
 
RESUME Phoonsak Rieamrat_2016
RESUME Phoonsak Rieamrat_2016RESUME Phoonsak Rieamrat_2016
RESUME Phoonsak Rieamrat_2016
 
CV_Kanokwan_new
CV_Kanokwan_newCV_Kanokwan_new
CV_Kanokwan_new
 
Resume_Ananyoth
Resume_AnanyothResume_Ananyoth
Resume_Ananyoth
 

Similar to Resume for Thai Electrical Engineer with Offshore Experience (20)

Resume
ResumeResume
Resume
 
Hamdy cv
Hamdy cvHamdy cv
Hamdy cv
 
Abdul Mujiono CV1
Abdul Mujiono CV1Abdul Mujiono CV1
Abdul Mujiono CV1
 
Abdul Mujiono CV
Abdul Mujiono CVAbdul Mujiono CV
Abdul Mujiono CV
 
irfan final cv (2)
irfan final cv (2)irfan final cv (2)
irfan final cv (2)
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
CV-Elect-C-o-RRS - Copy
CV-Elect-C-o-RRS - CopyCV-Elect-C-o-RRS - Copy
CV-Elect-C-o-RRS - Copy
 
CV Dewaharbabu
CV DewaharbabuCV Dewaharbabu
CV Dewaharbabu
 
viklesh essar
viklesh essarviklesh essar
viklesh essar
 
Abdou fattouh cv
Abdou fattouh cvAbdou fattouh cv
Abdou fattouh cv
 
RESUME
RESUMERESUME
RESUME
 
Gowtham resume
Gowtham resumeGowtham resume
Gowtham resume
 
Cv
CvCv
Cv
 
Jose_resume 1
Jose_resume 1Jose_resume 1
Jose_resume 1
 
Saran Resume
Saran ResumeSaran Resume
Saran Resume
 
Mohammed Tawfik CV 4-2016
Mohammed Tawfik CV 4-2016 Mohammed Tawfik CV 4-2016
Mohammed Tawfik CV 4-2016
 
