Prepared By: Khurram Fayyaz
Inspection Report during Plant Outage @ NA Plant
Equipment: B-101 A/H-105 A (Lamont Boiler)
Inspection Technique: VI, DPT, UT and Metallography
INSPECTION SCOPE:
· VI and DPT of Burner Head.
· DPT of Weld Seams of Shroud.
· DPT of Welding Seams of Catalyst Basket.
· Hardness Measurement.
· Visual Inspection of Coils.
· Thickness Monitoring of Coils.
· Inspection of Shell, Nozzles and coils welding joints.
· Metallography of Shell
OBSERVATIONS:
Inspection of B-101 A/H-105 A (Lamont Boiler) was carried out and observations are as follows:-
· DPT of Welding Seams of Burner head was carried out and no cracks/pinholes were observed
· DPT of Welding seams of Catalyst basket was carried out and found satisfactory
· DPT of Burner head external and internal nozzles was carried out and found satisfactory
· DPT of Weld Seams of Shroud was carried out and found satisfactory
· Mesh of Basket found damaged at one point. New Mesh Installed.
· Thickness Monitoring of coils was carried out;
Max: 3.7 mm, Min: 3.4 mm, Design: 3.6 mm
· Hardness Testing of shell was carried out and all the values are in acceptable range;
Max: 175 HB, Min: 150 HB
Hardness Values in TA-2015: Max: 190 HB, Min: 135 HB
· 70% Thickness monitoring of line included fittings from H-105 to H-112 has been carried out and found
satisfactory.
· Max: 6.7 mm, Min: 6.1 mm, Design: 4.2 mm
· Metallography activity for La-Mont Boiler on H-105 A/B has been completed, 01 Replica from H-105 A on shell
was taken. Report is awaited.
Prepared By: Khurram Fayyaz
Inspection Report during Plant Outage @ NA Plant
PICTORIAL
DPT of nozzle of Burner head
DPT of T-Joints of basket
Prepared By: Khurram Fayyaz
Inspection Report during Plant Outage @ NA Plant
PICTORIAL
Mesh of basket found damaged
Thickness Monitoring of Coils
Prepared By: Khurram Fayyaz
Inspection Report during Plant Outage @ NA Plant
Equipment: B-101 A/H-105 B (Lamont Boiler)
Inspection Technique: VI, DPT, UT and Metallography
INSPECTION SCOPE:
· VI and DPT of Burner Head.
· DPT of Weld Seams of Shroud.
· DPT of Welding Seams of Catalyst Basket.
· Hardness Measurement.
· Visual Inspection of Coils.
· Thickness Monitoring of Coils.
· Inspection of Shell, Nozzles and coils welding joints.
· Metallography of Shell
OBSERVATIONS:
Inspection of B-101 A/H-105 B (Lamont Boiler) was carried out and observations are as follows:-
· DPT of Welding Seams of Burner head was carried out and no cracks/pinholes were observed
· DPT of Welding seams of Catalyst basket was carried out and found satisfactory
· DPT of Burner head external and internal nozzles was carried out and found satisfactory
· DPT of Weld Seams of Shroud was carried out and found satisfactory
· Mesh of Basket found satisfactory.
· Thickness Monitoring of coils was carried out;
Max: 3.8 mm, Min: 3.4 mm Design: 3.6 mm
· Hardness Testing of shell was carried out and all the values are in acceptable range;
Max: 164 HB, Min: 150 HB
Hardness Values in TA-2015: Max: 243 HB, Min: 140 HB
· 70% Thickness monitoring of line included fittings from H-105 to H-112 has been carried out and found
satisfactory.
Max: 6.4 mm, Min: 5.9 mm, Design: 4.2 mm
· Metallography activity for La-Mont Boiler on H-105 A/B has been completed, 03 Replicas from H-105 B were
taken (02 Replica from Shell near Cracks & 01 Replica from Flanged Portion near Crack). Reports are awaited.
· The existing crack has been checked and measured by Inspection team and No increase in crack size (Length)
observed.
Prepared By: Khurram Fayyaz
Inspection Report during Plant Outage @ NA Plant
PICTORIAL
DPT of T-Joints of Basket
DPT of T-Joints of burner head
Prepared By: Khurram Fayyaz
Inspection Report during Plant Outage @ NA Plant
PICTORIAL
DPT of nozzle of Burner head
DPT of Crack on shell after placing burner head back
Prepared By: Khurram Fayyaz
Inspection Report during Plant Outage @ NA Plant
Equipment: CDM NH3 Evaporator line
Inspection Technique: VI, DPT, UT
INSPECTION SCOPE:
· VI and DPT of Line
· UT of Line
OBSERVATIONS:
Inspection of CDM NH3 Evaporator line was carried out and observations are as follows:-
· Thickness Monitoring of CDM NH3 Evaporator was carried out and found satisfactory
Design: 5.54 mm, Min: 5.5 mm, Max: 5.7 mm
· DPT of complete line was carried out. 01 location through hole crack observed approximately 08 to 10 mm length.
Needs to be repair.
Work Done:
· After grinding DPT was performed again and branches of cracks were found due to which CDM ammonia vaporizer
affected portion has been replaced with a new one.
· DPT after Welding activity was carried out by Inspection and results found satisfactory.
Crack view after DPT
Prepared By: Khurram Fayyaz
Inspection Report during Plant Outage @ NA Plant
Miscellaneous Jobs:
1. Internal Inspection of Filter L-101 Air Duct was carried out.
o Cleaning required before Box-Up.
o Overall condition found satisfactory.
2. DPT after welding of STG Joints was carried out and found satisfactory.
3. PWHT of 09 Joints of STG area was carried out. Job Completed.
4. RT of 09 Joints of STG area has been carried out in night shift. Result found satisfactory.

