PREPARED BY: ARUP GHOSH
Interval between subsequent transmissions of RRC Connection Request.
>>Starts at the RRC connection REQ transmit
>>Stops at the Receipt of RRC connection setup or reject message OR at the cell
reselection time OR upon abortion of connection establishment by Higher layers (L2/L3).
>>At the expiry performs the actions
Enum {ms100, ms200, ms300, ms400, ms600, ms1000, ms1500, ms2000} This parameter is
settable by the operator
Ericsson Internal | 2015-05-11 | Page 3
Interval between subsequent transmission
RRC Connection Reestablishment Request
>>Starts at the RRC Connection Re-establishment REQUEST
>>Stops at the Receipt of RRC Connection Re-establishment OR
RRC Connection Re-Establishment REJECT message OR
When selected cell becomes unsuitable to continue further
>>At expiry, it Go to RRC_IDLE mode
Enum {ms100, ms200, ms300, ms400, ms600, ms1000, ms1500, ms2000} This parameter is
settable by the operator
Ericsson Internal | 2015-05-11 | Page 4
Time to wait for cell reselection or
RRC Connection Setup after RRC Connection Reject
Enum {ms100, ms200, ms300, ms400, ms600, ms1000, ms1500, ms2000} This parameter is
settable by the operator
Ericsson Internal | 2015-05-11 | Page 5
Time to wait for cell reselection or
RRC Connection Setup after RRC Connection Reject
>>Starts when access is barred while performing RRC CONNECTION ESTABLISHMENT for
MO(Mobile Originating) calls
>>Stops while entering RRC_CONNECTED and upon cell re-selection mode
>>At expiry, Informs higher layers about barring alleviation
.
Ericsson Internal | 2015-05-11 | Page 6
HO failure timer. Maps to t304 defined within IE Mobility Control Info in 36.331 and has
the set of values as defined in IE Mobility Control Info
>>Starts at the Receipt of RRC CONNECTION RECONFIGURATION message along with Mobility
Control Info OR at the receipt of mobility from EUTRA command message including CELL
CHANGE ORDER
>>Stops at the successful completion of HANDOVER to EUTRA or CELL CHANGE ORDER is met
>>At expiry, it performs action based on need.
1. In the case of CELL CHANGE ORDER from E-UTRA OR intra E-UTRA handover, initiate the
RRC connection re-establishment procedure.
.
2. In case of HANDOVER to E-UTRA, perform the actions defined as per the specifications
applicable for the source RAT.
ENUMERATED {ms50, ms100, ms150, ms200, ms500, ms1000, ms2000, spare1}, This parameter is
settable by the operator.
Ericsson Internal | 2015-05-11 | Page 7
HO failure timer. Maps to t304 defined within IE CellChangeOrder in 36.331 and has the
set of values as defined in IE CellChangeOrder
ENUMERATED {ms50, ms100, ms150, ms200, ms500, ms1000, ms2000, spare1}, This parameter is
settable by the operator.
Ericsson Internal | 2015-05-11 | Page 8
RLF declaration timer.
>>Starts when UE detects PHY layer related problems (when it receives N310
consecutive out-of-sync INDs from lower layers)
>>Stops 1. When UE receives N311 consecutive in-sync INDs from lower layers/
2. Upon triggering the HANDOVER procedure
3. Upon initiating the CONNECTION RE-ESTABLISHMENT procedure
>> At expiry, if security is not activated it goes to RRC IDLE else it initiates the CONNECTION
RE-ESTABLISHMENT Procedure
Enum ms0, ms50, ms100, ms200, ms500, ms1000, ms2000} This parameter is settable by the
operator.
Ericsson Internal | 2015-05-11 | Page 9
RLF recovery timer.
>>Starts while initiating RRC CONNECTION RE-ESTABLISHMENT procedure.
>>stops upon selection of suitable E-UTRA cell OR a cell using another RAT
>>At expiry it enters RRC IDLE state
Enum {ms1000, ms3000, ms5000, ms10000, ms15000, ms20000, ms30000} This parameter is
settable by the operator
Ko  lte timer values  and descriptions