alphonse manickaraj
alphonse manickarajalphonse manickaraj
alphonse manickaraj
 
CV Trac.Nguyen
CV Trac.NguyenCV Trac.Nguyen
CV Trac.Nguyen
 
Resume
ResumeResume
Resume
 
UPDATED CV-1
UPDATED CV-1UPDATED CV-1
UPDATED CV-1
 

Resume for Thai Electrical Engineer with Offshore Experience

  • 1. RESUME Name : Komsan Kanyakhiew Age : 45 Sex : Male Nationality : Thai Religion : Buddhism Language spoken : Thai, English, and Chinese Present Address : 39/195 Moo 4 T. Tupma Muang, Rayong, 21000 Contact Address : 39/195 Moo 4 T. Tupma Muang,Rayong,21000 (081) 4296291 komsanka@gmail.com Education : Certificate of Vocational Electrical Power Khonkaen Technical College, Khonkaen GPA. 2.84 : Diploma of Vocational, Electrical Power Technology Udonthani Technical College, Udonthani, GPA. 3.54 : Bachelor degree of Occupational Health and Safety Sukhothai Thammathirat University Summary qualification : Total more fifteen (20) years working experience in High Voltage Substation Power Generation System, Steam Boiler. Chiller and air condition system Water Plant Control System , Air compressor system, Also involve in Preventive maintenance of Switchgear, Motor Control Center High & Low voltage motor, Overhead cranes, PLC. Control system ( Mitsubishi ) (S7-300 SIEMENS) Off shore experience 7 years and Rig Electrician 5 years Other Skills : Computer Literate, Microsoft word / Excel, Knowledge in Instrumentation SCADA system, MMI system, Program PM MAXIMO, ERP SAP Experience : Rig Electrician
  • 2. Sapurakencana drilling Asia LTD(Rig Tender T-12) 21 September 2012 – Up to Present Responsibility : Total preventive maintenance & troubleshooting electrical system at Tender Rig T-12 such as Diesel Generator 6X2000 KVA, UPS ,Battery charger system , VFD for TDS(LTI), Draw work. Mud pump system , Instrument system so Flow ,level , Pressure, Fire & Gas detector system , Gai-Tronic phone system, HVAC system, Electronic Drilling system, Electrical crane system , Anchor winch , Fresh water maker, Experience : Advance E&I Technician B.E.S Energy Resources ( Offshore Chevron Thailand) 25 September 2010- 25 September 2012 Responsibility : Total preventive maintenance & troubleshooting electrical system at Chevron Thailand Benchamas field such as Gas turbine Generator , Gas Generator Diesel Generator, UPS ,Battery charger system , Medium & Low Volts Switch gear HVAC system ,MCC , Lighting and Navigation Aid system, Gai-Tronic Phone, Instrument system whole plant Experience : Electrical Utility & Instrument Senior Supervisor G-Steel Public Company Limited, Rayong, Thailand. 4 January 1999 – 10 September 2010 Responsibility : Total preventive maintenance & troubleshooting for main transformer 3x130 MV 23OKV/33KV equip by gas insulated switchgear which are supply to Electrical Arc Furnace & Hot Rolling Mill & Auxiliaries. Online with 175 MVA Thyristor Control Reactor & 185 MVA High Harmonic Filter. This system is back up By 3 units of Emergency Generators (1250 KVA each) with fully automatic start during power failure. All status monitor by SCADA system. Also responsible for preventive maintenance 6,6KV & low voltage motors control center instrumentation using in Water Treatment Plant & Air compressor system there are operate and monitor by MMI system. And Responsible to preventive maintenance Overhead crane 32 units maximum load 220 tons and Lighting system whole plant. All Protection Relay & Circuit Breaker of substation and distribution schedule annual testing Oil transformer annual analysis, Battery back up system. Also responsibility to preventive maintenance air condition system whole plant, schedule plan man power and assign job follow up maintenance program. Create practice or procedure follow up manual all machine responsible for training subordinate. Experience PLC program Mitshubishi (A-series and FXseries) Siemens (S7-300) can be create or apply for development program also
  • 3. experience to use Program maintenance control (MAXIMO,ERP,SAP) so to work with safety committee for risk assessment all job responsible. Experience : Operation & Maintenance Technician Bangkok Polyester Company Limited, Rayong December 1997- December 1998 Responsibility : Responsible for preventive maintenance & operation combination Gas Turbine Generator (11KV, 8MVA ) Series to 18MVA,11KV/22KV Transformer Which synchronized to PEA, 115KV/22KV Transformer including Steam Boiler Supply to Absorption Chiller, 730 Ton, Instrument of COGEN Waste Water Control System. Experience : Electrical Technician TFM Packaging Film Company Limited, Rayong May 1996 - November 1997 Responsibility : Preventive maintenance on 18 MVA, 115KV/22KV transformer Switchgear, Overhead cranes, Motor drive system ( Somer & Vecter), PLC system. (Mitsubishi) Basic instrumentation yard facilities in the whole plant Absorption Chiller & Boiler system. Experience : Industrial Electrician Continental Engineering Corporation Taiwan, Republic of China February 1994 - February 1996 Responsibility : Maintenance & troubleshooting Steam Boiler for fabrication of cement block Mold motor, lighting system, overhead crane. Training Crouse : Electrical High voltage TOSHIBA 10-12 May 1999 Power Harmonic Chulalongkorn University 18-20 Sep 2002 Intouch Basic training Sagitate (Thailand) 14-17 June 2004 SCADA System for Industrial Thai-German Institute 29-31 Aug 2005 Safety for supervisor level NPC 25-26 February 2008 SIMETIC MANAGER Step 7 & WINCC Flexible OF SIEMENS 60 Hr. by Ministry of Industry TDS-8SA/1000 Top Drive system electrical cause at NOV Singapore on 23-27 March 2015