More Related Content

What's hot

Storage tank inspection presentation
Storage tank inspection presentationStorage tank inspection presentation
Storage tank inspection presentation
Ian Moore
 
Itp
ItpItp
API 622, API 624 and API 641 for Fugitive Emissions
API 622, API 624 and API 641 for Fugitive EmissionsAPI 622, API 624 and API 641 for Fugitive Emissions
API 622, API 624 and API 641 for Fugitive Emissions
PGE India - PILOT Gaskets
 
Pqr0
Pqr0Pqr0
Pqr0
Zaki Fadl
 
API 510 Practice questions
API 510 Practice questions API 510 Practice questions
API 510 Practice questions
hariqwe
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellhead
Elsayed Amer
 
343312365 mt-ppt
343312365 mt-ppt343312365 mt-ppt
343312365 mt-ppt
MohamedAwad197
 
52240 plumbingfixtures
52240 plumbingfixtures52240 plumbingfixtures
52240 plumbingfixtures
tagalamut143
 
GTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXGTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IX
Antonius Pompi Bramono
 
Bursting Of Sand Blasting Hopper
Bursting Of Sand Blasting HopperBursting Of Sand Blasting Hopper
Bursting Of Sand Blasting Hoppervtsiri
 
14033
1403314033
14033
mmkatta
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
Elsayed Amer
 
PWHT
PWHTPWHT
Plate material
Plate materialPlate material
Plate material
Irfankhan Y. Pathan
 

What's hot (18)

Storage tank inspection presentation
Storage tank inspection presentationStorage tank inspection presentation
Storage tank inspection presentation
 
Itp
ItpItp
Itp
 
API 622, API 624 and API 641 for Fugitive Emissions
API 622, API 624 and API 641 for Fugitive EmissionsAPI 622, API 624 and API 641 for Fugitive Emissions
API 622, API 624 and API 641 for Fugitive Emissions
 
Pqr0
Pqr0Pqr0
Pqr0
 
API 510 Practice questions
API 510 Practice questions API 510 Practice questions
API 510 Practice questions
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellhead
 
343312365 mt-ppt
343312365 mt-ppt343312365 mt-ppt
343312365 mt-ppt
 
sapl-presentation
sapl-presentationsapl-presentation
sapl-presentation
 
52240 plumbingfixtures
52240 plumbingfixtures52240 plumbingfixtures
52240 plumbingfixtures
 
Api 570 01_api_570
Api 570 01_api_570Api 570 01_api_570
Api 570 01_api_570
 
ERJ DIVE
ERJ DIVEERJ DIVE
ERJ DIVE
 
Welders qualification
Welders qualificationWelders qualification
Welders qualification
 
GTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXGTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IX
 
Bursting Of Sand Blasting Hopper
Bursting Of Sand Blasting HopperBursting Of Sand Blasting Hopper
Bursting Of Sand Blasting Hopper
 
14033
1403314033
14033
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
 
PWHT
PWHTPWHT
PWHT
 
Plate material
Plate materialPlate material
Plate material
 

Viewers also liked

Asme pressure vessel protection since 1907
Asme pressure vessel protection since 1907Asme pressure vessel protection since 1907
Asme pressure vessel protection since 1907
George Evans
 
Recurring inspection in QM
Recurring inspection in QMRecurring inspection in QM
Recurring inspection in QM
Ankit Sharma
 
technical services for turnarounds in petrochemical plants in western europe
technical services for turnarounds in petrochemical plants in western europetechnical services for turnarounds in petrochemical plants in western europe
technical services for turnarounds in petrochemical plants in western europe
T.A. Cook
 
API 510 PRESSURE VESSEL INSPECTOR : FULL CERTIFICATION PREPARATION COURSE
API 510 PRESSURE VESSEL INSPECTOR : FULL CERTIFICATION PREPARATION COURSEAPI 510 PRESSURE VESSEL INSPECTOR : FULL CERTIFICATION PREPARATION COURSE
API 510 PRESSURE VESSEL INSPECTOR : FULL CERTIFICATION PREPARATION COURSE
Ir. Syed Fadzil Syed Mohamed, P.Eng, CEng
 
Self-inspection SOP
Self-inspection SOPSelf-inspection SOP
Self-inspection SOP
norwinu
 
Manufacturing planning and self inspection in pharmaceutical industries
Manufacturing planning and self inspection in pharmaceutical industriesManufacturing planning and self inspection in pharmaceutical industries
Manufacturing planning and self inspection in pharmaceutical industries
Sumita Sahoo
 
Plant shutdown
Plant shutdownPlant shutdown
Plant shutdown
willyfellow
 
Summary of pressure vessel 1
Summary of pressure vessel 1Summary of pressure vessel 1
Summary of pressure vessel 1
Mohamed Basyoni
 
Pharmaceutical Pellets and Granules – Manufacturing Plant Detailed Project Re...
Pharmaceutical Pellets and Granules – Manufacturing Plant Detailed Project Re...Pharmaceutical Pellets and Granules – Manufacturing Plant Detailed Project Re...
Pharmaceutical Pellets and Granules – Manufacturing Plant Detailed Project Re...
Ajjay Kumar Gupta
 
Pressure vessel manufacturing
Pressure vessel manufacturingPressure vessel manufacturing
Pressure vessel manufacturingphysics101
 
Welded steel tanks for storage oil
Welded steel tanks for storage oilWelded steel tanks for storage oil
Welded steel tanks for storage oilYahya Haggag
 
Pressure vessels
Pressure vessels  Pressure vessels
Pressure vessels GPTraining
 
2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE
2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE
2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE
Ir. Syed Fadzil Syed Mohamed, P.Eng, CEng
 
Boiler Presentation
Boiler PresentationBoiler Presentation
Boiler Presentation
anshsmartstud
 
Cfb boiler basic design, operation and maintenance
Cfb boiler basic design, operation and maintenanceCfb boiler basic design, operation and maintenance
Cfb boiler basic design, operation and maintenance
Pichai Chaibamrung
 

Viewers also liked (18)

Asme pressure vessel protection since 1907
Asme pressure vessel protection since 1907Asme pressure vessel protection since 1907
Asme pressure vessel protection since 1907
 
Recurring inspection in QM
Recurring inspection in QMRecurring inspection in QM
Recurring inspection in QM
 
technical services for turnarounds in petrochemical plants in western europe
technical services for turnarounds in petrochemical plants in western europetechnical services for turnarounds in petrochemical plants in western europe
technical services for turnarounds in petrochemical plants in western europe
 
