SCHEDULED INSPECTIONS BTH-47-CR&O
1200 hours inspections
Data 03/11/2015 Initial
Reference:BTH-47G3 mech other
Inspection task desription
Date: 03/11/2015
Facility:
HelicopterS/N:
Total time:
Ganeral
each listedinspectionitemor maintenance fuctionis to be
performedin accordance with the maintenance manual
chapter specified
Instruction
Chapter 53
PeriodicInspections- requiredat 50, 100, 600 and 1200
hour intervals.
Special Inspections- requiredbyunusual events,such as
hard landingor suddenstoppage of rotor.
Mandatory RetirementSchedule - listof parts which are
limitedto a definite maximumservice life.
Daily inspecion
The dailyinspectionisarigidvisual inspectiontoascertainif
the helicopterisairworthyandif anyitemhasbecome loose,
worn,or damagedduringflightthe previousdayorsince the
accomplishmentof anypreviousinspection.Performdaily
inspectionpriortothe firstflightof the day.
50 hours
-rigidvisual inspection
1. Inspectinstrumentsforbroken,crackedorloose cover
glass,and conditionof range andlimitmarkings.
2. Inspectbatteryfor evidenceof spilledelectrolyte,security
of mountingandgeneral conditionCheckbattery.draintube
for unobstructeddrainage.
3. Inspectgeneral conditionof all wiring,insulatedtubing
and clips.Testoperationof all switchesandcircuitbreakers.
Checknavigationandlandinglightsandrotatingbeaconsfor
operationandsecurityof mounting.
4. Inspectgeneratorandstarter forsecurity.
5. Drain static andpitottubesat drainplugif water,in
system,issuspected.
20 nov-2015 rev 1
SCHEDULED INSPECTIONS BTH- BTH-47-CR&O
1200 hours inspections
Data:03/11/2015 Initial
Reference:BTH-47G3 mech other
Inspection task desription
Date:03/11/2015
Facility:
HelicopterS/n
Total time:
Ganeral
each listedinspectionitemor maintenance fuctionis to be performed
in accordance with the maintenance manual chapter specified
Instrucion
Chapter44
100 hours
Flightcontrol
1.Disconnectcontrol rodfrom control ringhorns andcleanhorns with
suitable cleaning solvent.Inspecthornswith10 powermagnifyingglass
to determine if acrack or cracks exist.If cracks are found,remove
swashplate andreplace immediately.
2. Inspecttaperbushingsandboltsinlateral jackshaftat transmission
for security.
3. CheckCSC870-5 dampersfor security,leaksandpropertiming.
600 hours
Accomplishacomplete dailyinspection,50-hourinspection,100-hour
inspectionandthe inspection
1 Make thoroughvisual inspectionforcracksinall parts of cylinder
supportand bellcrankassemblies,including attachmentbrackets
2.Checkfor excessive radial playof cylindertrunnioninbushingsof
supportsandbellcranks.
3.Test systemoperatingpressure,adjustrelief valveasnecessary
ROTATINGAND FLIGHT CONTROLTUBES
1.Remove followingcontrol tubes
1200 hours
Note
The followingcontrol tubesare installedwithina30 degree angle of the
vertical axisof the helicopter.
b.Remove collectivepitchcontrol tube betweenpowercylinderand
idler.
c. Remove lateral cycliccontrol tube betweenpowercylinderand
torque tube assembly.Remove control tube betweentorque tube
assemblyandswashplate.
d. Remove fore andaftcyclic control tube betweenpowercylinderand
lever.Remove control tube between leverandswashplate.
