SlideShare a Scribd company logo
Palm Oil Plantation Project
Executive Summary
PT KALPATARU INVESTAMA
WISMA KOSGORO 15th FLOOR
JALAN M. H. THAMRIN KAV. 53
JAKARTA 10350
Tel: 6221 31923800 Fax: 6221 3142456
By Suhardiyoto Haryadi
Suhardiyoto Haryadi
8/5/2013 PT KALPATARU INVESTAMA
PALM OIL PROJECT
2
PT KALPATARU INVESTAMA
PROJECT LOCATION: KABUPATEN KUTAI KARTANEGARA, EAST KALIMANTAN.
Location
8/5/2013 PT KALPATARU INVESTAMA
PALM OIL PROJECT
3
PT KALPATARU INVESTAMA
• Location: All areas are situated in Kabupaten Kutai Kartanegara, East Kalimantan.
• Total area of HGU (inti): 78,876 Ha; Planted Area: 56, 560 Ha; Plasma: 19,616 Ha.
• Estimated Development Cost of Inti: 56,560 X USD 4,000 = USD 226,240,000
• Number of Palm Oil Mills: 4 units @ 60 ton/hr (should start construction in early 2011)
• Estimated Cost for Mills: 4 X USD 7,700,000 = USD 30,800,000
• Estimated Total Cost = USD 257,040,000
ESTIMATED COST
8/5/2013 PT KALPATARU INVESTAMA
PALM OIL PROJECT
4
PT KALPATARU INVESTAMA
PROJECT AREAS & LOCATION
No Company Name Area (Ha) Location
1 PT Malaya Sawit Khatulistiwa 8.384,86 (Inti) Kecamatan Tenggarong and Sebulu, Kabupaten Kutai
Kartanegara, East Kalimantan.
2 PT Mahakam Sawit Plantation 6.972,12 (Inti) Kecamatan Tenggarong, Sebulu and Muara Kaman,
Kabupaten Kutai Kartanegara, East Kalimantan.
3 PT Sawit Khatulistiwa
Plantation (TBG)
15.372,28 (Inti) Kecamatan Tabang, Kabupaten Kutai Kartanegara, East
Kalimantan.
4 PT Sawit Khatulistiwa
Plantation (TGR)
9.833,39 (Inti) Kecamatan Tenggarong Sebrang, Sebulu, Muara Kaman,
Kabupaten Kutai Kartanegara, East Kalimantan.
5 PT Kota Bangun Plantation 6.756,30 (Inti) Kecamatan Tenggarong, Loa Kulu & Loa Janan,
Kabupaten Kutai Kartanegara, East Kalimantan.
6 PT Kutai Inti Utama 7.812,57 (Inti) Kecamatan Loa Janan, Muara Jawa & Semboja,
Kabupaten Kutai Kartanegara, East Kalimantan.
7 Plasma (Small-holders’
Cooperatives)
11.000 Kabupaten Kutai Kartanegara, East Kalimantan.
T O T A L 66.131,52 Kabupaten Kutai Kartanegara, East Kalimantan.
8/5/2013 PT KALPATARU INVESTAMA
PALM OIL PROJECT
5
PT KALPATARU INVESTAMA
LAND TITLE & CERTIFICATION
No Company Name Ijin Lokasi Ijin Usaha
Perkebunan
AMDAL
1 PT Malaya Sawit Khatulistiwa 121/DPN.K/IL-121/XI-
2008
503/32/SK-DISBUN
KUKAR/VIII/2006
KAKK/16/AMDAL/P
KEBUNAN/2007
2 PT Mahakam Sawit Plantation 122/DPN.K/IL-122/XI-
2008
503/33/SK-DISBUN
KUKAR/VIII/2006
KAKK/13/AMDAL/P
KEBUNAN/2007
3 PT Sawit Khatulistiwa Plantation
(TBG)
29/DPN.K/IL-29/V-
2008
503/24/SK-DISBUN
KUKAR/IX/2008
KAKK/12/AMDAL/P
KEBUNAN/2007
4 PT Sawit Khatulistiwa Plantation
(TGR)
119/DPN.K/IL-119/XI-
2008
503/24/SK-DISBUN
KUKAR/IX/2008
KAKK/12/AMDAL/P
KEBUNAN/2007
5 PT Kota Bangun Plantation 120/DPN.K/IL-120/XI-
2008
503/49/SK-DISBUN
KUKAR/VI/2007
6 PT Kutai Inti Utama 46/DPN.K/IL-46/VI-
2008
503/25/SK-DISBUN
KUKAR/IX/2008
KAKK/14/AMDAL/P
KEBUNAN/2007
Note: * All company’s locations have been endorsed by the Panitia B for HGU certification.
8/5/2013 PT KALPATARU INVESTAMA
PALM OIL PROJECT
6
PT KALPATARU INVESTAMA
PROJECT LOCATION
8/5/2013 PT KALPATARU INVESTAMA
PALM OIL PROJECT
7
PT KALPATARU INVESTAMA
LAND SUITABILITY FOR OIL PALM CULTIVATION *)
No Company Name Rain Intensity/
Year
Soil Type Land Suitability
1 PT Malaya Sawit Khatulistiwa 2,358.2 mm Geisol Hidrik (21.96%)
Podsolic Chromic (48.07%)
Podsolik Haplik (18.68%)
Suitable (75.12%)
Not Suitable (24.88%)
2 PT Mahakam Sawit Plantation 2,358.2 mm Geisol Aerik (18.30%)
Podsolik Plintik (11.65%)
Podsolik Chromic (41.10%)
Podsolik Haplik (21.65%)
Suitable (93.78%)
Not Suitable (6.22%)
3 PT Sawit Khatulistiwa
Plantation (TBG)
2,265.1 mm Podsolik Plintik (32.12%)
Podsolik Kromik (21.63%)
Podsolik Haplik (42.74%)
Suitable (83.08%)
Not suitable (6.92%)
4 PT Sawit Khatulistiwa
Plantation (TGR)
2,358.2 mm Podsolik Plintik (16.66%)
Podsolik Chromic (34.59%)
Podsolik Haplik (42.61%)
Suitable (78.02%)
Not Suitable (21.88%)
5 PT Kota Bangun Plantation 2,265.1 mm Geisol Aerik (8.65%)
Podsolik Chromic (22.01%)
Podsolik Haplik (59.30%)
Suitable (72.51%)
Not Suitable (27.49%)
6 PT Kutai Inti Utama 2,265.1 mm Podsolik Arenik (26.39%)
Podsolik Chromic (34.80%)
Suitable (83.32%)
Not Suitable (16.68%)
Note: *) Data is derived from Block Design Survey performed by PT Permata Agro Sukses (Ocober 2008 – January 2009)
8/5/2013 PT KALPATARU INVESTAMA
PALM OIL PROJECT
8
PT KALPATARU INVESTAMA
• Head Office Staff: 8 persons
• Project Office: 29 persons
• Field Staff: 12 persons (not include
daily workers)
• 4-wheel Vehicles: 7 units
• Motor Cycles: 12 units
Project Office:
Jalan Patin No. 99 K
Tenggarong 75511
Kutai Kartanegara.
Head Office:
Wisma Kosgoro 15th Floor,
Jalan M. H. Thamrin Kav. 53,
Jakarta 10350
MANPOWER & SUPPORTING FACILITIES
Suhardiyoto Haryadi

