Managing Diverse Teams โ€“ An Effective
    and Efficient Way




Rajesh Rajagopalan โ€“ Assistant System Consultant,
                         TATA Consultancy Services Limited
Contents
 1. Abstract ......................................................................................................................................... 4
 2. Introduction ................................................................................................................................... 4
 3. Case Study ................................................................................................................................... 4
 4. Key Challenges ............................................................................................................................ 5
  a) Managing Diverse teams: ......................................................................................................... 5
  b) Managing teams in multiple locations: ................................................................................... 6
 5. Methodology/Process Followed ................................................................................................. 7
  a) For managing a diverse team: ................................................................................................. 7
  b) For managing teams in multiple locations: ............................................................................ 9
 6. Critical Success Factor ............................................................................................................. 10
 7. Quantified Benefits To Business ............................................................................................. 11
 8. Lessons Learnt ........................................................................................................................... 12
 9. Conclusion .................................................................................................................................. 13
 10. References ............................................................................................................................... 13
 11. Authorโ€™s Profile: ........................................................................................................................ 14




3 Page
1. Abstract
Every project has its own complexities. Managing a project comprising of members from diverse
cultures and languages, always poses a challenge, more so, if the project team is divided across
multiple locations.

Projects with multi-lingual and multi-located team members pose numerous challenges. Overcoming
these challenges require careful planning and threadbare analysis. Each challenge requires timely
and precise intervention resulting in its permanent resolution.

Primary Challenges revolve around the efficiency of communication โ€“ in terms of proper and timely
communication, project control, resource availability, team bonding, team recognition, providing
opportunity and team building activities.

This paper helps in finding an effective and efficient way to address these challenges.


2. Introduction
Any project or program, having multi-lingual and multi-located teams provides a stiffer test in a
dynamic global IT environment where an organisation has to keep pace with ever evolving customer
expectations while at the same time keeping competitors at bay.

Multi-lingual teams provide a chance for the management team to draw the insights of the teamโ€™s
strengths and weaknesses. Presence of multi-located teams would help the management team to
assess the strength of the project lead. With the help of a case study which points out the challenges
faced in a multi-lingual and multi-located team(s), let us dwelve upon the approach to overcome these
challenges.


3. Case Study
Web Based Reporting System (WBRS), a program, was launched, to view the audience for TV and
Internet Viewership, for the Customer โ€œNESโ€. The program had three projects namely Engine of
Statistics (EoS), Report Formatter (RF), Front-End And View (FEV). The program had offshore and
onsite delivery centres in India and USA. It had several delivery centres in India with Chennai as the
primary delivery centre, followed by Bhubaneswar, Bangalore.

Initially there were not only technical challenges in the program. There were also complex challenges
in managing the team members distributed across various locations and also the fact, the resources
of the project, came from various states of India and thereby imbibing different work culture and
styles. This hampered the smooth functioning of the project/program.




4 Page
4. Key Challenges
There were quite a few challenges in managing diverse teams and managing teams distributed
across various locations.

a) Managing Diverse teams:

Communication:

The team in Chennai had a size of 30 on an average. Bhubaneswar had 3. Bangalore had 2. In
Chennai location, about 60% of resources in the team spoke Tamil. 20% spoke Hindi and the rest
spoke the other south Indian languages. As the program was done using Agile methodology,
communication played a key role in the program. Invariably most of the times, communication within
the project happened, in Tamil. This put the non-tamil speaking team members in a spot of bother as
well the project, at times. Figure 1 shows the communication process that existed in the earlier stages
of the program.




Figure 1: COPIS Diagram of the Original State (AS โ€“ IS Process)

Team Cohesiveness:

Natural Alignment did not happen among team members because of different cultural styles/work
styles and different spoken languages. Also, because of the availability of more than one person
knowing a particular language, group affinity, based on language was formed, and as there was no
need for the team members to speak to the Organisationโ€™s common language (English), the need for
cohesiveness, became irrelevant.




5 Page
Preferred Language:

Since the team members knew that they could affinitize themselves to resources/team members who
speak their languages, they chose their mother-tongue as their preferred language ignoring the
organisationโ€™s preferred language of English.

Regional Bias:

In one of the project in the program, the Project Lead (PL) and one of the team members in the
project, shared the same geographical region. There was an open chance for that project team
members to showcase their mettle on a Business Opportunity. But the PL provided the opportunity to
the particular team member who came from his region.

b) Managing teams in multiple locations:

Control Over the Project:

The FEV Project team had its offshore team members split across Chennai and Bhubaneswar and
Bangalore. Initially the Project Lead did not have control over the project proceedings since there was
lack of effective work coordination and cooperation among the team members either due to work
culture of the place or due to the work style of the individual.

Project Environmental Setup:

The FEV project team members at Bangalore and Bhubaneswar, had to toil hard to setup their project
environments as they had to get the requisite softwares and their corresponding licenses after
obtaining necessary approvals and permissions, by which time, the project work had started .

Communication on Time:

At the start of the program, project communication between team members of FEV project did not
happen smoothly mainly because of the difference in the work culture/timings of the resources.

Availability of Resources on Project Need:

For some time, till the beginning of the development stage, FEV project lead did not have proper
control over the availability of the resources (team members) in Bangalore and Bhubaneswar at any
given point of time. This was because the team was often thinking themselves working in isolation
and not part as of a team.

Difficulty in Setting up Meetings/Trainings:

In the beginning of the FEV project, the project lead had trouble in arranging meetings and trainings.
It is because he could never ascertain that all the resources placed at the various offshore locations,

6 Page
would be available, at any given point of time, even though he had the Resource Calendar of the
team, at his disposal. Arranging a meeting/training often required some follow-ups or concurrent calls.

Recognition of the Remote Teams:

Project leads of the program, looked for the successful outcome without peeping into what will ensure
a successful outcome. In other words, they looked for the end results and not the means, to achieve
them. The efforts of the team members at remote locations were not fully understood and appreciated
by the leads.


