ALYNDe LLC

       “Managing The Pace of Change and Complexity of
       Innovation by Aligning Your Business Strategy and IT
       Factory to Achieve Results”




                                 By:
                           Glenn A. Bunker
                               Partner




  Agenda                                            ALYNDe LLC


 Review Marketplace Dynamics
 Leadership Challenges: Understanding Your Strategic Direction
 The Value Proposition for Innovation Lifecycle Management
 Solution Management Approach and Common Challenges




Transforming Innovation      © 2009 ALYNDe, LLC                   2




                                                                      1
ALYNDe LLC


                   Review Marketplace Dynamics




  Introduction                                                               ALYNDe LLC


  Key contributors see Innovation Lifecycle Management (ILM) activities a little differently:
                            The Strategist sees ILM solutions as a way to improve the
                             allocation of resources across the enterprise and to develop a
                             strategically correct portfolio to support the corporate vision.
                            Finance looks to ILM solutions to improve the allocation of
                             scarce financial resources more effectively while optimally
                             achieving maximum shareholder value.
                            IT views ILM solutions as a means to prioritize and select the
                             right projects to support business strategy, foster
                             accountability and deliver results with a highly skilled but
                             constrained workforce.
                            Business Units (LOB’s) see ILM solutions as the framework
                             within which to manage the processes, collaboration and
                             work needed to deliver products to customers faster -
                             improving time to market performance, operational
                             effectiveness and ROI.

       CEO’s, CIO’s, COO’s, CFO’s and LOB Executives should look to ILM frameworks to
         deliver big wins with positive financial impacts within a climate of rapid change.
Transforming Innovation                  © 2009 ALYNDe, LLC                                     4




                                                                                                    2
There Are Pressures For Change…                                           ALYNDe LLC




                                      External Pressures
        Pace of Technology                                        Resource Issues
        Change                            Margin Zone             (Supply and Demand
                                                                   Constraints for Skilled
                                                                   Workers)



                                      Constrained Performance
                                      Workforce Pressures
                                      Internal Pressures                 Business Climate
        Mergers &                                                        (New Markets,
        Acquisitions                                                     Innovation Complexity)

                                        Reduced Budgets




          New Competitors                                                  Regulatory
Transforming Innovation                 © 2009 ALYNDe, LLC                                        5




  Causing Operational Concerns...                                         ALYNDe LLC


    Including:

        Disruptions to launch schedules and budgets for new business solutions,
         regulatory changes and demand complexity (managing dynamic
         demand)

        Poor project planning, management and communications regarding issues
         that affect timely delivery of programs, products and services (time to
         market)

        Shortages of critical resource skills, especially for emerging technologies,
         methodologies and business processes; Lack of tools for human resource
         capacity planning and optimization (workforce management)

        Inefficient, “silo’ed” and redundant program and project management tools
         and procedures (program and project management)

        Ineffective knowledge capture, search and distribution capability to improve
         problem solving and team performance (knowledge management)


Transforming Innovation                 © 2009 ALYNDe, LLC                                        6




                                                                                                      3
Forcing Consideration Of Solutions That...                       ALYNDe LLC


 Enable partners, employees, managers and executives to perform everyday
 activities themselves, anytime and anywhere in order to:

       Create a culture that is comfortable with collaboration
       Establish the concept of an integrated/virtual community
       Manage the impact and complexity of innovation on your competitive
        posture
       Streamline decision-making processes for new development opportunities
       Allow management to focus on executing the company’s overall business
        strategy with the support of an agile IT operation

            … Support “proactive” vs. “reactive” decision-making


The ultimate goal is to combine Process, People, Portfolio and Project Management
        best practices to help people improve the way they do their jobs.