More Related Content

What's hot

laporan praktek kerja lapangan
laporan praktek kerja lapanganlaporan praktek kerja lapangan
laporan praktek kerja lapangan
Restu Budy
 
Surat perjanjian kerjasama
Surat perjanjian kerjasamaSurat perjanjian kerjasama
Surat perjanjian kerjasama
Membangun city
 
Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...
Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...
Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...
GLC
 
Surat permohonan kunjungan industri (KI)
Surat permohonan kunjungan industri (KI)Surat permohonan kunjungan industri (KI)
Surat permohonan kunjungan industri (KI)
20570832
 
contoh surat permohonan domisili
contoh surat permohonan domisilicontoh surat permohonan domisili
contoh surat permohonan domisili
husnah thohir
 
Surat perjanjian kontrak kerja
Surat perjanjian kontrak kerjaSurat perjanjian kontrak kerja
Surat perjanjian kontrak kerjaVika Yurista
 
Keterangan akses jalan
Keterangan akses jalanKeterangan akses jalan
Keterangan akses jalan
Aria Handara
 
Contoh surat jual beli tanah
Contoh surat jual beli tanahContoh surat jual beli tanah
Contoh surat jual beli tanahsyahrulhtb
 
Surat keterangan tanah dan bangunan
Surat keterangan tanah dan bangunanSurat keterangan tanah dan bangunan
Surat keterangan tanah dan bangunan
Pemerintah Pauh
 
Surat keterangan
Surat keteranganSurat keterangan
Surat keterangan
Operator Warnet Vast Raha
 
Laporan pkl pt pegadaian (persero) kanwil vi makassar 2018
Laporan pkl pt pegadaian (persero) kanwil vi makassar   2018Laporan pkl pt pegadaian (persero) kanwil vi makassar   2018
Laporan pkl pt pegadaian (persero) kanwil vi makassar 2018
Amalia Novianti
 
Surat Pengantar RT
Surat Pengantar RTSurat Pengantar RT
Surat Pengantar RT
Jamaludin Al Fijar
 
Uji Tuntas Hukum Akuisisi Saham
Uji Tuntas Hukum Akuisisi SahamUji Tuntas Hukum Akuisisi Saham
Uji Tuntas Hukum Akuisisi Saham
Leks&Co
 