5. Methodology/Process Followed
a) For managing a diverse team:

Following methodologies/steps were judiciously used, as the program/projects started to gain
ground, in order to overcome the challenges faced while managing a program with a multi-
culture background

   Communication Standardization
   Team Building Activity and Team Outing
   Transparent way to provide an opportunity

Communication Standardization:

1. Awareness sessions were conducted to the team members, to speak in the Organisationโ€™s official
   language or client-specific language or a common language to all the project members, which
   obviously was โ€œEnglishโ€.
2. Trainings on mail etiquette and basic communication were conducted by experienced
   professionals in the program, to all the members in the team.
3. Activities 1 and 2 were included as part of the Induction Program.

The resultant effect was that the team understood the need of the hour and started to appreciate the
work ambience and embrace the situation. Figure 2 shows the modified communication process
(depicting these activities) that was later followed in the program.




7 Page
Figure 2: COPIS Diagram of the New State (Improved Process)

Team Building Activity and Team Outing:

Team Building: Team building activities evolved as the program started to develop. Following were
the activities used in the program:

a).โ€œFridayโ€ Fun Time: This helped in team members having a camaraderie among the team
members. Team Building games were organised .Some of the games were โ€œConstruction of Bridge
(using Straws)โ€œ, โ€œGroup games like Anthakshris, Quizzing on Movies/Technicalโ€ etc.,.

b).โ€œBirthday Bashโ€: Birthdays were celebrated at the end of every month, with a gift, given to the
birthday boy/girl.

Team Outing: Team Outing activities started to flourish as an extension of team building activities.
This became useful when and there were stressful times and also when there was a project/program
success.

These activities effectively had a terrific positive impact on the team and the team members started to
know each other better and there was better rapport among themselves which in turn started to
improve the productivity and quality of the project.

Transparent way to provide an opportunity:

Any initiative or business opportunity that came to the program, were intimated in detail, to the team
members immediately. This made the team members think that the project management think tank
team was open and transparent to them and that the project management team was transparent to
their aspirations. This motivated the team members to excel in their respective projects.

8 Page
b) For managing teams in multiple locations:

Following were the methodologies /approaches used to overcome the challenges faced in managing
the project teams (members) distributed at Chennai, Bangalore and Bhubaneswar.

   Availability of a strong lead with a good process background.
   Set up proper communication mechanism.
   Creation of flexible and contingency plans.
   Proper Planning prevented delays in meetings/trainings.
   Routine Feedback, timely appreciations and providing opportunities.

Availability of a strong lead with a good process background:

A resource with leadership traits and with a good process background was identified for FEV project.
This helped in resolving the logistical and project communicational issues and enabled the smooth
functioning of the project and hence the program.

Set up proper communication mechanism:

A proper communication mechanism was setup through proper planning. Apart from the normal back-
up plans , judicious usage of open source status reporting tools such as Bugzilla and internal
repositories of the organisation, helped in tracking of the project work statuses of the team members,
which ensured project communication gap was reduced to a great extent.

Creation of flexible and contingency plans:

At times, the resource calendar, which had the details of resource availability for a given year, would
go in disarray as there were unavoidable leaves taken by or absence of the team members. In the
case of such scenarios, as a contingency, the back-up persons were called for, into actions.

Every project lead had discussions with her/his team members on what each one of the team
members are doing. Apart from that the entire project team had almost regular status call with the
clients on what was achieved on a single day. This gave each one, an insight of what the other team
member is doing with his/her deliverable. This helped the project lead to find the right back up person
easily.

As the projects had onsite location (USA) as well, project communication had to happen between
onsite and offshore locations. This was a problem for onsite team members, who were less in size
when compared with offshore. They were given the โ€œwork from homeโ€ option and they worked in a
secured network.

The FEV project which had the biggest team in the program got affected, often, with these resource
issues and were bailed out with the contingency and flexible plans.



9 Page
Proper planning prevented delays in Meetings/Trainings:

Diligent Planning by the project lead of the FEV project, in the development stage of the project
helped him to conduct timely meetings and trainings. Key Meetings and Trainings were scheduled
after getting consensus from the team members and were planned in advance. Meeting Minutes were
taken as well to ensure that the gist of the meetings/trainings were shared to the absentees, due to
unavoidable circumstances and also to emphasise the importance of the meetings.

Planning steps Involved:

1. Advance mail communication to all the Stakeholders
2. Reminder mail : Automatic Alarm sent to all stakeholders excluding the client
3. Tasks were setup on the Internal Project Management System of the Organisation and also task
   activities were created on Bugzilla tool.

Routine Feedback, Timely Appreciations and providing Opportunities:

As the program started rolling, the Project leads started to understand the importance of timely
feedback of their wardsโ€™ work and started to provide them, routine feedback and timely appreciations
from the project lead and the client. Rewards were given in recognition of the performance of the
team members.

Certification and Rewards were given for Best Performer of the project/program, both at project level
and at the Customer relationship level. Team members who were aspiring to go in a particular
area/domain were identified and were given opportunities to enhance their skills in their area of liking
whenever there was an opportunity.


6. Critical Success Factor
Three critical factors occured as a result of overcoming these challenges

   Encouraging Work Environment
   Employee Satisfaction
   Satisfied Clients

Encouraging Work Environment:

The work ambience in the program helped the team members to motivate themselves to work hard
when needed. Also there was good gelling within the team members, through which they helped one
another.




10 Page
Employee Satisfaction:

Because the project management team took care of the teamโ€™s needs and aspirations, there was a
high level of satisfaction among the team members

Satisfied Clients:

A highly satisfied team produced a high performance from the team which resulted in a high quality
and on-time delivery of the project. This obviously provided a delight to the clients, who gave a very
good Customer Satisfaction Rating.