More Related Content

What's hot

Huawei 3 g_capacity_optimization
Huawei 3 g_capacity_optimizationHuawei 3 g_capacity_optimization
Huawei 3 g_capacity_optimization
Febrianto Halim Masigi
 
LTE Interference troubleshooting guide
LTE Interference troubleshooting guideLTE Interference troubleshooting guide
LTE Interference troubleshooting guide
Klajdi Husi
 
UMTS Drive Test Analysis and Examples
UMTS Drive Test Analysis and ExamplesUMTS Drive Test Analysis and Examples
UMTS Drive Test Analysis and Examples
Assim Mubder
 
3 g parameter ericsson
3 g parameter ericsson3 g parameter ericsson
3 g parameter ericssonMitul Shah
 
volte ims network architecture tutorial - Explained
volte ims network architecture tutorial - Explained volte ims network architecture tutorial - Explained
volte ims network architecture tutorial - Explained
Vikas Shokeen
 
Tems layer3_messages
Tems  layer3_messagesTems  layer3_messages
Tems layer3_messages
badgirl3086
 
Lte drive test parameter introduction
Lte drive test parameter introductionLte drive test parameter introduction
Lte drive test parameter introduction
Ray KHASTUR
 
02 umts network architecturenew
02 umts network architecturenew02 umts network architecturenew
02 umts network architecturenew
sivakumar D
 
Ericsson 2 g ran optimization complete training
Ericsson 2 g ran optimization complete trainingEricsson 2 g ran optimization complete training
Ericsson 2 g ran optimization complete training
sekit123
 
Lte irat-troubleshooting-guide
Lte irat-troubleshooting-guideLte irat-troubleshooting-guide
Lte irat-troubleshooting-guide
Denmark Wilson
 
zte umts-cs-call-drop-analysis-guide-zte
zte umts-cs-call-drop-analysis-guide-ztezte umts-cs-call-drop-analysis-guide-zte
zte umts-cs-call-drop-analysis-guide-zte
3ggprs
 
2G optimization_with_optima
2G optimization_with_optima2G optimization_with_optima
2G optimization_with_optima
ZIZI Yahia
 
LTE Optimization-KPIs.pptx
LTE Optimization-KPIs.pptxLTE Optimization-KPIs.pptx
LTE Optimization-KPIs.pptx
HasanBilalKhan
 
Presentation Rf Optimization And Planning
Presentation  Rf Optimization And PlanningPresentation  Rf Optimization And Planning
Presentation Rf Optimization And Planning
Ummaarraa Raa
 
Wcdma kpi-analysis
Wcdma kpi-analysisWcdma kpi-analysis
Wcdma kpi-analysisa8us
 
Huawei case analysis call drop
Huawei case analysis call dropHuawei case analysis call drop
Huawei case analysis call dropMuffat Itoro
 
04. lte kpi in lte radio network
04. lte   kpi in lte radio network04. lte   kpi in lte radio network
04. lte kpi in lte radio network
Dani Indra Kumara
 
40234553 drive-test
40234553 drive-test40234553 drive-test
40234553 drive-test
محمد مشعل
 

What's hot (20)

Huawei 3 g_capacity_optimization
Huawei 3 g_capacity_optimizationHuawei 3 g_capacity_optimization
Huawei 3 g_capacity_optimization
 
LTE Interference troubleshooting guide
LTE Interference troubleshooting guideLTE Interference troubleshooting guide
LTE Interference troubleshooting guide
 
UMTS Drive Test Analysis and Examples
UMTS Drive Test Analysis and ExamplesUMTS Drive Test Analysis and Examples
UMTS Drive Test Analysis and Examples
 
3 g parameter ericsson
3 g parameter ericsson3 g parameter ericsson
3 g parameter ericsson
 
