2013-1-HU1-LEO05-09615
it-shape.hu
NEWSLETTER
3. issue April 2014
Page 1 of 7
This project has been funded with support from the European Commission. This publication reflects the views only of the author,
and the Commission cannot be held responsible for any use which may be made of the information contained therein.
Welcome
Demand for e-skills has been growing steadily
during the last years all over the world. According
to the study published in the frame of European
e-Skills Forum: “e-Skills shortages will result in an
excess demand of 384.000 ICT practitioners in
2015.” (Körte, W. B., Hüsing T.: Evaluation of the
Implementation of the EC's Communication on
"e-Skills for the 21st Century", Empirica, Bonn).
An important conclusion of related studies was,
that European companies "were increasingly
struggling to hire people who were competent in
both information technology and business
management. Companies need so called "T-
Shaped" professionals who enter the workforce
with a strong business understanding, ‘soft’ skills
and knowledge of leading-edge technology.”
(Fonstad, N., Lanivyn, B.: European e-
Competence Curricula development guidelines,
Final Reports, European Commission, European
e-Skills Forum, 2010).
EUCIP Core - at European level recognized IT
qualification - is an answer exactly to this
demand as its competence framework strongly
focuses on the business skills related to the
fundamental e-skills. The certificate was
established by CEPIS (Council of European
Professional Informatics Societies) and has been
used with success already in seven European
countries.
IT-Shape project aims to adapt EUCIP Core
certificate in the Hungarian Vocational Education.
The main impact of the project are the increased
chances of Hungarian (young and adult) people
getting their placement at enterprises, by
offering them internationally recognized, true
pan-European IT qualification.
I-T Shape Consortium
Table of Content
Welcome.............................................................. 1
The Second I-T Shape Meeting............................ 2
Events .................................................................. 6
Project basics....................................................... 7
Partnership .......................................................... 7
Target groups....................................................... 7
Objectives ............................................................ 7
Work-packages .................................................... 7
This issue was published by:
ITCG E. Fermi Pontedera (PI) Italy
Editor: Adriana Fasulo
Copyright © IT-Shape Consortium
2013-1-HU1-LEO05-09615
it-shape.hu
NEWSLETTER
3. issue April 2014
Page 2 of 7
This project has been funded with support from the European Commission. This publication reflects the views only of the author,
and the Commission cannot be held responsible for any use which may be made of the information contained therein.
The Second I‐T Shape Meeting
The second IT-Shape meeting, attended by representatives of the 10 project partners, took place on 1st,
2nd and 3rd April 2014 at ITCG E. Fermi in Pontedera. The Pontedera meeting followed the kick-off meeting
that took place in November in Budapest (Hungary). Between the two meetings, six months of hard work
on the project. The aim of the meeting was to evaluate and discuss the activities carried out so far and to
examine the activities to perform before the next meeting, which will take place in Ireland at the end of
October.
Mária Hartyányi, the project coordinator from iTStudy
Hungary Ltd, presented an activity progress report, where
she highlighted that the project is being developed
according to the initial plan. She also presented a new
version of the web platform to be used to upload and
manage the project contents (it-shape.hu).
Peter Tóth, headmaster from the Oveges Jozsef Vocational
School, shared the results of the survey which has been
carried out in Hungarian vocational educational schools,
involving about 500 students. The aim of the survey was to
get their views for the introduction of a European level IT professional training qualification among IT
students. Most of the students in the panel are open to taking part in an IT training which gives access to a
certificate recognized in Europe. The main issue coming up from the survey is linked to the lack of good
English language skills among Hungarian
students, even if most of the students are
willing to improve their competences, as
they are aware of the importance of
English in order to be more competitive
on the European job market.
In addition to that, the teachers from the
Hungarian partner schools have presented
the experience of the ITAF text exams.
The results were not what they expected.
Some students found it difficult to
understand the questions (there were
translation problems as the questions
were translated into Hungarian) and therefore the teachers have requested the tests in English and a
support from AICA (Associazione italiana per l’Informatica e il Calcolo Automatico – is an Italian Association,
member of Council of European Professional Informatics Societies ).
In the pilot phase of the project 200 Hungarian students have the opportunity to obtain the EUCIP Core IT
certificate. The students can decide to choose Hungarian or English language for their exam, and in case
they pass the three module tests (PLAN, BUILD, OPERATE), AICA will submit the EU-level recognized IT
2013-1-HU1-LEO05-09615
it-shape.hu
NEWSLETTER
3. issue April 2014
Page 3 of 7
This project has been funded with support from the European Commission. This publication reflects the views only of the author,
and the Commission cannot be held responsible for any use which may be made of the information contained therein.
certificate. This would be the first step towards the Hungarian adaptation of EUCIP Core programme.
