SlideShare a Scribd company logo
1 of 37
Presentation
on
Accidents in Steel Gas Pipe Line
INDRAPRASTHA GAS LIMITED
Date: 1st June 2006 at 9.00 hrs
Total Hours of interruption: 648
 Location : at Adchini junction
 Affected section of pipe line : Sarojini
Nagar flyover to Laddo Sarai CNG Station
Affected Length: 6.8 km
Diameter: 6’’
Reason : 3rd party Damage( by D.K
Enterprises on (contractor of BSES) during
laying of cable).
 Cause : Negligence of BSES, Reamer of HDD
Machine hit steel line due to trenchless
activities.
There was gas leakage.
 No. of CNG Stations affected: 1
 No. of DTC Depot affected : 0
 No. of R.O affected : 0
 No. of FRS affected : 0
 Date: 19th July 2006 at 12.30 hrs
 Total Hours of interruption: 154.3
 Location : near Mukherjee Nagar drain
 Affected section of pipe line : Dheerpur CNG
Station to Chattersal CNG Station
 Affected Length: 7.8 km
 Diameter: 4"
 Reason : 3rd party Damage( by DDA during
construction of bridge)
 Cause : pipe line get punctured due to piling
work, negligent effect of DDA authorities,
securities had made aware about location
prior to 4 days of damage.
There was gas leakage.
 No. of CNG Stations affected: 5
 No. of DTC Depot affected :2
 No. of R.O affected :1
 No. of FRS affected :0
 Date: 6th December 2006 at 12.40 hrs
 Location : Ghazipur Drain Crossing
 Total Hours of interruption: 257.2
Affected section of pipe line : Gail P/L TO
Mayur Vihar PH-I CNG
 Affected Length: 0.6 km
 Diameter: 4"
 Reason :3rd party Damage (by Flood &
Irrigation Deptt due to rupture of IGL’’s pipe
line).
 Cause : Due to Dredging work during
cleaning of drain by JCB.
There was gas leakage.
 No. of CNG Stations affected:1
 No. of DTC Depot affected :0
 No. of R.O affected :0
 No. of FRS affected :0
 Remedies : The damaged portion was being
at the depth of approx 7 m inside the flowing
drain. Repair was not possible at all.
For this an alternate line was passed.
 Date: 14th May 2008 at 16.30 hrs
 Diameter: 4
 Affected Length: 7.1 km
 Affected section of pipe line :S.V-4 (Gail)
To Okhla PH-I CNG Station
 Total Hours of interruption: 17.5
 Reason :3rd party Damage (by DJB)
 Cause : Negligence of DJB during boring.
There was gas leakage.
 No. of CNG Stations affected:2
 No. of DTC Depot affected :2
 No. of R.O affected :1
 No. of FRS affected :0
 Date: 2th jan 2009 at 17.00 hrs
 Diameter: 4"
 Affected Length: 3.36 km
 Affected section of pipe line : SGTN-II To
Siddhu Petrol Pump
 Total Hours of interruption: 49.5
 Reason : 3rd party damage (by PWD)
 Cause: During building of flyover , pockline
machine hit the steel pipe line.
Only Dent, no gas leakage.
 No. of CNG Stations affected: 3
 No. of DTC Depot affected :1
 No. of R.O affected :1
 No. of FRS affected :0
 Date: 9th June 2009 at 15.45 hrs
 Diameter: 6"&4"
 Affected Length: 28 km
 Affected section of pipe line : Complete East
Delhi Pipeline Section (S.V-1Ghazipur to
Loni Road)
 Total Hours of interruption: 11.45
 Reason :3rd party Damage ( by PWD)
 Cause : During building of flyover , Piling
machine hit the steel pipe line.
 No. of CNG Stations affected: 8
 No. of DTC Depot affected :3
 No. of R.O affected :6
 No. of FRS affected :1
 Date: 22th Aug 2009 at 9.15 hrs
 Diameter: 6“
 Affected Length: 4.5 km
 Affected section of pipe line :T-Point West
Enclave to Rohini Mega CNG Station.
 Total Hours of interruption: 218.45
 Reason : : Uncontrolled Error ( Damage by
Power Cable)
 Cause : High tension wire fell in the the
Budhvihar drain and Surge pass to underlying
steel pipe line.
 No. of CNG Stations affected:1
 No. of DTC Depot affected : 0
 No. of R.O affected : 1
 No. of FRS affected : 0
 Date: 23th june 2010 at 16.30 hrs
 Total Hours of interruption: 26
 Affected section of pipe line :Jassa Singh Park
to Saksham Petrol Pump
 Affected Length: 1.443km
 Diameter: 4"
 Reason : operational error ( by MDPE Project )
 Cause : There was a bend connecting 1 m
pipe line to 3 m pipe line. Drawing was not
checked and HDD reamer hit 3 m line joint.
 No. of CNG Stations affected:0
 No. of DTC Depot affected :0
 No. of R.O affected :1
 No. of FRS affected :0
 Suggestions : Check through both locator
and drawing.
 Date: 10th May 2011 at 14.00 hrs
 Diameter: 4”
 Affected Length: 1.4 km
 Affected section of pipe line : Kalka ji DTC
Depot to Okhla Ph-1 CNG station
 Total Hours of interruption: 82
 Reason : operational error( improper line
laying practice)
 Cause : Damage due to Corrosion/incorrect
laying of pipeline in DJB valve chamber, pipe
line rest over water line valve stem for 8 years
and also due to differential aeration.
 No. of CNG Stations affected:1
 No. of DTC Depot affected :0
 No. of R.O affected :0
 No. of FRS affected :0
 Date: 23th May 2012 at 0.00 hrs
 Location :Kapashera Chawk( Near Police
Station
 Diameter: 12"
 Affected Length: 2.8 km
 Total Hours of interruption: 32
 Reason : 3rd party Damage( by BUCON Reamer
of HDD knocked already newly operational
12” line).
 Cause: HDD Calibration was not correct. HDD
was working on 4.5m instead of 5 m and till
that date IGL don't have drawing. Locator
gave incorrect reading.
There was gas leakage.
 No. of CNG Stations affected:1
 No. of DTC Depot affected :0
 No. of R.O affected :2
 No. of FRS affected :0
 Date: 28th Oct 2012 at 00.45 hrs
 Diameter: 4
 Affected section of pipe line :Burari to
Chattrasal CNG Station
 Affected Length: 11.65 km
 Total Hours of interruption: 15.25
 Reason : 3rd party Damage( by Model Town
Market Association).
 During placing a tent there someone took a
thick nail and hit the pipe line and there was
gas leakage.
 No. of CNG Stations affected:3
 No. of DTC Depot affected :2
 No. of R.O affected :3
 No. of FRS affected :0
 Date: 10th may 2013 at 7.30 hrs
 Diameter:4“
 Affected section of pipe line : From Up-Gate
to Ashiram Batra R.O.
 Affected Length: 7.97 km
 Total Hours of interruption: 27.1
 Reason :3rd party Damage (by Vishwa Infra on
the contract of DJB for laying of sewer line of
dia 1.5 m).