Surat perjanjian jual beli tanah 23
Surat perjanjian jual beli tanah 23Surat perjanjian jual beli tanah 23
Surat perjanjian jual beli tanah 23
Operator Warnet Vast Raha
 
Daftar Perusahaan Pelapor Pertambangan Mineral dan Batubara di Laporan EITI T...
Daftar Perusahaan Pelapor Pertambangan Mineral dan Batubara di Laporan EITI T...Daftar Perusahaan Pelapor Pertambangan Mineral dan Batubara di Laporan EITI T...
Daftar Perusahaan Pelapor Pertambangan Mineral dan Batubara di Laporan EITI T...
Publish What You Pay (PWYP) Indonesia
 
Laporan kunjungan industri
Laporan kunjungan industriLaporan kunjungan industri
Laporan kunjungan industri
Rezka Pratama
 
4. surat perjanjian sewa menyewa tanah
4. surat perjanjian sewa menyewa tanah4. surat perjanjian sewa menyewa tanah
4. surat perjanjian sewa menyewa tanahAbdillah Syafei
 
Contoh Kasus Akuisisi
Contoh Kasus AkuisisiContoh Kasus Akuisisi
Contoh Kasus Akuisisi
Leks&Co
 

What's hot (20)

laporan praktek kerja lapangan
laporan praktek kerja lapanganlaporan praktek kerja lapangan
laporan praktek kerja lapangan
 
Surat perjanjian kerjasama
Surat perjanjian kerjasamaSurat perjanjian kerjasama
Surat perjanjian kerjasama
 
Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...
Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...
Perjanjian Land Clearing, Pembuatan Jalan clean dan Parit (Beli Perjanjian, H...
 
Surat permohonan kunjungan industri (KI)
Surat permohonan kunjungan industri (KI)Surat permohonan kunjungan industri (KI)
Surat permohonan kunjungan industri (KI)
 
contoh surat permohonan domisili
contoh surat permohonan domisilicontoh surat permohonan domisili
contoh surat permohonan domisili
 
Surat perjanjian kontrak kerja
Surat perjanjian kontrak kerjaSurat perjanjian kontrak kerja
Surat perjanjian kontrak kerja
 
Keterangan akses jalan
Keterangan akses jalanKeterangan akses jalan
Keterangan akses jalan
 
Contoh surat jual beli tanah
Contoh surat jual beli tanahContoh surat jual beli tanah
Contoh surat jual beli tanah
 
Surat keterangan tanah dan bangunan
Surat keterangan tanah dan bangunanSurat keterangan tanah dan bangunan
Surat keterangan tanah dan bangunan
 
Surat keterangan
Surat keteranganSurat keterangan
Surat keterangan
 
Laporan pkl pt pegadaian (persero) kanwil vi makassar 2018
Laporan pkl pt pegadaian (persero) kanwil vi makassar   2018Laporan pkl pt pegadaian (persero) kanwil vi makassar   2018
Laporan pkl pt pegadaian (persero) kanwil vi makassar 2018
 
Surat Pengantar RT
Surat Pengantar RTSurat Pengantar RT
Surat Pengantar RT
 
Uji Tuntas Hukum Akuisisi Saham
Uji Tuntas Hukum Akuisisi SahamUji Tuntas Hukum Akuisisi Saham
Uji Tuntas Hukum Akuisisi Saham
 
Pola kemitraan
Pola kemitraanPola kemitraan
Pola kemitraan
 
Surat pernyataan jual beli tanah
Surat pernyataan jual beli tanahSurat pernyataan jual beli tanah
Surat pernyataan jual beli tanah
 
Surat perjanjian jual beli tanah 23
Surat perjanjian jual beli tanah 23Surat perjanjian jual beli tanah 23
Surat perjanjian jual beli tanah 23
 
Daftar Perusahaan Pelapor Pertambangan Mineral dan Batubara di Laporan EITI T...
Daftar Perusahaan Pelapor Pertambangan Mineral dan Batubara di Laporan EITI T...Daftar Perusahaan Pelapor Pertambangan Mineral dan Batubara di Laporan EITI T...
Daftar Perusahaan Pelapor Pertambangan Mineral dan Batubara di Laporan EITI T...
 
