Integrated
Business Planning
Process
Your Company Name
Integrated Business Process Outline
Operational Plan
• Analyses
• Key Result Areas
• Operational Objectives
• Performance Indicators
• Action Plans
• Budget
Strategic Plan
• Mission
• Goals
• Objectives
• Strategies
• Financial Projection
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
2
Strategic
Planning
3
• Who we are
• What we value
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Mission Statement
• What we want to
become
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Vision Statement
• How we will
achieve our vision
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Strategy
• How we gauge or
degree of success
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Goals & Objectives
Mission, Vision, Goals & Objectives
4
Business Strategy
5
Identify the
Opportunity
• Unmet needs
• Differentiated value
proposition
• Opportunity
prioritization
Competitive
Assessment
• Core
Competencies
• Current
Landscape
• New entrants
Optimizing the
Solution & Strategy
• Solution design
and features
• Positioning
• Quantifying ROI
• Market access
Strategy
Strategic Planning
• Forecasts and sales
models
• Pro forma financials
• Risks and
uncertainties.
Analyzing
the market
• Defining the
market
• Sizing the market
• Understanding
the trends
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Financial Projection (Income Statement)
Mar-13 Mar-14 Mar-15 Mar-16 Mar-17 Mar-18 Mar-19 Mar-20 Mar-21 Mar-22 Mar-23
Net Sales 1,703.1 2,022.0 3,184.5 3,476.6 4,632.6 6,421.4 8,542.4 11,451.0 14,418.8 18,109.4 20,979.0
Expenses
Cost of Goods Sold 1,282.5 1,374.7 2,028.2 2,200.4 2,859.0 4,148.2 5,467.2 7,271.4 9,156.0 11,499.5 13,321.7
Employee Benefit Expense 92.1 128.4 155.6 226.5 280.5 321.1 507.2 583.9 675.3 875.4 962.3
Other Expenses 71.2 167.3 265.6 299.7 552.9 570.1 728.9 939.7 1,162.5 1,429.8 1,667.8
EBITDA 261.3 361.6 746.9 781.8 971.7 1,409.1 1,868.5 2,687.8 3,459.5 4,342.0 5,067.7
% EBITDA 15.3% 17.8% 23.4% 22.3% 20.8% 21.9% 21.8% 23.4% 23.9% 23.9% 24.1%
Financing cost 66.9 128.8 198.1 273.9 293.0 305.3 361.9 423.0 500.6 646.0 786.3
Profit After Tax 162.0 187.7 350.0 337.7 409.5 691.5 972.9 1,614.7 2,109.5 2,361.8 2,742.3
% PAT 9.5% 9.2% 11.0% 9.6% 8.8% 10.7% 11.4% 14.1% 14.6% 13.0% 13.0%
Income Statement (USD MM)
This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 6
Mar-13 Mar-14 Mar-15 Mar-16 Mar-17 Mar-18 Mar-19 Mar-20 Mar-21 Mar-22 Mar-23
Shareholders‘ Equity 529.8 1,067.8 1,294.6 1,632.4 1,856.0 3,247.5 4,220.4 5,835.2 7,944.6 10,306.4 13,048.6
Non–current Liabilities 535.0 548.2 513.5 989.0 1,155.0 1,033.3 829.1 744.2 569.8 1,285.4 1,283.5
Short–term Borrowings 439.8 622.7 720.6 1,603.8 1,681.6 2,139.6 2,835.0 3,813.4 4,797.6 5,982.1 6,897.9
Trade Payables 352.9 508.9 760.4 433.7 682.6 852.4 1,123.4 1,494.1 1,881.4 2,362.9 2,737.3
Current Liabilities 820.1 1,285.0 1,785.5 2,438.1 3,258.5 4,097.1 5,434.9 7,287.5 9,170.6 11,472.5 13,252.3
Total Liabilities 1,760.4 2,678.1 3,316.3 4,730.4 5,904.1 8,012.6 10,119.1 13,501.5 17,319.7 22,699.0 27,219.1
Total Fixed Assets 803.2 1,034.6 1,159.5 1,751.3 2,073.3 2,734.8 2,726.7 2,848.2 2,943.7 4,462.7 4,693.7
Inventories 341.3 731.3 771.3 1,215.8 1,355.2 2,120.6 2,754.6 3,649.3 4,569.9 5,730.8 6,627.5
Trade Receivables 477.6 605.1 996.1 1,061.3 1,713.1 2,068.3 2,742.9 3,657.9 4,596.4 5,752.4 6,637.4
Cash and Bank Balances 33.0 89.5 132.2 258.8 264.4 375.5 1,018.9 2,288.3 3,948.9 5,287.4 7,542.8
Short–term Loans & Advances 75.8 169.1 76.9 131.6 290.6 325.8 387.1 456.4 530.7 623.2 702.2
Current Assets 930.5 1,595.1 1,978.8 2,747.8 3,624.0 4,890.9 6,904.1 10,052.5 13,646.5 17,394.5 21,510.6
Total Assets 1,760.4 2,678.1 3,316.3 4,730.4 5,904.1 8,012.6 10,119.1 13,501.5 17,319.7 22,699.0 27,219.1
