The document is a report on the measured drawings project of the Ipoh Rainbow Shop Houses located in Ipoh, Perak, Malaysia. It was produced by 18 students from Taylor's University as part of their coursework. The report documents the research, measurements, interviews, photography and drafting work done by the students to study and document the seven colorful shophouses through measured drawings, a report, photos and a physical model. It provides an overview of the project methodology and the background, history and architectural elements of the unique shophouses.