Laporan kunjungan industri
Laporan kunjungan industriLaporan kunjungan industri
Laporan kunjungan industri
 
4. surat perjanjian sewa menyewa tanah
4. surat perjanjian sewa menyewa tanah4. surat perjanjian sewa menyewa tanah
4. surat perjanjian sewa menyewa tanah
 
Contoh Kasus Akuisisi
Contoh Kasus AkuisisiContoh Kasus Akuisisi
Contoh Kasus Akuisisi
 

Viewers also liked

Formulation of corporate strategy to get successful in rspo and ispo certific...
Formulation of corporate strategy to get successful in rspo and ispo certific...Formulation of corporate strategy to get successful in rspo and ispo certific...
Formulation of corporate strategy to get successful in rspo and ispo certific...
Suhardiyoto Haryadi
 
Perawatan dan perbaikan jalan perkebunan
Perawatan dan perbaikan jalan perkebunanPerawatan dan perbaikan jalan perkebunan
Perawatan dan perbaikan jalan perkebunan
Nasikhin Aries
 
Democracy and alternative political systems in Asia: After the Strong Men
Democracy and alternative political systems in Asia: After the Strong MenDemocracy and alternative political systems in Asia: After the Strong Men
Democracy and alternative political systems in Asia: After the Strong Men
Suhardiyoto Haryadi
 
Tugas kesehatan dan keselamatan kerja polusi udara karena kebakaran hutan
Tugas kesehatan dan keselamatan kerja   polusi udara karena kebakaran hutanTugas kesehatan dan keselamatan kerja   polusi udara karena kebakaran hutan
Tugas kesehatan dan keselamatan kerja polusi udara karena kebakaran hutan
Lambung Mangkurat University
 
Kalpataru Imperial
Kalpataru ImperialKalpataru Imperial
Kalpataru Imperial
Sameer Jain
 
Keterkaitan infrastruktur Jalan & hujan thd restan TBS kelapa sawit
Keterkaitan infrastruktur Jalan & hujan thd restan TBS kelapa sawitKeterkaitan infrastruktur Jalan & hujan thd restan TBS kelapa sawit
Keterkaitan infrastruktur Jalan & hujan thd restan TBS kelapa sawitAndreas W. Krisdiarto
 
Topograf dan umur Pemanen Thd Kapasitas Pemanenan TBS Kelapa Sawit
Topograf dan umur Pemanen Thd Kapasitas Pemanenan TBS Kelapa SawitTopograf dan umur Pemanen Thd Kapasitas Pemanenan TBS Kelapa Sawit
Topograf dan umur Pemanen Thd Kapasitas Pemanenan TBS Kelapa Sawit
Andreas W. Krisdiarto
 
Rencana Tata Ruang Wilayah Provinsi Kalimantan Timur
Rencana Tata Ruang Wilayah Provinsi Kalimantan TimurRencana Tata Ruang Wilayah Provinsi Kalimantan Timur
Rencana Tata Ruang Wilayah Provinsi Kalimantan Timur
Kamen Ride
 
Perkembangan Skema dan keberterimaan Indonesia Suistainable Palm Oil
Perkembangan Skema dan keberterimaan Indonesia Suistainable Palm Oil Perkembangan Skema dan keberterimaan Indonesia Suistainable Palm Oil
Perkembangan Skema dan keberterimaan Indonesia Suistainable Palm Oil
Instansi
 
Bab 2 turbin uap
Bab 2 turbin uapBab 2 turbin uap
Bab 2 turbin uap
Rina rina
 
Stasiun boiler kelapa_sawit
Stasiun boiler kelapa_sawitStasiun boiler kelapa_sawit
Stasiun boiler kelapa_sawit
Bristia Sinyo Saputra
 
Penetapan kadar ca dalam CaCO3 SMK-SMAK Bogor
Penetapan kadar ca dalam CaCO3 SMK-SMAK BogorPenetapan kadar ca dalam CaCO3 SMK-SMAK Bogor
Penetapan kadar ca dalam CaCO3 SMK-SMAK Bogor
DeviPurnama
 
Penetapan kadar Ca dalam CaCO3
Penetapan kadar Ca dalam CaCO3Penetapan kadar Ca dalam CaCO3
Penetapan kadar Ca dalam CaCO3
aprijal_99
 
peraturan dan sumber limbah b3
peraturan dan sumber limbah b3peraturan dan sumber limbah b3
peraturan dan sumber limbah b3
Rindi Sulistyani
 
Opsi Teknologi Pengelolaan Air Limbah Permukiman
Opsi Teknologi  Pengelolaan Air Limbah Permukiman Opsi Teknologi  Pengelolaan Air Limbah Permukiman
Opsi Teknologi Pengelolaan Air Limbah Permukiman
infosanitasi
 
Viskositas zat cair cara stokes
Viskositas zat cair cara stokesViskositas zat cair cara stokes
Viskositas zat cair cara stokes
Putri Aulia
 
Instalasi ketel uap ( steam boiler )
Instalasi ketel uap ( steam boiler )Instalasi ketel uap ( steam boiler )
Instalasi ketel uap ( steam boiler )
Amirul AmMu
 
3 Besaran Arus dan Tegangan
3 Besaran  Arus dan Tegangan3 Besaran  Arus dan Tegangan
3 Besaran Arus dan Tegangan
Simon Patabang
 
Alat ukur & pengukuran listrik
Alat ukur & pengukuran listrikAlat ukur & pengukuran listrik
Alat ukur & pengukuran listrikfaqih12
 
Cara menghitung kebutuhan tenaga panen kebun kelapa sawit
Cara menghitung kebutuhan tenaga panen kebun kelapa sawitCara menghitung kebutuhan tenaga panen kebun kelapa sawit
Cara menghitung kebutuhan tenaga panen kebun kelapa sawit
Benny Benny
 

Viewers also liked (20)

Formulation of corporate strategy to get successful in rspo and ispo certific...
Formulation of corporate strategy to get successful in rspo and ispo certific...Formulation of corporate strategy to get successful in rspo and ispo certific...
Formulation of corporate strategy to get successful in rspo and ispo certific...
 