Financial Projection (Balance Sheet)
Balance Sheet (USD MM)
This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 7
Operational
Plan
8
Business Operations Analysis
9
Key Ingredients of the
Operational Plan
Consultation
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Budgetary Information
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Calendar of Events
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Facility Use Schedules
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Training Plans
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Maintenance Schedules
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Key Result Areas
10
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Develop and implement a
performance management system
KEY RESULT AREA 1
KEY RESULT AREA2
Provide an effective awareness and
communication support programme for
the system
KEY RESULT AREA 3
Develop a feedback system to management,
departments and employees as a basis for
improving performance
Business
Operations
Key Result Areas
11
Business
Operations
Develop and implement a
performance management system
KEY RESULT AREA 3
KEY RESULT AREA 1
Provide an effective awareness and
communication support programme for
the system
KEY RESULT AREA 2
Develop a feedback system to
management, departments
and employees as a basis for
improving performance
Cost & Volume
This slide is 100%
editable. Adapt it to your
needs and capture your
audience's attention.
Quality
This slide is 100%
editable. Adapt it to your
needs and capture your
audience's attention.
Efficiency &
Flexibility
This slide is 100%
editable. Adapt it to your
needs and capture your
audience's attention.
Environmental
This slide is 100%
editable. Adapt it to your
needs and capture your
audience's attention.
Operational Objectives
12
Performance Objectives
Fixed Asset Turnover
Revenue /
Average net fixed Assets
How effectively a business generates
revenue from its Fixed Assets
6.7
Total Asset Turnover
Revenue /
Average Total Assets
How effectively a business generates
revenue from its Total Assets
2.3
Working Capital
Turnover
Revenue /
Average Working Capital
How effectively a business generates
revenue from its Working Capital
12.5
13This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Action Plan
OBJECTIVES
(Lists of Goals)
TASKS
(What you need to do to
achieve the Goals)
SUCCESS CRIETERIA
(How you will Identify your
success)
TIME FRAME
(By when you need to
complete the tasks)
RESOURCES
(What or who can help you
complete tasks)
Text Here Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here
Text HereText Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here Text Here
Text Here Text Here Text Here Text Here Text Here
14
Budget
Agency FY 2015 Budget Enacted ($M) FY 2016 Budget Enacted ($M) FY 2017 Budget Requested ($M)
Component 1 96 98 124
Component 2 312 283 342
Component 3 214 238 242
Component 4 1 8 8
Component 5 16 57 63
Component 6 331 1 22
Component 7 8 1,549
Total 1500 2398 1225
15
Overview of Integrated Business Planning
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Sales Revenue Planning
• New Product Planning
• Sales Opportunity Planning
Demand Planning
• Demand Forecasting
• Demand Collaboration (Sales,
Marketing, Operations input)
Supply Planning
• Capacity Planning (Labor
Leveling, Resource Planning)
Profit based Supply/
Demand Balancing
• Product Mix
• Constraints Management
• What if Analysis
Management Review
• KPI Measurement
• Working Capital
• Gross Margins
16
Integrated Business Planning Broad Framework
17
Supply Chain Planning
This slide is 100% editable. Adapt it to your needs and capture
your audience's attention.