08. DRIVE TEST Analysis
08. DRIVE TEST Analysis08. DRIVE TEST Analysis
08. DRIVE TEST Analysis
 
volte ims network architecture tutorial - Explained
volte ims network architecture tutorial - Explained volte ims network architecture tutorial - Explained
volte ims network architecture tutorial - Explained
 
Tems layer3_messages
Tems  layer3_messagesTems  layer3_messages
Tems layer3_messages
 
3 g call flow
3 g call flow3 g call flow
3 g call flow
 
Lte drive test parameter introduction
Lte drive test parameter introductionLte drive test parameter introduction
Lte drive test parameter introduction
 
02 umts network architecturenew
02 umts network architecturenew02 umts network architecturenew
02 umts network architecturenew
 
Ericsson 2 g ran optimization complete training
Ericsson 2 g ran optimization complete trainingEricsson 2 g ran optimization complete training
Ericsson 2 g ran optimization complete training
 
Lte irat-troubleshooting-guide
Lte irat-troubleshooting-guideLte irat-troubleshooting-guide
Lte irat-troubleshooting-guide
 
zte umts-cs-call-drop-analysis-guide-zte
zte umts-cs-call-drop-analysis-guide-ztezte umts-cs-call-drop-analysis-guide-zte
zte umts-cs-call-drop-analysis-guide-zte
 
2G optimization_with_optima
2G optimization_with_optima2G optimization_with_optima
2G optimization_with_optima
 
LTE Optimization-KPIs.pptx
LTE Optimization-KPIs.pptxLTE Optimization-KPIs.pptx
LTE Optimization-KPIs.pptx
 
Presentation Rf Optimization And Planning
Presentation  Rf Optimization And PlanningPresentation  Rf Optimization And Planning
Presentation Rf Optimization And Planning
 
Wcdma kpi-analysis
Wcdma kpi-analysisWcdma kpi-analysis
Wcdma kpi-analysis
 
Huawei case analysis call drop
Huawei case analysis call dropHuawei case analysis call drop
Huawei case analysis call drop
 
04. lte kpi in lte radio network
04. lte   kpi in lte radio network04. lte   kpi in lte radio network
04. lte kpi in lte radio network
 
40234553 drive-test
40234553 drive-test40234553 drive-test
40234553 drive-test
 

Similar to Ko lte timer values and descriptions

LTE KPI Optimization - A to Z Abiola.pptx
LTE KPI Optimization - A to Z Abiola.pptxLTE KPI Optimization - A to Z Abiola.pptx
LTE KPI Optimization - A to Z Abiola.pptx
ssuser574918
 
359182077-LTE-Mobility-Strategy.pptx
359182077-LTE-Mobility-Strategy.pptx359182077-LTE-Mobility-Strategy.pptx
359182077-LTE-Mobility-Strategy.pptx
ssuser38e5dc1
 
Interworking wcdma to lte
Interworking wcdma to lteInterworking wcdma to lte
Interworking wcdma to lte
bahar
 
Ttsl orissa-egprs-download-throughput-improved-new
Ttsl orissa-egprs-download-throughput-improved-newTtsl orissa-egprs-download-throughput-improved-new
Ttsl orissa-egprs-download-throughput-improved-new
swatisabnis87
 
LTE Mobile Measurements in Air/eUu interface
LTE Mobile Measurements in Air/eUu interfaceLTE Mobile Measurements in Air/eUu interface
LTE Mobile Measurements in Air/eUu interfaceJustin MA (馬嘉昌)
 
Q & A for 3G Optimization
Q & A for 3G Optimization Q & A for 3G Optimization
Q & A for 3G Optimization
l3p15
 
Distribution Automation based on IEC61850
Distribution Automation based on IEC61850Distribution Automation based on IEC61850
Distribution Automation based on IEC61850
Nirmal Thaliyil
 
43096827 gsm-timers
43096827 gsm-timers43096827 gsm-timers
43096827 gsm-timers
Sanwari Lal
 