Perawatan dan perbaikan jalan perkebunan
Perawatan dan perbaikan jalan perkebunanPerawatan dan perbaikan jalan perkebunan
Perawatan dan perbaikan jalan perkebunan
 
Democracy and alternative political systems in Asia: After the Strong Men
Democracy and alternative political systems in Asia: After the Strong MenDemocracy and alternative political systems in Asia: After the Strong Men
Democracy and alternative political systems in Asia: After the Strong Men
 
Tugas kesehatan dan keselamatan kerja polusi udara karena kebakaran hutan
Tugas kesehatan dan keselamatan kerja   polusi udara karena kebakaran hutanTugas kesehatan dan keselamatan kerja   polusi udara karena kebakaran hutan
Tugas kesehatan dan keselamatan kerja polusi udara karena kebakaran hutan
 
Kalpataru Imperial
Kalpataru ImperialKalpataru Imperial
Kalpataru Imperial
 
Keterkaitan infrastruktur Jalan & hujan thd restan TBS kelapa sawit
Keterkaitan infrastruktur Jalan & hujan thd restan TBS kelapa sawitKeterkaitan infrastruktur Jalan & hujan thd restan TBS kelapa sawit
Keterkaitan infrastruktur Jalan & hujan thd restan TBS kelapa sawit
 
Topograf dan umur Pemanen Thd Kapasitas Pemanenan TBS Kelapa Sawit
Topograf dan umur Pemanen Thd Kapasitas Pemanenan TBS Kelapa SawitTopograf dan umur Pemanen Thd Kapasitas Pemanenan TBS Kelapa Sawit
Topograf dan umur Pemanen Thd Kapasitas Pemanenan TBS Kelapa Sawit
 
Rencana Tata Ruang Wilayah Provinsi Kalimantan Timur
Rencana Tata Ruang Wilayah Provinsi Kalimantan TimurRencana Tata Ruang Wilayah Provinsi Kalimantan Timur
Rencana Tata Ruang Wilayah Provinsi Kalimantan Timur
 
Perkembangan Skema dan keberterimaan Indonesia Suistainable Palm Oil
Perkembangan Skema dan keberterimaan Indonesia Suistainable Palm Oil Perkembangan Skema dan keberterimaan Indonesia Suistainable Palm Oil
Perkembangan Skema dan keberterimaan Indonesia Suistainable Palm Oil
 
Bab 2 turbin uap
Bab 2 turbin uapBab 2 turbin uap
Bab 2 turbin uap
 
Stasiun boiler kelapa_sawit
Stasiun boiler kelapa_sawitStasiun boiler kelapa_sawit
Stasiun boiler kelapa_sawit
 
Penetapan kadar ca dalam CaCO3 SMK-SMAK Bogor
Penetapan kadar ca dalam CaCO3 SMK-SMAK BogorPenetapan kadar ca dalam CaCO3 SMK-SMAK Bogor
Penetapan kadar ca dalam CaCO3 SMK-SMAK Bogor
 
Penetapan kadar Ca dalam CaCO3
Penetapan kadar Ca dalam CaCO3Penetapan kadar Ca dalam CaCO3
Penetapan kadar Ca dalam CaCO3
 
peraturan dan sumber limbah b3
peraturan dan sumber limbah b3peraturan dan sumber limbah b3
peraturan dan sumber limbah b3
 
Opsi Teknologi Pengelolaan Air Limbah Permukiman
Opsi Teknologi  Pengelolaan Air Limbah Permukiman Opsi Teknologi  Pengelolaan Air Limbah Permukiman
Opsi Teknologi Pengelolaan Air Limbah Permukiman
 
Viskositas zat cair cara stokes
Viskositas zat cair cara stokesViskositas zat cair cara stokes
Viskositas zat cair cara stokes
 
Instalasi ketel uap ( steam boiler )
Instalasi ketel uap ( steam boiler )Instalasi ketel uap ( steam boiler )
Instalasi ketel uap ( steam boiler )
 
3 Besaran Arus dan Tegangan
3 Besaran  Arus dan Tegangan3 Besaran  Arus dan Tegangan
3 Besaran Arus dan Tegangan
 
Alat ukur & pengukuran listrik
Alat ukur & pengukuran listrikAlat ukur & pengukuran listrik
Alat ukur & pengukuran listrik
 
