Click to edit Master subtitle style
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
INNOVATION
Ideas Generation Workshop
Presented by Damian Connelly,
Director/Principal Consulting Engineer
Mineral Engineering Technical Services Pty Ltd © 2010
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Mining Industry
> Conservative industry-resistant to change
> Ideas-Methods & procedures to implement changes
> $$$ Financial managers have a large say where money is spent
> History of innovation has been brilliant
> “We tried that”-been done before
> Key Performance Indicators (KPIs)
> Budgets & schedules
> Cyclic Boom or Bust industry
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
> Creativity is the generation of new ideas
> Great things or inventions start as an idea
> Innovation is the process of transformation of
creative ideas into desired outputs
What Is Creativity & Innovation?
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Objectives
> To introduce a new management paradigm: Total Innovation
Management (TIM)
> To increase the awareness about the importance of creativity and
innovation in organisation
> To develop a list of ideas to take forward and develop these
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
What is TIM?
> “The term Total Innovation Management (TIM) is define as the
innovation synergy among technology, organization and culture
and oriented to building up innovation competence for an
organisation”
Chen., Gang., Zhangshu., Zheng., Jin., Jingjiang., Liu., Qingrui., Wang., Xie., Xu., & Yong. (2007).
Total Innovation Management: a novel paradigm of innovation management in the 21st
century. The Journal of Technology Transfer, 32(1-2), 9-25.
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Sustainable Mineral Processing
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Thinking Outside The Square
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Could We Reduce The CAPEX?
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
A Changing Industry-FLSmidth
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
A Nordic Company Goes Global
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Ranking Against Your Competitors
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Maelgwyn Mineral Services
> Leachox-refractory gold
> G cell-Pneumatic
flotation
> CND cyanide destruction
> SGS has taken them over
> This company was selling
what appears to be
common knowledge
technology.
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Outotec
> A technology company
> Equipment manufacturer
> Engineering & consulting
> After sales service
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Competitive Advantage
> What is our competitive
advantage?
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
R&D vs Technical Development
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Technology & Competitive Advantage
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Sources Of Competitive Advantage
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
1 - 18
Different Types Of Innovation
Source: Costas Markides, Paul A. Geroski, Racing to be 2nd: Conquering the Industries of the future, Business Strategy Review, Vol 15, Issue
4, Winter 2004, p25-31, Blackwell Publishing Ltd
Crafting & Executing Strategy, Thompson, Strickland & Gamble, McGraw Hill
Effect of innovations on
established firms’
competences and
complimentary assets
Major Major Innovation Radical
Innovation
Minor Incremental
Innovation
Strategic
Innovation
Effect Enhances Destroys
Effect of
innovations on
consumer
habits/behaviours
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Internal Sources For TIM
> Own R&D –literature searches
> Technical divisions – design, technology
> Production divisions (production, provision of services)
> Marketing and sales
> Logistics (purchase and supplies)
> Guarantee and post-guarantee service
> Owners
> QCC and QIT
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
External Sources For TIM
> Customers
> Suppliers
> Competitors