Narrowband IoT
Narrowband IoTNarrowband IoT
Lte principle
Lte principleLte principle
Lte principle
Hatim100
 
CRC and Transmitt Error Report_V1
CRC and Transmitt Error Report_V1CRC and Transmitt Error Report_V1
CRC and Transmitt Error Report_V1Alex TX
 
Improved EPRCA Congestion Control Scheme for ATM Networks
Improved EPRCA Congestion Control Scheme for ATM NetworksImproved EPRCA Congestion Control Scheme for ATM Networks
Improved EPRCA Congestion Control Scheme for ATM Networks
Eswar Publications
 
395317358-LTE-Resource-Usage-Optimization.pptx
395317358-LTE-Resource-Usage-Optimization.pptx395317358-LTE-Resource-Usage-Optimization.pptx
395317358-LTE-Resource-Usage-Optimization.pptx
SudheeraIndrajith
 
Irat handover basics
Irat handover basicsIrat handover basics
Irat handover basics
ZIZI Yahia
 
Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02bahareh jalali farahani
 
Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02bahareh jalali farahani
 
sd
sdsd
Rf congestion control measures heavy traffic special events
Rf congestion control measures heavy traffic special eventsRf congestion control measures heavy traffic special events
Rf congestion control measures heavy traffic special events
pintor63
 
Improved SCTP Scheme To Overcome Congestion Losses Over Manet
Improved SCTP Scheme To Overcome Congestion Losses Over ManetImproved SCTP Scheme To Overcome Congestion Losses Over Manet
Improved SCTP Scheme To Overcome Congestion Losses Over Manet
IJERA Editor
 
Cs fallback feature
Cs fallback featureCs fallback feature
Cs fallback feature
Achmad Salsabil
 

Similar to Ko lte timer values and descriptions (20)

LTE KPI Optimization - A to Z Abiola.pptx
LTE KPI Optimization - A to Z Abiola.pptxLTE KPI Optimization - A to Z Abiola.pptx
LTE KPI Optimization - A to Z Abiola.pptx
 
359182077-LTE-Mobility-Strategy.pptx
359182077-LTE-Mobility-Strategy.pptx359182077-LTE-Mobility-Strategy.pptx
359182077-LTE-Mobility-Strategy.pptx
 
Interworking wcdma to lte
Interworking wcdma to lteInterworking wcdma to lte
Interworking wcdma to lte
 
Ttsl orissa-egprs-download-throughput-improved-new
Ttsl orissa-egprs-download-throughput-improved-newTtsl orissa-egprs-download-throughput-improved-new
Ttsl orissa-egprs-download-throughput-improved-new
 
LTE Mobile Measurements in Air/eUu interface
LTE Mobile Measurements in Air/eUu interfaceLTE Mobile Measurements in Air/eUu interface
LTE Mobile Measurements in Air/eUu interface
 
Q & A for 3G Optimization
Q & A for 3G Optimization Q & A for 3G Optimization
Q & A for 3G Optimization
 
Distribution Automation based on IEC61850
Distribution Automation based on IEC61850Distribution Automation based on IEC61850
Distribution Automation based on IEC61850
 
43096827 gsm-timers
43096827 gsm-timers43096827 gsm-timers
43096827 gsm-timers
 
Narrowband IoT
Narrowband IoTNarrowband IoT
Narrowband IoT
 
Lte principle
Lte principleLte principle
Lte principle
 
CRC and Transmitt Error Report_V1
CRC and Transmitt Error Report_V1CRC and Transmitt Error Report_V1
CRC and Transmitt Error Report_V1
 
Improved EPRCA Congestion Control Scheme for ATM Networks
Improved EPRCA Congestion Control Scheme for ATM NetworksImproved EPRCA Congestion Control Scheme for ATM Networks
Improved EPRCA Congestion Control Scheme for ATM Networks
 
