BAM has successfully completed the student accommodation building for Aga Khan’s
Institute of Ismaili Studies and the Institute for the Study of Muslim Civilisations. It provides
11 storeys of high quality student accommodation on the T5 plot of the King’s Cross site in
London, for the Aga Khan Development Network.
Aga Khan student accommodation at King’s Cross (T5)
London, N1
Client:
Argent
Architect:
Stanton Williams
Quantity Surveyor:
AECOM
Project Management:
AECOM
Structural Engineer:
AKT II
M&E Consultants:
Grontmij
Value:
£27.5m
Floor area:
9,029m2
Completion:
January 2016
ED270ContractNoHLN.0257
Key Features:
•	 High quality student
accommodation
•	 Ensuite pre-fabricated shower
room pods
•	 Handset brickwork façade
•	 Concrete frame
•	 Limestone flooring
•	 Landscaped courtyards to first
and eighth floors
•	 BREEAM ‘Excellent’ rating
•	 Working in close proximity to the
High Speed 1 rail lines
The new building comprises 198 high
quality, lettable study bedrooms as well as
a mixture of communal and commercial
use spaces.
It is made up of 156 cluster rooms
(each 17m²) and 42 studio flats of
various sizes. The cluster rooms are
organised into groups of six, with each
bedroom having an en-suite bathroom,
and each cluster sharing a kitchen. BAM
used pre-fabricated bathroom pods to
accelerate the programme and ensure
consistent quality in all the rooms.
Located on the ground floor is the reception
area, offices, laundry, plant and bike store,
as well as over 240m² of commercial space.
The first floor is a communal area, which
includes breakout areas and multi-purpose
spaces. There is a gym on the eighth floor.
BAM clad the concrete frame structure in
handset brickwork with ‘Hit and Miss’ bays
in front of each bedroom window, creating
a lattice effect reminiscent of oriental
window designs.
BAM created a landscaped communal
roof garden on the eighth floor and a
landscaped courtyard on the first floor
(350m² and 170m² respectively).
BAM worked in close proximity to the
High Speed 1 rail lines, which required
careful planning and liaison with rail
operator Network Rail.
The building achieved an ‘Excellent’ rating
through environmental scheme BREEAM.
Sustainability measures include, natural
ventilation, photovoltaic cells, green roof
and district heating.
T5 adjoins the student tower at plot T6
and will be an integral part of the wider
T Zone within the King’s Cross Central
master plan.

More Related Content

What's hot

30 st mary axe the bullet building
30 st mary axe   the bullet building30 st mary axe   the bullet building
30 st mary axe the bullet building
Rohan Maskay
 
Sandal magna community primary school
Sandal magna community primary schoolSandal magna community primary school
Sandal magna community primary school
16zer07
 
Gerard Cheyroux Resume 2016 #2
Gerard Cheyroux Resume 2016 #2Gerard Cheyroux Resume 2016 #2
Gerard Cheyroux Resume 2016 #2
Gerard Yro1983
 
Lastingham Mill
Lastingham MillLastingham Mill
Lastingham Mill
Llion Scott
 
AG Education Portfolio
AG Education PortfolioAG Education Portfolio
AG Education Portfolio
Niall Parfitt
 
The National Eco House Oman
The National Eco House OmanThe National Eco House Oman
The National Eco House Oman
MECandPMV
 
3 BHK flats near Siruseri | Apartment for sale in Chennai
3 BHK flats near Siruseri | Apartment for sale in Chennai3 BHK flats near Siruseri | Apartment for sale in Chennai
3 BHK flats near Siruseri | Apartment for sale in Chennai
varshinisweet
 
3 BHK flats near Siruseri | Apartment for sale in Chennai
3 BHK flats near Siruseri | Apartment for sale in Chennai3 BHK flats near Siruseri | Apartment for sale in Chennai
3 BHK flats near Siruseri | Apartment for sale in Chennai
varshinisweet
 
Provident Freedom
Provident FreedomProvident Freedom
Provident Freedom
PuruvankaraRealEstat
 
Provident Freedom | Flats in Chennai | Ready to Move Flats in Chennai
Provident Freedom | Flats in Chennai | Ready to Move Flats in ChennaiProvident Freedom | Flats in Chennai | Ready to Move Flats in Chennai
Provident Freedom | Flats in Chennai | Ready to Move Flats in Chennai
PuruvankaraRealEstat
 
Projects slide show
Projects slide showProjects slide show
Projects slide show
David R. Bascom
 
Case Study Ronald Openshaw3
Case Study Ronald Openshaw3Case Study Ronald Openshaw3
Case Study Ronald Openshaw3
Carmelcrest
 
functional requirement of building
functional requirement of buildingfunctional requirement of building
functional requirement of building
Ramu Neupane
 
