SlideShare a Scribd company logo
KANBAN SYSTEMS
Push and Pull method of Work
Flow
Push Method: A method in which production of the item
begins in advance of customer needs.
Example: A buffet where food is prepared in advance.
Pull Method: A method in which customer demand activates
production of the service or item.
Example: A restaurant where food is only prepared when
orders are placed.
Lean systems use the pull method of
work flow.
KANBAN
Kanban means “card” or
“visible record” in Japanese &
refers to cards used to control the
flow of production through a
factory.
KANBAN is a PULL System .
General Operating Rules:
1. Each container must have a card.
2. The assembly line always withdraws materials from
fabrication (pull system).
3. Containers of parts must never be removed from a storage
area without a kanban being posted on the receiving post.
4. The containers should always contain the same number of
good parts. The use of nonstandard containers or irregularly
filled containers disrupts the production flow of the assembly
line.
5. Only nondefective parts should be passed along.
6. Total production should not exceed the total amount
authorized on the kanbans in the system.
–
看板 Kanban cards limit excess
work in progress
• –
看板 Kanban literally means
“visual card,” “signboard,” or
“billboard.”
• Toyota originally used Kanban
cards to limit the amount of
inventory tied up in “work in
progress” on a manufacturing
floor
• Not only is excess inventory
waste, time spent producing it
is time that could be expended
elsewhere
• Kanban cards act as a form of
“currency” representing how
WIP is allowed in a system.
5
“Pull” system to avoid overproduction
• Milk example – weekly batch or daily purchase?
• Next purchase triggered when you start using the only
bottle of milk you have.
• Not an example of zero-inventory, but still a pull system.
• Because of demand uncertainty and lead-times, in many
cases inventory is necessary to allow for smooth
production.
• Hence TPS follows the supermarket model or keeping a
small amount in stock. As soon as customers take
products away, they are replenished.
• Each demand instance triggers a part being pulled from
upstream.
• The triggering mechanism is called “Kanban” which
means cards, signboard or a poster.
6
Kanban system
• At Toyota, empty bin (a kanban) is send upstream after a
demand instance.
• It is a signal to refill it with a specific number of parts or send
back a card with detailed information about the part location.
• Even today, one can see Kanban cards and bins moving on the
shop-floor.
• Instead of using sophisticated computer scheduling
techniques, this is a simple, effective and visual system of
managing and ensuring the product flow and JIT production
system.
7
Kanban system
• Gas tank example.
• Toyota philosophy about kanban:
“Kanban is an organized system of inventory buffers and
as per TPS (Toyota Production System ), inventory is
waste, whether it is in pull system or push system. So
kanban is something you strive to get rid of.”
• Toyota uses kanban to force process improvements.
8
Kanban Flow
Kanban Rule: No Kanban card, no production
or movement of material
Can accommodate 10%-20% of changes in
planned production
Can easily extend to suppliers (supplier
Kanban)
Kanban card for
Kanban card for
product 1
product 1
Kanban card for
Kanban card for
product 2
product 2
Fabrication
Fabrication
cell
cell
O
O1
1
O
O2
2
O
O3
3
O
O2
2
Storage
Storage
area
area
Empty containers
Empty containers
Full containers
Full containers
Assembly line 1
Assembly line 1
Assembly line 2
Assembly line 2
The Single-Card
Kanban System
Receiving post
Receiving post
Storage
Storage
area
area
Empty containers
Empty containers
Full containers
Full containers
Kanban card for
Kanban card for
product 1
product 1
Kanban card for
Kanban card for
product 2
product 2
Fabrication
Fabrication
cell
cell
O
O1
1
O
O2
2
O
O3
3
O
O2
2
Assembly line 1
Assembly line 1
Assembly line 2
Assembly line 2
Receiving post
Receiving post
The Single-Card
Kanban System
Storage
Storage
area
area
Empty containers
Empty containers
Full containers
Full containers
Kanban card for
Kanban card for
product 1
product 1
Kanban card for
Kanban card for
product 2
product 2
Fabrication
Fabrication
cell
cell
O
O1
1
O
O2
2
O
O3
3
O
O2
2
Assembly line 1
Assembly line 1
Assembly line 2
Assembly line 2
Receiving post
Receiving post
The Single-Card
Kanban System
Storage
Storage
area
area
Empty containers
Empty containers
Full containers
Full containers
Kanban card for
Kanban card for
product 1
product 1
Kanban card for
Kanban card for
product 2
product 2
Fabrication
Fabrication
cell
cell
O
O1
1
O
O2
2
O
O3
3
O
O2
2
Assembly line 1
Assembly line 1
Assembly line 2
Assembly line 2
Receiving post
Receiving post
The Single-Card
Kanban System
Storage
Storage
area
area
Empty containers
Empty containers
Full containers
Full containers
Kanban card for
Kanban card for
product 1
product 1
Kanban card for
Kanban card for
product 2
product 2
Fabrication
Fabrication
cell
cell
O
O1
1
O
O2
2
O
O3
3
O
O2
2
Assembly line 1
Assembly line 1
Assembly line 2
Assembly line 2
Receiving post
Receiving post
The Single-Card
Kanban System
Storage
Storage
area
area
Empty containers
Empty containers
Full containers
Full containers
Kanban card for
Kanban card for
product 1
product 1
Kanban card for
Kanban card for
product 2
product 2
Fabrication
Fabrication
cell
cell
O
O1
1
O
O2
2
O
O3
3
O
O2
2
Assembly line 1
Assembly line 1
Assembly line 2
Assembly line 2
Receiving post
Receiving post
The Single-Card
Kanban System
Storage
Storage
area
area
Empty containers
Empty containers
Full containers
Full containers
Kanban card for
Kanban card for
product 1
product 1
Kanban card for
Kanban card for
product 2
product 2
Fabrication
Fabrication
cell
cell
O
O1
1
O
O2
2
O
O3
3
O
O2
2
Assembly line 1
Assembly line 1
Assembly line 2
Assembly line 2
Receiving post
Receiving post
The Single-Card
Kanban System
A TYPICAL KANBAN CARD
We can also modify this
Kanban card to suit our
requirement the best .
This card acts like a visual
control to replenish the
required quantity .
PARTVISUAL INSERTPHOTO HERE
PARTNO
PARTDESCRIPTION
PRODUCTION LINE
WORK STATION NO
LINESIDERACK NO
LINESIDELOAD QTY
REPLINSHMENT TRIGGER QTY
REPLINSHMENT FROMLOCATION
REPLINSHMENT QTY
KANBAN CARD
Thank you so much for viewing ………..
Let me know your feedbacks at :
industrialenggconsultancy@gmail.com