API 510 PRESSURE VESSEL INSPECTOR : FULL CERTIFICATION PREPARATION COURSE
API 510 PRESSURE VESSEL INSPECTOR : FULL CERTIFICATION PREPARATION COURSEAPI 510 PRESSURE VESSEL INSPECTOR : FULL CERTIFICATION PREPARATION COURSE
API 510 PRESSURE VESSEL INSPECTOR : FULL CERTIFICATION PREPARATION COURSE
 
Self-inspection SOP
Self-inspection SOPSelf-inspection SOP
Self-inspection SOP
 
Manufacturing planning and self inspection in pharmaceutical industries
Manufacturing planning and self inspection in pharmaceutical industriesManufacturing planning and self inspection in pharmaceutical industries
Manufacturing planning and self inspection in pharmaceutical industries
 
Plant shutdown
Plant shutdownPlant shutdown
Plant shutdown
 
Summary of pressure vessel 1
Summary of pressure vessel 1Summary of pressure vessel 1
Summary of pressure vessel 1
 
Ffs assessment
Ffs assessmentFfs assessment
Ffs assessment
 
Pharmaceutical Pellets and Granules – Manufacturing Plant Detailed Project Re...
Pharmaceutical Pellets and Granules – Manufacturing Plant Detailed Project Re...Pharmaceutical Pellets and Granules – Manufacturing Plant Detailed Project Re...
Pharmaceutical Pellets and Granules – Manufacturing Plant Detailed Project Re...
 
Pressure vessel manufacturing
Pressure vessel manufacturingPressure vessel manufacturing
Pressure vessel manufacturing
 
Welded steel tanks for storage oil
Welded steel tanks for storage oilWelded steel tanks for storage oil
Welded steel tanks for storage oil
 
Pressure vessels
Pressure vessels  Pressure vessels
Pressure vessels
 
Pressure vessels
Pressure vesselsPressure vessels
Pressure vessels
 
2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE
2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE
2015 API 510 PRESSURE VESSEL INSPECTOR CERTIFICATION PREPARATION COURSE
 
Boiler Presentation
Boiler PresentationBoiler Presentation
Boiler Presentation
 
Cfb boiler basic design, operation and maintenance
Cfb boiler basic design, operation and maintenanceCfb boiler basic design, operation and maintenance
Cfb boiler basic design, operation and maintenance
 
Pharmaceutical manufacturing plant
Pharmaceutical manufacturing plantPharmaceutical manufacturing plant
Pharmaceutical manufacturing plant
 

Similar to Inspection Report during Plant Outage @ NA Plant

Testing_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptTesting_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.ppt
Satish Pydimarla
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
MOHAMED DAOWOD
 
Reformer Catalyst Report
Reformer Catalyst ReportReformer Catalyst Report
Reformer Catalyst Report
Dharmaraj Daddikar
 
CV not functioning CA report_linkedIn
CV not functioning CA report_linkedInCV not functioning CA report_linkedIn
CV not functioning CA report_linkedInGopi nadh
 
Site Report
Site ReportSite Report
Site Report
ShavneelChand
 
VISUAL INSPECTION pt 2
VISUAL INSPECTION   pt 2VISUAL INSPECTION   pt 2
VISUAL INSPECTION pt 2Mogekwu Chinye
 
Rbi presentation inventure technologies
Rbi presentation inventure technologiesRbi presentation inventure technologies
Rbi presentation inventure technologies
Rindert Algra
 
Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014Stuart Cooper
 
Heynck profile info
Heynck profile infoHeynck profile info
Heynck profile info
Sanket Kanada
 
FABRICATION_OF_OFFSHORE_PLATFORM.pdf
FABRICATION_OF_OFFSHORE_PLATFORM.pdfFABRICATION_OF_OFFSHORE_PLATFORM.pdf
FABRICATION_OF_OFFSHORE_PLATFORM.pdf
ribby1
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC SupervisorPranesh Kumar
 
Coke drum applications Claudio Allevato
Coke drum applications Claudio AllevatoCoke drum applications Claudio Allevato
Coke drum applications Claudio Allevato
Minacore
 
Scheduled inspections BTH
Scheduled inspections                                       BTH Scheduled inspections                                       BTH
Scheduled inspections BTH
brayan pertuz
 