395317358-LTE-Resource-Usage-Optimization.pptx
395317358-LTE-Resource-Usage-Optimization.pptx395317358-LTE-Resource-Usage-Optimization.pptx
395317358-LTE-Resource-Usage-Optimization.pptx
 
Irat handover basics
Irat handover basicsIrat handover basics
Irat handover basics
 
Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02
 
Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02
 
sd
sdsd
sd
 
Rf congestion control measures heavy traffic special events
Rf congestion control measures heavy traffic special eventsRf congestion control measures heavy traffic special events
Rf congestion control measures heavy traffic special events
 
Improved SCTP Scheme To Overcome Congestion Losses Over Manet
Improved SCTP Scheme To Overcome Congestion Losses Over ManetImproved SCTP Scheme To Overcome Congestion Losses Over Manet
Improved SCTP Scheme To Overcome Congestion Losses Over Manet
 
Cs fallback feature
Cs fallback featureCs fallback feature
Cs fallback feature
 

Recently uploaded

Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
ameli25062005
 
Top Interior Designers in Bangalore.pdf1
Top Interior Designers in Bangalore.pdf1Top Interior Designers in Bangalore.pdf1
Top Interior Designers in Bangalore.pdf1
Decomart Studio
 
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
pmgdscunsri
 
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
7sd8fier
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
Alan Dix
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
7sd8fier
 
ZAPATILLAS 2 X 110 ABRIL.pdf compra economico
ZAPATILLAS 2 X 110 ABRIL.pdf compra economicoZAPATILLAS 2 X 110 ABRIL.pdf compra economico
ZAPATILLAS 2 X 110 ABRIL.pdf compra economico
jhonguerrerobarturen
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
ameli25062005
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
M. A. Architect
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
smpc3nvg
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
708pb191
 
White wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva TschoppWhite wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva Tschopp
Mansi Shah
 
ARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdfARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdf
Knight Moves
 
Impact of Fonts: in Web and Apps Design
Impact of Fonts:  in Web and Apps DesignImpact of Fonts:  in Web and Apps Design
Impact of Fonts: in Web and Apps Design
contactproperweb2014
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptxUNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
GOWSIKRAJA PALANISAMY
 
Storytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design ProcessStorytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design Process
Chiara Aliotta
 
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
gpffo76j
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
jyz59f4j
 
Connect Conference 2022: Passive House - Economic and Environmental Solution...
Connect Conference 2022: Passive House -  Economic and Environmental Solution...Connect Conference 2022: Passive House -  Economic and Environmental Solution...
Connect Conference 2022: Passive House - Economic and Environmental Solution...
TE Studio
 

Recently uploaded (20)

Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
 
Top Interior Designers in Bangalore.pdf1
Top Interior Designers in Bangalore.pdf1Top Interior Designers in Bangalore.pdf1
Top Interior Designers in Bangalore.pdf1
 
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
 
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
 
ZAPATILLAS 2 X 110 ABRIL.pdf compra economico
ZAPATILLAS 2 X 110 ABRIL.pdf compra economicoZAPATILLAS 2 X 110 ABRIL.pdf compra economico
ZAPATILLAS 2 X 110 ABRIL.pdf compra economico
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
 
White wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva TschoppWhite wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva Tschopp
 
ARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdfARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdf
 
Impact of Fonts: in Web and Apps Design
Impact of Fonts:  in Web and Apps DesignImpact of Fonts:  in Web and Apps Design
Impact of Fonts: in Web and Apps Design
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptxUNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
 
Storytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design ProcessStorytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design Process
 
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
 
Connect Conference 2022: Passive House - Economic and Environmental Solution...
Connect Conference 2022: Passive House -  Economic and Environmental Solution...Connect Conference 2022: Passive House -  Economic and Environmental Solution...
Connect Conference 2022: Passive House - Economic and Environmental Solution...
 