 Cause : Pipe Line was hit during laying of
sever line by MTBM( Micro tunnel Boring
Machine)
Information was not provided.
 No. of CNG Stations affected:3
 No. of DTC Depot affected :2
 No. of R.O affected :3
 No. of FRS affected :0
 Date: 2th Jan 2014 at 15.00 hrs
 Location : NH-24 CNG Station
 Diameter: 4"
 Affected Length: 6.4 km
 Total Hours of interruption: 20
 Reason : Damage by Puncture of dielectric
material of Insulating Joint at NH-24 CNG
station due to electric surge.
There was a fire at CNG station.
High pressure leakage occurred.
 No. of CNG Stations affected:0
 No. of DTC Depot affected :2
 No. of R.O affected :3
 No. of FRS affected :1
 Date: 3th Feb 2014 at 17.50 hrs
 Location : Burari chawk
 Diameter: 4"
 Affected section of pipe line :Burari chawk To
Sai R.O.
 Affected Length: 0.6 km
 Reason :Operational error (by PWD during
construction of Mukarba Wazirabad elevated
road)
 Cause : Wrong offsets in drawing and locator
couldn’t locate because of its depth(13 m)
according to drawing, offset of line was 11
m, clearance was provided to the contractor
17 m, piling activity was done at 23 m.
 No. of CNG Stations affected:0
 No. of DTC Depot affected:0
 No. of R.O affected :2
 No. of FRS affected :0
 Findings : locator can’t locate below 5 m
Following are the reasons for the Damages:
 3rd Party damage due to excavation by DTL,
DDA, PWD, DJB etc.
 Operational Errors like improper working of
locator, not to check drawings etc.
 Un controlled errors / time independent like
puncture of dielectric material, due to
electric surge.
 Total no. of Damages : 14
 No. Of Damages by 3rd Party Damage : 8
 No. Of Damages due to Operational errors : 4
 No. Of damages due to un controlled/time
independent :2
57%
29%
14%
3rd Party Damage
Operational Errors
uncontrolled/time
independent
To Rectify operational errors
 Calibration of the equipments to be done on
timely basis.( not followed till now)
 Check the certificates of HDD operator and
Tracker.
 All pipeline fittings and accessories should
be checked and operational life time of all
should be decided.
 Check drawings and locator both during the
construction work.
 Drawings should be properly checked by
zonal in charge after laying of steel line by
contractor.
 The hydrostatically tested pipes should be
retested by nitrogen gas before charging the
line.
 Protective measures from Electric installation(
Neoprene sheets, RCC blocks, Minimum
distance should be maintained).
 Proper communication with BSES and other
agencies.
 Proper patrolling of pipeline by patrolling guard.
 Reporting by patrolling guard is very important,
train and test patrolling guard.
 Intimation should be given to the various
authorities like DJB , DTL, BSES, MCD, DDA, etc
prior to construction work.
 Depute IGL representative on 3rd party work
specifically on HDD REAMER,PILLING, JCB,
BORING.
 Markers should be properly maintained near
steel gas line with contact no. provided so that
3rd party could contact before excavation.
Khurana