Transforming Innovation                © 2009 ALYNDe, LLC                        7




        ALYNDe LLC


               Leadership Challenges: Understanding Your
               Strategic Direction




                                                                                     4
Leadership Challenges                                                             ALYNDe LLC


            Executive Leadership is facing increasing pressure to control costs and improve
                   operational performance for future business growth and profitability

    External Forces – Customers,                                         Planning, Building & Integrating
      Competitors & Technology                                                  Business Solutions
                Trends                                                   Define effective strategic planning and
    Capitalize on emerging technologies                                  governance processes.
     to achieve a competitive advantage.                                 Meet capital planning requirements for
    Provide IT-enabled products and                                      effective innovation.
     services before competitors.            Create an ILM               Break down business unit silos and
    Adapt to changing business models       Framework for                identify common applications and IT
     and partnerships.                          Managing                  services needed to eliminate NVA
                                                                          work.
                                             Organizational
                                              Performance
                                                                              Measuring & Reporting
       Controlling & Managing                 Improvement
              Operations                                                 Calculate the return on investment for
                                                                          proposed IT investments by determining
    Manage Product/Service portfolios                                    the expected business and technology
     and IT investments needed for                                        costs and benefits.
     effective support.
                                                                         Establish an Innovation Management
    Identify strategic cost savings.                                     Office to monitor status and manage
    Define and monitor performance                                       risks.
     metrics and service level agreements.                               Develop an effective Governance
                                                                          program that involves business and
Transforming Innovation                      © 2009 ALYNDe, LLC           technology leaders.                       9




    Can You Identify With This Manager?                                               ALYNDe LLC




Transforming Innovation                      © 2009 ALYNDe, LLC                                                 10




                                                                                                                        5
“Managing is Harder Than it Looks…”                                                       ALYNDe LLC


                    Integrating and over-customizing                   Managing simultaneous rollout of multiple
                    systems/processes to fit current                   initiatives & scope creep beyond
                    stove pipes                                        organizational capability to execute


                    Consolidating data from                            Automating methodology,
                    disparate systems and                              workflows & processes
                    different sources


                    Manage the entire investment                       Managing investment portfolio
                    portfolio & relevant information                   costs, benefits & capacity


                    Managing demand & performing                       Lack of critical skills at the
                    ‘real time’ what if analysis and                   right time due to poor
                    simulations                                        resource planning

                    Identify losing project and
                                                                       Improve quality of decisions &
                    product candidates (go/kill                        reduce decision lead times
                    gating criteria)

Transforming Innovation                           © 2009 ALYNDe, LLC                                        11




Given These Challenges, What Is Your
                                                                                            ALYNDe LLC
Strategic Direction?


      To meet these business challenges while exceeding performance
     goals, an Innovation Lifecycle Management Framework is needed to
       enable Operational Excellence, Customer Intimacy and Product
        Innovation strategies to levels consistent with your business
                                  objectives.


                          Let your portfolio metrics reflect your emphasis…




Transforming Innovation                           © 2009 ALYNDe, LLC                                        12




                                                                                                                   6
Given These Challenges, What Is Your
                                                                                         ALYNDe LLC
Strategic Direction?
                           Low (total) price
                           Low (total) price
                           Emphasis on efficiency and reliability
                           Emphasis on efficiency and reliability
                           Hassle-free service
                           Hassle-free service
                           Standardized processes and operations
                           Standardized processes and operations
                           Management systems that measure and monitor transactions
                           Management systems that measure and monitor transactions

                                              Operational Excellence




                          Customer Intimacy                             Product Innovation

 Organization built around the customer rather
 Organization built around the customer rather                 Focus on invention, creativity and
                                                                Focus on invention, creativity and
  than the market
  than the market                                                experimentation
                                                                 experimentation
 Emphasis on flexibility and responsiveness
 Emphasis on flexibility and responsiveness                    Willing to make one’s own products obsolete
                                                                Willing to make one’s own products obsolete
 Business structure that delegates decision
 Business structure that delegates decision                    Loosely-knit organization based on teams
                                                                Loosely-knit organization based on teams
  making to the field
  making to the field                                           Management systems that are results driven
                                                                Management systems that are results driven
 Culture that embraces specific rather than
 Culture that embraces specific rather than
  general solutions
  general solutions                                             A culture that encourages innovation
                                                                A culture that encourages innovation

Transforming Innovation                            © 2009 ALYNDe, LLC                                      13




Questions Regarding Your Strategic Direction…                                            ALYNDe LLC


                       Lost in the process of reacting to market forces and
                  organizational challenges is the need to extend your strategic
                    plans to a level of measurable operational effectiveness.