Strategic & Commercial Planning
This slide is 100% editable. Adapt it to your needs and capture
your audience's attention.
Sales Forecasting & Budgeting
This slide is 100% editable. Adapt it to your needs and capture
your audience's attention.
Integrated
Business
Planning
Integrated Planning Process
18
Strategic Initiatives and
their ownership
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Strategic Direction
and Context
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Plan, report and Forecast
Company performance
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Rewards, Consequences
and actions
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Performance Dialogues
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Set Business Targets
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Measure Value
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Integrated
Planning
Process
Integrated Planning Framework
19
Strategic
Planning
Program
Planning
Business
Planning
Organizational Development
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Identity & Branding
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Advancement Planning
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Human Resource Planning
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Technology Planning
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Facility Planning
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Integrated Business Planning Process Icon Slides
20
Additional Slides
21
Our Mission
22
Vision
This slide is 100% editable. Adapt it to your needs and capture
your audience's attention.
Mission
This slide is 100% editable. Adapt it to your needs and capture
your audience's attention.
Goal
This slide is 100% editable. Adapt it to your needs and capture
your audience's attention.
Our Mission
23
Vision
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Mission
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Goal
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Our Team
24
Name Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Designation
Name Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Designation
Name Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Designation
About Us
25
This slide is 100% editable. Adapt it to your needs and capture
your audience's attention.
Target Audiences
This slide is 100% editable. Adapt it to your needs and capture
your audience's attention.
Values Client
This slide is 100% editable. Adapt it to your needs and capture
your audience's attention.
Preferred by Many
Comparison
26
PC User
70%
Mobile User
90%
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Our Goal
27
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Goal 01
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Target 03
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Goal 02
Quotes
28
I choose a lazy person to do a
hard jab. because a lazy
person will find an easy way
to do it.
Bill Gates
Our Target
29
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Target 01
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Target 03
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Target 02
Idea Generation
30
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Text Here
Financial
31
Minimum
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
445$
Medium
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
490$
Maximum
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
500$
Lego
32
Your Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Your Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Your Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Your Text Here
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Timeline
33
2016
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
2018
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
2015
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
2017
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
2019
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Post it Notes
34
Your Text Here
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Your Text Here
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Your Text Here
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Thank You
35
Contact Number
0123456789
Email Address
emailaddress123@gmail.com
Address
# street number, city, state

Integrated Business Planning Process PowerPoint Presentation Slides

  • 1.
  • 2.
    Integrated Business ProcessOutline Operational Plan • Analyses • Key Result Areas • Operational Objectives • Performance Indicators • Action Plans • Budget Strategic Plan • Mission • Goals • Objectives • Strategies • Financial Projection This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 2
  • 3.
  • 4.
    • Who weare • What we value This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Mission Statement • What we want to become This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Vision Statement • How we will achieve our vision This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Strategy • How we gauge or degree of success This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Goals & Objectives Mission, Vision, Goals & Objectives 4
  • 5.
    Business Strategy 5 Identify the Opportunity •Unmet needs • Differentiated value proposition • Opportunity prioritization Competitive Assessment • Core Competencies • Current Landscape • New entrants Optimizing the Solution & Strategy • Solution design and features • Positioning • Quantifying ROI • Market access Strategy Strategic Planning • Forecasts and sales models • Pro forma financials • Risks and uncertainties. Analyzing the market • Defining the market • Sizing the market • Understanding the trends This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 6.