7. Quantified Benefits To Business
Table 1 and 2 illustrate the benefits of the project that was, before resolving the challenges (issues),


  Statistic                         Before Resolving the             After Resolving the Challenges
                                    Challenges

  Communication Hassle,             Less Productivity                Improved Productivity
  Team Cohesiveness

  Communication Hassle,             No appreciable change in the     High Quality Product
  Team Cohesiveness,                quality
  Planning

  Communication Hassle,             No new Business                  More Business Opportunity, as
  Team Cohesiveness                 Opportunity. It remained as      clients were satisfied
                                    such.

the program faced, and after resolving the challenges

Table1: Quantification of Benefits: Qualitative Analysis


  Statistic                        Before Resolving the                After Resolving the
                                   Challenges                          Challenges

  Communication Hassle,            Not Applicable                      Saved 5 Working Days = $ 1000
  Team Cohesiveness

  Communication Hassle,            Not Applicable                      Saved 2 Days in rework effort =$
  Team Cohesiveness,                                                   384
  Planning

Table2: Quantification of Benefits: Quantitative Analysis



11 Page
Team Cohesiveness involves the Motivational activities such as Team Building and Team Outing
activities which rekindled the spirit of the team members and made them refreshing while doing their
project work. This was useful especially in hectic work periods. This improved the productivity of the
team and the clients were happy to see such wonderfully well-knit dedicated team.


8. Lessons Learnt
The team did not understand the project needs initially. This created a lot of challenges. The project
management team also slowly started to understand the needs of the team, better, as the program
started to progress. The expectations of both the parties were set and the expectations (needs) being
depicted with the help of a Kano Model. Figure 3 depicts the prioritization of Project needs i.e, it set
the expectations on the team members and Figure 4 depicts the prioritization of team (members)
needs (expectation set on the project / project management team).




Figure 3: Prioritization of Project Needs




12 Page
Figure 4: Prioritization of Team (Members) Needs

The Basic needs in the Kano model indicates that those needs (expectations) ultimately became
must. The โ€œExciting Needsโ€ were delighters which ultimately became a โ€œmustโ€ over a period.


9. Conclusion
Successfully managing a project team, that has a diverse culture and which is distributed across
multiple locations/delivery centres relies upon several factors:

   Project expectations clearly needs to be known, to the team members.
   Creating a vibrant and conducive work atmosphere has to be a prerequisite.
   Timely communication to all stakeholders is of paramount importance.
   Routine team outing and team building activities is a must in the longer run for the welfare of the
   project.
   Timely Recognition of work performance of the project members
   Project should have strong project leads with good process background.
   Having an effective contingency plan (backup plan/options) / with some flexible plans will give the
project much needed stability even in emergency situations.


10. References
None.


13 Page
11. Authorโ€™s Profile:
               Rajesh Rajagopalan is a Delivery Manager, who has 13+ years of IT
               experience, with 8 years in Tata Consultancy Services and is a Six
               Sigma Green Belt certified professional. Has been a Program
               Manager/Project Manager for the past 5 years and has been in
               Retail domain for the past 6 years.

               Mail Id: rajesh.rajagopalan@tcs.com




14 Page

More Related Content

What's hot

ISO_1
ISO_1ISO_1
ISO_1PMI2011
ย 
Info461ProjectCharterEskridgeAs08
Info461ProjectCharterEskridgeAs08Info461ProjectCharterEskridgeAs08
Info461ProjectCharterEskridgeAs08Greg Eskridge
ย 
Report iatc-final
Report iatc-finalReport iatc-final
Report iatc-finalagjinopulli
ย 
CERTIFIED ORGANIZATION DEVELOPMENT ANALYST
CERTIFIED ORGANIZATION DEVELOPMENT ANALYSTCERTIFIED ORGANIZATION DEVELOPMENT ANALYST
CERTIFIED ORGANIZATION DEVELOPMENT ANALYST
ponz123
ย 
Soma roy sarkar
Soma roy sarkarSoma roy sarkar
Soma roy sarkarPMI2011
ย 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment help
Online Assignment Help
ย 
Delivering global e-learning programmes
Delivering global e-learning programmesDelivering global e-learning programmes
Delivering global e-learning programmes
Saffron Interactive
ย 
Ppt 4 managing new product development teams
Ppt 4 managing new product development teamsPpt 4 managing new product development teams
Ppt 4 managing new product development teams
irwanHabibie
ย 
Advanced concept of project risk management project report
Advanced concept of project risk management project reportAdvanced concept of project risk management project report
Advanced concept of project risk management project report
ramesh roy
ย 
P761 Public Web
P761 Public WebP761 Public Web
P761 Public Webperformanceweb
ย 
T353 Web Asmi
T353 Web AsmiT353 Web Asmi
T353 Web Asmiperformanceweb
ย 
managing new product development teams
managing new product development teamsmanaging new product development teams
managing new product development teams
Razwand
ย 
Implementing Change in the Capacity Planning Group
Implementing Change in the Capacity Planning GroupImplementing Change in the Capacity Planning Group
Implementing Change in the Capacity Planning GroupFrank Isham
ย 
Project management in_practice_a_guideline_and_toolbox_for_successful_projects
Project management in_practice_a_guideline_and_toolbox_for_successful_projectsProject management in_practice_a_guideline_and_toolbox_for_successful_projects
Project management in_practice_a_guideline_and_toolbox_for_successful_projects
PamelaRosaleschicago
ย 
Presentation by pranal dongare
Presentation by pranal dongarePresentation by pranal dongare
Presentation by pranal dongarePMI_IREP_TP
ย 

What's hot (20)