In the second part of the meeting Fabrizio Agnesi (AICA) presented the modalities and the running
environment for the Eucip Core tests.
Adriana Fasulo from ITCG E.Fermi spoke about the experience of her school following the introduction of
Eucip Core in the educational curricula. The main goal in starting EUCIP Core certification in their school had
been:
• the strong demand to meet the needs of the job market;
• the need to define a professional profile which shouldn’t be linked to a single commercial product
or vendor or specific model, which often become obsolete in a short time;
• to offer an European professional profile for their students.
She listed the contents covered by the modules, the requirements for the exams, the difficulties the
teachers have faced, the critical points to pay attention to. Adriana introduced the three modules (PLAN,
BUILD, OPERATE) of EUCIP Core syllabus:
• PLAN: It concerns the analysis of ICT requirements and the planning of the use of technologies
within organisations (how businesses are organised, returns on investment, process analysis,
financing, risks, planning, etc.)
• BUILD: It concerns all the main aspects related to building and improving information systems, the
process of developing information systems, graphic and multimedia aspects, software planning and
development, database planning and management
• OPERATE: Operating management and supporting the functioning of information systems,
technological aspects, infrastructures, architectures
After a very detailed introduction into the three knowledge areas, Adriana explained the new didactics and
methodologies applied in the course. The strength of these methodologies could be summarized:
• CLIL (Content and Language Integrated Learning) has been introduced and two teachers involved in
the project have spent two weeks in the UK for CLIL training under the LLP scheme.
• Use of interactive lessons based on an online system (IWB), each class has an IWB connected to the
Internet.
• To adapt the school syllabus to the Eucip Core areas, the teachers developed Learning Objects
available by the students on the IWB platform.
She explained that the students learning in the normal school hours in the morning join to extra lessons in
the afternoon on specific topics before the exams. As critical points she mentioned:
• Work plans have to be periodically revisited to be adapted to new ideas and to new suggestions
made by the teachers involved;
• Teachers of different subjects have to collaborate regularly, especially for the plan module;
• The teacher is the motivator! If the teacher does not believe in what s/he is doing, the students
give up after a few months;
• Some modules are carried out in English, and this slows down the pace of the learning path.
She finally showed some test examples in order to make the participants understand the level of
complexity of the questions in the Eucip Core certification exam.
2013-1-HU1-LEO05-09615
it-shape.hu
NEWSLETTER
3. issue April 2014
Page 4 of 7
This project has been funded with support from the European Commission. This publication reflects the views only of the author,
and the Commission cannot be held responsible for any use which may be made of the information contained therein.
The aim of next presentation of the day was to place EUCIP system, EUCIP Core certificate into a wider
context. As Pierfranco Ravotto (AICA) explained EUCIP defined by CEPIS is
• a competence system (frameworks are the syllabuses)
• a certification system (IT Administrator, Core - Plan, Build, Operate- , Professional - 21 profiles)
• a set of services for businesses and individuals (Self-assessment & proximity profile, Assisted
assessment, learning paths)
EUCIP is promoted by CEPIS, the Council of European Professionals Informatics Societies, and is managed
by the ECDL Foundation. Another European system is e-CF, the e-Competences Framework, defined by the
CEN (European committee for Standardization). E-CF is not a certification but only a competence system. It
is not proposed as an alternative to other frameworks, such as EUCIP but wants to be a common language
in IT sector. EUCIP and the e-Competence Framework have common features and interesting potential
synergies. EUCIP is moving to be compliant with the e-CF framework.
Pierfranco provided definitions related to EUCIP Core system as follows:
• Competence: a demonstrated ability to apply knowledge, skills and attitudes to achieving
observable results.
• Knowledge represents the “set of know-what” (e.g. programming languages, design tools, ...) and
can be described by operational descriptions.
• Skill is defined as “ability to carry out managerial or technical tasks”. Managerial and technical skills
are the components of competences and specify some core abilities which form a competence.
• Attitude means in this context the “cognitive and relational capacity” (e.g. analysis capacity,
synthesis capacity, flexibility, pragmatism, ...). If skills and knowledge are the components, attitudes
are the glue, which keeps them together.
The Hungarian partners agreed that these terms are used differently in Hungary, but there is an on-going
process to align the Hungarian education with the European Qualification Framework (EQF), aiming the
adaptation of the European terminology into the Hungarian system.