    Financial Projection (IncomeStatement) Mar-13 Mar-14 Mar-15 Mar-16 Mar-17 Mar-18 Mar-19 Mar-20 Mar-21 Mar-22 Mar-23 Net Sales 1,703.1 2,022.0 3,184.5 3,476.6 4,632.6 6,421.4 8,542.4 11,451.0 14,418.8 18,109.4 20,979.0 Expenses Cost of Goods Sold 1,282.5 1,374.7 2,028.2 2,200.4 2,859.0 4,148.2 5,467.2 7,271.4 9,156.0 11,499.5 13,321.7 Employee Benefit Expense 92.1 128.4 155.6 226.5 280.5 321.1 507.2 583.9 675.3 875.4 962.3 Other Expenses 71.2 167.3 265.6 299.7 552.9 570.1 728.9 939.7 1,162.5 1,429.8 1,667.8 EBITDA 261.3 361.6 746.9 781.8 971.7 1,409.1 1,868.5 2,687.8 3,459.5 4,342.0 5,067.7 % EBITDA 15.3% 17.8% 23.4% 22.3% 20.8% 21.9% 21.8% 23.4% 23.9% 23.9% 24.1% Financing cost 66.9 128.8 198.1 273.9 293.0 305.3 361.9 423.0 500.6 646.0 786.3 Profit After Tax 162.0 187.7 350.0 337.7 409.5 691.5 972.9 1,614.7 2,109.5 2,361.8 2,742.3 % PAT 9.5% 9.2% 11.0% 9.6% 8.8% 10.7% 11.4% 14.1% 14.6% 13.0% 13.0% Income Statement (USD MM) This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 6
  • 7.
    Mar-13 Mar-14 Mar-15Mar-16 Mar-17 Mar-18 Mar-19 Mar-20 Mar-21 Mar-22 Mar-23 Shareholders‘ Equity 529.8 1,067.8 1,294.6 1,632.4 1,856.0 3,247.5 4,220.4 5,835.2 7,944.6 10,306.4 13,048.6 Non–current Liabilities 535.0 548.2 513.5 989.0 1,155.0 1,033.3 829.1 744.2 569.8 1,285.4 1,283.5 Short–term Borrowings 439.8 622.7 720.6 1,603.8 1,681.6 2,139.6 2,835.0 3,813.4 4,797.6 5,982.1 6,897.9 Trade Payables 352.9 508.9 760.4 433.7 682.6 852.4 1,123.4 1,494.1 1,881.4 2,362.9 2,737.3 Current Liabilities 820.1 1,285.0 1,785.5 2,438.1 3,258.5 4,097.1 5,434.9 7,287.5 9,170.6 11,472.5 13,252.3 Total Liabilities 1,760.4 2,678.1 3,316.3 4,730.4 5,904.1 8,012.6 10,119.1 13,501.5 17,319.7 22,699.0 27,219.1 Total Fixed Assets 803.2 1,034.6 1,159.5 1,751.3 2,073.3 2,734.8 2,726.7 2,848.2 2,943.7 4,462.7 4,693.7 Inventories 341.3 731.3 771.3 1,215.8 1,355.2 2,120.6 2,754.6 3,649.3 4,569.9 5,730.8 6,627.5 Trade Receivables 477.6 605.1 996.1 1,061.3 1,713.1 2,068.3 2,742.9 3,657.9 4,596.4 5,752.4 6,637.4 Cash and Bank Balances 33.0 89.5 132.2 258.8 264.4 375.5 1,018.9 2,288.3 3,948.9 5,287.4 7,542.8 Short–term Loans & Advances 75.8 169.1 76.9 131.6 290.6 325.8 387.1 456.4 530.7 623.2 702.2 Current Assets 930.5 1,595.1 1,978.8 2,747.8 3,624.0 4,890.9 6,904.1 10,052.5 13,646.5 17,394.5 21,510.6 Total Assets 1,760.4 2,678.1 3,316.3 4,730.4 5,904.1 8,012.6 10,119.1 13,501.5 17,319.7 22,699.0 27,219.1 Financial Projection (Balance Sheet) Balance Sheet (USD MM) This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 7
  • 8.
  • 9.
    Business Operations Analysis 9 KeyIngredients of the Operational Plan Consultation This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Budgetary Information This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Calendar of Events This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Facility Use Schedules This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Training Plans This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Maintenance Schedules This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 10.
    Key Result Areas 10 Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. Develop and implement a performance management system KEY RESULT AREA 1 KEY RESULT AREA2 Provide an effective awareness and communication support programme for the system KEY RESULT AREA 3 Develop a feedback system to management, departments and employees as a basis for improving performance Business Operations
  • 11.