> Consultants, R&D institutions
> Schools, universities
> Professional publications,
Internet
> Exhibitions, fairs, specialized
seminars and conferences
> Advertising agencies
> Investors
> Media
> Authorized testing laboratories,
certification agencies
> State institutions, public sector
> Legislation
> Globalization
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Some Of TIM Formation Tools
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
The Challenges Going Forward (cont)
> Global warming-energy consumption
> Lower grade ores-larger projects
> Complex ores
> Environmental controls will be more stringent
> Pyrometallurgy will die
> Hydrometallurgy will be required to do more
> Economics (NPV/IRR)
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Innovation Or Invention & Implementation
> Level floor tanks
> Open Stockpiles > Crushing (Not inside buildings)
> Working Access Around Mills
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Innovation Or Invention & Implementation
> Plant Layouts > Flotation Cells Outside
> Mills Outside
> 3D Modelling
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Innovation Or Invention & Implementation
> 1 MW Crushers > Banana Screens
> Mineral Liberation Analysis > AG Milling/Pebble Crushing
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Innovation Or Invention & Implementation
> SAG Milling
> HPGR
> Isamill > Vertimill
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Innovation Or Invention & Implementation
> Flash Flotation > Rare Earth Magnets
> Pressure
Filters
> Wash waterless
spirals
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Innovation Or Invention & Implementation
> Knelson
concentrators
> Intensive Leaching
> Variable Speed Pumps > Ion exchange Resins
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Innovation Or Invention & Implementation
Recoverytime curve
0
20
40
60
80
100
0 5 10 15 20 25 30
Time (mins)
Cum%Recovery
Cu Rec
Co Rec
> Large flotation
Cells
Gemeni Tables
Flotation Developments
Controlled Potential Sulphidisation
REDOX Flotation
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Innovation Or Invention & Implementation
> IPJ
> Kelsey Jig
> ILR
> Electrowinning Cells
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Innovation Or Invention & Implementation
> Vertical Regeneration
Kilns
> CIP/CIL Plants
> Intertank
Screens
> Oxygen sparging
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Innovation Or Invention & Implementation
> Heap Leaching
> Pressure Oxidation (POX)
> High Pressure Acid Leaching
> Solvent Extraction
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Innovation Or Invention & Implementation
> Reagent Preparation > Clarometers
> Hi Rate Thickeners > Particle Size Analysers
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Innovation Or Invention & Implementation
> Slon
> Paste Thickeners
> Circular Tailings Dams
> Thickener Feedwells
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Innovation Or Invention & Implementation
> Integrated Pressure Strip
> Distributed
Control Systems
> JK SimMet
> Bacterial Leaching
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Innovation Or Invention & Implementation
> OSA & In Stream Analysis
6%
5%
6%
6%
5%
6%
17%
5%
8%
5%
6%
7%
Start Emergency
Work ?
Perform
Planned
Lubrication
Service
Conduct
PM
Inspections
Report
Deficiencies
Report
Completion
Of WorkInspect
Results of
MNT
Work
Respond to
Emergency
Maintenance
Needs
Conduct
Running
Repairs as the
Need Arises
Conduct
Periodic
Change out of
Equipment
Components
Plan, Coordinate
and Schedule MNT
Needs as Approved
by Operations
OPNS accept
Results or Defers
Recommendations
Confer
with OPNS
on Needs
Convert
INSP
Results
into MNT
Needs
1
2
3
4
5
6
7
8
9
10
11
Conduct
Planned and
Scheduled
Major Repair
Work
Yes
N
o
By-Pass Detailed
Planning when
Doing Emergency
Work
MAINTENANCE
CYCLE
Concept of
Maintenance
12
13
> PC Based
Maintenance Packages
> Instrumentation
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Continuous Improvement