More Related Content

Viewers also liked

Construction of CNG station project final report.
Construction of CNG station project final report.Construction of CNG station project final report.
Construction of CNG station project final report.Hagi Sahib
 
Getting the fish (ball) in the net
Getting the fish (ball) in the netGetting the fish (ball) in the net
Getting the fish (ball) in the netAli Anani, PhD
 
off grid solar product UNIVPO
off grid solar product UNIVPOoff grid solar product UNIVPO
off grid solar product UNIVPOMark Robinson
 
Snaky assumptions a creative approach
Snaky assumptions a creative approachSnaky assumptions a creative approach
Snaky assumptions a creative approachAli Anani, PhD
 
Grafico diario del dax perfomance index para el 09 12-2011
Grafico diario del dax perfomance index para el 09 12-2011Grafico diario del dax perfomance index para el 09 12-2011
Grafico diario del dax perfomance index para el 09 12-2011Experiencia Trading
 
気象庁発表の地震情報
気象庁発表の地震情報気象庁発表の地震情報
気象庁発表の地震情報Kentaro Ikehata
 
Social Network Analysis Of Intangibles
Social Network Analysis Of IntangiblesSocial Network Analysis Of Intangibles
Social Network Analysis Of IntangiblesAli Anani, PhD
 
Hashtags & Retweets: Using Twitter to aid Community, Communication and Casual...
Hashtags & Retweets: Using Twitter to aid Community, Communication and Casual...Hashtags & Retweets: Using Twitter to aid Community, Communication and Casual...
Hashtags & Retweets: Using Twitter to aid Community, Communication and Casual...Peter Reed
 

Viewers also liked (11)

Construction of CNG station project final report.
Construction of CNG station project final report.Construction of CNG station project final report.
Construction of CNG station project final report.
 