Pierfranco explained that 150 schools are involved now in the EUCIP Core programme in Italy. Three
schools started with the programme in 2010, but the number of schools involved is increasing continuously.
On the third day the partners, among them the teachers from the Hungarian vocational schools had been
invited for a meeting with the Italian teachers and the students involved into the EUCIP Core Program in
the high-school ITCG E. Fermi in Pontedera.
Some students of IT classes take part to Company Program, a program of Junior Achievement
(international not profit organization). JA inspires students to develop competitive skills and help prepare
young people for the real world by showing them how to create jobs and how to apply entrepreneurial
thinking to the workplace. The primary purpose of the project is the creation of a micro-enterprise that
encourages the entrepreneurial spirit in students, promoting creativity, use of resources, the courage and
the responsibility for the risk, just like the real entrepreneurs know how to do. The students created a
company named 4 assi spa. This company produces Aperipuzzle. It is a tray / cutting board suitable for
2013-1-HU1-LEO05-09615
it-shape.hu
NEWSLETTER
3. issue April 2014
Page 5 of 7
This project has been funded with support from the European Commission. This publication reflects the views only of the author,
and the Commission cannot be held responsible for any use which may be made of the information contained therein.
“apericena”, so it can be sold in bars, pubs, which offer that kind of service, or customers may be families
that use the tray for those moments of conviviality with friends .
In the business management, the micro-company has been supported by some topics learned in Eucip Core
context: project management issues and tools, business application like CRM, e-commerce website, and so
on.
The demonstration gave an example of the new methodology used in the Italian school, namely how the
project-based approach could help to develop business competences of the IT students.
Later, the partners visited the “Creative Room” of the school . It is a math lab where simple but creative
tools could be used for developing logical competences of the students. In the laboratory, through
games and fun activities, the students discover rules and mathematical properties working in a group
and then comparing to get yourself to the solution.
Both visits had been very interesting and useful – as agreed by the guests.
2013-1-HU1-LEO05-09615
it-shape.hu
NEWSLETTER
3. issue April 2014
Page 6 of 7
This project has been funded with support from the European Commission. This publication reflects the views only of the author,
and the Commission cannot be held responsible for any use which may be made of the information contained therein.
Events
On 16th May 2014 (at 6pm) the North-East AICA section is organizing a meeting about
THE VALUE OF IT COMPETENCES AT SCHOOL AND ON THE JOB MARKET
Free admission. Venue: Aula Magna of the “Luigi Pierobon” school in Cittadella (PD)
For further details visit: http://www.aicanet.it/eventicontestuali/2014/subscribableevent.2014-03-
26.1935366749
Didamatica 2014
New processes e paradigms for didactic
28° edition – Naples 7, 8 e 9 May 2014
For further details visit: http://didamatica2014.unina.it
2013-1-HU1-LEO05-09615
it-shape.hu
NEWSLETTER
3. issue April 2014
Page 7 of 7
This project has been funded with support from the European Commission. This publication reflects the views only of the author,
and the Commission cannot be held responsible for any use which may be made of the information contained therein.
Project basics
Acronym: I-T Shape
Title: I-T Shape – Shape European Level Competitive IT Certification for the Hungarian Vocational Education
Duration: 1.October 2013 – 30 September 2015
Action type: Transfer of Innovation
Program: Leonardo da Vinci – LLL Subprogram
Participating countries: Hungary, Italy, Ireland
Website: http://it-shape.hu
Contact: Mária Hartyányi, iTStudy Hungary Educational and Researching Centre, Hungary
E-mail: maria.hartyanyi@itstudy.hu, skype: hmaria718
Partnership
ITSTUDY- iTStudy Hungary Ltd. HU
AICA - Association of Italian Information Technology IT
ITCG – E. Fermi in Pontedera IT
ICS The Irish Computer Society IE
SZÁMALK-Szalézi Vocational Highschool HU
Öveges József Vocational and Grammar School HU
Neumann János Vocational School for Information Technology HU
Makó – Galamb József Agricultural Vocational School HU
University of West Hungary HU
Enterprise Development Foundation of Pest Country HU
Target groups
Primary target group: Hungarian VET students, career changers, non-qualified IT practitioners, job-seekers
looking to break into the industry, secondary target group: VET teachers and trainers, managers and
employees of SMEs
Objectives
Adaptation and localization of EUCIP Core in Hungary included its three Knowledge Areas (Plan, Build and
Operate)
Elaborate the detailed syllabuses and the Hungarian EUCIP Core Program
Validating the results: piloting the first module by involving Hungarian teachers, 50-60 participants from
vocational/university and adult educational institutes
Accrediting EUCIP Core under the Hungarian Program Accreditation System.