More Related Content

What's hot

Kanban
KanbanKanban
Kanban
KanbanKanban
Agile manufacturing
Agile manufacturingAgile manufacturing
Agile manufacturing
MNNIT Allahabad
 
Kanban siom
Kanban   siomKanban   siom
Kanban siom
adcom2015
 
Cellular Manufacturing
Cellular ManufacturingCellular Manufacturing
Cellular ManufacturingSagar Kurde
 
Lean Management and Kanban System
Lean Management and Kanban SystemLean Management and Kanban System
Lean Management and Kanban System
Gaurav Singh
 
Jidoka PowerPoint Presentation Slides
Jidoka PowerPoint Presentation SlidesJidoka PowerPoint Presentation Slides
Jidoka PowerPoint Presentation Slides
SlideTeam
 
value stream mapping
value stream mappingvalue stream mapping
value stream mapping
Jitesh Gaurav
 
elimination of wastes
elimination of wastes elimination of wastes
elimination of wastes
Mutahira Ahad
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
Abhishek Botre
 
Muda,muri,mura
Muda,muri,muraMuda,muri,mura
Muda,muri,muraskolery
 
Ian's 7 wastes of production
Ian's 7 wastes of productionIan's 7 wastes of production
Ian's 7 wastes of production
Ian Timm
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
Anand Subramaniam
 
Akshay kanban
Akshay kanbanAkshay kanban
Akshay kanban
Akshay Gautam
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future State
krishnaheda
 