Cara menghitung kebutuhan tenaga panen kebun kelapa sawit
Cara menghitung kebutuhan tenaga panen kebun kelapa sawitCara menghitung kebutuhan tenaga panen kebun kelapa sawit
Cara menghitung kebutuhan tenaga panen kebun kelapa sawit
 

More from Suhardiyoto Haryadi

Indonesia's palm oil outlook 2020
Indonesia's palm oil outlook 2020Indonesia's palm oil outlook 2020
Indonesia's palm oil outlook 2020
Suhardiyoto Haryadi
 
WIRAJASA Waste Oil Burner
WIRAJASA Waste Oil BurnerWIRAJASA Waste Oil Burner
WIRAJASA Waste Oil Burner
Suhardiyoto Haryadi
 
Excellence in mechanical engineering, a profile of CV Wirajasa Teknik Industri
Excellence in mechanical engineering, a profile of CV Wirajasa Teknik IndustriExcellence in mechanical engineering, a profile of CV Wirajasa Teknik Industri
Excellence in mechanical engineering, a profile of CV Wirajasa Teknik Industri
Suhardiyoto Haryadi
 
Excellence in mechanical engineering
Excellence in mechanical engineeringExcellence in mechanical engineering
Excellence in mechanical engineering
Suhardiyoto Haryadi
 
Bulk material handling equipment
Bulk material handling equipmentBulk material handling equipment
Bulk material handling equipment
Suhardiyoto Haryadi
 
Biomass Block Press Witech BP 18
Biomass Block Press Witech BP 18Biomass Block Press Witech BP 18
Biomass Block Press Witech BP 18
Suhardiyoto Haryadi
 
Pulp & Paper Waste Handling System
Pulp & Paper Waste Handling SystemPulp & Paper Waste Handling System
Pulp & Paper Waste Handling System
Suhardiyoto Haryadi
 
Organic Fertilizers Production (Bahasa Indonesia)
Organic Fertilizers Production (Bahasa Indonesia)Organic Fertilizers Production (Bahasa Indonesia)
Organic Fertilizers Production (Bahasa Indonesia)
Suhardiyoto Haryadi
 
Composting process and organic fertilizers production
Composting process and organic fertilizers productionComposting process and organic fertilizers production
Composting process and organic fertilizers production
Suhardiyoto Haryadi
 
Waste to energy in Indonesia
Waste to energy in IndonesiaWaste to energy in Indonesia
Waste to energy in Indonesia
Suhardiyoto Haryadi
 
Synthetic Asphalt or Bio-Asphalt Production Plant (Bahasa Indonesia)
Synthetic Asphalt or Bio-Asphalt Production Plant (Bahasa Indonesia)Synthetic Asphalt or Bio-Asphalt Production Plant (Bahasa Indonesia)
Synthetic Asphalt or Bio-Asphalt Production Plant (Bahasa Indonesia)
Suhardiyoto Haryadi
 
Flowchart of composting and organic fertilizer production plants.
Flowchart of composting and organic fertilizer production plants.Flowchart of composting and organic fertilizer production plants.
Flowchart of composting and organic fertilizer production plants.
Suhardiyoto Haryadi
 
Major equipment of organic fertilizer production plant.
Major equipment of organic fertilizer production plant.Major equipment of organic fertilizer production plant.
Major equipment of organic fertilizer production plant.
Suhardiyoto Haryadi
 
Major equipment of composting facility
Major equipment of composting facilityMajor equipment of composting facility
Major equipment of composting facility
Suhardiyoto Haryadi
 
Major equipment of sorting/separation plant.
Major equipment of sorting/separation plant.Major equipment of sorting/separation plant.
Major equipment of sorting/separation plant.
Suhardiyoto Haryadi
 

More from Suhardiyoto Haryadi (15)

Indonesia's palm oil outlook 2020
Indonesia's palm oil outlook 2020Indonesia's palm oil outlook 2020
Indonesia's palm oil outlook 2020
 
WIRAJASA Waste Oil Burner
WIRAJASA Waste Oil BurnerWIRAJASA Waste Oil Burner
WIRAJASA Waste Oil Burner
 
Excellence in mechanical engineering, a profile of CV Wirajasa Teknik Industri
Excellence in mechanical engineering, a profile of CV Wirajasa Teknik IndustriExcellence in mechanical engineering, a profile of CV Wirajasa Teknik Industri
Excellence in mechanical engineering, a profile of CV Wirajasa Teknik Industri
 
Excellence in mechanical engineering
Excellence in mechanical engineeringExcellence in mechanical engineering
Excellence in mechanical engineering
 
Bulk material handling equipment
Bulk material handling equipmentBulk material handling equipment
Bulk material handling equipment
 