2. Remove endfittingfromcontrol tubesasfollows:
a. Mark fittings andtube endstoensure fittingisassembledinoriginal
position.
b. Remove bothendfittingsbycarefullydrillingoff rivetheadsanddrive
out rivets.Donot enlarge rivetholes intube orfitting.
3. Inspecteach control tube forinternal corrosionusingalightand
borescope orequivalentinspectionmeans
Note
Control tubeswithdouble drilledrivetholes,sharpnicks,scratchesor
internal corrosionare consideredunserviceable.
4. Cleanand refinishacceptable control tubesasfollows:
a. Remove all paintandprimerfrominternal surface of control tubes,
usingsteel wire brushonsteel control tubesandbristle brushon
aluminumcontrol tubes,withMethyl-Ethyl-Ketone.
Note
a.Internal surface mustbe completelycleantoensure adhesionof
protective film.
b. Addthree partsof thinner(TolueneTT-T-548) to fourparts of zinc
chromate primer,byvolume,andmix thoroughly.
c. Applyprimertoinside of control tubes,coatentire internal surface
while rotatingcontrol tube.Allow excessprimertodrain.Wipe excess
fromfittingarea,leavingalightcoat.Allow six hoursminimumdrying
time priorto furtherfinishing.
Mixaluminumpaintasfollows:
The followingwill provide approximatelyone gallon.If asmall quantity
isrequired,reduce all quantitiesproportionally.
a. Dissolve sixteenouncesof aluminumpigment(TT-P-320A) paste
(Type 11 ClassA)orpowder(Type IClassA)ina small amountof thinner
(TT-T-266).
b. Addaluminumpigmenttoone gallonof clearcellulose nitratelacquer
(TT-L-32).
c. Addequal volume of thinnertolacquerandmix thoroughly.Strain
througha paint strainer.
6. Applyaluminumlacquertoinside of control tube,coatentire internal
surface while rotatingcontrol tube,Allow excesslacquertodrain.Wipe
excessfromfittingarea,leavingalightcoat.Allow 2 hoursbefore
installingendfittings.
Note
Rod ends,fittings,andcevisesmustbe platedortreated;andmust
notexhibitanycorrosion.Replace partsthathave inadequate finish.
7. Hollowendsmayrequire refilling.If adhesive fillerisdamagedwhen
the rivetswere drivenout,remove oldfillerandfill withhardepoxy
adhesive Metal SetA4or equivalent.Allow adhesivetocure 24 hours
before drillingholes
Note
Outside surface of control tube assemblymaybe primedpriorto
applyingsealant.Sealantwilladhere tochemicallytreatedmetal orfully
curedzinc chromate surface.
8. Applyproseal 890-B2 to I.D.of control tubesandO.D. of endfittings,
at fayingsurfaces,before assemblyInstall endfittings incontrol tube.
9. Dip MS20613-5P rivetsinproseal andinstall.MS20613-6P rivets
(oversize) maybe used.Replace anysteel
control tube that requiresrivetslargerthanMS20613-6P rivets.
a. On aluminumrotatingcontrol tubes,use MS20470-AD5 rivets. Use of
oversize rivetsisnotapprovedonaluminumrotatingcontrol tube
assemblies.
10. Seal eachendof control tube assemblyandaroundrivetswith
proseal 890-B2 sealant.Applysealantasshownonfigure 1-20control
tube sealing(typical).Cure sealant atroomtemperature for72 hours.
Note
Control tubesmaybe reinstalledwhensealantisnottacky
(approximately24hours).Do notuse heat to cure sealant.
11. Reinstall all control tubesandcheckrigging.Tightenjam-nutsand
install all cotterpins.
20 nov-2015 rev