TOC ConWIP Kanban
TOC ConWIP KanbanTOC ConWIP Kanban
TOC ConWIP Kanban
Serhiy Yevtushenko
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
Michael (Mike) Nunn
 
JIT
JITJIT

What's hot (20)

Kanban
KanbanKanban
Kanban
 
Kanban
KanbanKanban
Kanban
 
Agile manufacturing
Agile manufacturingAgile manufacturing
Agile manufacturing
 
Kanban siom
Kanban   siomKanban   siom
Kanban siom
 
Cellular Manufacturing
Cellular ManufacturingCellular Manufacturing
Cellular Manufacturing
 
Lean Management and Kanban System
Lean Management and Kanban SystemLean Management and Kanban System
Lean Management and Kanban System
 
Jidoka PowerPoint Presentation Slides
Jidoka PowerPoint Presentation SlidesJidoka PowerPoint Presentation Slides
Jidoka PowerPoint Presentation Slides
 
value stream mapping
value stream mappingvalue stream mapping
value stream mapping
 
elimination of wastes
elimination of wastes elimination of wastes
elimination of wastes
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
Muda,muri,mura
Muda,muri,muraMuda,muri,mura
Muda,muri,mura
 
Ian's 7 wastes of production
Ian's 7 wastes of productionIan's 7 wastes of production
Ian's 7 wastes of production
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
16 lean manufacturing
16 lean manufacturing16 lean manufacturing
16 lean manufacturing
 
Akshay kanban
Akshay kanbanAkshay kanban
Akshay kanban
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future State
 
TOC ConWIP Kanban
TOC ConWIP KanbanTOC ConWIP Kanban
TOC ConWIP Kanban
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
JIT
JITJIT
JIT
 
Kanban Pull System
Kanban Pull SystemKanban Pull System
Kanban Pull System
 

Similar to Kanban System .pdf

Kanban system (presentation for blog ) 2003
Kanban system (presentation for blog ) 2003Kanban system (presentation for blog ) 2003
Kanban system (presentation for blog ) 2003
industrialengg
 
Kanban system (presentation for blog )
Kanban system (presentation for blog )Kanban system (presentation for blog )
Kanban system (presentation for blog )
industrialengg
 
kanban1-140329054118-phpapp02.ppt
kanban1-140329054118-phpapp02.pptkanban1-140329054118-phpapp02.ppt
kanban1-140329054118-phpapp02.ppt
Rodrigo Costa, MSc, HCMP
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
jasonhian
 
Intro to pull kan ban
Intro to pull kan banIntro to pull kan ban
Intro to pull kan ban
Steve Eckhardt
 
kanban an integrated jit system
kanban an integrated jit systemkanban an integrated jit system
kanban an integrated jit systemSridhar Siddu
 
Kanban presentation
Kanban presentationKanban presentation
Kanban presentation
Bijo Joseph
 
Kanban presentation
Kanban presentationKanban presentation
Kanban presentation
sarah Benmerzouk
 
Kanban system in fast food industry
Kanban system in fast food industryKanban system in fast food industry
Kanban system in fast food industryJessica Allison
 
PPC Chapter 8.pdf
PPC Chapter 8.pdfPPC Chapter 8.pdf
PPC Chapter 8.pdf
Mywife15
 
Supermarket delivery system
Supermarket delivery systemSupermarket delivery system
Supermarket delivery system
mwrye
 
Just in time technology (JIT)
Just in time technology (JIT)Just in time technology (JIT)
Just in time technology (JIT)
Akash Dutta
 
Kanban Lean Thinking - Fakeeh quality week
Kanban Lean Thinking - Fakeeh quality weekKanban Lean Thinking - Fakeeh quality week
Kanban Lean Thinking - Fakeeh quality week
Rashad Helal
 
11.1-JIT.pptjust in time for management th
11.1-JIT.pptjust in time for management th11.1-JIT.pptjust in time for management th
11.1-JIT.pptjust in time for management th
ssuser72b8e8
 

Similar to Kanban System .pdf (20)

Kanban system (presentation for blog ) 2003
Kanban system (presentation for blog ) 2003Kanban system (presentation for blog ) 2003
Kanban system (presentation for blog ) 2003
 