Biomass Block Press Witech BP 18
Biomass Block Press Witech BP 18Biomass Block Press Witech BP 18
Biomass Block Press Witech BP 18
 
Pulp & Paper Waste Handling System
Pulp & Paper Waste Handling SystemPulp & Paper Waste Handling System
Pulp & Paper Waste Handling System
 
Organic Fertilizers Production (Bahasa Indonesia)
Organic Fertilizers Production (Bahasa Indonesia)Organic Fertilizers Production (Bahasa Indonesia)
Organic Fertilizers Production (Bahasa Indonesia)
 
Composting process and organic fertilizers production
Composting process and organic fertilizers productionComposting process and organic fertilizers production
Composting process and organic fertilizers production
 
Waste to energy in Indonesia
Waste to energy in IndonesiaWaste to energy in Indonesia
Waste to energy in Indonesia
 
Synthetic Asphalt or Bio-Asphalt Production Plant (Bahasa Indonesia)
Synthetic Asphalt or Bio-Asphalt Production Plant (Bahasa Indonesia)Synthetic Asphalt or Bio-Asphalt Production Plant (Bahasa Indonesia)
Synthetic Asphalt or Bio-Asphalt Production Plant (Bahasa Indonesia)
 
Flowchart of composting and organic fertilizer production plants.
Flowchart of composting and organic fertilizer production plants.Flowchart of composting and organic fertilizer production plants.
Flowchart of composting and organic fertilizer production plants.
 
Major equipment of organic fertilizer production plant.
Major equipment of organic fertilizer production plant.Major equipment of organic fertilizer production plant.
Major equipment of organic fertilizer production plant.
 
Major equipment of composting facility
Major equipment of composting facilityMajor equipment of composting facility
Major equipment of composting facility
 
Major equipment of sorting/separation plant.
Major equipment of sorting/separation plant.Major equipment of sorting/separation plant.
Major equipment of sorting/separation plant.
 

Recently uploaded

Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
Top Forex Brokers Review
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
DerekIwanaka1
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
LuanWise
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
Adani case
 
An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
Any kyc Account
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
WilliamRodrigues148
 

Recently uploaded (20)

Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Building Your Employer Brand with Social Media
Building Your Employer Brand with Social MediaBuilding Your Employer Brand with Social Media
Building Your Employer Brand with Social Media
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
 