PROCESS GAS COMPRESSOR AND PT OVERHAULING
PROCESS GAS COMPRESSOR AND PT OVERHAULINGPROCESS GAS COMPRESSOR AND PT OVERHAULING
PROCESS GAS COMPRESSOR AND PT OVERHAULING
ASHWIN A
 

Similar to Inspection Report during Plant Outage @ NA Plant (20)

Testing_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptTesting_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.ppt
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
 
Reformer Catalyst Report
Reformer Catalyst ReportReformer Catalyst Report
Reformer Catalyst Report
 
CV not functioning CA report_linkedIn
CV not functioning CA report_linkedInCV not functioning CA report_linkedIn
CV not functioning CA report_linkedIn
 
Site Report
Site ReportSite Report
Site Report
 
Nagarajan Saravanan
Nagarajan SaravananNagarajan Saravanan
Nagarajan Saravanan
 
Inspection Activity
Inspection ActivityInspection Activity
Inspection Activity
 
Mithun Banjan CV
Mithun Banjan CVMithun Banjan CV
Mithun Banjan CV
 
VISUAL INSPECTION pt 2
VISUAL INSPECTION   pt 2VISUAL INSPECTION   pt 2
VISUAL INSPECTION pt 2
 
Rbi presentation inventure technologies
Rbi presentation inventure technologiesRbi presentation inventure technologies
Rbi presentation inventure technologies
 
anuj cv
anuj cvanuj cv
anuj cv
 
Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014
 
Heynck profile info
Heynck profile infoHeynck profile info
Heynck profile info
 
FABRICATION_OF_OFFSHORE_PLATFORM.pdf
FABRICATION_OF_OFFSHORE_PLATFORM.pdfFABRICATION_OF_OFFSHORE_PLATFORM.pdf
FABRICATION_OF_OFFSHORE_PLATFORM.pdf
 
PROJECT PPT. (1)
PROJECT PPT. (1)PROJECT PPT. (1)
PROJECT PPT. (1)
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
 
COMPL OF WORKS1
COMPL OF WORKS1COMPL OF WORKS1
COMPL OF WORKS1
 
Coke drum applications Claudio Allevato
Coke drum applications Claudio AllevatoCoke drum applications Claudio Allevato
Coke drum applications Claudio Allevato
 
Scheduled inspections BTH
Scheduled inspections                                       BTH Scheduled inspections                                       BTH
Scheduled inspections BTH
 
PROCESS GAS COMPRESSOR AND PT OVERHAULING
PROCESS GAS COMPRESSOR AND PT OVERHAULINGPROCESS GAS COMPRESSOR AND PT OVERHAULING
PROCESS GAS COMPRESSOR AND PT OVERHAULING
 