Work‐packages
WP1 Project Management
WP2 Analysis and Design
WP3 EUCIP Core Adaptation
WP4 EUCIP Core Localization
WP5 Pilot trainings
WP6 Evaluation
WP7 Valorization
WP8 Dissemination

IT-Shape 3. Newsletter

  • 1.
    2013-1-HU1-LEO05-09615 it-shape.hu NEWSLETTER 3. issue April2014 Page 1 of 7 This project has been funded with support from the European Commission. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein. Welcome Demand for e-skills has been growing steadily during the last years all over the world. According to the study published in the frame of European e-Skills Forum: “e-Skills shortages will result in an excess demand of 384.000 ICT practitioners in 2015.” (Körte, W. B., Hüsing T.: Evaluation of the Implementation of the EC's Communication on "e-Skills for the 21st Century", Empirica, Bonn). An important conclusion of related studies was, that European companies "were increasingly struggling to hire people who were competent in both information technology and business management. Companies need so called "T- Shaped" professionals who enter the workforce with a strong business understanding, ‘soft’ skills and knowledge of leading-edge technology.” (Fonstad, N., Lanivyn, B.: European e- Competence Curricula development guidelines, Final Reports, European Commission, European e-Skills Forum, 2010). EUCIP Core - at European level recognized IT qualification - is an answer exactly to this demand as its competence framework strongly focuses on the business skills related to the fundamental e-skills. The certificate was established by CEPIS (Council of European Professional Informatics Societies) and has been used with success already in seven European countries. IT-Shape project aims to adapt EUCIP Core certificate in the Hungarian Vocational Education. The main impact of the project are the increased chances of Hungarian (young and adult) people getting their placement at enterprises, by offering them internationally recognized, true pan-European IT qualification. I-T Shape Consortium Table of Content Welcome.............................................................. 1 The Second I-T Shape Meeting............................ 2 Events .................................................................. 6 Project basics....................................................... 7 Partnership .......................................................... 7 Target groups....................................................... 7 Objectives ............................................................ 7 Work-packages .................................................... 7 This issue was published by: ITCG E. Fermi Pontedera (PI) Italy Editor: Adriana Fasulo Copyright © IT-Shape Consortium
  • 2.
    2013-1-HU1-LEO05-09615 it-shape.hu NEWSLETTER 3. issue April2014 Page 2 of 7 This project has been funded with support from the European Commission. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein. The Second I‐T Shape Meeting The second IT-Shape meeting, attended by representatives of the 10 project partners, took place on 1st, 2nd and 3rd April 2014 at ITCG E. Fermi in Pontedera. The Pontedera meeting followed the kick-off meeting that took place in November in Budapest (Hungary). Between the two meetings, six months of hard work on the project. The aim of the meeting was to evaluate and discuss the activities carried out so far and to examine the activities to perform before the next meeting, which will take place in Ireland at the end of October. Mária Hartyányi, the project coordinator from iTStudy Hungary Ltd, presented an activity progress report, where she highlighted that the project is being developed according to the initial plan. She also presented a new version of the web platform to be used to upload and manage the project contents (it-shape.hu). Peter Tóth, headmaster from the Oveges Jozsef Vocational School, shared the results of the survey which has been carried out in Hungarian vocational educational schools, involving about 500 students. The aim of the survey was to get their views for the introduction of a European level IT professional training qualification among IT students. Most of the students in the panel are open to taking part in an IT training which gives access to a certificate recognized in Europe. The main issue coming up from the survey is linked to the lack of good English language skills among Hungarian students, even if most of the students are willing to improve their competences, as they are aware of the importance of English in order to be more competitive on the European job market. In addition to that, the teachers from the Hungarian partner schools have presented the experience of the ITAF text exams. The results were not what they expected. Some students found it difficult to understand the questions (there were translation problems as the questions were translated into Hungarian) and therefore the teachers have requested the tests in English and a support from AICA (Associazione italiana per l’Informatica e il Calcolo Automatico – is an Italian Association, member of Council of European Professional Informatics Societies ). In the pilot phase of the project 200 Hungarian students have the opportunity to obtain the EUCIP Core IT certificate. The students can decide to choose Hungarian or English language for their exam, and in case they pass the three module tests (PLAN, BUILD, OPERATE), AICA will submit the EU-level recognized IT
  • 3.