T375
T375T375
T375
ย 
ISO_1
ISO_1ISO_1
ISO_1
ย 
Info461ProjectCharterEskridgeAs08
Info461ProjectCharterEskridgeAs08Info461ProjectCharterEskridgeAs08
Info461ProjectCharterEskridgeAs08
ย 
Report iatc-final
Report iatc-finalReport iatc-final
Report iatc-final
ย 
CERTIFIED ORGANIZATION DEVELOPMENT ANALYST
CERTIFIED ORGANIZATION DEVELOPMENT ANALYSTCERTIFIED ORGANIZATION DEVELOPMENT ANALYST
CERTIFIED ORGANIZATION DEVELOPMENT ANALYST
ย 
Soma roy sarkar
Soma roy sarkarSoma roy sarkar
Soma roy sarkar
ย 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment help
ย 
Delivering global e-learning programmes
Delivering global e-learning programmesDelivering global e-learning programmes
Delivering global e-learning programmes
ย 
Ppt 4 managing new product development teams
Ppt 4 managing new product development teamsPpt 4 managing new product development teams
Ppt 4 managing new product development teams
ย 
T359
T359T359
T359
ย 
Advanced concept of project risk management project report
Advanced concept of project risk management project reportAdvanced concept of project risk management project report
Advanced concept of project risk management project report
ย 
P761 Public Web
P761 Public WebP761 Public Web
P761 Public Web
ย 
T353 Web Asmi
T353 Web AsmiT353 Web Asmi
T353 Web Asmi
ย 
managing new product development teams
managing new product development teamsmanaging new product development teams
managing new product development teams
ย 
Implementing Change in the Capacity Planning Group
Implementing Change in the Capacity Planning GroupImplementing Change in the Capacity Planning Group
Implementing Change in the Capacity Planning Group
ย 
Project management in_practice_a_guideline_and_toolbox_for_successful_projects
Project management in_practice_a_guideline_and_toolbox_for_successful_projectsProject management in_practice_a_guideline_and_toolbox_for_successful_projects
Project management in_practice_a_guideline_and_toolbox_for_successful_projects
ย 
Presentation by pranal dongare
Presentation by pranal dongarePresentation by pranal dongare
Presentation by pranal dongare
ย 
B331
B331B331
B331
ย 
B317
B317B317
B317
ย 
P765
P765P765
P765
ย 

Similar to EMDT_5

RFQ FY23 145 Girl-Centered Design Approach for Plan - Final.pdf
RFQ FY23 145 Girl-Centered Design Approach for Plan - Final.pdfRFQ FY23 145 Girl-Centered Design Approach for Plan - Final.pdf
RFQ FY23 145 Girl-Centered Design Approach for Plan - Final.pdf
Julia885437
ย 
PMC8
PMC8PMC8
PMC8PMI2011
ย 
Mastering Project Management
Mastering Project ManagementMastering Project Management
Mastering Project Management
ddonahoo
ย 
Adventures in Animal Health
Adventures in Animal HealthAdventures in Animal Health
Adventures in Animal HealthJennifer Jackson
ย 
Contextualized Instruction Impacts the Workplace
Contextualized Instruction Impacts the WorkplaceContextualized Instruction Impacts the Workplace
Contextualized Instruction Impacts the WorkplaceVera Grishkina
ย 
Training material development guide
Training material development guideTraining material development guide
Training material development guide
Eric Bruggeman ET
ย 
Project Management Report
Project Management ReportProject Management Report
Project Management ReportSyed Hassan Ahmed
ย 
Projectmanagement Refresher for Trainees
Projectmanagement Refresher for TraineesProjectmanagement Refresher for Trainees
Projectmanagement Refresher for Trainees
Siep Littooij
ย 
Hilary's Capstone
Hilary's CapstoneHilary's Capstone
Hilary's CapstoneHilary Stowell
ย 
A LEADER IN ME Webinar A Project Management Final Output
A LEADER IN ME Webinar   A Project Management Final OutputA LEADER IN ME Webinar   A Project Management Final Output
A LEADER IN ME Webinar A Project Management Final Output
Justin Knight
ย 
Software Project Management: Project Initiation
Software Project Management: Project InitiationSoftware Project Management: Project Initiation
Software Project Management: Project Initiation
Minhas Kamal
ย 
10 Powerful Strategies for Leading Remote and Distributed Teams | The Entrepr...
10 Powerful Strategies for Leading Remote and Distributed Teams | The Entrepr...10 Powerful Strategies for Leading Remote and Distributed Teams | The Entrepr...
10 Powerful Strategies for Leading Remote and Distributed Teams | The Entrepr...
TheEntrepreneurRevie
ย 
Project method
Project methodProject method
Project method
eTwinning Latvia
ย 
POM 3 JUNE 2022 PROJECT MANAGEMENT QUESTION.pdf
POM 3 JUNE 2022 PROJECT MANAGEMENT QUESTION.pdfPOM 3 JUNE 2022 PROJECT MANAGEMENT QUESTION.pdf
POM 3 JUNE 2022 PROJECT MANAGEMENT QUESTION.pdf
Alison Tutors
ย 
Project Management Application Form (Fully Customizable Template)
Project Management Application Form (Fully Customizable Template)Project Management Application Form (Fully Customizable Template)
Project Management Application Form (Fully Customizable Template)
MarjoToska
ย 
Senior Leadership Development Case Study
Senior Leadership Development Case Study Senior Leadership Development Case Study
Senior Leadership Development Case Study
Abhinandan Chatterjee
ย 
Project Management Sample
Project Management SampleProject Management Sample
Project Management Sample
Lori Krein Studios
ย 
Team building-module-facilitators-guide
Team building-module-facilitators-guideTeam building-module-facilitators-guide
Team building-module-facilitators-guide
Ana Palma
ย 
Project Management 2011
Project Management 2011Project Management 2011
Project Management 2011College Pro
ย 

Similar to EMDT_5 (20)

