6.      ALL INDIA REGIONWISE GENERATING INSTALLED CAPACITY (MW) OF
      POWER UTILITIES INCLUDING ALLOCATED SHARES IN JOINT AND CENTRAL
      SECTOR UTILITIES                                 (As on 30-06-2012)

SL.    REGION                            THERMAL                                  Nuclear       HYDRO          R.E.S.@           TOTAL
NO.                        COAL           GAS      DSL              TOTAL                   (Renewable)        (MNRE)
 1    Northern           29923.50       4671.26   12.99              34607.75     1620.00       15423.75         4406.64       56058.14
 2    Western            41129.50       8254.81   17.48              49401.79     1840.00        7447.50         8067.26       66756.55
 3    Southern           22882.50       4962.78  939.32              28784.60     1320.00       11338.03        11713.98       53156.61
 4    Eastern            22337.88        190.00   17.20              22545.08        0.00        3882.12          410.71       26837.91
 5    N. Eastern            60.00        824.20  142.74               1026.94        0.00        1200.00          228.00        2454.94
 6    Islands                0.00          0.00   70.02                 70.02        0.00           0.00            6.10          76.12
 7    All India         116333.38      18903.05 1199.75             136436.18     4780.00       39291.40        24832.68      205340.26
@ RES- Renewable Energy Sources includes Small Hydro Projects (SHP), Biomass Power (BP), Urban & Industrial Waste Power (U&I)
Wind Energy and Solar Power.


Note:- UNITS COMMISSIONED, DERATED & DECOMMISSIONED DURING JUNE.12
Thermal
1) Sipat STTP St-I (Unit 3) 660 MW of NTPC in Chatisgarh commissioned on 02-06-2012 (Full Load) by NTPC
2) Salaya TPP Unit 2 (600MW) of Essar in Gujrat commisiioned on 13-06-2012 on Full Load by Essar Power Ltd.
3) Vindhyachal TPP IV Unit 11 ((500MW) of NTPC in MP commisiioned on 14-06-2012 on Full Load by NTPC
4) Kasaipalli TPS (Unit 2) 135 MW in Chhatisgarh commissioned on 21-06-2012 on Full Load by ACB
5) Pragati CCGT (Unit 3) 250 MW in Delhi commissioned on 27-06-2012 on Full Load by PPCL
Hydro
1) Chamera-III Unit 3 (77 MW) in HP commissioned on 07-06-2012 by NHPC
2) Chamera-III Unit 2 (77 MW) in HP commissioned on 12-06-2012 by NHPC
3) Chamera-III Unit 1 (77 MW) in HP commissioned on 28-06-2012 by NHPC
Units Retired
1) Unit No. 1 &2 125 MW each (Total 250MW) of Nshik TPS MaharashtraState Power Gen Co. Ltd.(MAHAGENCO)
   w.e.f. 25-06-12 & 30-06-12 respectively
2) Unit No. 6 of Obra "A" TPS UPRVUNL approved for retirement w.e.f. 12-01-11 on 12-06-2012

ALL INDIA GENERATING INSTALLED CAPACITY ( MW ) AS ON 30-06-2012




  250000
  225000                                                                                              205340
  200000
  175000
  150000          136436
  125000
  100000
   75000
   50000                                                    39291
                                                                                24833
   25000                                4780                                                                                 0
          0
                 Thermal              Nuclear               Hydro                RES                  Total                Captive

                                     Thermal      Nuclear      Hydro     RES      Total     Captive




                                ENERGY SAVED IS ENERGY PRODUCED

More Related Content

What's hot

Automatic dual axis solar tracking system(eee499.blogspot.com)
Automatic dual axis solar tracking system(eee499.blogspot.com)Automatic dual axis solar tracking system(eee499.blogspot.com)
Automatic dual axis solar tracking system(eee499.blogspot.com)
slmnsvn
 
Design and Implementation of Dual Axis Solar Tracking system
Design and Implementation of Dual Axis Solar Tracking systemDesign and Implementation of Dual Axis Solar Tracking system
Design and Implementation of Dual Axis Solar Tracking system
IJERA Editor
 
IRJET- Automatic Solar Tracking Panel
IRJET- Automatic Solar Tracking PanelIRJET- Automatic Solar Tracking Panel
IRJET- Automatic Solar Tracking Panel
IRJET Journal
 