    2013-1-HU1-LEO05-09615 it-shape.hu NEWSLETTER 3. issue April2014 Page 3 of 7 This project has been funded with support from the European Commission. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein. certificate. This would be the first step towards the Hungarian adaptation of EUCIP Core programme. In the second part of the meeting Fabrizio Agnesi (AICA) presented the modalities and the running environment for the Eucip Core tests. Adriana Fasulo from ITCG E.Fermi spoke about the experience of her school following the introduction of Eucip Core in the educational curricula. The main goal in starting EUCIP Core certification in their school had been: • the strong demand to meet the needs of the job market; • the need to define a professional profile which shouldn’t be linked to a single commercial product or vendor or specific model, which often become obsolete in a short time; • to offer an European professional profile for their students. She listed the contents covered by the modules, the requirements for the exams, the difficulties the teachers have faced, the critical points to pay attention to. Adriana introduced the three modules (PLAN, BUILD, OPERATE) of EUCIP Core syllabus: • PLAN: It concerns the analysis of ICT requirements and the planning of the use of technologies within organisations (how businesses are organised, returns on investment, process analysis, financing, risks, planning, etc.) • BUILD: It concerns all the main aspects related to building and improving information systems, the process of developing information systems, graphic and multimedia aspects, software planning and development, database planning and management • OPERATE: Operating management and supporting the functioning of information systems, technological aspects, infrastructures, architectures After a very detailed introduction into the three knowledge areas, Adriana explained the new didactics and methodologies applied in the course. The strength of these methodologies could be summarized: • CLIL (Content and Language Integrated Learning) has been introduced and two teachers involved in the project have spent two weeks in the UK for CLIL training under the LLP scheme. • Use of interactive lessons based on an online system (IWB), each class has an IWB connected to the Internet. • To adapt the school syllabus to the Eucip Core areas, the teachers developed Learning Objects available by the students on the IWB platform. She explained that the students learning in the normal school hours in the morning join to extra lessons in the afternoon on specific topics before the exams. As critical points she mentioned: • Work plans have to be periodically revisited to be adapted to new ideas and to new suggestions made by the teachers involved; • Teachers of different subjects have to collaborate regularly, especially for the plan module; • The teacher is the motivator! If the teacher does not believe in what s/he is doing, the students give up after a few months; • Some modules are carried out in English, and this slows down the pace of the learning path. She finally showed some test examples in order to make the participants understand the level of complexity of the questions in the Eucip Core certification exam.
  • 4.
    2013-1-HU1-LEO05-09615 it-shape.hu NEWSLETTER 3. issue April2014 Page 4 of 7 This project has been funded with support from the European Commission. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein. The aim of next presentation of the day was to place EUCIP system, EUCIP Core certificate into a wider context. As Pierfranco Ravotto (AICA) explained EUCIP defined by CEPIS is • a competence system (frameworks are the syllabuses) • a certification system (IT Administrator, Core - Plan, Build, Operate- , Professional - 21 profiles) • a set of services for businesses and individuals (Self-assessment & proximity profile, Assisted assessment, learning paths) EUCIP is promoted by CEPIS, the Council of European Professionals Informatics Societies, and is managed by the ECDL Foundation. Another European system is e-CF, the e-Competences Framework, defined by the CEN (European committee for Standardization). E-CF is not a certification but only a competence system. It is not proposed as an alternative to other frameworks, such as EUCIP but wants to be a common language in IT sector. EUCIP and the e-Competence Framework have common features and interesting potential synergies. EUCIP is moving to be compliant with the e-CF framework. Pierfranco provided definitions related to EUCIP Core system as follows: • Competence: a demonstrated ability to apply knowledge, skills and attitudes to achieving observable results. • Knowledge represents the “set of know-what” (e.g. programming languages, design tools, ...) and can be described by operational descriptions. • Skill is defined as “ability to carry out managerial or technical tasks”. Managerial and technical skills are the components of competences and specify some core abilities which form a competence. • Attitude means in this context the “cognitive and relational capacity” (e.g. analysis capacity, synthesis capacity, flexibility, pragmatism, ...). If skills and knowledge are the components, attitudes are the glue, which keeps them together. The Hungarian partners agreed that these terms are used differently in Hungary, but there is an on-going process to align the Hungarian education with the European Qualification Framework (EQF), aiming the adaptation of the European terminology into the Hungarian system. Pierfranco explained that 150 schools are involved now in the EUCIP Core programme in Italy. Three schools started with the programme in 2010, but the number of schools involved is increasing continuously. On the third day the partners, among them the teachers from the Hungarian vocational schools had been invited for a meeting with the Italian teachers and the students involved into the EUCIP Core Program in the high-school ITCG E. Fermi in Pontedera. Some students of IT classes take part to Company Program, a program of Junior Achievement (international not profit organization). JA inspires students to develop competitive skills and help prepare young people for the real world by showing them how to create jobs and how to apply entrepreneurial thinking to the workplace. The primary purpose of the project is the creation of a micro-enterprise that encourages the entrepreneurial spirit in students, promoting creativity, use of resources, the courage and the responsibility for the risk, just like the real entrepreneurs know how to do. The students created a company named 4 assi spa. This company produces Aperipuzzle. It is a tray / cutting board suitable for
  • 5.