Disaster Risk Reduction
Disaster Risk ReductionDisaster Risk Reduction
Disaster Risk Reduction
 
Getting the fish (ball) in the net
Getting the fish (ball) in the netGetting the fish (ball) in the net
Getting the fish (ball) in the net
 
off grid solar product UNIVPO
off grid solar product UNIVPOoff grid solar product UNIVPO
off grid solar product UNIVPO
 
Snaky assumptions a creative approach
Snaky assumptions a creative approachSnaky assumptions a creative approach
Snaky assumptions a creative approach
 
Grafico diario del dax perfomance index para el 09 12-2011
Grafico diario del dax perfomance index para el 09 12-2011Grafico diario del dax perfomance index para el 09 12-2011
Grafico diario del dax perfomance index para el 09 12-2011
 
気象庁発表の地震情報
気象庁発表の地震情報気象庁発表の地震情報
気象庁発表の地震情報
 
Simple School Lunch Ideas
Simple School Lunch IdeasSimple School Lunch Ideas
Simple School Lunch Ideas
 
Zaragoza turismo 234
Zaragoza turismo 234Zaragoza turismo 234
Zaragoza turismo 234
 
Social Network Analysis Of Intangibles
Social Network Analysis Of IntangiblesSocial Network Analysis Of Intangibles
Social Network Analysis Of Intangibles
 
Hashtags & Retweets: Using Twitter to aid Community, Communication and Casual...
Hashtags & Retweets: Using Twitter to aid Community, Communication and Casual...Hashtags & Retweets: Using Twitter to aid Community, Communication and Casual...
Hashtags & Retweets: Using Twitter to aid Community, Communication and Casual...
 

Similar to Khurana

Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
43-PROD-2013-For LinkedIn
43-PROD-2013-For LinkedIn43-PROD-2013-For LinkedIn
43-PROD-2013-For LinkedInHARDIK MODI
 
Effect of Arresters on Erosion in Economizer Zone and its Analysis
Effect of Arresters on Erosion in Economizer Zone and its AnalysisEffect of Arresters on Erosion in Economizer Zone and its Analysis
Effect of Arresters on Erosion in Economizer Zone and its AnalysisIDES Editor
 
LTG_Job Status_25May10.ppt
LTG_Job Status_25May10.pptLTG_Job Status_25May10.ppt
LTG_Job Status_25May10.pptEhtishamAndrAbi1
 
Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine Roshan Sharma
 
20070088 eia4 en
20070088 eia4 en20070088 eia4 en
20070088 eia4 enali sabouri
 
05. PPT for EAC (BPCL).ppt
05. PPT for EAC (BPCL).ppt05. PPT for EAC (BPCL).ppt
05. PPT for EAC (BPCL).pptNMnam
 
corrosion monitoring Algeria.pdf
corrosion monitoring Algeria.pdfcorrosion monitoring Algeria.pdf
corrosion monitoring Algeria.pdfFouadOudina2
 
Material Cost Estimate of BS 32 BRT ,Peshawar
Material Cost Estimate of BS 32 BRT ,PeshawarMaterial Cost Estimate of BS 32 BRT ,Peshawar
Material Cost Estimate of BS 32 BRT ,PeshawarSyed Qaseem Haider
 
@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1Rajendra Yadav
 
AIWSP presentation SCM 3 11.09.2018 (1).ppt
AIWSP presentation SCM 3  11.09.2018 (1).pptAIWSP presentation SCM 3  11.09.2018 (1).ppt
AIWSP presentation SCM 3 11.09.2018 (1).pptRajabdeen Amjath
 
asset integrity gail.pdf
asset integrity gail.pdfasset integrity gail.pdf
asset integrity gail.pdfsriram123456
 
Automated Orbital Welding Machines
Automated Orbital Welding MachinesAutomated Orbital Welding Machines
Automated Orbital Welding Machinesishubhamp
 
Aim condition assessment (2)
Aim condition assessment (2)Aim condition assessment (2)
Aim condition assessment (2)Akshay Gottlieb
 
A thesis on pi robot
A thesis on pi robotA thesis on pi robot
A thesis on pi robotNitesh Prasad
 
CV not functioning CA report_linkedIn
CV not functioning CA report_linkedInCV not functioning CA report_linkedIn
CV not functioning CA report_linkedInGopi nadh
 

Similar to Khurana (20)

Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
43-PROD-2013-For LinkedIn
43-PROD-2013-For LinkedIn43-PROD-2013-For LinkedIn
43-PROD-2013-For LinkedIn
 
Effect of Arresters on Erosion in Economizer Zone and its Analysis
Effect of Arresters on Erosion in Economizer Zone and its AnalysisEffect of Arresters on Erosion in Economizer Zone and its Analysis
Effect of Arresters on Erosion in Economizer Zone and its Analysis
 