RFQ FY23 145 Girl-Centered Design Approach for Plan - Final.pdf
RFQ FY23 145 Girl-Centered Design Approach for Plan - Final.pdfRFQ FY23 145 Girl-Centered Design Approach for Plan - Final.pdf
RFQ FY23 145 Girl-Centered Design Approach for Plan - Final.pdf
ย 
PMC8
PMC8PMC8
PMC8
ย 
Mastering Project Management
Mastering Project ManagementMastering Project Management
Mastering Project Management
ย 
Adventures in Animal Health
Adventures in Animal HealthAdventures in Animal Health
Adventures in Animal Health
ย 
Contextualized Instruction Impacts the Workplace
Contextualized Instruction Impacts the WorkplaceContextualized Instruction Impacts the Workplace
Contextualized Instruction Impacts the Workplace
ย 
Training material development guide
Training material development guideTraining material development guide
Training material development guide
ย 
Project Management Report
Project Management ReportProject Management Report
Project Management Report
ย 
MENTORING PROGRAM
MENTORING PROGRAMMENTORING PROGRAM
MENTORING PROGRAM
ย 
Projectmanagement Refresher for Trainees
Projectmanagement Refresher for TraineesProjectmanagement Refresher for Trainees
Projectmanagement Refresher for Trainees
ย 
Hilary's Capstone
Hilary's CapstoneHilary's Capstone
Hilary's Capstone
ย 
A LEADER IN ME Webinar A Project Management Final Output
A LEADER IN ME Webinar   A Project Management Final OutputA LEADER IN ME Webinar   A Project Management Final Output
A LEADER IN ME Webinar A Project Management Final Output
ย 
Software Project Management: Project Initiation
Software Project Management: Project InitiationSoftware Project Management: Project Initiation
Software Project Management: Project Initiation
ย 
10 Powerful Strategies for Leading Remote and Distributed Teams | The Entrepr...
10 Powerful Strategies for Leading Remote and Distributed Teams | The Entrepr...10 Powerful Strategies for Leading Remote and Distributed Teams | The Entrepr...
10 Powerful Strategies for Leading Remote and Distributed Teams | The Entrepr...
ย 
Project method
Project methodProject method
Project method
ย 
POM 3 JUNE 2022 PROJECT MANAGEMENT QUESTION.pdf
POM 3 JUNE 2022 PROJECT MANAGEMENT QUESTION.pdfPOM 3 JUNE 2022 PROJECT MANAGEMENT QUESTION.pdf
POM 3 JUNE 2022 PROJECT MANAGEMENT QUESTION.pdf
ย 
Project Management Application Form (Fully Customizable Template)
Project Management Application Form (Fully Customizable Template)Project Management Application Form (Fully Customizable Template)
Project Management Application Form (Fully Customizable Template)
ย 
Senior Leadership Development Case Study
Senior Leadership Development Case Study Senior Leadership Development Case Study
Senior Leadership Development Case Study
ย 
Project Management Sample
Project Management SampleProject Management Sample
Project Management Sample
ย 
Team building-module-facilitators-guide
Team building-module-facilitators-guideTeam building-module-facilitators-guide
Team building-module-facilitators-guide
ย 
Project Management 2011
Project Management 2011Project Management 2011
Project Management 2011
ย 

More from PMI2011

Bhavesh pmi final
Bhavesh  pmi finalBhavesh  pmi final
Bhavesh pmi finalPMI2011
ย 
Day 1 1410 - 1455 - pearl 2 - vijay sane
Day 1   1410 - 1455 - pearl 2 - vijay saneDay 1   1410 - 1455 - pearl 2 - vijay sane
Day 1 1410 - 1455 - pearl 2 - vijay sanePMI2011
ย 
Day 1 1620 - 1705 - maple - pranabendu bhattacharyya
Day 1   1620 - 1705 - maple - pranabendu bhattacharyyaDay 1   1620 - 1705 - maple - pranabendu bhattacharyya
Day 1 1620 - 1705 - maple - pranabendu bhattacharyyaPMI2011
ย 
Final chakradhar purohith proposal milieu analysis (without account data un...
Final chakradhar purohith proposal milieu analysis (without account data   un...Final chakradhar purohith proposal milieu analysis (without account data   un...
Final chakradhar purohith proposal milieu analysis (without account data un...PMI2011
ย 
Wilso anandaraj balasubramaniankrishnamurthy
Wilso anandaraj balasubramaniankrishnamurthyWilso anandaraj balasubramaniankrishnamurthy
Wilso anandaraj balasubramaniankrishnamurthyPMI2011
ย 
Vs velan dchakravarty_ppchakraborti
Vs velan dchakravarty_ppchakrabortiVs velan dchakravarty_ppchakraborti
Vs velan dchakravarty_ppchakrabortiPMI2011
ย 
Vineet jain
Vineet jainVineet jain
Vineet jainPMI2011
ย 
Yamuna padmanaban
Yamuna padmanabanYamuna padmanaban
Yamuna padmanabanPMI2011
ย 
Vimal kumarkhanna
Vimal kumarkhannaVimal kumarkhanna
Vimal kumarkhannaPMI2011
ย 
Venkatraman l
Venkatraman lVenkatraman l
Venkatraman lPMI2011
ย 
Vardarajan sethuraman
Vardarajan sethuramanVardarajan sethuraman
Vardarajan sethuramanPMI2011
ย 
Soumen de
Soumen deSoumen de
Soumen dePMI2011
ย 
Sujit sopan barhate
Sujit sopan barhateSujit sopan barhate
Sujit sopan barhatePMI2011
ย 
Srinivasa desikanraghavan
Srinivasa desikanraghavanSrinivasa desikanraghavan
Srinivasa desikanraghavanPMI2011
ย 
Sharad pandey abhisek goswami
Sharad pandey abhisek goswamiSharad pandey abhisek goswami
Sharad pandey abhisek goswamiPMI2011
ย 
Shallu soni mymoonshabana_lavanya raghuraman
Shallu soni mymoonshabana_lavanya raghuramanShallu soni mymoonshabana_lavanya raghuraman
Shallu soni mymoonshabana_lavanya raghuramanPMI2011
ย 
Regeena pererira sujithn_rai_suchitrajoyceb
Regeena pererira sujithn_rai_suchitrajoycebRegeena pererira sujithn_rai_suchitrajoyceb
Regeena pererira sujithn_rai_suchitrajoycebPMI2011
ย 
Ramesh ganiga
Ramesh ganigaRamesh ganiga
Ramesh ganigaPMI2011
ย 
Pranabendu
PranabenduPranabendu
PranabenduPMI2011
ย 
Rt sundari ashutosh_pandey
Rt sundari ashutosh_pandeyRt sundari ashutosh_pandey
Rt sundari ashutosh_pandeyPMI2011
ย 

More from PMI2011 (20)