Ijmet 06 07_010
Ijmet 06 07_010Ijmet 06 07_010
Ijmet 06 07_010
IAEME Publication
 
Self-sustaining and externally-powered fixed, single, and dual-axis solar tra...
Self-sustaining and externally-powered fixed, single, and dual-axis solar tra...Self-sustaining and externally-powered fixed, single, and dual-axis solar tra...
Self-sustaining and externally-powered fixed, single, and dual-axis solar tra...
International Journal of Power Electronics and Drive Systems
 
IRJET- Smart and Intelligent Dual Axis Solar Tracker using Arduino Micro-Cont...
IRJET- Smart and Intelligent Dual Axis Solar Tracker using Arduino Micro-Cont...IRJET- Smart and Intelligent Dual Axis Solar Tracker using Arduino Micro-Cont...
IRJET- Smart and Intelligent Dual Axis Solar Tracker using Arduino Micro-Cont...
IRJET Journal
 
Korba super thermal power plant wikipedia, the free encyclopedia
Korba super thermal power plant   wikipedia, the free encyclopediaKorba super thermal power plant   wikipedia, the free encyclopedia
Korba super thermal power plant wikipedia, the free encyclopedia
Aashutosh Rathore
 
single axis solar tracker with out micro controller
single axis solar tracker with out micro controllersingle axis solar tracker with out micro controller
single axis solar tracker with out micro controller
Narendhar Kumar
 
IRJET- Modification of Magnet Operated Engine
IRJET-  	  Modification of Magnet Operated EngineIRJET-  	  Modification of Magnet Operated Engine
IRJET- Modification of Magnet Operated Engine
IRJET Journal
 
Project Report
Project ReportProject Report
Project Report
mukesh choudhary
 
Army Institute of Technology,Pune
Army Institute of Technology,PuneArmy Institute of Technology,Pune
Army Institute of Technology,Pune
mukesh choudhary
 
Libya
LibyaLibya
Libya
RCREEE
 
Dual Axis Solar Tracker Using Microcontroller
Dual Axis Solar Tracker Using MicrocontrollerDual Axis Solar Tracker Using Microcontroller
Dual Axis Solar Tracker Using Microcontroller
IRJET Journal
 
IRJET- Dual Axis Solar Tracking System using Arduino
IRJET- Dual Axis Solar Tracking System using ArduinoIRJET- Dual Axis Solar Tracking System using Arduino
IRJET- Dual Axis Solar Tracking System using Arduino
IRJET Journal
 
Dual axis
Dual axis Dual axis
Dual axis
mohdMoon1
 
Dual axis solar tracking using arduino with lab view (1)
Dual axis solar tracking using arduino with lab view (1)Dual axis solar tracking using arduino with lab view (1)
Dual axis solar tracking using arduino with lab view (1)
LOCHANBHATT1
 
solar tracker by kanav mansotra
solar tracker by kanav mansotrasolar tracker by kanav mansotra
solar tracker by kanav mansotra
Kanav Mansotra
 
Dual axis tracker_final_report
Dual axis tracker_final_reportDual axis tracker_final_report
Dual axis tracker_final_report
Sai Ram
 
Development of FPGA based Dual Axis Solar Tracking System
Development of FPGA based Dual Axis Solar Tracking SystemDevelopment of FPGA based Dual Axis Solar Tracking System
Development of FPGA based Dual Axis Solar Tracking System
drboon
 
Gulbrga history
Gulbrga historyGulbrga history
Gulbrga history
Ramesh Meti
 

What's hot (20)

Automatic dual axis solar tracking system(eee499.blogspot.com)
Automatic dual axis solar tracking system(eee499.blogspot.com)Automatic dual axis solar tracking system(eee499.blogspot.com)
Automatic dual axis solar tracking system(eee499.blogspot.com)
 
Design and Implementation of Dual Axis Solar Tracking system
Design and Implementation of Dual Axis Solar Tracking systemDesign and Implementation of Dual Axis Solar Tracking system
Design and Implementation of Dual Axis Solar Tracking system
 
IRJET- Automatic Solar Tracking Panel
IRJET- Automatic Solar Tracking PanelIRJET- Automatic Solar Tracking Panel
IRJET- Automatic Solar Tracking Panel
 
Ijmet 06 07_010
Ijmet 06 07_010Ijmet 06 07_010
Ijmet 06 07_010
 
Self-sustaining and externally-powered fixed, single, and dual-axis solar tra...
Self-sustaining and externally-powered fixed, single, and dual-axis solar tra...Self-sustaining and externally-powered fixed, single, and dual-axis solar tra...
Self-sustaining and externally-powered fixed, single, and dual-axis solar tra...
 