DRT Portfolio Works
DRT Portfolio WorksDRT Portfolio Works
DRT Portfolio Works
Dan Rymer Trenholme
 
Andrew James Hobbs cv
Andrew James Hobbs cvAndrew James Hobbs cv
Andrew James Hobbs cv
andrew hobbs
 

What's hot (15)

30 st mary axe the bullet building
30 st mary axe   the bullet building30 st mary axe   the bullet building
30 st mary axe the bullet building
 
Sandal magna community primary school
Sandal magna community primary schoolSandal magna community primary school
Sandal magna community primary school
 
Gerard Cheyroux Resume 2016 #2
Gerard Cheyroux Resume 2016 #2Gerard Cheyroux Resume 2016 #2
Gerard Cheyroux Resume 2016 #2
 
Lastingham Mill
Lastingham MillLastingham Mill
Lastingham Mill
 
AG Education Portfolio
AG Education PortfolioAG Education Portfolio
AG Education Portfolio
 
The National Eco House Oman
The National Eco House OmanThe National Eco House Oman
The National Eco House Oman
 
3 BHK flats near Siruseri | Apartment for sale in Chennai
3 BHK flats near Siruseri | Apartment for sale in Chennai3 BHK flats near Siruseri | Apartment for sale in Chennai
3 BHK flats near Siruseri | Apartment for sale in Chennai
 
3 BHK flats near Siruseri | Apartment for sale in Chennai
3 BHK flats near Siruseri | Apartment for sale in Chennai3 BHK flats near Siruseri | Apartment for sale in Chennai
3 BHK flats near Siruseri | Apartment for sale in Chennai
 
Provident Freedom
Provident FreedomProvident Freedom
Provident Freedom
 
Provident Freedom | Flats in Chennai | Ready to Move Flats in Chennai
Provident Freedom | Flats in Chennai | Ready to Move Flats in ChennaiProvident Freedom | Flats in Chennai | Ready to Move Flats in Chennai
Provident Freedom | Flats in Chennai | Ready to Move Flats in Chennai
 
Projects slide show
Projects slide showProjects slide show
Projects slide show
 
Case Study Ronald Openshaw3
Case Study Ronald Openshaw3Case Study Ronald Openshaw3
Case Study Ronald Openshaw3
 
functional requirement of building
functional requirement of buildingfunctional requirement of building
functional requirement of building
 
DRT Portfolio Works
DRT Portfolio WorksDRT Portfolio Works
DRT Portfolio Works
 
Andrew James Hobbs cv
Andrew James Hobbs cvAndrew James Hobbs cv
Andrew James Hobbs cv
 

Similar to King's Cross T5

Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
Tim Read
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
Tim Read
 
09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012
JerramFalkus
 
MHA Brochure 2013
MHA Brochure 2013MHA Brochure 2013
MHA Brochure 2013
Katie Frost
 
Healthcare projects 2013
Healthcare projects 2013Healthcare projects 2013
Healthcare projects 2013
roger_lawson
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
Eamon Hannaway
 
Baytree Dagenham Brochure
Baytree Dagenham BrochureBaytree Dagenham Brochure
Baytree Dagenham Brochure
Jonathan Priestley
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
Steve Bailey
 
The Deep - Hull
The Deep -  HullThe Deep -  Hull
The Deep - Hull
Alan Wood & Partners
 
Concrete society award 2007 -Hilton hotel
Concrete society award 2007 -Hilton hotelConcrete society award 2007 -Hilton hotel
Concrete society award 2007 -Hilton hotel
Dave Deakin
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15
Arafat Akash
 
The-Shard
The-ShardThe-Shard
The-Shard
Tim Thomas
 
John Pattison CV 2016 for web
John Pattison CV 2016 for webJohn Pattison CV 2016 for web
John Pattison CV 2016 for web
John Pattison
 
Angelo_Hellawell_CV_January 15
Angelo_Hellawell_CV_January 15Angelo_Hellawell_CV_January 15
Angelo_Hellawell_CV_January 15
Angelo Hellawell
 
Dave Arkell Latest CV
Dave Arkell Latest CVDave Arkell Latest CV
Dave Arkell Latest CV
Dave Arkell
 
HVN_14January15_p18-19
HVN_14January15_p18-19HVN_14January15_p18-19
HVN_14January15_p18-19
terry wall
 
Mipim2012
Mipim2012Mipim2012
Concrete, vol 47, June 2013 Tesco, Woolwich
Concrete, vol 47, June 2013 Tesco, WoolwichConcrete, vol 47, June 2013 Tesco, Woolwich
Concrete, vol 47, June 2013 Tesco, Woolwich
rgaskill
 