Bhavesh pmi final
Bhavesh  pmi finalBhavesh  pmi final
Bhavesh pmi final
ย 
Day 1 1410 - 1455 - pearl 2 - vijay sane
Day 1   1410 - 1455 - pearl 2 - vijay saneDay 1   1410 - 1455 - pearl 2 - vijay sane
Day 1 1410 - 1455 - pearl 2 - vijay sane
ย 
Day 1 1620 - 1705 - maple - pranabendu bhattacharyya
Day 1   1620 - 1705 - maple - pranabendu bhattacharyyaDay 1   1620 - 1705 - maple - pranabendu bhattacharyya
Day 1 1620 - 1705 - maple - pranabendu bhattacharyya
ย 
Final chakradhar purohith proposal milieu analysis (without account data un...
Final chakradhar purohith proposal milieu analysis (without account data   un...Final chakradhar purohith proposal milieu analysis (without account data   un...
Final chakradhar purohith proposal milieu analysis (without account data un...
ย 
Wilso anandaraj balasubramaniankrishnamurthy
Wilso anandaraj balasubramaniankrishnamurthyWilso anandaraj balasubramaniankrishnamurthy
Wilso anandaraj balasubramaniankrishnamurthy
ย 
Vs velan dchakravarty_ppchakraborti
Vs velan dchakravarty_ppchakrabortiVs velan dchakravarty_ppchakraborti
Vs velan dchakravarty_ppchakraborti
ย 
Vineet jain
Vineet jainVineet jain
Vineet jain
ย 
Yamuna padmanaban
Yamuna padmanabanYamuna padmanaban
Yamuna padmanaban
ย 
Vimal kumarkhanna
Vimal kumarkhannaVimal kumarkhanna
Vimal kumarkhanna
ย 
Venkatraman l
Venkatraman lVenkatraman l
Venkatraman l
ย 
Vardarajan sethuraman
Vardarajan sethuramanVardarajan sethuraman
Vardarajan sethuraman
ย 
Soumen de
Soumen deSoumen de
Soumen de
ย 
Sujit sopan barhate
Sujit sopan barhateSujit sopan barhate
Sujit sopan barhate
ย 
Srinivasa desikanraghavan
Srinivasa desikanraghavanSrinivasa desikanraghavan
Srinivasa desikanraghavan
ย 
Sharad pandey abhisek goswami
Sharad pandey abhisek goswamiSharad pandey abhisek goswami
Sharad pandey abhisek goswami
ย 
Shallu soni mymoonshabana_lavanya raghuraman
Shallu soni mymoonshabana_lavanya raghuramanShallu soni mymoonshabana_lavanya raghuraman
Shallu soni mymoonshabana_lavanya raghuraman
ย 
Regeena pererira sujithn_rai_suchitrajoyceb
Regeena pererira sujithn_rai_suchitrajoycebRegeena pererira sujithn_rai_suchitrajoyceb
Regeena pererira sujithn_rai_suchitrajoyceb
ย 
Ramesh ganiga
Ramesh ganigaRamesh ganiga
Ramesh ganiga
ย 
Pranabendu
PranabenduPranabendu
Pranabendu
ย 
Rt sundari ashutosh_pandey
Rt sundari ashutosh_pandeyRt sundari ashutosh_pandey
Rt sundari ashutosh_pandey
ย 

Recently uploaded

Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
ย 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
ย 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
ย 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
ย 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
ย 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
ย 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
ย 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
ย 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
ย 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
ย 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
ย 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
ย 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
ย 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
ย 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
ย 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
ย 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
ย 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
ย 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
ย 

Recently uploaded (20)

Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
ย 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
ย 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
ย 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
ย 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
ย 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
ย 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ย 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ย 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
ย 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
ย 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
ย 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
ย 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
ย 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
ย 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
ย 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
ย 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
ย 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ย 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
ย 