More Related Content

What's hot

John deere power tech 12.5l diesel base engine service repair technical manua...
John deere power tech 12.5l diesel base engine service repair technical manua...John deere power tech 12.5l diesel base engine service repair technical manua...
John deere power tech 12.5l diesel base engine service repair technical manua...
fjjsfkskemem
 
Caterpillar cat 308 e2sr mini hydraulic excavator (prefix tm2) service repair...
Caterpillar cat 308 e2sr mini hydraulic excavator (prefix tm2) service repair...Caterpillar cat 308 e2sr mini hydraulic excavator (prefix tm2) service repair...
Caterpillar cat 308 e2sr mini hydraulic excavator (prefix tm2) service repair...
jfjskeksemmme
 
Caterpillar cat m315 c wheeled excavator (prefix h2b) service repair manual (...
Caterpillar cat m315 c wheeled excavator (prefix h2b) service repair manual (...Caterpillar cat m315 c wheeled excavator (prefix h2b) service repair manual (...
Caterpillar cat m315 c wheeled excavator (prefix h2b) service repair manual (...
hhjsekmdmm
 
Caterpillar cat m316 d wheeled excavator (prefix w6a) service repair manual (...
Caterpillar cat m316 d wheeled excavator (prefix w6a) service repair manual (...Caterpillar cat m316 d wheeled excavator (prefix w6a) service repair manual (...
Caterpillar cat m316 d wheeled excavator (prefix w6a) service repair manual (...
fujsjefjwerkskemm
 

What's hot (6)

John deere power tech 12.5l diesel base engine service repair technical manua...
John deere power tech 12.5l diesel base engine service repair technical manua...John deere power tech 12.5l diesel base engine service repair technical manua...
John deere power tech 12.5l diesel base engine service repair technical manua...
 
John deere power tech 2.9l diesel engine diagnostic service repair technical ...
John deere power tech 2.9l diesel engine diagnostic service repair technical ...John deere power tech 2.9l diesel engine diagnostic service repair technical ...
John deere power tech 2.9l diesel engine diagnostic service repair technical ...
 
Caterpillar cat 308 e2sr mini hydraulic excavator (prefix tm2) service repair...
Caterpillar cat 308 e2sr mini hydraulic excavator (prefix tm2) service repair...Caterpillar cat 308 e2sr mini hydraulic excavator (prefix tm2) service repair...
Caterpillar cat 308 e2sr mini hydraulic excavator (prefix tm2) service repair...
 
Caterpillar cat m315 c wheeled excavator (prefix h2b) service repair manual (...
Caterpillar cat m315 c wheeled excavator (prefix h2b) service repair manual (...Caterpillar cat m315 c wheeled excavator (prefix h2b) service repair manual (...
Caterpillar cat m315 c wheeled excavator (prefix h2b) service repair manual (...
 
Jcb 3 cx t2 t3 backhoe loader service repair manual from 2615002 to 2616002
Jcb 3 cx t2  t3 backhoe loader service repair manual from 2615002 to 2616002Jcb 3 cx t2  t3 backhoe loader service repair manual from 2615002 to 2616002
Jcb 3 cx t2 t3 backhoe loader service repair manual from 2615002 to 2616002
 
Caterpillar cat m316 d wheeled excavator (prefix w6a) service repair manual (...
Caterpillar cat m316 d wheeled excavator (prefix w6a) service repair manual (...Caterpillar cat m316 d wheeled excavator (prefix w6a) service repair manual (...
Caterpillar cat m316 d wheeled excavator (prefix w6a) service repair manual (...
 

Similar to Scheduled inspections BTH

Toyota 5FD70 Forklift Service Repair Manual
Toyota 5FD70 Forklift Service Repair ManualToyota 5FD70 Forklift Service Repair Manual
Toyota 5FD70 Forklift Service Repair Manual
dfujdjfjkskekmd
 
Toyota 52-6FGU33 Forklift Service Repair Manual
Toyota 52-6FGU33 Forklift Service Repair ManualToyota 52-6FGU33 Forklift Service Repair Manual
Toyota 52-6FGU33 Forklift Service Repair Manual
ujjsjefkskemmem
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
ram111eg
 
Toyota 5FD70 Forklift Service Repair Manual
Toyota 5FD70 Forklift Service Repair ManualToyota 5FD70 Forklift Service Repair Manual
Toyota 5FD70 Forklift Service Repair Manual
jkseodlpled
 
Toyota 5 fg60 forklift service repair manual
Toyota 5 fg60 forklift service repair manualToyota 5 fg60 forklift service repair manual
Toyota 5 fg60 forklift service repair manual
jsemm fvdcf
 