An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
 

Kalpataru Group Plantations Project

  • 1. Palm Oil Plantation Project Executive Summary PT KALPATARU INVESTAMA WISMA KOSGORO 15th FLOOR JALAN M. H. THAMRIN KAV. 53 JAKARTA 10350 Tel: 6221 31923800 Fax: 6221 3142456 By Suhardiyoto Haryadi Suhardiyoto Haryadi
  • 2. 8/5/2013 PT KALPATARU INVESTAMA PALM OIL PROJECT 2 PT KALPATARU INVESTAMA PROJECT LOCATION: KABUPATEN KUTAI KARTANEGARA, EAST KALIMANTAN. Location
  • 3. 8/5/2013 PT KALPATARU INVESTAMA PALM OIL PROJECT 3 PT KALPATARU INVESTAMA • Location: All areas are situated in Kabupaten Kutai Kartanegara, East Kalimantan. • Total area of HGU (inti): 78,876 Ha; Planted Area: 56, 560 Ha; Plasma: 19,616 Ha. • Estimated Development Cost of Inti: 56,560 X USD 4,000 = USD 226,240,000 • Number of Palm Oil Mills: 4 units @ 60 ton/hr (should start construction in early 2011) • Estimated Cost for Mills: 4 X USD 7,700,000 = USD 30,800,000 • Estimated Total Cost = USD 257,040,000 ESTIMATED COST
  • 4. 8/5/2013 PT KALPATARU INVESTAMA PALM OIL PROJECT 4 PT KALPATARU INVESTAMA PROJECT AREAS & LOCATION No Company Name Area (Ha) Location 1 PT Malaya Sawit Khatulistiwa 8.384,86 (Inti) Kecamatan Tenggarong and Sebulu, Kabupaten Kutai Kartanegara, East Kalimantan. 2 PT Mahakam Sawit Plantation 6.972,12 (Inti) Kecamatan Tenggarong, Sebulu and Muara Kaman, Kabupaten Kutai Kartanegara, East Kalimantan. 3 PT Sawit Khatulistiwa Plantation (TBG) 15.372,28 (Inti) Kecamatan Tabang, Kabupaten Kutai Kartanegara, East Kalimantan. 4 PT Sawit Khatulistiwa Plantation (TGR) 9.833,39 (Inti) Kecamatan Tenggarong Sebrang, Sebulu, Muara Kaman, Kabupaten Kutai Kartanegara, East Kalimantan. 5 PT Kota Bangun Plantation 6.756,30 (Inti) Kecamatan Tenggarong, Loa Kulu & Loa Janan, Kabupaten Kutai Kartanegara, East Kalimantan. 6 PT Kutai Inti Utama 7.812,57 (Inti) Kecamatan Loa Janan, Muara Jawa & Semboja, Kabupaten Kutai Kartanegara, East Kalimantan. 7 Plasma (Small-holders’ Cooperatives) 11.000 Kabupaten Kutai Kartanegara, East Kalimantan. T O T A L 66.131,52 Kabupaten Kutai Kartanegara, East Kalimantan.
  • 5. 8/5/2013 PT KALPATARU INVESTAMA PALM OIL PROJECT 5 PT KALPATARU INVESTAMA LAND TITLE & CERTIFICATION No Company Name Ijin Lokasi Ijin Usaha Perkebunan AMDAL 1 PT Malaya Sawit Khatulistiwa 121/DPN.K/IL-121/XI- 2008 503/32/SK-DISBUN KUKAR/VIII/2006 KAKK/16/AMDAL/P KEBUNAN/2007 2 PT Mahakam Sawit Plantation 122/DPN.K/IL-122/XI- 2008 503/33/SK-DISBUN KUKAR/VIII/2006 KAKK/13/AMDAL/P KEBUNAN/2007 3 PT Sawit Khatulistiwa Plantation (TBG) 29/DPN.K/IL-29/V- 2008 503/24/SK-DISBUN KUKAR/IX/2008 KAKK/12/AMDAL/P KEBUNAN/2007 4 PT Sawit Khatulistiwa Plantation (TGR) 119/DPN.K/IL-119/XI- 2008 503/24/SK-DISBUN KUKAR/IX/2008 KAKK/12/AMDAL/P KEBUNAN/2007 5 PT Kota Bangun Plantation 120/DPN.K/IL-120/XI- 2008 503/49/SK-DISBUN KUKAR/VI/2007 6 PT Kutai Inti Utama 46/DPN.K/IL-46/VI- 2008 503/25/SK-DISBUN KUKAR/IX/2008 KAKK/14/AMDAL/P KEBUNAN/2007 Note: * All company’s locations have been endorsed by the Panitia B for HGU certification.
  • 6. 8/5/2013 PT KALPATARU INVESTAMA PALM OIL PROJECT 6 PT KALPATARU INVESTAMA PROJECT LOCATION
  • 7. 8/5/2013 PT KALPATARU INVESTAMA PALM OIL PROJECT 7 PT KALPATARU INVESTAMA LAND SUITABILITY FOR OIL PALM CULTIVATION *) No Company Name Rain Intensity/ Year Soil Type Land Suitability 1 PT Malaya Sawit Khatulistiwa 2,358.2 mm Geisol Hidrik (21.96%) Podsolic Chromic (48.07%) Podsolik Haplik (18.68%) Suitable (75.12%) Not Suitable (24.88%) 2 PT Mahakam Sawit Plantation 2,358.2 mm Geisol Aerik (18.30%) Podsolik Plintik (11.65%) Podsolik Chromic (41.10%) Podsolik Haplik (21.65%) Suitable (93.78%) Not Suitable (6.22%) 3 PT Sawit Khatulistiwa Plantation (TBG) 2,265.1 mm Podsolik Plintik (32.12%) Podsolik Kromik (21.63%) Podsolik Haplik (42.74%) Suitable (83.08%) Not suitable (6.92%) 4 PT Sawit Khatulistiwa Plantation (TGR) 2,358.2 mm Podsolik Plintik (16.66%) Podsolik Chromic (34.59%) Podsolik Haplik (42.61%) Suitable (78.02%) Not Suitable (21.88%) 5 PT Kota Bangun Plantation 2,265.1 mm Geisol Aerik (8.65%) Podsolik Chromic (22.01%) Podsolik Haplik (59.30%) Suitable (72.51%) Not Suitable (27.49%) 6 PT Kutai Inti Utama 2,265.1 mm Podsolik Arenik (26.39%) Podsolik Chromic (34.80%) Suitable (83.32%) Not Suitable (16.68%) Note: *) Data is derived from Block Design Survey performed by PT Permata Agro Sukses (Ocober 2008 – January 2009)
  • 8. 8/5/2013 PT KALPATARU INVESTAMA PALM OIL PROJECT 8 PT KALPATARU INVESTAMA • Head Office Staff: 8 persons • Project Office: 29 persons • Field Staff: 12 persons (not include daily workers) • 4-wheel Vehicles: 7 units • Motor Cycles: 12 units Project Office: Jalan Patin No. 99 K Tenggarong 75511 Kutai Kartanegara. Head Office: Wisma Kosgoro 15th Floor, Jalan M. H. Thamrin Kav. 53, Jakarta 10350 MANPOWER & SUPPORTING FACILITIES Suhardiyoto Haryadi