EMDT_5

  • 2. Managing Diverse Teams โ€“ An Effective and Efficient Way Rajesh Rajagopalan โ€“ Assistant System Consultant, TATA Consultancy Services Limited
  • 3. Contents 1. Abstract ......................................................................................................................................... 4 2. Introduction ................................................................................................................................... 4 3. Case Study ................................................................................................................................... 4 4. Key Challenges ............................................................................................................................ 5 a) Managing Diverse teams: ......................................................................................................... 5 b) Managing teams in multiple locations: ................................................................................... 6 5. Methodology/Process Followed ................................................................................................. 7 a) For managing a diverse team: ................................................................................................. 7 b) For managing teams in multiple locations: ............................................................................ 9 6. Critical Success Factor ............................................................................................................. 10 7. Quantified Benefits To Business ............................................................................................. 11 8. Lessons Learnt ........................................................................................................................... 12 9. Conclusion .................................................................................................................................. 13 10. References ............................................................................................................................... 13 11. Authorโ€™s Profile: ........................................................................................................................ 14 3 Page
  • 4. 1. Abstract Every project has its own complexities. Managing a project comprising of members from diverse cultures and languages, always poses a challenge, more so, if the project team is divided across multiple locations. Projects with multi-lingual and multi-located team members pose numerous challenges. Overcoming these challenges require careful planning and threadbare analysis. Each challenge requires timely and precise intervention resulting in its permanent resolution. Primary Challenges revolve around the efficiency of communication โ€“ in terms of proper and timely communication, project control, resource availability, team bonding, team recognition, providing opportunity and team building activities. This paper helps in finding an effective and efficient way to address these challenges. 2. Introduction Any project or program, having multi-lingual and multi-located teams provides a stiffer test in a dynamic global IT environment where an organisation has to keep pace with ever evolving customer expectations while at the same time keeping competitors at bay. Multi-lingual teams provide a chance for the management team to draw the insights of the teamโ€™s strengths and weaknesses. Presence of multi-located teams would help the management team to assess the strength of the project lead. With the help of a case study which points out the challenges faced in a multi-lingual and multi-located team(s), let us dwelve upon the approach to overcome these challenges. 3. Case Study Web Based Reporting System (WBRS), a program, was launched, to view the audience for TV and Internet Viewership, for the Customer โ€œNESโ€. The program had three projects namely Engine of Statistics (EoS), Report Formatter (RF), Front-End And View (FEV). The program had offshore and onsite delivery centres in India and USA. It had several delivery centres in India with Chennai as the primary delivery centre, followed by Bhubaneswar, Bangalore. Initially there were not only technical challenges in the program. There were also complex challenges in managing the team members distributed across various locations and also the fact, the resources of the project, came from various states of India and thereby imbibing different work culture and styles. This hampered the smooth functioning of the project/program. 4 Page
  • 5. 4. Key Challenges There were quite a few challenges in managing diverse teams and managing teams distributed across various locations. a) Managing Diverse teams: Communication: The team in Chennai had a size of 30 on an average. Bhubaneswar had 3. Bangalore had 2. In Chennai location, about 60% of resources in the team spoke Tamil. 20% spoke Hindi and the rest spoke the other south Indian languages. As the program was done using Agile methodology, communication played a key role in the program. Invariably most of the times, communication within the project happened, in Tamil. This put the non-tamil speaking team members in a spot of bother as well the project, at times. Figure 1 shows the communication process that existed in the earlier stages of the program. Figure 1: COPIS Diagram of the Original State (AS โ€“ IS Process) Team Cohesiveness: Natural Alignment did not happen among team members because of different cultural styles/work styles and different spoken languages. Also, because of the availability of more than one person knowing a particular language, group affinity, based on language was formed, and as there was no need for the team members to speak to the Organisationโ€™s common language (English), the need for cohesiveness, became irrelevant. 5 Page
  • 6. Preferred Language: Since the team members knew that they could affinitize themselves to resources/team members who speak their languages, they chose their mother-tongue as their preferred language ignoring the organisationโ€™s preferred language of English. Regional Bias: In one of the project in the program, the Project Lead (PL) and one of the team members in the project, shared the same geographical region. There was an open chance for that project team members to showcase their mettle on a Business Opportunity. But the PL provided the opportunity to the particular team member who came from his region. b) Managing teams in multiple locations: Control Over the Project: The FEV Project team had its offshore team members split across Chennai and Bhubaneswar and Bangalore. Initially the Project Lead did not have control over the project proceedings since there was lack of effective work coordination and cooperation among the team members either due to work culture of the place or due to the work style of the individual. Project Environmental Setup: The FEV project team members at Bangalore and Bhubaneswar, had to toil hard to setup their project environments as they had to get the requisite softwares and their corresponding licenses after obtaining necessary approvals and permissions, by which time, the project work had started . Communication on Time: At the start of the program, project communication between team members of FEV project did not happen smoothly mainly because of the difference in the work culture/timings of the resources. Availability of Resources on Project Need: For some time, till the beginning of the development stage, FEV project lead did not have proper control over the availability of the resources (team members) in Bangalore and Bhubaneswar at any given point of time. This was because the team was often thinking themselves working in isolation and not part as of a team. Difficulty in Setting up Meetings/Trainings: In the beginning of the FEV project, the project lead had trouble in arranging meetings and trainings. It is because he could never ascertain that all the resources placed at the various offshore locations, 6 Page
  • 7. would be available, at any given point of time, even though he had the Resource Calendar of the team, at his disposal. Arranging a meeting/training often required some follow-ups or concurrent calls. Recognition of the Remote Teams: Project leads of the program, looked for the successful outcome without peeping into what will ensure a successful outcome. In other words, they looked for the end results and not the means, to achieve them. The efforts of the team members at remote locations were not fully understood and appreciated by the leads. 5. Methodology/Process Followed a) For managing a diverse team: Following methodologies/steps were judiciously used, as the program/projects started to gain ground, in order to overcome the challenges faced while managing a program with a multi- culture background Communication Standardization Team Building Activity and Team Outing Transparent way to provide an opportunity Communication Standardization: 1. Awareness sessions were conducted to the team members, to speak in the Organisationโ€™s official language or client-specific language or a common language to all the project members, which obviously was โ€œEnglishโ€. 2. Trainings on mail etiquette and basic communication were conducted by experienced professionals in the program, to all the members in the team. 3. Activities 1 and 2 were included as part of the Induction Program. The resultant effect was that the team understood the need of the hour and started to appreciate the work ambience and embrace the situation. Figure 2 shows the modified communication process (depicting these activities) that was later followed in the program. 7 Page