> Identify opportunities in our area
> Question operating philosophy- can things be done better
> Reduce inputs
> De bottleneck
> Develop operating models
> Innovate-review progress-update
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Continuous Improvement (cont)
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Source: E.S. Rubin, Carnegie Mellon
Technology Innovations Needed
To Mitigate CO2 Emissions
> More efficient technologies for
energy conversion and utilization
in all end-use sectors
(transportation, industry, buildings,
agriculture; power generation)
> New or improved technologies for
utilizing alternative energy sources
with lower or no GHG emissions
(such as natural gas and
renewables)
> Technologies for CO2 capture and
storage (for large-scale industrial
processes like electric power
generation and fuels production)
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
The Linear Model Of
Technological Change
Invention Adoption DiffusionInnovation
Source: E.S. Rubin, Carnegie Mellon
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
A More Realistic Model
Invention
Adoption
(initial
design)
Diffusion
(improved
technology)
Innovation
(new or better
product)
Learning
By Doing
Learning
By Using
R&D
Source: E.S. Rubin, Carnegie Mellon
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
E.S. Rubin, Carnegie Mellon
U.S. Patenting Activity in SO2 Control
Technology
CAA Regs + R&DNo Federal R&D Some
Federal
R&D
(U.S. Patents, Class-based dataset)
U.S. Clean Air
Act of 1970
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Patenting Activity Index For
Flue Gas DeNOx Technology
0
1
2
3
4
5
6
7
8
9
10
11
12
1972 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998
Year Patent Filed
PatentActivityIndex
Japan
Germany
Strict NOx regs
in Germany
First NOx regs
in Japan
Source: E.S. Rubin, Carnegie Mellon
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
> "Whoever desires constant success
must change his conduct with the
times"
Adaptability
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Key Effects Of IT Age
> Digitalization
> Automation
> Robotization
> Miniaturization
> Specialization
> Customization
> Globalization
> Mutation
> Commoditization
> Disintermediation
> Modularization
> Technological Determinism
> Acronymization or TCCTA
– Tendency to Create Colorful
Technical Acronyms
– If you have a problem with that,
join SPAM or Society to Prevent
Acronym Memorization
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
The Pace of Change Is Accelerating
Source: http://en.wikipedia.org/wiki/Image:PPTParadigmShiftsFrr15Events.jpg
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Motivating Questions
> What kinds of technology innovations are needed to mitigate greenhouse
gas emissions linked to global climate change?
> What do we know about the process of technology innovation?
> How do government actions influence the pace and direction of
technology innovation?
> What types of policies are needed to stimulate innovations that mitigate
GHG emissions?
> How does consideration of technology innovation affect climate policy
analysis?
Source: E.S. Rubin, Carnegie Mellon
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
METS 7 Service Pillars
Slide
Owner:
Presenter
“METSPSR”
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Do We Need A Model?
Mt Weld Presentation 1
Process Technology Model
Manufacturing
Consultancy
Commercial
Laboratories
AMIRA
JK Tech
Inventors
CSIRO
Universities
Parker Centre
TUNRA
MINTEK
Information
Technology
PARTNERS
METS
CONCEPT
EVALUATION
APPLICATION
BENEFITS
PROTOTYPES
METHODOLOGIES
VENTURE
CAPITAL
$
REJECT
VALUE ADDING
ACCEPT
TOTAL PROJECT
SOLUTION
DELIVERY
INDUSTRY
CUSTOMERS
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Suggestions & Ideas
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
Where Can We Go From Here?
What ideas can we come up with?
All ideas are welcome
Form a committee-sub group
working parties?
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training
THANK YOU
www.mets.net.au