Kanban system (presentation for blog )
Kanban system (presentation for blog )Kanban system (presentation for blog )
Kanban system (presentation for blog )
 
kanban1-140329054118-phpapp02.ppt
kanban1-140329054118-phpapp02.pptkanban1-140329054118-phpapp02.ppt
kanban1-140329054118-phpapp02.ppt
 
KANBAN
KANBANKANBAN
KANBAN
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
 
Intro to pull kan ban
Intro to pull kan banIntro to pull kan ban
Intro to pull kan ban
 
kanban an integrated jit system
kanban an integrated jit systemkanban an integrated jit system
kanban an integrated jit system
 
Kanban presentation
Kanban presentationKanban presentation
Kanban presentation
 
Kanban
KanbanKanban
Kanban
 
Kanban systems
Kanban systemsKanban systems
Kanban systems
 
Kanban
KanbanKanban
Kanban
 
Connectivity Solutions SAP Kanban Training
Connectivity Solutions SAP Kanban Training Connectivity Solutions SAP Kanban Training
Connectivity Solutions SAP Kanban Training
 
Kanban presentation
Kanban presentationKanban presentation
Kanban presentation
 
Kanban system in fast food industry
Kanban system in fast food industryKanban system in fast food industry
Kanban system in fast food industry
 
PPC Chapter 8.pdf
PPC Chapter 8.pdfPPC Chapter 8.pdf
PPC Chapter 8.pdf
 
Supermarket delivery system
Supermarket delivery systemSupermarket delivery system
Supermarket delivery system
 
Just in time technology (JIT)
Just in time technology (JIT)Just in time technology (JIT)
Just in time technology (JIT)
 
Kanban Lean Thinking - Fakeeh quality week
Kanban Lean Thinking - Fakeeh quality weekKanban Lean Thinking - Fakeeh quality week
Kanban Lean Thinking - Fakeeh quality week
 
11.1-JIT.pptjust in time for management th
11.1-JIT.pptjust in time for management th11.1-JIT.pptjust in time for management th
11.1-JIT.pptjust in time for management th
 
Kanban ppt
Kanban ppt Kanban ppt
Kanban ppt
 

Recently uploaded

5 Red Flags Your VW Camshaft Position Sensor Might Be Failing
5 Red Flags Your VW Camshaft Position Sensor Might Be Failing5 Red Flags Your VW Camshaft Position Sensor Might Be Failing
5 Red Flags Your VW Camshaft Position Sensor Might Be Failing
Fifth Gear Automotive Cross Roads
 
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
ahmedendrise81
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
jennifermiller8137
 
Hero Glamour Xtec Brochure | Hero MotoCorp
Hero Glamour Xtec Brochure | Hero MotoCorpHero Glamour Xtec Brochure | Hero MotoCorp
Hero Glamour Xtec Brochure | Hero MotoCorp
Hero MotoCorp
 
What Could Cause The Headlights On Your Porsche 911 To Stop Working
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingWhat Could Cause The Headlights On Your Porsche 911 To Stop Working
What Could Cause The Headlights On Your Porsche 911 To Stop Working
Lancer Service
 
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
bouvoy
 
5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing
5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing
5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing
Fifth Gear Automotive Argyle
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
Dart Auto
 
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
mymwpc
 
Renal elimination.pdf fffffffffffffffffffff
Renal elimination.pdf fffffffffffffffffffffRenal elimination.pdf fffffffffffffffffffff
Renal elimination.pdf fffffffffffffffffffff
RehanRustam2
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
Antique Plastic Traders
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
Hyundai Motor Group
 
Regeneration of Diesel Particulate Filter in Automobile
Regeneration of Diesel Particulate Filter in AutomobileRegeneration of Diesel Particulate Filter in Automobile
Regeneration of Diesel Particulate Filter in Automobile
AtanuGhosh62
 
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...
Import Motorworks
 
TRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electricalTRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electrical
JohnCarloPajarilloKa
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
jennifermiller8137
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
Autohaus Service and Sales
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Precious Mvulane CA (SA),RA
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Vic Auto Collision & Repair
 