LTG_Job Status_25May10.ppt
LTG_Job Status_25May10.pptLTG_Job Status_25May10.ppt
LTG_Job Status_25May10.ppt
 
Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine
 
20070088 eia4 en
20070088 eia4 en20070088 eia4 en
20070088 eia4 en
 
PDash,NMDCEDL6.pptx
PDash,NMDCEDL6.pptxPDash,NMDCEDL6.pptx
PDash,NMDCEDL6.pptx
 
05. PPT for EAC (BPCL).ppt
05. PPT for EAC (BPCL).ppt05. PPT for EAC (BPCL).ppt
05. PPT for EAC (BPCL).ppt
 
corrosion monitoring Algeria.pdf
corrosion monitoring Algeria.pdfcorrosion monitoring Algeria.pdf
corrosion monitoring Algeria.pdf
 
Material Cost Estimate of BS 32 BRT ,Peshawar
Material Cost Estimate of BS 32 BRT ,PeshawarMaterial Cost Estimate of BS 32 BRT ,Peshawar
Material Cost Estimate of BS 32 BRT ,Peshawar
 
@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1
 
AIWSP presentation SCM 3 11.09.2018 (1).ppt
AIWSP presentation SCM 3  11.09.2018 (1).pptAIWSP presentation SCM 3  11.09.2018 (1).ppt
AIWSP presentation SCM 3 11.09.2018 (1).ppt
 
CV LS Khalsa -2015
CV LS Khalsa -2015CV LS Khalsa -2015
CV LS Khalsa -2015
 
Dalmia cement Dalmiapuram.pdf
Dalmia cement Dalmiapuram.pdfDalmia cement Dalmiapuram.pdf
Dalmia cement Dalmiapuram.pdf
 
asset integrity gail.pdf
asset integrity gail.pdfasset integrity gail.pdf
asset integrity gail.pdf
 
Automated Orbital Welding Machines
Automated Orbital Welding MachinesAutomated Orbital Welding Machines
Automated Orbital Welding Machines
 
Aim condition assessment (2)
Aim condition assessment (2)Aim condition assessment (2)
Aim condition assessment (2)
 
A thesis on pi robot
A thesis on pi robotA thesis on pi robot
A thesis on pi robot
 
bro.pptx
bro.pptxbro.pptx
bro.pptx
 
CV not functioning CA report_linkedIn
CV not functioning CA report_linkedInCV not functioning CA report_linkedIn
CV not functioning CA report_linkedIn
 