Inspection Report during Plant Outage @ NA Plant

  • 1. Prepared By: Khurram Fayyaz Inspection Report during Plant Outage @ NA Plant Equipment: B-101 A/H-105 A (Lamont Boiler) Inspection Technique: VI, DPT, UT and Metallography INSPECTION SCOPE: · VI and DPT of Burner Head. · DPT of Weld Seams of Shroud. · DPT of Welding Seams of Catalyst Basket. · Hardness Measurement. · Visual Inspection of Coils. · Thickness Monitoring of Coils. · Inspection of Shell, Nozzles and coils welding joints. · Metallography of Shell OBSERVATIONS: Inspection of B-101 A/H-105 A (Lamont Boiler) was carried out and observations are as follows:- · DPT of Welding Seams of Burner head was carried out and no cracks/pinholes were observed · DPT of Welding seams of Catalyst basket was carried out and found satisfactory · DPT of Burner head external and internal nozzles was carried out and found satisfactory · DPT of Weld Seams of Shroud was carried out and found satisfactory · Mesh of Basket found damaged at one point. New Mesh Installed. · Thickness Monitoring of coils was carried out; Max: 3.7 mm, Min: 3.4 mm, Design: 3.6 mm · Hardness Testing of shell was carried out and all the values are in acceptable range; Max: 175 HB, Min: 150 HB Hardness Values in TA-2015: Max: 190 HB, Min: 135 HB · 70% Thickness monitoring of line included fittings from H-105 to H-112 has been carried out and found satisfactory. · Max: 6.7 mm, Min: 6.1 mm, Design: 4.2 mm · Metallography activity for La-Mont Boiler on H-105 A/B has been completed, 01 Replica from H-105 A on shell was taken. Report is awaited.
  • 2. Prepared By: Khurram Fayyaz Inspection Report during Plant Outage @ NA Plant PICTORIAL DPT of nozzle of Burner head DPT of T-Joints of basket
  • 3. Prepared By: Khurram Fayyaz Inspection Report during Plant Outage @ NA Plant PICTORIAL Mesh of basket found damaged Thickness Monitoring of Coils
  • 4. Prepared By: Khurram Fayyaz Inspection Report during Plant Outage @ NA Plant Equipment: B-101 A/H-105 B (Lamont Boiler) Inspection Technique: VI, DPT, UT and Metallography INSPECTION SCOPE: · VI and DPT of Burner Head. · DPT of Weld Seams of Shroud. · DPT of Welding Seams of Catalyst Basket. · Hardness Measurement. · Visual Inspection of Coils. · Thickness Monitoring of Coils. · Inspection of Shell, Nozzles and coils welding joints. · Metallography of Shell OBSERVATIONS: Inspection of B-101 A/H-105 B (Lamont Boiler) was carried out and observations are as follows:- · DPT of Welding Seams of Burner head was carried out and no cracks/pinholes were observed · DPT of Welding seams of Catalyst basket was carried out and found satisfactory · DPT of Burner head external and internal nozzles was carried out and found satisfactory · DPT of Weld Seams of Shroud was carried out and found satisfactory · Mesh of Basket found satisfactory. · Thickness Monitoring of coils was carried out; Max: 3.8 mm, Min: 3.4 mm Design: 3.6 mm · Hardness Testing of shell was carried out and all the values are in acceptable range; Max: 164 HB, Min: 150 HB Hardness Values in TA-2015: Max: 243 HB, Min: 140 HB · 70% Thickness monitoring of line included fittings from H-105 to H-112 has been carried out and found satisfactory. Max: 6.4 mm, Min: 5.9 mm, Design: 4.2 mm · Metallography activity for La-Mont Boiler on H-105 A/B has been completed, 03 Replicas from H-105 B were taken (02 Replica from Shell near Cracks & 01 Replica from Flanged Portion near Crack). Reports are awaited. · The existing crack has been checked and measured by Inspection team and No increase in crack size (Length) observed.
  • 5. Prepared By: Khurram Fayyaz Inspection Report during Plant Outage @ NA Plant PICTORIAL DPT of T-Joints of Basket DPT of T-Joints of burner head
  • 6. Prepared By: Khurram Fayyaz Inspection Report during Plant Outage @ NA Plant PICTORIAL DPT of nozzle of Burner head DPT of Crack on shell after placing burner head back
  • 7. Prepared By: Khurram Fayyaz Inspection Report during Plant Outage @ NA Plant Equipment: CDM NH3 Evaporator line Inspection Technique: VI, DPT, UT INSPECTION SCOPE: · VI and DPT of Line · UT of Line OBSERVATIONS: Inspection of CDM NH3 Evaporator line was carried out and observations are as follows:- · Thickness Monitoring of CDM NH3 Evaporator was carried out and found satisfactory Design: 5.54 mm, Min: 5.5 mm, Max: 5.7 mm · DPT of complete line was carried out. 01 location through hole crack observed approximately 08 to 10 mm length. Needs to be repair. Work Done: · After grinding DPT was performed again and branches of cracks were found due to which CDM ammonia vaporizer affected portion has been replaced with a new one. · DPT after Welding activity was carried out by Inspection and results found satisfactory. Crack view after DPT
  • 8. Prepared By: Khurram Fayyaz Inspection Report during Plant Outage @ NA Plant Miscellaneous Jobs: 1. Internal Inspection of Filter L-101 Air Duct was carried out. o Cleaning required before Box-Up. o Overall condition found satisfactory. 2. DPT after welding of STG Joints was carried out and found satisfactory. 3. PWHT of 09 Joints of STG area was carried out. Job Completed. 4. RT of 09 Joints of STG area has been carried out in night shift. Result found satisfactory.