    Key Result Areas 11 Business Operations Developand implement a performance management system KEY RESULT AREA 3 KEY RESULT AREA 1 Provide an effective awareness and communication support programme for the system KEY RESULT AREA 2 Develop a feedback system to management, departments and employees as a basis for improving performance
  • 12.
    Cost & Volume Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. Quality This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Efficiency & Flexibility This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Environmental This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Operational Objectives 12
  • 13.
    Performance Objectives Fixed AssetTurnover Revenue / Average net fixed Assets How effectively a business generates revenue from its Fixed Assets 6.7 Total Asset Turnover Revenue / Average Total Assets How effectively a business generates revenue from its Total Assets 2.3 Working Capital Turnover Revenue / Average Working Capital How effectively a business generates revenue from its Working Capital 12.5 13This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 14.
    Action Plan OBJECTIVES (Lists ofGoals) TASKS (What you need to do to achieve the Goals) SUCCESS CRIETERIA (How you will Identify your success) TIME FRAME (By when you need to complete the tasks) RESOURCES (What or who can help you complete tasks) Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text HereText Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here Text Here 14
  • 15.
    Budget Agency FY 2015Budget Enacted ($M) FY 2016 Budget Enacted ($M) FY 2017 Budget Requested ($M) Component 1 96 98 124 Component 2 312 283 342 Component 3 214 238 242 Component 4 1 8 8 Component 5 16 57 63 Component 6 331 1 22 Component 7 8 1,549 Total 1500 2398 1225 15
  • 16.
    Overview of IntegratedBusiness Planning This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Sales Revenue Planning • New Product Planning • Sales Opportunity Planning Demand Planning • Demand Forecasting • Demand Collaboration (Sales, Marketing, Operations input) Supply Planning • Capacity Planning (Labor Leveling, Resource Planning) Profit based Supply/ Demand Balancing • Product Mix • Constraints Management • What if Analysis Management Review • KPI Measurement • Working Capital • Gross Margins 16
  • 17.
    Integrated Business PlanningBroad Framework 17 Supply Chain Planning This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Strategic & Commercial Planning This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Sales Forecasting & Budgeting This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Integrated Business Planning
  • 18.
    Integrated Planning Process 18 StrategicInitiatives and their ownership This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Strategic Direction and Context This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Plan, report and Forecast Company performance This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Rewards, Consequences and actions This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Performance Dialogues This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Set Business Targets This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Measure Value This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Integrated Planning Process
  • 19.
    Integrated Planning Framework 19 Strategic Planning Program Planning Business Planning OrganizationalDevelopment This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Identity & Branding This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Advancement Planning This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Human Resource Planning This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Technology Planning This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Facility Planning This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 20.
    Integrated Business PlanningProcess Icon Slides 20
  • 21.
  • 22.
    Our Mission 22 Vision This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Mission This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Goal This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 23.
    Our Mission 23 Vision This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Mission This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Goal This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 24.
    Our Team 24 Name Here Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. Designation Name Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Designation Name Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Designation
  • 25.
    About Us 25 This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Target Audiences This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Values Client This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Preferred by Many
  • 26.
    Comparison 26 PC User 70% Mobile User 90% Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 27.
    Our Goal 27 This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Goal 01 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Target 03 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Goal 02
  • 28.
    Quotes 28 I choose alazy person to do a hard jab. because a lazy person will find an easy way to do it. Bill Gates
  • 29.
    Our Target 29 This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Target 01 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Target 03 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Target 02
  • 30.
    Idea Generation 30 This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Text Here
  • 31.
    Financial 31 Minimum This slide is100% editable. Adapt it to your needs and capture your audience's attention. 445$ Medium This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 490$ Maximum This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 500$
  • 32.
    Lego 32 Your Text Here Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. Your Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Your Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Your Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 33.
    Timeline 33 2016 This slide is100% editable. Adapt it to your needs and capture your audience's attention. 2018 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 2015 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 2017 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 2019 This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 34.
    Post it Notes 34 YourText Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Your Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Your Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
  • 35.
    Thank You 35 Contact Number 0123456789 EmailAddress emailaddress123@gmail.com Address # street number, city, state