Khurana

  • 1. Presentation on Accidents in Steel Gas Pipe Line INDRAPRASTHA GAS LIMITED
  • 2. Date: 1st June 2006 at 9.00 hrs Total Hours of interruption: 648  Location : at Adchini junction  Affected section of pipe line : Sarojini Nagar flyover to Laddo Sarai CNG Station Affected Length: 6.8 km Diameter: 6’’ Reason : 3rd party Damage( by D.K Enterprises on (contractor of BSES) during laying of cable).
  • 3.  Cause : Negligence of BSES, Reamer of HDD Machine hit steel line due to trenchless activities. There was gas leakage.  No. of CNG Stations affected: 1  No. of DTC Depot affected : 0  No. of R.O affected : 0  No. of FRS affected : 0
  • 4.  Date: 19th July 2006 at 12.30 hrs  Total Hours of interruption: 154.3  Location : near Mukherjee Nagar drain  Affected section of pipe line : Dheerpur CNG Station to Chattersal CNG Station  Affected Length: 7.8 km  Diameter: 4"  Reason : 3rd party Damage( by DDA during construction of bridge)
  • 5.  Cause : pipe line get punctured due to piling work, negligent effect of DDA authorities, securities had made aware about location prior to 4 days of damage. There was gas leakage.  No. of CNG Stations affected: 5  No. of DTC Depot affected :2  No. of R.O affected :1  No. of FRS affected :0
  • 6.  Date: 6th December 2006 at 12.40 hrs  Location : Ghazipur Drain Crossing  Total Hours of interruption: 257.2 Affected section of pipe line : Gail P/L TO Mayur Vihar PH-I CNG  Affected Length: 0.6 km  Diameter: 4"  Reason :3rd party Damage (by Flood & Irrigation Deptt due to rupture of IGL’’s pipe line).
  • 7.  Cause : Due to Dredging work during cleaning of drain by JCB. There was gas leakage.  No. of CNG Stations affected:1  No. of DTC Depot affected :0  No. of R.O affected :0  No. of FRS affected :0  Remedies : The damaged portion was being at the depth of approx 7 m inside the flowing drain. Repair was not possible at all. For this an alternate line was passed.
  • 8.  Date: 14th May 2008 at 16.30 hrs  Diameter: 4  Affected Length: 7.1 km  Affected section of pipe line :S.V-4 (Gail) To Okhla PH-I CNG Station  Total Hours of interruption: 17.5  Reason :3rd party Damage (by DJB)
  • 9.  Cause : Negligence of DJB during boring. There was gas leakage.  No. of CNG Stations affected:2  No. of DTC Depot affected :2  No. of R.O affected :1  No. of FRS affected :0
  • 10.  Date: 2th jan 2009 at 17.00 hrs  Diameter: 4"  Affected Length: 3.36 km  Affected section of pipe line : SGTN-II To Siddhu Petrol Pump  Total Hours of interruption: 49.5  Reason : 3rd party damage (by PWD)
  • 11.  Cause: During building of flyover , pockline machine hit the steel pipe line. Only Dent, no gas leakage.  No. of CNG Stations affected: 3  No. of DTC Depot affected :1  No. of R.O affected :1  No. of FRS affected :0
  • 12.  Date: 9th June 2009 at 15.45 hrs  Diameter: 6"&4"  Affected Length: 28 km  Affected section of pipe line : Complete East Delhi Pipeline Section (S.V-1Ghazipur to Loni Road)  Total Hours of interruption: 11.45  Reason :3rd party Damage ( by PWD)
  • 13.  Cause : During building of flyover , Piling machine hit the steel pipe line.  No. of CNG Stations affected: 8  No. of DTC Depot affected :3  No. of R.O affected :6  No. of FRS affected :1
  • 14.  Date: 22th Aug 2009 at 9.15 hrs  Diameter: 6“  Affected Length: 4.5 km  Affected section of pipe line :T-Point West Enclave to Rohini Mega CNG Station.  Total Hours of interruption: 218.45  Reason : : Uncontrolled Error ( Damage by Power Cable)
  • 15.  Cause : High tension wire fell in the the Budhvihar drain and Surge pass to underlying steel pipe line.  No. of CNG Stations affected:1  No. of DTC Depot affected : 0  No. of R.O affected : 1  No. of FRS affected : 0
  • 16.  Date: 23th june 2010 at 16.30 hrs  Total Hours of interruption: 26  Affected section of pipe line :Jassa Singh Park to Saksham Petrol Pump  Affected Length: 1.443km  Diameter: 4"  Reason : operational error ( by MDPE Project )
  • 17.  Cause : There was a bend connecting 1 m pipe line to 3 m pipe line. Drawing was not checked and HDD reamer hit 3 m line joint.  No. of CNG Stations affected:0  No. of DTC Depot affected :0  No. of R.O affected :1  No. of FRS affected :0  Suggestions : Check through both locator and drawing.
  • 18.  Date: 10th May 2011 at 14.00 hrs  Diameter: 4”  Affected Length: 1.4 km  Affected section of pipe line : Kalka ji DTC Depot to Okhla Ph-1 CNG station  Total Hours of interruption: 82  Reason : operational error( improper line laying practice)