Introduction to The Elliott Thomas Group
Introduction to The Elliott Thomas GroupIntroduction to The Elliott Thomas Group
Introduction to The Elliott Thomas Group
John Self
 
Appendices
AppendicesAppendices

Similar to King's Cross T5 (20)

Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012
 
MHA Brochure 2013
MHA Brochure 2013MHA Brochure 2013
MHA Brochure 2013
 
Healthcare projects 2013
Healthcare projects 2013Healthcare projects 2013
Healthcare projects 2013
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
 
Baytree Dagenham Brochure
Baytree Dagenham BrochureBaytree Dagenham Brochure
Baytree Dagenham Brochure
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
The Deep - Hull
The Deep -  HullThe Deep -  Hull
The Deep - Hull
 
Concrete society award 2007 -Hilton hotel
Concrete society award 2007 -Hilton hotelConcrete society award 2007 -Hilton hotel
Concrete society award 2007 -Hilton hotel
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15
 
The-Shard
The-ShardThe-Shard
The-Shard
 
John Pattison CV 2016 for web
John Pattison CV 2016 for webJohn Pattison CV 2016 for web
John Pattison CV 2016 for web
 
Angelo_Hellawell_CV_January 15
Angelo_Hellawell_CV_January 15Angelo_Hellawell_CV_January 15
Angelo_Hellawell_CV_January 15
 
Dave Arkell Latest CV
Dave Arkell Latest CVDave Arkell Latest CV
Dave Arkell Latest CV
 
HVN_14January15_p18-19
HVN_14January15_p18-19HVN_14January15_p18-19
HVN_14January15_p18-19
 
Mipim2012
Mipim2012Mipim2012
Mipim2012
 
Concrete, vol 47, June 2013 Tesco, Woolwich
Concrete, vol 47, June 2013 Tesco, WoolwichConcrete, vol 47, June 2013 Tesco, Woolwich
Concrete, vol 47, June 2013 Tesco, Woolwich
 
Introduction to The Elliott Thomas Group
Introduction to The Elliott Thomas GroupIntroduction to The Elliott Thomas Group
Introduction to The Elliott Thomas Group
 
Appendices
AppendicesAppendices
Appendices
 

King's Cross T5

  • 1. For more details about BAM visit: www.bam.co.uk BAM has successfully completed the student accommodation building for Aga Khan’s Institute of Ismaili Studies and the Institute for the Study of Muslim Civilisations. It provides 11 storeys of high quality student accommodation on the T5 plot of the King’s Cross site in London, for the Aga Khan Development Network. Aga Khan student accommodation at King’s Cross (T5) London, N1 Client: Argent Architect: Stanton Williams Quantity Surveyor: AECOM Project Management: AECOM Structural Engineer: AKT II M&E Consultants: Grontmij Value: £27.5m Floor area: 9,029m2 Completion: January 2016 ED270ContractNoHLN.0257 Key Features: • High quality student accommodation • Ensuite pre-fabricated shower room pods • Handset brickwork façade • Concrete frame • Limestone flooring • Landscaped courtyards to first and eighth floors • BREEAM ‘Excellent’ rating • Working in close proximity to the High Speed 1 rail lines The new building comprises 198 high quality, lettable study bedrooms as well as a mixture of communal and commercial use spaces. It is made up of 156 cluster rooms (each 17m²) and 42 studio flats of various sizes. The cluster rooms are organised into groups of six, with each bedroom having an en-suite bathroom, and each cluster sharing a kitchen. BAM used pre-fabricated bathroom pods to accelerate the programme and ensure consistent quality in all the rooms. Located on the ground floor is the reception area, offices, laundry, plant and bike store, as well as over 240m² of commercial space. The first floor is a communal area, which includes breakout areas and multi-purpose spaces. There is a gym on the eighth floor. BAM clad the concrete frame structure in handset brickwork with ‘Hit and Miss’ bays in front of each bedroom window, creating a lattice effect reminiscent of oriental window designs. BAM created a landscaped communal roof garden on the eighth floor and a landscaped courtyard on the first floor (350m² and 170m² respectively). BAM worked in close proximity to the High Speed 1 rail lines, which required careful planning and liaison with rail operator Network Rail. The building achieved an ‘Excellent’ rating through environmental scheme BREEAM. Sustainability measures include, natural ventilation, photovoltaic cells, green roof and district heating. T5 adjoins the student tower at plot T6 and will be an integral part of the wider T Zone within the King’s Cross Central master plan.