More Related Content

Similar to Innovation presentation 22nd october 2010 rev d

SPSU UC DAVIS PROPOSAL 12-15-14
SPSU UC DAVIS PROPOSAL 12-15-14SPSU UC DAVIS PROPOSAL 12-15-14
SPSU UC DAVIS PROPOSAL 12-15-14
Andrew Milota
 
Moody International Group Presentation
Moody International Group PresentationMoody International Group Presentation
Moody International Group Presentation
trincanello
 
Australia Brochure
Australia BrochureAustralia Brochure
Australia Brochure
Blairinho
 
Australia Brochure
Australia BrochureAustralia Brochure
Australia Brochure
Trevor Burne
 
Ecg Overview.May 2010
Ecg Overview.May 2010Ecg Overview.May 2010
Ecg Overview.May 2010
markclyons
 
Synefra e-PM Update with ISO 2015
Synefra e-PM Update with ISO 2015Synefra e-PM Update with ISO 2015
Synefra e-PM Update with ISO 2015
Sagar Raiyarela
 
Synefra e-pm brochure for mail
Synefra e-pm brochure for mailSynefra e-pm brochure for mail
Synefra e-pm brochure for mail
Manjit Dey
 
Microlucid profile
Microlucid profileMicrolucid profile
Microlucid profile
Anil Yadav
 
ALAA MOHAN ALI CV
ALAA MOHAN ALI CVALAA MOHAN ALI CV
ALAA MOHAN ALI CV
Alaa Mohan
 
Bilal Consultancy Pvt Ltd
Bilal Consultancy Pvt LtdBilal Consultancy Pvt Ltd
Bilal Consultancy Pvt Ltd
Babar Bilal
 

Similar to Innovation presentation 22nd october 2010 rev d (20)

Mish Calendar 2016
Mish Calendar 2016Mish Calendar 2016
Mish Calendar 2016
 
SPSU UC DAVIS PROPOSAL 12-15-14
SPSU UC DAVIS PROPOSAL 12-15-14SPSU UC DAVIS PROPOSAL 12-15-14
SPSU UC DAVIS PROPOSAL 12-15-14
 
Prolotek Technologies
Prolotek Technologies Prolotek Technologies
Prolotek Technologies
 
Corporate Brochure 26 May 2011
Corporate Brochure 26 May 2011Corporate Brochure 26 May 2011
Corporate Brochure 26 May 2011
 
Facade Consultancy Enveloptechnik
Facade Consultancy EnveloptechnikFacade Consultancy Enveloptechnik
Facade Consultancy Enveloptechnik
 
concept of value engineering-construction industry.
concept of value engineering-construction industry.concept of value engineering-construction industry.
concept of value engineering-construction industry.
 
EngineeringBrochure_FIN
EngineeringBrochure_FINEngineeringBrochure_FIN
EngineeringBrochure_FIN
 
Moody International Group Presentation
Moody International Group PresentationMoody International Group Presentation
Moody International Group Presentation
 
Lean Construction Abdullah Alvi
Lean Construction  Abdullah AlviLean Construction  Abdullah Alvi
Lean Construction Abdullah Alvi
 
Australia Brochure
Australia BrochureAustralia Brochure
Australia Brochure
 
Australia Brochure
Australia BrochureAustralia Brochure
Australia Brochure
 
Ecg Overview.May 2010
Ecg Overview.May 2010Ecg Overview.May 2010
Ecg Overview.May 2010
 
Synefra e-PM Update with ISO 2015
Synefra e-PM Update with ISO 2015Synefra e-PM Update with ISO 2015
Synefra e-PM Update with ISO 2015
 
Synefra e-pm brochure for mail
Synefra e-pm brochure for mailSynefra e-pm brochure for mail
Synefra e-pm brochure for mail
 
PIC Brochure 101615
PIC Brochure 101615PIC Brochure 101615
PIC Brochure 101615
 
Microlucid profile
Microlucid profileMicrolucid profile
Microlucid profile
 
ALAA MOHAN ALI CV
ALAA MOHAN ALI CVALAA MOHAN ALI CV
ALAA MOHAN ALI CV
 
Bilal Consultancy Pvt Ltd
Bilal Consultancy Pvt LtdBilal Consultancy Pvt Ltd
Bilal Consultancy Pvt Ltd
 
Aashray Design Consultants - Institutional Projects
Aashray Design Consultants - Institutional ProjectsAashray Design Consultants - Institutional Projects
Aashray Design Consultants - Institutional Projects
 
Mintech Engineering
Mintech EngineeringMintech Engineering
Mintech Engineering
 

Recently uploaded

Revolutionizing SAP® Processes with Automation and Artificial Intelligence
Revolutionizing SAP® Processes with Automation and Artificial IntelligenceRevolutionizing SAP® Processes with Automation and Artificial Intelligence
Revolutionizing SAP® Processes with Automation and Artificial Intelligence
Precisely
 

Recently uploaded (20)

Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on ThanabotsContinuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
 
TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024
 
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps Productivity
 
JavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate GuideJavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate Guide
 