    2013-1-HU1-LEO05-09615 it-shape.hu NEWSLETTER 3. issue April2014 Page 5 of 7 This project has been funded with support from the European Commission. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein. “apericena”, so it can be sold in bars, pubs, which offer that kind of service, or customers may be families that use the tray for those moments of conviviality with friends . In the business management, the micro-company has been supported by some topics learned in Eucip Core context: project management issues and tools, business application like CRM, e-commerce website, and so on. The demonstration gave an example of the new methodology used in the Italian school, namely how the project-based approach could help to develop business competences of the IT students. Later, the partners visited the “Creative Room” of the school . It is a math lab where simple but creative tools could be used for developing logical competences of the students. In the laboratory, through games and fun activities, the students discover rules and mathematical properties working in a group and then comparing to get yourself to the solution. Both visits had been very interesting and useful – as agreed by the guests.
  • 6.
    2013-1-HU1-LEO05-09615 it-shape.hu NEWSLETTER 3. issue April2014 Page 6 of 7 This project has been funded with support from the European Commission. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein. Events On 16th May 2014 (at 6pm) the North-East AICA section is organizing a meeting about THE VALUE OF IT COMPETENCES AT SCHOOL AND ON THE JOB MARKET Free admission. Venue: Aula Magna of the “Luigi Pierobon” school in Cittadella (PD) For further details visit: http://www.aicanet.it/eventicontestuali/2014/subscribableevent.2014-03- 26.1935366749 Didamatica 2014 New processes e paradigms for didactic 28° edition – Naples 7, 8 e 9 May 2014 For further details visit: http://didamatica2014.unina.it
  • 7.
    2013-1-HU1-LEO05-09615 it-shape.hu NEWSLETTER 3. issue April2014 Page 7 of 7 This project has been funded with support from the European Commission. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein. Project basics Acronym: I-T Shape Title: I-T Shape – Shape European Level Competitive IT Certification for the Hungarian Vocational Education Duration: 1.October 2013 – 30 September 2015 Action type: Transfer of Innovation Program: Leonardo da Vinci – LLL Subprogram Participating countries: Hungary, Italy, Ireland Website: http://it-shape.hu Contact: Mária Hartyányi, iTStudy Hungary Educational and Researching Centre, Hungary E-mail: maria.hartyanyi@itstudy.hu, skype: hmaria718 Partnership ITSTUDY- iTStudy Hungary Ltd. HU AICA - Association of Italian Information Technology IT ITCG – E. Fermi in Pontedera IT ICS The Irish Computer Society IE SZÁMALK-Szalézi Vocational Highschool HU Öveges József Vocational and Grammar School HU Neumann János Vocational School for Information Technology HU Makó – Galamb József Agricultural Vocational School HU University of West Hungary HU Enterprise Development Foundation of Pest Country HU Target groups Primary target group: Hungarian VET students, career changers, non-qualified IT practitioners, job-seekers looking to break into the industry, secondary target group: VET teachers and trainers, managers and employees of SMEs Objectives Adaptation and localization of EUCIP Core in Hungary included its three Knowledge Areas (Plan, Build and Operate) Elaborate the detailed syllabuses and the Hungarian EUCIP Core Program Validating the results: piloting the first module by involving Hungarian teachers, 50-60 participants from vocational/university and adult educational institutes Accrediting EUCIP Core under the Hungarian Program Accreditation System. Work‐packages WP1 Project Management WP2 Analysis and Design WP3 EUCIP Core Adaptation WP4 EUCIP Core Localization WP5 Pilot trainings WP6 Evaluation WP7 Valorization WP8 Dissemination