IRJET- Smart and Intelligent Dual Axis Solar Tracker using Arduino Micro-Cont...
IRJET- Smart and Intelligent Dual Axis Solar Tracker using Arduino Micro-Cont...IRJET- Smart and Intelligent Dual Axis Solar Tracker using Arduino Micro-Cont...
IRJET- Smart and Intelligent Dual Axis Solar Tracker using Arduino Micro-Cont...
 
Korba super thermal power plant wikipedia, the free encyclopedia
Korba super thermal power plant   wikipedia, the free encyclopediaKorba super thermal power plant   wikipedia, the free encyclopedia
Korba super thermal power plant wikipedia, the free encyclopedia
 
single axis solar tracker with out micro controller
single axis solar tracker with out micro controllersingle axis solar tracker with out micro controller
single axis solar tracker with out micro controller
 
IRJET- Modification of Magnet Operated Engine
IRJET-  	  Modification of Magnet Operated EngineIRJET-  	  Modification of Magnet Operated Engine
IRJET- Modification of Magnet Operated Engine
 
Project Report
Project ReportProject Report
Project Report
 
Army Institute of Technology,Pune
Army Institute of Technology,PuneArmy Institute of Technology,Pune
Army Institute of Technology,Pune
 
Libya
LibyaLibya
Libya
 
Dual Axis Solar Tracker Using Microcontroller
Dual Axis Solar Tracker Using MicrocontrollerDual Axis Solar Tracker Using Microcontroller
Dual Axis Solar Tracker Using Microcontroller
 
IRJET- Dual Axis Solar Tracking System using Arduino
IRJET- Dual Axis Solar Tracking System using ArduinoIRJET- Dual Axis Solar Tracking System using Arduino
IRJET- Dual Axis Solar Tracking System using Arduino
 
Dual axis
Dual axis Dual axis
Dual axis
 
Dual axis solar tracking using arduino with lab view (1)
Dual axis solar tracking using arduino with lab view (1)Dual axis solar tracking using arduino with lab view (1)
Dual axis solar tracking using arduino with lab view (1)
 
solar tracker by kanav mansotra
solar tracker by kanav mansotrasolar tracker by kanav mansotra
solar tracker by kanav mansotra
 
Dual axis tracker_final_report
Dual axis tracker_final_reportDual axis tracker_final_report
Dual axis tracker_final_report
 
Development of FPGA based Dual Axis Solar Tracking System
Development of FPGA based Dual Axis Solar Tracking SystemDevelopment of FPGA based Dual Axis Solar Tracking System
Development of FPGA based Dual Axis Solar Tracking System
 
Gulbrga history
Gulbrga historyGulbrga history
Gulbrga history
 

Similar to Installed capacity

southern grid
southern grid southern grid
southern grid
Molla Morshad
 
dgr4-2022-02-04.pdf
dgr4-2022-02-04.pdfdgr4-2022-02-04.pdf
dgr4-2022-02-04.pdf
DataCentrum1
 
Inverted Energy: Diesel Generator Set Replacement
Inverted Energy: Diesel Generator Set Replacement Inverted Energy: Diesel Generator Set Replacement
Inverted Energy: Diesel Generator Set Replacement
Inverted2019
 
Issues in hydro power development
Issues in hydro power developmentIssues in hydro power development
Issues in hydro power development
IPPAI
 
Renewable energy transmission [CSTP 2009]
Renewable energy transmission [CSTP 2009]Renewable energy transmission [CSTP 2009]
Renewable energy transmission [CSTP 2009]
Smithers Apex
 
CEA's Monthly Review of Indian Power Sector
CEA's Monthly Review of Indian Power SectorCEA's Monthly Review of Indian Power Sector
CEA's Monthly Review of Indian Power Sector
Spark Network
 
8b80ade8 7b96-4114-9e36-76dcf21dc74d-150219134514-conversion-gate02 (1) (1) (...
8b80ade8 7b96-4114-9e36-76dcf21dc74d-150219134514-conversion-gate02 (1) (1) (...8b80ade8 7b96-4114-9e36-76dcf21dc74d-150219134514-conversion-gate02 (1) (1) (...
8b80ade8 7b96-4114-9e36-76dcf21dc74d-150219134514-conversion-gate02 (1) (1) (...
Shubham Garg
 
Presentation for cm 24.04.2012
Presentation for cm 24.04.2012Presentation for cm 24.04.2012
Presentation for cm 24.04.2012
Rashid Ahmed
 
A n srivastava
A n srivastavaA n srivastava
A n srivastava
ninedotnine
 
12 B .Storage CEA.pptx
12 B .Storage CEA.pptx12 B .Storage CEA.pptx
12 B .Storage CEA.pptx
ssuser0f80df
 
The Current Status Of Nuclear Power In The
The Current Status Of Nuclear Power In TheThe Current Status Of Nuclear Power In The
The Current Status Of Nuclear Power In The
Joe Miller
 