Revolutionizing SAP® Processes with Automation and Artificial Intelligence
Revolutionizing SAP® Processes with Automation and Artificial IntelligenceRevolutionizing SAP® Processes with Automation and Artificial Intelligence
Revolutionizing SAP® Processes with Automation and Artificial Intelligence
 
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
 
AI mind or machine power point presentation
AI mind or machine power point presentationAI mind or machine power point presentation
AI mind or machine power point presentation
 
Overview of Hyperledger Foundation
Overview of Hyperledger FoundationOverview of Hyperledger Foundation
Overview of Hyperledger Foundation
 
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptx
 
Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024
 
Generative AI Use Cases and Applications.pdf
Generative AI Use Cases and Applications.pdfGenerative AI Use Cases and Applications.pdf
Generative AI Use Cases and Applications.pdf
 
ERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage IntacctERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage Intacct
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
 
Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptx
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 Warsaw
 
Design Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxDesign Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptx
 
The Metaverse: Are We There Yet?
The  Metaverse:    Are   We  There  Yet?The  Metaverse:    Are   We  There  Yet?
The Metaverse: Are We There Yet?
 
Top 10 CodeIgniter Development Companies
Top 10 CodeIgniter Development CompaniesTop 10 CodeIgniter Development Companies
Top 10 CodeIgniter Development Companies
 