  • 8. Figure 2: COPIS Diagram of the New State (Improved Process) Team Building Activity and Team Outing: Team Building: Team building activities evolved as the program started to develop. Following were the activities used in the program: a).โ€œFridayโ€ Fun Time: This helped in team members having a camaraderie among the team members. Team Building games were organised .Some of the games were โ€œConstruction of Bridge (using Straws)โ€œ, โ€œGroup games like Anthakshris, Quizzing on Movies/Technicalโ€ etc.,. b).โ€œBirthday Bashโ€: Birthdays were celebrated at the end of every month, with a gift, given to the birthday boy/girl. Team Outing: Team Outing activities started to flourish as an extension of team building activities. This became useful when and there were stressful times and also when there was a project/program success. These activities effectively had a terrific positive impact on the team and the team members started to know each other better and there was better rapport among themselves which in turn started to improve the productivity and quality of the project. Transparent way to provide an opportunity: Any initiative or business opportunity that came to the program, were intimated in detail, to the team members immediately. This made the team members think that the project management think tank team was open and transparent to them and that the project management team was transparent to their aspirations. This motivated the team members to excel in their respective projects. 8 Page
  • 9. b) For managing teams in multiple locations: Following were the methodologies /approaches used to overcome the challenges faced in managing the project teams (members) distributed at Chennai, Bangalore and Bhubaneswar. Availability of a strong lead with a good process background. Set up proper communication mechanism. Creation of flexible and contingency plans. Proper Planning prevented delays in meetings/trainings. Routine Feedback, timely appreciations and providing opportunities. Availability of a strong lead with a good process background: A resource with leadership traits and with a good process background was identified for FEV project. This helped in resolving the logistical and project communicational issues and enabled the smooth functioning of the project and hence the program. Set up proper communication mechanism: A proper communication mechanism was setup through proper planning. Apart from the normal back- up plans , judicious usage of open source status reporting tools such as Bugzilla and internal repositories of the organisation, helped in tracking of the project work statuses of the team members, which ensured project communication gap was reduced to a great extent. Creation of flexible and contingency plans: At times, the resource calendar, which had the details of resource availability for a given year, would go in disarray as there were unavoidable leaves taken by or absence of the team members. In the case of such scenarios, as a contingency, the back-up persons were called for, into actions. Every project lead had discussions with her/his team members on what each one of the team members are doing. Apart from that the entire project team had almost regular status call with the clients on what was achieved on a single day. This gave each one, an insight of what the other team member is doing with his/her deliverable. This helped the project lead to find the right back up person easily. As the projects had onsite location (USA) as well, project communication had to happen between onsite and offshore locations. This was a problem for onsite team members, who were less in size when compared with offshore. They were given the โ€œwork from homeโ€ option and they worked in a secured network. The FEV project which had the biggest team in the program got affected, often, with these resource issues and were bailed out with the contingency and flexible plans. 9 Page
  • 10. Proper planning prevented delays in Meetings/Trainings: Diligent Planning by the project lead of the FEV project, in the development stage of the project helped him to conduct timely meetings and trainings. Key Meetings and Trainings were scheduled after getting consensus from the team members and were planned in advance. Meeting Minutes were taken as well to ensure that the gist of the meetings/trainings were shared to the absentees, due to unavoidable circumstances and also to emphasise the importance of the meetings. Planning steps Involved: 1. Advance mail communication to all the Stakeholders 2. Reminder mail : Automatic Alarm sent to all stakeholders excluding the client 3. Tasks were setup on the Internal Project Management System of the Organisation and also task activities were created on Bugzilla tool. Routine Feedback, Timely Appreciations and providing Opportunities: As the program started rolling, the Project leads started to understand the importance of timely feedback of their wardsโ€™ work and started to provide them, routine feedback and timely appreciations from the project lead and the client. Rewards were given in recognition of the performance of the team members. Certification and Rewards were given for Best Performer of the project/program, both at project level and at the Customer relationship level. Team members who were aspiring to go in a particular area/domain were identified and were given opportunities to enhance their skills in their area of liking whenever there was an opportunity. 6. Critical Success Factor Three critical factors occured as a result of overcoming these challenges Encouraging Work Environment Employee Satisfaction Satisfied Clients Encouraging Work Environment: The work ambience in the program helped the team members to motivate themselves to work hard when needed. Also there was good gelling within the team members, through which they helped one another. 10 Page
  • 11. Employee Satisfaction: Because the project management team took care of the teamโ€™s needs and aspirations, there was a high level of satisfaction among the team members Satisfied Clients: A highly satisfied team produced a high performance from the team which resulted in a high quality and on-time delivery of the project. This obviously provided a delight to the clients, who gave a very good Customer Satisfaction Rating. 7. Quantified Benefits To Business Table 1 and 2 illustrate the benefits of the project that was, before resolving the challenges (issues), Statistic Before Resolving the After Resolving the Challenges Challenges Communication Hassle, Less Productivity Improved Productivity Team Cohesiveness Communication Hassle, No appreciable change in the High Quality Product Team Cohesiveness, quality Planning Communication Hassle, No new Business More Business Opportunity, as Team Cohesiveness Opportunity. It remained as clients were satisfied such. the program faced, and after resolving the challenges Table1: Quantification of Benefits: Qualitative Analysis Statistic Before Resolving the After Resolving the Challenges Challenges Communication Hassle, Not Applicable Saved 5 Working Days = $ 1000 Team Cohesiveness Communication Hassle, Not Applicable Saved 2 Days in rework effort =$ Team Cohesiveness, 384 Planning Table2: Quantification of Benefits: Quantitative Analysis 11 Page
  • 12. Team Cohesiveness involves the Motivational activities such as Team Building and Team Outing activities which rekindled the spirit of the team members and made them refreshing while doing their project work. This was useful especially in hectic work periods. This improved the productivity of the team and the clients were happy to see such wonderfully well-knit dedicated team. 8. Lessons Learnt The team did not understand the project needs initially. This created a lot of challenges. The project management team also slowly started to understand the needs of the team, better, as the program started to progress. The expectations of both the parties were set and the expectations (needs) being depicted with the help of a Kano Model. Figure 3 depicts the prioritization of Project needs i.e, it set the expectations on the team members and Figure 4 depicts the prioritization of team (members) needs (expectation set on the project / project management team). Figure 3: Prioritization of Project Needs 12 Page
  • 13. Figure 4: Prioritization of Team (Members) Needs The Basic needs in the Kano model indicates that those needs (expectations) ultimately became must. The โ€œExciting Needsโ€ were delighters which ultimately became a โ€œmustโ€ over a period. 9. Conclusion Successfully managing a project team, that has a diverse culture and which is distributed across multiple locations/delivery centres relies upon several factors: Project expectations clearly needs to be known, to the team members. Creating a vibrant and conducive work atmosphere has to be a prerequisite. Timely communication to all stakeholders is of paramount importance. Routine team outing and team building activities is a must in the longer run for the welfare of the project. Timely Recognition of work performance of the project members Project should have strong project leads with good process background. Having an effective contingency plan (backup plan/options) / with some flexible plans will give the project much needed stability even in emergency situations. 10. References None. 13 Page
  • 14. 11. Authorโ€™s Profile: Rajesh Rajagopalan is a Delivery Manager, who has 13+ years of IT experience, with 8 years in Tata Consultancy Services and is a Six Sigma Green Belt certified professional. Has been a Program Manager/Project Manager for the past 5 years and has been in Retail domain for the past 6 years. Mail Id: rajesh.rajagopalan@tcs.com 14 Page