Ko lte timer values and descriptions

  • 2. Interval between subsequent transmissions of RRC Connection Request. >>Starts at the RRC connection REQ transmit >>Stops at the Receipt of RRC connection setup or reject message OR at the cell reselection time OR upon abortion of connection establishment by Higher layers (L2/L3). >>At the expiry performs the actions Enum {ms100, ms200, ms300, ms400, ms600, ms1000, ms1500, ms2000} This parameter is settable by the operator
  • 3. Ericsson Internal | 2015-05-11 | Page 3 Interval between subsequent transmission RRC Connection Reestablishment Request >>Starts at the RRC Connection Re-establishment REQUEST >>Stops at the Receipt of RRC Connection Re-establishment OR RRC Connection Re-Establishment REJECT message OR When selected cell becomes unsuitable to continue further >>At expiry, it Go to RRC_IDLE mode Enum {ms100, ms200, ms300, ms400, ms600, ms1000, ms1500, ms2000} This parameter is settable by the operator
  • 4. Ericsson Internal | 2015-05-11 | Page 4 Time to wait for cell reselection or RRC Connection Setup after RRC Connection Reject Enum {ms100, ms200, ms300, ms400, ms600, ms1000, ms1500, ms2000} This parameter is settable by the operator
  • 5. Ericsson Internal | 2015-05-11 | Page 5 Time to wait for cell reselection or RRC Connection Setup after RRC Connection Reject >>Starts when access is barred while performing RRC CONNECTION ESTABLISHMENT for MO(Mobile Originating) calls >>Stops while entering RRC_CONNECTED and upon cell re-selection mode >>At expiry, Informs higher layers about barring alleviation .
  • 6. Ericsson Internal | 2015-05-11 | Page 6 HO failure timer. Maps to t304 defined within IE Mobility Control Info in 36.331 and has the set of values as defined in IE Mobility Control Info >>Starts at the Receipt of RRC CONNECTION RECONFIGURATION message along with Mobility Control Info OR at the receipt of mobility from EUTRA command message including CELL CHANGE ORDER >>Stops at the successful completion of HANDOVER to EUTRA or CELL CHANGE ORDER is met >>At expiry, it performs action based on need. 1. In the case of CELL CHANGE ORDER from E-UTRA OR intra E-UTRA handover, initiate the RRC connection re-establishment procedure. . 2. In case of HANDOVER to E-UTRA, perform the actions defined as per the specifications applicable for the source RAT. ENUMERATED {ms50, ms100, ms150, ms200, ms500, ms1000, ms2000, spare1}, This parameter is settable by the operator.
  • 7. Ericsson Internal | 2015-05-11 | Page 7 HO failure timer. Maps to t304 defined within IE CellChangeOrder in 36.331 and has the set of values as defined in IE CellChangeOrder ENUMERATED {ms50, ms100, ms150, ms200, ms500, ms1000, ms2000, spare1}, This parameter is settable by the operator.
  • 8. Ericsson Internal | 2015-05-11 | Page 8 RLF declaration timer. >>Starts when UE detects PHY layer related problems (when it receives N310 consecutive out-of-sync INDs from lower layers) >>Stops 1. When UE receives N311 consecutive in-sync INDs from lower layers/ 2. Upon triggering the HANDOVER procedure 3. Upon initiating the CONNECTION RE-ESTABLISHMENT procedure >> At expiry, if security is not activated it goes to RRC IDLE else it initiates the CONNECTION RE-ESTABLISHMENT Procedure Enum ms0, ms50, ms100, ms200, ms500, ms1000, ms2000} This parameter is settable by the operator.
  • 9. Ericsson Internal | 2015-05-11 | Page 9 RLF recovery timer. >>Starts while initiating RRC CONNECTION RE-ESTABLISHMENT procedure. >>stops upon selection of suitable E-UTRA cell OR a cell using another RAT >>At expiry it enters RRC IDLE state Enum {ms1000, ms3000, ms5000, ms10000, ms15000, ms20000, ms30000} This parameter is settable by the operator