Report ntpc auraiya
Report ntpc auraiyaReport ntpc auraiya
Report ntpc auraiya
Gopesh Kushwaha
 
Energy Sector - 12th Plan (2012 - 2017)
Energy Sector - 12th Plan (2012 - 2017)Energy Sector - 12th Plan (2012 - 2017)
Energy Sector - 12th Plan (2012 - 2017)
NITI Aayog
 
Lecture 1 piyush 21
Lecture 1 piyush 21Lecture 1 piyush 21
Lecture 1 piyush 21
Dr Piyush Charan
 
Sopitsuda thailandssolarfit
Sopitsuda thailandssolarfitSopitsuda thailandssolarfit
Sopitsuda thailandssolarfit
Next Gen Group of Company
 
Conference ppt
Conference pptConference ppt
Conference ppt
ramesh2300958
 
Study & Resech Potential Development PLTS 120 MW at TIRIP.
Study & Resech Potential Development PLTS 120 MW at TIRIP.Study & Resech Potential Development PLTS 120 MW at TIRIP.
Study & Resech Potential Development PLTS 120 MW at TIRIP.
PT Temartek Elvantama Mandiri
 
Go Ahead for F&O Report 09 November 2012-Mansukh Investment and Trading Solut...
Go Ahead for F&O Report 09 November 2012-Mansukh Investment and Trading Solut...Go Ahead for F&O Report 09 November 2012-Mansukh Investment and Trading Solut...
Go Ahead for F&O Report 09 November 2012-Mansukh Investment and Trading Solut...
Mansukh Investment & Trading Solutions
 
STX 93 generator design & assembly
STX 93 generator design & assemblySTX 93 generator design & assembly
STX 93 generator design & assembly
Dutch Power
 
Renewable energy consumption estimates by source
Renewable energy consumption estimates by sourceRenewable energy consumption estimates by source
Renewable energy consumption estimates by source
Sunworks
 

Similar to Installed capacity (20)

southern grid
southern grid southern grid
southern grid
 
dgr4-2022-02-04.pdf
dgr4-2022-02-04.pdfdgr4-2022-02-04.pdf
dgr4-2022-02-04.pdf
 
Inverted Energy: Diesel Generator Set Replacement
Inverted Energy: Diesel Generator Set Replacement Inverted Energy: Diesel Generator Set Replacement
Inverted Energy: Diesel Generator Set Replacement
 
Issues in hydro power development
Issues in hydro power developmentIssues in hydro power development
Issues in hydro power development
 
Renewable energy transmission [CSTP 2009]
Renewable energy transmission [CSTP 2009]Renewable energy transmission [CSTP 2009]
Renewable energy transmission [CSTP 2009]
 
CEA's Monthly Review of Indian Power Sector
CEA's Monthly Review of Indian Power SectorCEA's Monthly Review of Indian Power Sector
CEA's Monthly Review of Indian Power Sector
 
8b80ade8 7b96-4114-9e36-76dcf21dc74d-150219134514-conversion-gate02 (1) (1) (...
8b80ade8 7b96-4114-9e36-76dcf21dc74d-150219134514-conversion-gate02 (1) (1) (...8b80ade8 7b96-4114-9e36-76dcf21dc74d-150219134514-conversion-gate02 (1) (1) (...
8b80ade8 7b96-4114-9e36-76dcf21dc74d-150219134514-conversion-gate02 (1) (1) (...
 
Presentation for cm 24.04.2012
Presentation for cm 24.04.2012Presentation for cm 24.04.2012
Presentation for cm 24.04.2012
 
A n srivastava
A n srivastavaA n srivastava
A n srivastava
 
12 B .Storage CEA.pptx
12 B .Storage CEA.pptx12 B .Storage CEA.pptx
12 B .Storage CEA.pptx
 
The Current Status Of Nuclear Power In The
The Current Status Of Nuclear Power In TheThe Current Status Of Nuclear Power In The
The Current Status Of Nuclear Power In The
 
Report ntpc auraiya
Report ntpc auraiyaReport ntpc auraiya
Report ntpc auraiya
 
Energy Sector - 12th Plan (2012 - 2017)
Energy Sector - 12th Plan (2012 - 2017)Energy Sector - 12th Plan (2012 - 2017)
Energy Sector - 12th Plan (2012 - 2017)
 
Lecture 1 piyush 21
Lecture 1 piyush 21Lecture 1 piyush 21
Lecture 1 piyush 21
 
Sopitsuda thailandssolarfit
Sopitsuda thailandssolarfitSopitsuda thailandssolarfit
Sopitsuda thailandssolarfit
 
Conference ppt
Conference pptConference ppt
Conference ppt
 
Study & Resech Potential Development PLTS 120 MW at TIRIP.
Study & Resech Potential Development PLTS 120 MW at TIRIP.Study & Resech Potential Development PLTS 120 MW at TIRIP.
Study & Resech Potential Development PLTS 120 MW at TIRIP.
 