Toyota 5FD60 Forklift Service Repair Manual
Toyota 5FD60 Forklift Service Repair ManualToyota 5FD60 Forklift Service Repair Manual
Toyota 5FD60 Forklift Service Repair Manual
ukjkme kjdmfkm
 
Toyota 5FDM70 Forklift Service Repair Manual
Toyota 5FDM70 Forklift Service Repair ManualToyota 5FDM70 Forklift Service Repair Manual
Toyota 5FDM70 Forklift Service Repair Manual
ukjemm kjskmfm
 

Similar to Scheduled inspections BTH (20)

General safety precautions for maintenance of extinguisher
General safety precautions for maintenance of extinguisherGeneral safety precautions for maintenance of extinguisher
General safety precautions for maintenance of extinguisher
 
propeller-maintenance.pptx
propeller-maintenance.pptxpropeller-maintenance.pptx
propeller-maintenance.pptx
 
Report steffones
Report steffonesReport steffones
Report steffones
 
Cswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursCswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 cours
 
Toyota 5FD70 Forklift Service Repair Manual
Toyota 5FD70 Forklift Service Repair ManualToyota 5FD70 Forklift Service Repair Manual
Toyota 5FD70 Forklift Service Repair Manual
 
Bladd maint
Bladd maintBladd maint
Bladd maint
 
“Borescope” - An Inspection Device to Reach Every Crevice
“Borescope” - An Inspection Device to Reach Every Crevice“Borescope” - An Inspection Device to Reach Every Crevice
“Borescope” - An Inspection Device to Reach Every Crevice
 
Toyota 52-6FGU33 Forklift Service Repair Manual
Toyota 52-6FGU33 Forklift Service Repair ManualToyota 52-6FGU33 Forklift Service Repair Manual
Toyota 52-6FGU33 Forklift Service Repair Manual
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1
 
186912819 crown-block
186912819 crown-block186912819 crown-block
186912819 crown-block
 
BOP
BOPBOP
BOP
 
Differential pressure cylinder tester
Differential pressure cylinder testerDifferential pressure cylinder tester
Differential pressure cylinder tester
 
Api 650 & 653 questions closed book with answers
Api 650 & 653 questions closed book with answersApi 650 & 653 questions closed book with answers
Api 650 & 653 questions closed book with answers
 
ZELS1206B Portable Water Velocity Meter Data
ZELS1206B Portable Water Velocity Meter DataZELS1206B Portable Water Velocity Meter Data
ZELS1206B Portable Water Velocity Meter Data
 
Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)
 
Toyota 5FD70 Forklift Service Repair Manual
Toyota 5FD70 Forklift Service Repair ManualToyota 5FD70 Forklift Service Repair Manual
Toyota 5FD70 Forklift Service Repair Manual
 
Toyota 5 fg60 forklift service repair manual
Toyota 5 fg60 forklift service repair manualToyota 5 fg60 forklift service repair manual
Toyota 5 fg60 forklift service repair manual
 
Toyota 5FD60 Forklift Service Repair Manual
Toyota 5FD60 Forklift Service Repair ManualToyota 5FD60 Forklift Service Repair Manual
Toyota 5FD60 Forklift Service Repair Manual
 
Toyota 5FDM70 Forklift Service Repair Manual
Toyota 5FDM70 Forklift Service Repair ManualToyota 5FDM70 Forklift Service Repair Manual
Toyota 5FDM70 Forklift Service Repair Manual
 

Recently uploaded

Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
AnaAcapella
 
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
中 央社
 
SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project research
CaitlinCummins3
 

Recently uploaded (20)

Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
Supporting Newcomer Multilingual Learners
Supporting Newcomer  Multilingual LearnersSupporting Newcomer  Multilingual Learners
Supporting Newcomer Multilingual Learners
 
Mattingly "AI and Prompt Design: LLMs with NER"
Mattingly "AI and Prompt Design: LLMs with NER"Mattingly "AI and Prompt Design: LLMs with NER"
Mattingly "AI and Prompt Design: LLMs with NER"
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...
 
VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 
e-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopale-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopal
 
Improved Approval Flow in Odoo 17 Studio App
Improved Approval Flow in Odoo 17 Studio AppImproved Approval Flow in Odoo 17 Studio App
Improved Approval Flow in Odoo 17 Studio App
 
MOOD STABLIZERS DRUGS.pptx
MOOD     STABLIZERS           DRUGS.pptxMOOD     STABLIZERS           DRUGS.pptx
MOOD STABLIZERS DRUGS.pptx
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
 
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
 
Major project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesMajor project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategies
 
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading RoomSternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptx
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
 
SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project research
 
Trauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical PrinciplesTrauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical Principles
 
How to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptxHow to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptx
 
UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024
 

Scheduled inspections BTH

  • 1. SCHEDULED INSPECTIONS BTH-47-CR&O 1200 hours inspections Data 03/11/2015 Initial Reference:BTH-47G3 mech other Inspection task desription Date: 03/11/2015 Facility: HelicopterS/N: Total time: Ganeral each listedinspectionitemor maintenance fuctionis to be performedin accordance with the maintenance manual chapter specified Instruction Chapter 53 PeriodicInspections- requiredat 50, 100, 600 and 1200 hour intervals. Special Inspections- requiredbyunusual events,such as hard landingor suddenstoppage of rotor. Mandatory RetirementSchedule - listof parts which are limitedto a definite maximumservice life. Daily inspecion The dailyinspectionisarigidvisual inspectiontoascertainif the helicopterisairworthyandif anyitemhasbecome loose, worn,or damagedduringflightthe previousdayorsince the accomplishmentof anypreviousinspection.Performdaily inspectionpriortothe firstflightof the day.
  • 2. 50 hours -rigidvisual inspection 1. Inspectinstrumentsforbroken,crackedorloose cover glass,and conditionof range andlimitmarkings. 2. Inspectbatteryfor evidenceof spilledelectrolyte,security of mountingandgeneral conditionCheckbattery.draintube for unobstructeddrainage. 3. Inspectgeneral conditionof all wiring,insulatedtubing and clips.Testoperationof all switchesandcircuitbreakers. Checknavigationandlandinglightsandrotatingbeaconsfor operationandsecurityof mounting. 4. Inspectgeneratorandstarter forsecurity. 5. Drain static andpitottubesat drainplugif water,in system,issuspected. 20 nov-2015 rev 1
  • 3. SCHEDULED INSPECTIONS BTH- BTH-47-CR&O 1200 hours inspections Data:03/11/2015 Initial Reference:BTH-47G3 mech other Inspection task desription Date:03/11/2015 Facility: HelicopterS/n Total time: Ganeral each listedinspectionitemor maintenance fuctionis to be performed in accordance with the maintenance manual chapter specified Instrucion Chapter44 100 hours Flightcontrol 1.Disconnectcontrol rodfrom control ringhorns andcleanhorns with suitable cleaning solvent.Inspecthornswith10 powermagnifyingglass to determine if acrack or cracks exist.If cracks are found,remove swashplate andreplace immediately. 2. Inspecttaperbushingsandboltsinlateral jackshaftat transmission for security. 3. CheckCSC870-5 dampersfor security,leaksandpropertiming.