TRANSFORMER OIL classifications and specifications
TRANSFORMER OIL classifications and specificationsTRANSFORMER OIL classifications and specifications
TRANSFORMER OIL classifications and specifications
vishnup11
 

Recently uploaded (20)

5 Red Flags Your VW Camshaft Position Sensor Might Be Failing
5 Red Flags Your VW Camshaft Position Sensor Might Be Failing5 Red Flags Your VW Camshaft Position Sensor Might Be Failing
5 Red Flags Your VW Camshaft Position Sensor Might Be Failing
 
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
 
Hero Glamour Xtec Brochure | Hero MotoCorp
Hero Glamour Xtec Brochure | Hero MotoCorpHero Glamour Xtec Brochure | Hero MotoCorp
Hero Glamour Xtec Brochure | Hero MotoCorp
 
What Could Cause The Headlights On Your Porsche 911 To Stop Working
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingWhat Could Cause The Headlights On Your Porsche 911 To Stop Working
What Could Cause The Headlights On Your Porsche 911 To Stop Working
 
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
一比一原版(UNITEC毕业证)UNITEC理工学院毕业证成绩单如何办理
 
5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing
5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing
5 Warning Signs Your Mercedes Exhaust Back Pressure Sensor Is Failing
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
 
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
 
Renal elimination.pdf fffffffffffffffffffff
Renal elimination.pdf fffffffffffffffffffffRenal elimination.pdf fffffffffffffffffffff
Renal elimination.pdf fffffffffffffffffffff
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
 
Regeneration of Diesel Particulate Filter in Automobile
Regeneration of Diesel Particulate Filter in AutomobileRegeneration of Diesel Particulate Filter in Automobile
Regeneration of Diesel Particulate Filter in Automobile
 
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...
 
TRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electricalTRAINEES-RECORD-BOOK- electronics and electrical
TRAINEES-RECORD-BOOK- electronics and electrical
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
 
TRANSFORMER OIL classifications and specifications
TRANSFORMER OIL classifications and specificationsTRANSFORMER OIL classifications and specifications
TRANSFORMER OIL classifications and specifications
 