Go Ahead for F&O Report 09 November 2012-Mansukh Investment and Trading Solut...
Go Ahead for F&O Report 09 November 2012-Mansukh Investment and Trading Solut...Go Ahead for F&O Report 09 November 2012-Mansukh Investment and Trading Solut...
Go Ahead for F&O Report 09 November 2012-Mansukh Investment and Trading Solut...
 
STX 93 generator design & assembly
STX 93 generator design & assemblySTX 93 generator design & assembly
STX 93 generator design & assembly
 
Renewable energy consumption estimates by source
Renewable energy consumption estimates by sourceRenewable energy consumption estimates by source
Renewable energy consumption estimates by source
 

Installed capacity

  • 1. 6. ALL INDIA REGIONWISE GENERATING INSTALLED CAPACITY (MW) OF POWER UTILITIES INCLUDING ALLOCATED SHARES IN JOINT AND CENTRAL SECTOR UTILITIES (As on 30-06-2012) SL. REGION THERMAL Nuclear HYDRO R.E.S.@ TOTAL NO. COAL GAS DSL TOTAL (Renewable) (MNRE) 1 Northern 29923.50 4671.26 12.99 34607.75 1620.00 15423.75 4406.64 56058.14 2 Western 41129.50 8254.81 17.48 49401.79 1840.00 7447.50 8067.26 66756.55 3 Southern 22882.50 4962.78 939.32 28784.60 1320.00 11338.03 11713.98 53156.61 4 Eastern 22337.88 190.00 17.20 22545.08 0.00 3882.12 410.71 26837.91 5 N. Eastern 60.00 824.20 142.74 1026.94 0.00 1200.00 228.00 2454.94 6 Islands 0.00 0.00 70.02 70.02 0.00 0.00 6.10 76.12 7 All India 116333.38 18903.05 1199.75 136436.18 4780.00 39291.40 24832.68 205340.26 @ RES- Renewable Energy Sources includes Small Hydro Projects (SHP), Biomass Power (BP), Urban & Industrial Waste Power (U&I) Wind Energy and Solar Power. Note:- UNITS COMMISSIONED, DERATED & DECOMMISSIONED DURING JUNE.12 Thermal 1) Sipat STTP St-I (Unit 3) 660 MW of NTPC in Chatisgarh commissioned on 02-06-2012 (Full Load) by NTPC 2) Salaya TPP Unit 2 (600MW) of Essar in Gujrat commisiioned on 13-06-2012 on Full Load by Essar Power Ltd. 3) Vindhyachal TPP IV Unit 11 ((500MW) of NTPC in MP commisiioned on 14-06-2012 on Full Load by NTPC 4) Kasaipalli TPS (Unit 2) 135 MW in Chhatisgarh commissioned on 21-06-2012 on Full Load by ACB 5) Pragati CCGT (Unit 3) 250 MW in Delhi commissioned on 27-06-2012 on Full Load by PPCL Hydro 1) Chamera-III Unit 3 (77 MW) in HP commissioned on 07-06-2012 by NHPC 2) Chamera-III Unit 2 (77 MW) in HP commissioned on 12-06-2012 by NHPC 3) Chamera-III Unit 1 (77 MW) in HP commissioned on 28-06-2012 by NHPC Units Retired 1) Unit No. 1 &2 125 MW each (Total 250MW) of Nshik TPS MaharashtraState Power Gen Co. Ltd.(MAHAGENCO) w.e.f. 25-06-12 & 30-06-12 respectively 2) Unit No. 6 of Obra "A" TPS UPRVUNL approved for retirement w.e.f. 12-01-11 on 12-06-2012 ALL INDIA GENERATING INSTALLED CAPACITY ( MW ) AS ON 30-06-2012 250000 225000 205340 200000 175000 150000 136436 125000 100000 75000 50000 39291 24833 25000 4780 0 0 Thermal Nuclear Hydro RES Total Captive Thermal Nuclear Hydro RES Total Captive ENERGY SAVED IS ENERGY PRODUCED