Innovation presentation 22nd october 2010 rev d

  • 1. Click to edit Master subtitle style > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training INNOVATION Ideas Generation Workshop Presented by Damian Connelly, Director/Principal Consulting Engineer Mineral Engineering Technical Services Pty Ltd © 2010
  • 2. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Mining Industry > Conservative industry-resistant to change > Ideas-Methods & procedures to implement changes > $$$ Financial managers have a large say where money is spent > History of innovation has been brilliant > “We tried that”-been done before > Key Performance Indicators (KPIs) > Budgets & schedules > Cyclic Boom or Bust industry
  • 3. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training > Creativity is the generation of new ideas > Great things or inventions start as an idea > Innovation is the process of transformation of creative ideas into desired outputs What Is Creativity & Innovation?
  • 4. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Objectives > To introduce a new management paradigm: Total Innovation Management (TIM) > To increase the awareness about the importance of creativity and innovation in organisation > To develop a list of ideas to take forward and develop these
  • 5. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training What is TIM? > “The term Total Innovation Management (TIM) is define as the innovation synergy among technology, organization and culture and oriented to building up innovation competence for an organisation” Chen., Gang., Zhangshu., Zheng., Jin., Jingjiang., Liu., Qingrui., Wang., Xie., Xu., & Yong. (2007). Total Innovation Management: a novel paradigm of innovation management in the 21st century. The Journal of Technology Transfer, 32(1-2), 9-25.
  • 6. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Sustainable Mineral Processing
  • 7. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Thinking Outside The Square
  • 8. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Could We Reduce The CAPEX?
  • 9. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training A Changing Industry-FLSmidth
  • 10. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training A Nordic Company Goes Global
  • 11. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Ranking Against Your Competitors
  • 12. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Maelgwyn Mineral Services > Leachox-refractory gold > G cell-Pneumatic flotation > CND cyanide destruction > SGS has taken them over > This company was selling what appears to be common knowledge technology.
  • 13. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Outotec > A technology company > Equipment manufacturer > Engineering & consulting > After sales service
  • 14. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Competitive Advantage > What is our competitive advantage?
  • 15. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training R&D vs Technical Development
  • 16. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Technology & Competitive Advantage
  • 17. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Sources Of Competitive Advantage
  • 18. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training 1 - 18 Different Types Of Innovation Source: Costas Markides, Paul A. Geroski, Racing to be 2nd: Conquering the Industries of the future, Business Strategy Review, Vol 15, Issue 4, Winter 2004, p25-31, Blackwell Publishing Ltd Crafting & Executing Strategy, Thompson, Strickland & Gamble, McGraw Hill Effect of innovations on established firms’ competences and complimentary assets Major Major Innovation Radical Innovation Minor Incremental Innovation Strategic Innovation Effect Enhances Destroys Effect of innovations on consumer habits/behaviours
  • 19. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Internal Sources For TIM > Own R&D –literature searches > Technical divisions – design, technology > Production divisions (production, provision of services) > Marketing and sales > Logistics (purchase and supplies) > Guarantee and post-guarantee service > Owners > QCC and QIT
  • 20. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training External Sources For TIM > Customers > Suppliers > Competitors > Consultants, R&D institutions > Schools, universities > Professional publications, Internet > Exhibitions, fairs, specialized seminars and conferences > Advertising agencies > Investors > Media > Authorized testing laboratories, certification agencies > State institutions, public sector > Legislation > Globalization
  • 21. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Some Of TIM Formation Tools
  • 22. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training The Challenges Going Forward (cont) > Global warming-energy consumption > Lower grade ores-larger projects > Complex ores > Environmental controls will be more stringent > Pyrometallurgy will die > Hydrometallurgy will be required to do more > Economics (NPV/IRR)
  • 23. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Innovation Or Invention & Implementation > Level floor tanks > Open Stockpiles > Crushing (Not inside buildings) > Working Access Around Mills
  • 24. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Innovation Or Invention & Implementation > Plant Layouts > Flotation Cells Outside > Mills Outside > 3D Modelling
  • 25. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Innovation Or Invention & Implementation > 1 MW Crushers > Banana Screens > Mineral Liberation Analysis > AG Milling/Pebble Crushing
  • 26. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Innovation Or Invention & Implementation > SAG Milling > HPGR > Isamill > Vertimill
  • 27. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Innovation Or Invention & Implementation > Flash Flotation > Rare Earth Magnets > Pressure Filters > Wash waterless spirals
  • 28. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Innovation Or Invention & Implementation > Knelson concentrators > Intensive Leaching > Variable Speed Pumps > Ion exchange Resins
  • 29. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Innovation Or Invention & Implementation Recoverytime curve 0 20 40 60 80 100 0 5 10 15 20 25 30 Time (mins) Cum%Recovery Cu Rec Co Rec > Large flotation Cells Gemeni Tables Flotation Developments Controlled Potential Sulphidisation REDOX Flotation