Kanban System .pdf

  • 2. Push and Pull method of Work Flow Push Method: A method in which production of the item begins in advance of customer needs. Example: A buffet where food is prepared in advance. Pull Method: A method in which customer demand activates production of the service or item. Example: A restaurant where food is only prepared when orders are placed. Lean systems use the pull method of work flow.
  • 3. KANBAN Kanban means “card” or “visible record” in Japanese & refers to cards used to control the flow of production through a factory. KANBAN is a PULL System .
  • 4. General Operating Rules: 1. Each container must have a card. 2. The assembly line always withdraws materials from fabrication (pull system). 3. Containers of parts must never be removed from a storage area without a kanban being posted on the receiving post. 4. The containers should always contain the same number of good parts. The use of nonstandard containers or irregularly filled containers disrupts the production flow of the assembly line. 5. Only nondefective parts should be passed along. 6. Total production should not exceed the total amount authorized on the kanbans in the system.
  • 5. – 看板 Kanban cards limit excess work in progress • – 看板 Kanban literally means “visual card,” “signboard,” or “billboard.” • Toyota originally used Kanban cards to limit the amount of inventory tied up in “work in progress” on a manufacturing floor • Not only is excess inventory waste, time spent producing it is time that could be expended elsewhere • Kanban cards act as a form of “currency” representing how WIP is allowed in a system. 5
  • 6. “Pull” system to avoid overproduction • Milk example – weekly batch or daily purchase? • Next purchase triggered when you start using the only bottle of milk you have. • Not an example of zero-inventory, but still a pull system. • Because of demand uncertainty and lead-times, in many cases inventory is necessary to allow for smooth production. • Hence TPS follows the supermarket model or keeping a small amount in stock. As soon as customers take products away, they are replenished. • Each demand instance triggers a part being pulled from upstream. • The triggering mechanism is called “Kanban” which means cards, signboard or a poster. 6
  • 7. Kanban system • At Toyota, empty bin (a kanban) is send upstream after a demand instance. • It is a signal to refill it with a specific number of parts or send back a card with detailed information about the part location. • Even today, one can see Kanban cards and bins moving on the shop-floor. • Instead of using sophisticated computer scheduling techniques, this is a simple, effective and visual system of managing and ensuring the product flow and JIT production system. 7
  • 8. Kanban system • Gas tank example. • Toyota philosophy about kanban: “Kanban is an organized system of inventory buffers and as per TPS (Toyota Production System ), inventory is waste, whether it is in pull system or push system. So kanban is something you strive to get rid of.” • Toyota uses kanban to force process improvements. 8
  • 9. Kanban Flow Kanban Rule: No Kanban card, no production or movement of material Can accommodate 10%-20% of changes in planned production Can easily extend to suppliers (supplier Kanban)
  • 10. Kanban card for Kanban card for product 1 product 1 Kanban card for Kanban card for product 2 product 2 Fabrication Fabrication cell cell O O1 1 O O2 2 O O3 3 O O2 2 Storage Storage area area Empty containers Empty containers Full containers Full containers Assembly line 1 Assembly line 1 Assembly line 2 Assembly line 2 The Single-Card Kanban System Receiving post Receiving post
  • 11. Storage Storage area area Empty containers Empty containers Full containers Full containers Kanban card for Kanban card for product 1 product 1 Kanban card for Kanban card for product 2 product 2 Fabrication Fabrication cell cell O O1 1 O O2 2 O O3 3 O O2 2 Assembly line 1 Assembly line 1 Assembly line 2 Assembly line 2 Receiving post Receiving post The Single-Card Kanban System
  • 12. Storage Storage area area Empty containers Empty containers Full containers Full containers Kanban card for Kanban card for product 1 product 1 Kanban card for Kanban card for product 2 product 2 Fabrication Fabrication cell cell O O1 1 O O2 2 O O3 3 O O2 2 Assembly line 1 Assembly line 1 Assembly line 2 Assembly line 2 Receiving post Receiving post The Single-Card Kanban System
  • 13. Storage Storage area area Empty containers Empty containers Full containers Full containers Kanban card for Kanban card for product 1 product 1 Kanban card for Kanban card for product 2 product 2 Fabrication Fabrication cell cell O O1 1 O O2 2 O O3 3 O O2 2 Assembly line 1 Assembly line 1 Assembly line 2 Assembly line 2 Receiving post Receiving post The Single-Card Kanban System
  • 14. Storage Storage area area Empty containers Empty containers Full containers Full containers Kanban card for Kanban card for product 1 product 1 Kanban card for Kanban card for product 2 product 2 Fabrication Fabrication cell cell O O1 1 O O2 2 O O3 3 O O2 2 Assembly line 1 Assembly line 1 Assembly line 2 Assembly line 2 Receiving post Receiving post The Single-Card Kanban System
  • 15. Storage Storage area area Empty containers Empty containers Full containers Full containers Kanban card for Kanban card for product 1 product 1 Kanban card for Kanban card for product 2 product 2 Fabrication Fabrication cell cell O O1 1 O O2 2 O O3 3 O O2 2 Assembly line 1 Assembly line 1 Assembly line 2 Assembly line 2 Receiving post Receiving post The Single-Card Kanban System
  • 16. Storage Storage area area Empty containers Empty containers Full containers Full containers Kanban card for Kanban card for product 1 product 1 Kanban card for Kanban card for product 2 product 2 Fabrication Fabrication cell cell O O1 1 O O2 2 O O3 3 O O2 2 Assembly line 1 Assembly line 1 Assembly line 2 Assembly line 2 Receiving post Receiving post The Single-Card Kanban System
  • 17. A TYPICAL KANBAN CARD We can also modify this Kanban card to suit our requirement the best . This card acts like a visual control to replenish the required quantity . PARTVISUAL INSERTPHOTO HERE PARTNO PARTDESCRIPTION PRODUCTION LINE WORK STATION NO LINESIDERACK NO LINESIDELOAD QTY REPLINSHMENT TRIGGER QTY REPLINSHMENT FROMLOCATION REPLINSHMENT QTY KANBAN CARD
  • 18. Thank you so much for viewing ……….. Let me know your feedbacks at : industrialenggconsultancy@gmail.com