  • 4. 600 hours Accomplishacomplete dailyinspection,50-hourinspection,100-hour inspectionandthe inspection 1 Make thoroughvisual inspectionforcracksinall parts of cylinder supportand bellcrankassemblies,including attachmentbrackets 2.Checkfor excessive radial playof cylindertrunnioninbushingsof supportsandbellcranks. 3.Test systemoperatingpressure,adjustrelief valveasnecessary ROTATINGAND FLIGHT CONTROLTUBES 1.Remove followingcontrol tubes 1200 hours Note The followingcontrol tubesare installedwithina30 degree angle of the vertical axisof the helicopter. b.Remove collectivepitchcontrol tube betweenpowercylinderand idler. c. Remove lateral cycliccontrol tube betweenpowercylinderand torque tube assembly.Remove control tube betweentorque tube assemblyandswashplate. d. Remove fore andaftcyclic control tube betweenpowercylinderand lever.Remove control tube between leverandswashplate. 2. Remove endfittingfromcontrol tubesasfollows: a. Mark fittings andtube endstoensure fittingisassembledinoriginal position. b. Remove bothendfittingsbycarefullydrillingoff rivetheadsanddrive out rivets.Donot enlarge rivetholes intube orfitting. 3. Inspecteach control tube forinternal corrosionusingalightand borescope orequivalentinspectionmeans
  • 5. Note Control tubeswithdouble drilledrivetholes,sharpnicks,scratchesor internal corrosionare consideredunserviceable. 4. Cleanand refinishacceptable control tubesasfollows: a. Remove all paintandprimerfrominternal surface of control tubes, usingsteel wire brushonsteel control tubesandbristle brushon aluminumcontrol tubes,withMethyl-Ethyl-Ketone. Note a.Internal surface mustbe completelycleantoensure adhesionof protective film. b. Addthree partsof thinner(TolueneTT-T-548) to fourparts of zinc chromate primer,byvolume,andmix thoroughly. c. Applyprimertoinside of control tubes,coatentire internal surface while rotatingcontrol tube.Allow excessprimertodrain.Wipe excess fromfittingarea,leavingalightcoat.Allow six hoursminimumdrying time priorto furtherfinishing. Mixaluminumpaintasfollows: The followingwill provide approximatelyone gallon.If asmall quantity isrequired,reduce all quantitiesproportionally. a. Dissolve sixteenouncesof aluminumpigment(TT-P-320A) paste (Type 11 ClassA)orpowder(Type IClassA)ina small amountof thinner (TT-T-266). b. Addaluminumpigmenttoone gallonof clearcellulose nitratelacquer (TT-L-32). c. Addequal volume of thinnertolacquerandmix thoroughly.Strain througha paint strainer. 6. Applyaluminumlacquertoinside of control tube,coatentire internal surface while rotatingcontrol tube,Allow excesslacquertodrain.Wipe excessfromfittingarea,leavingalightcoat.Allow 2 hoursbefore installingendfittings.
  • 6. Note Rod ends,fittings,andcevisesmustbe platedortreated;andmust notexhibitanycorrosion.Replace partsthathave inadequate finish. 7. Hollowendsmayrequire refilling.If adhesive fillerisdamagedwhen the rivetswere drivenout,remove oldfillerandfill withhardepoxy adhesive Metal SetA4or equivalent.Allow adhesivetocure 24 hours before drillingholes Note Outside surface of control tube assemblymaybe primedpriorto applyingsealant.Sealantwilladhere tochemicallytreatedmetal orfully curedzinc chromate surface. 8. Applyproseal 890-B2 to I.D.of control tubesandO.D. of endfittings, at fayingsurfaces,before assemblyInstall endfittings incontrol tube. 9. Dip MS20613-5P rivetsinproseal andinstall.MS20613-6P rivets (oversize) maybe used.Replace anysteel control tube that requiresrivetslargerthanMS20613-6P rivets. a. On aluminumrotatingcontrol tubes,use MS20470-AD5 rivets. Use of oversize rivetsisnotapprovedonaluminumrotatingcontrol tube assemblies. 10. Seal eachendof control tube assemblyandaroundrivetswith proseal 890-B2 sealant.Applysealantasshownonfigure 1-20control tube sealing(typical).Cure sealant atroomtemperature for72 hours. Note Control tubesmaybe reinstalledwhensealantisnottacky (approximately24hours).Do notuse heat to cure sealant. 11. Reinstall all control tubesandcheckrigging.Tightenjam-nutsand install all cotterpins.