  • 30. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Innovation Or Invention & Implementation > IPJ > Kelsey Jig > ILR > Electrowinning Cells
  • 31. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Innovation Or Invention & Implementation > Vertical Regeneration Kilns > CIP/CIL Plants > Intertank Screens > Oxygen sparging
  • 32. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Innovation Or Invention & Implementation > Heap Leaching > Pressure Oxidation (POX) > High Pressure Acid Leaching > Solvent Extraction
  • 33. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Innovation Or Invention & Implementation > Reagent Preparation > Clarometers > Hi Rate Thickeners > Particle Size Analysers
  • 34. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Innovation Or Invention & Implementation > Slon > Paste Thickeners > Circular Tailings Dams > Thickener Feedwells
  • 35. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Innovation Or Invention & Implementation > Integrated Pressure Strip > Distributed Control Systems > JK SimMet > Bacterial Leaching
  • 36. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Innovation Or Invention & Implementation > OSA & In Stream Analysis 6% 5% 6% 6% 5% 6% 17% 5% 8% 5% 6% 7% Start Emergency Work ? Perform Planned Lubrication Service Conduct PM Inspections Report Deficiencies Report Completion Of WorkInspect Results of MNT Work Respond to Emergency Maintenance Needs Conduct Running Repairs as the Need Arises Conduct Periodic Change out of Equipment Components Plan, Coordinate and Schedule MNT Needs as Approved by Operations OPNS accept Results or Defers Recommendations Confer with OPNS on Needs Convert INSP Results into MNT Needs 1 2 3 4 5 6 7 8 9 10 11 Conduct Planned and Scheduled Major Repair Work Yes N o By-Pass Detailed Planning when Doing Emergency Work MAINTENANCE CYCLE Concept of Maintenance 12 13 > PC Based Maintenance Packages > Instrumentation
  • 37. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Continuous Improvement > Identify opportunities in our area > Question operating philosophy- can things be done better > Reduce inputs > De bottleneck > Develop operating models > Innovate-review progress-update
  • 38. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Continuous Improvement (cont)
  • 39. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Source: E.S. Rubin, Carnegie Mellon Technology Innovations Needed To Mitigate CO2 Emissions > More efficient technologies for energy conversion and utilization in all end-use sectors (transportation, industry, buildings, agriculture; power generation) > New or improved technologies for utilizing alternative energy sources with lower or no GHG emissions (such as natural gas and renewables) > Technologies for CO2 capture and storage (for large-scale industrial processes like electric power generation and fuels production)
  • 40. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training The Linear Model Of Technological Change Invention Adoption DiffusionInnovation Source: E.S. Rubin, Carnegie Mellon
  • 41. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training A More Realistic Model Invention Adoption (initial design) Diffusion (improved technology) Innovation (new or better product) Learning By Doing Learning By Using R&D Source: E.S. Rubin, Carnegie Mellon
  • 42. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training E.S. Rubin, Carnegie Mellon U.S. Patenting Activity in SO2 Control Technology CAA Regs + R&DNo Federal R&D Some Federal R&D (U.S. Patents, Class-based dataset) U.S. Clean Air Act of 1970
  • 43. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Patenting Activity Index For Flue Gas DeNOx Technology 0 1 2 3 4 5 6 7 8 9 10 11 12 1972 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 Year Patent Filed PatentActivityIndex Japan Germany Strict NOx regs in Germany First NOx regs in Japan Source: E.S. Rubin, Carnegie Mellon
  • 44. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training > "Whoever desires constant success must change his conduct with the times" Adaptability
  • 45. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Key Effects Of IT Age > Digitalization > Automation > Robotization > Miniaturization > Specialization > Customization > Globalization > Mutation > Commoditization > Disintermediation > Modularization > Technological Determinism > Acronymization or TCCTA – Tendency to Create Colorful Technical Acronyms – If you have a problem with that, join SPAM or Society to Prevent Acronym Memorization
  • 46. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training The Pace of Change Is Accelerating Source: http://en.wikipedia.org/wiki/Image:PPTParadigmShiftsFrr15Events.jpg
  • 47. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Motivating Questions > What kinds of technology innovations are needed to mitigate greenhouse gas emissions linked to global climate change? > What do we know about the process of technology innovation? > How do government actions influence the pace and direction of technology innovation? > What types of policies are needed to stimulate innovations that mitigate GHG emissions? > How does consideration of technology innovation affect climate policy analysis? Source: E.S. Rubin, Carnegie Mellon
  • 48. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training METS 7 Service Pillars Slide Owner: Presenter “METSPSR”
  • 49. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Do We Need A Model? Mt Weld Presentation 1 Process Technology Model Manufacturing Consultancy Commercial Laboratories AMIRA JK Tech Inventors CSIRO Universities Parker Centre TUNRA MINTEK Information Technology PARTNERS METS CONCEPT EVALUATION APPLICATION BENEFITS PROTOTYPES METHODOLOGIES VENTURE CAPITAL $ REJECT VALUE ADDING ACCEPT TOTAL PROJECT SOLUTION DELIVERY INDUSTRY CUSTOMERS
  • 50. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Suggestions & Ideas
  • 51. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training Where Can We Go From Here? What ideas can we come up with? All ideas are welcome Form a committee-sub group working parties?
  • 52. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Specialist Services > Simulation & Optimisation > Project Management > Risk Management > Training THANK YOU www.mets.net.au