  • 19.  Cause : Damage due to Corrosion/incorrect laying of pipeline in DJB valve chamber, pipe line rest over water line valve stem for 8 years and also due to differential aeration.  No. of CNG Stations affected:1  No. of DTC Depot affected :0  No. of R.O affected :0  No. of FRS affected :0
  • 20.  Date: 23th May 2012 at 0.00 hrs  Location :Kapashera Chawk( Near Police Station  Diameter: 12"  Affected Length: 2.8 km  Total Hours of interruption: 32  Reason : 3rd party Damage( by BUCON Reamer of HDD knocked already newly operational 12” line).
  • 21.  Cause: HDD Calibration was not correct. HDD was working on 4.5m instead of 5 m and till that date IGL don't have drawing. Locator gave incorrect reading. There was gas leakage.  No. of CNG Stations affected:1  No. of DTC Depot affected :0  No. of R.O affected :2  No. of FRS affected :0
  • 22.  Date: 28th Oct 2012 at 00.45 hrs  Diameter: 4  Affected section of pipe line :Burari to Chattrasal CNG Station  Affected Length: 11.65 km  Total Hours of interruption: 15.25  Reason : 3rd party Damage( by Model Town Market Association).
  • 23.  During placing a tent there someone took a thick nail and hit the pipe line and there was gas leakage.  No. of CNG Stations affected:3  No. of DTC Depot affected :2  No. of R.O affected :3  No. of FRS affected :0
  • 24.  Date: 10th may 2013 at 7.30 hrs  Diameter:4“  Affected section of pipe line : From Up-Gate to Ashiram Batra R.O.  Affected Length: 7.97 km  Total Hours of interruption: 27.1  Reason :3rd party Damage (by Vishwa Infra on the contract of DJB for laying of sewer line of dia 1.5 m). 
  • 25.  Cause : Pipe Line was hit during laying of sever line by MTBM( Micro tunnel Boring Machine) Information was not provided.  No. of CNG Stations affected:3  No. of DTC Depot affected :2  No. of R.O affected :3  No. of FRS affected :0
  • 26.  Date: 2th Jan 2014 at 15.00 hrs  Location : NH-24 CNG Station  Diameter: 4"  Affected Length: 6.4 km  Total Hours of interruption: 20  Reason : Damage by Puncture of dielectric material of Insulating Joint at NH-24 CNG station due to electric surge.
  • 27. There was a fire at CNG station. High pressure leakage occurred.  No. of CNG Stations affected:0  No. of DTC Depot affected :2  No. of R.O affected :3  No. of FRS affected :1
  • 28.  Date: 3th Feb 2014 at 17.50 hrs  Location : Burari chawk  Diameter: 4"  Affected section of pipe line :Burari chawk To Sai R.O.  Affected Length: 0.6 km  Reason :Operational error (by PWD during construction of Mukarba Wazirabad elevated road)
  • 29.  Cause : Wrong offsets in drawing and locator couldn’t locate because of its depth(13 m) according to drawing, offset of line was 11 m, clearance was provided to the contractor 17 m, piling activity was done at 23 m.  No. of CNG Stations affected:0  No. of DTC Depot affected:0  No. of R.O affected :2  No. of FRS affected :0  Findings : locator can’t locate below 5 m
  • 30. Following are the reasons for the Damages:  3rd Party damage due to excavation by DTL, DDA, PWD, DJB etc.  Operational Errors like improper working of locator, not to check drawings etc.  Un controlled errors / time independent like puncture of dielectric material, due to electric surge.
  • 31.  Total no. of Damages : 14  No. Of Damages by 3rd Party Damage : 8  No. Of Damages due to Operational errors : 4  No. Of damages due to un controlled/time independent :2
  • 32. 57% 29% 14% 3rd Party Damage Operational Errors uncontrolled/time independent
  • 33. To Rectify operational errors  Calibration of the equipments to be done on timely basis.( not followed till now)  Check the certificates of HDD operator and Tracker.  All pipeline fittings and accessories should be checked and operational life time of all should be decided.  Check drawings and locator both during the construction work.
  • 34.  Drawings should be properly checked by zonal in charge after laying of steel line by contractor.  The hydrostatically tested pipes should be retested by nitrogen gas before charging the line.
  • 35.  Protective measures from Electric installation( Neoprene sheets, RCC blocks, Minimum distance should be maintained).  Proper communication with BSES and other agencies.
  • 36.  Proper patrolling of pipeline by patrolling guard.  Reporting by patrolling guard is very important, train and test patrolling guard.  Intimation should be given to the various authorities like DJB , DTL, BSES, MCD, DDA, etc prior to construction work.  Depute IGL representative on 3rd party work specifically on HDD REAMER,PILLING, JCB, BORING.  Markers should be properly maintained near steel gas line with contact no. provided so that 3rd party could contact before excavation.