               First and foremost, what existing processes, methods and/or
                tools give you confidence in your ability to meet or exceed
                performance objectives?
               What do you find to be the greatest challenges regarding your
                ability to meet and/or exceed performance objectives? Are
                there innovation management, product development, resource
                planning & utilization, cross-departmental strategy
                coordination, process/workflow enablement and/or program
                management concerns?
               What are your experiences to date with organizational
                Portfolio, Program, Project and Resource Management
                solutions? Positive? Beneficial? Ineffective?

Transforming Innovation                            © 2009 ALYNDe, LLC                                      14




                                                                                                                7
Questions Regarding Your Strategic Direction…                             ALYNDe LLC


                       Lost in the process of reacting to market forces and
                  organizational challenges is the need to extend your strategic
                    plans to a level of measurable operational effectiveness.

             How would you grade your ability to link your organization’s
              strategic goals to the various work initiatives (product
              development programs, IT projects, application development,
              service management) that are planned? ...in process?
             Do you have a well-defined IT Governance model that highlights
              the status of cost take-out or revenue-generating initiatives and
              the subsequent actions that deliver differentiated products and
              services to your customers?
             Do your project teams have the ability to collaborate? …Inform
              Management? …Measure Performance?



Transforming Innovation                   © 2009 ALYNDe, LLC                       15




Questions Regarding Your Strategic Direction…                             ALYNDe LLC


                       Lost in the process of reacting to market forces and
                  organizational challenges is the need to extend your strategic
                    plans to a level of measurable operational effectiveness.

             How would you grade your position as a “1st-Mover” within the
              markets/segments you serve?
             Are consistent valuation methods and measures being used to
              determine such things as: 1. earned-value performance, 2.
              stage-gate performance, 3. financial impacts to on-going
              programs, and 4. post-delivery results for each program,
              project or service initiative?
             Can your organization “load balance” the workforce for an
              optimal mix of internal (employee) and external (contractor,
              supplier, partner) personnel based upon cost and demand
              requirements?




Transforming Innovation                   © 2009 ALYNDe, LLC                       16




                                                                                        8
Answers to These Questions Force Strategic
                                                                                       ALYNDe LLC
 Choices…

                 You will confront a set of cascading strategic choices...


            What are
           your goals
         and aspirations?

                               Where
                                 will
                            you compete?

                                           How will you win
                                            in your chosen
                                               markets?

                                                                What capabilities
                                                                  must be in
                                                                 place to win?

                                                                                    What management
                                                                                      systems are
                                                                                       required?




Transforming Innovation                    © 2009 ALYNDe, LLC                                         17




 Answers to These Questions Force Strategic
                                                                                       ALYNDe LLC
 Choices…

                 You will confront a set of cascading strategic choices...

             Understanding these choices means:
              Your Strategy will become the pattern or plan that integrates your
               major goals, policies and action sequences into a cohesive
               measurement-enabled Framework …and positions your business
               within your competitive markets …in order to create a sustainable
               competitive advantage.
              Where do you play?
               - Industry Segment(s)
               - Narrow vs. Broad Focus
              How will you win?
               - Value Proposition
               - Sources of Competitive Advantage (Operational Effectiveness,
               Product Innovation, Customer Intimacy?)
              How best to configure your portfolio management framework to
               measure business performance against strategy to deliver value to
               targeted customers as efficiently and effectively as possible?


Transforming Innovation                    © 2009 ALYNDe, LLC                                         18




                                                                                                           9
Answers to These Questions Force Strategic
                                                                                                                       ALYNDe LLC
 Choices…

                 You will confront a set of cascading strategic choices...

             You should confront these choices to develop actionable
             strategies supported by:
                  Enterprise and IT Governance Frameworks (CoBIT, ITIL,
                   etc),
                  Effective Innovation Management, Application and Product
                   Development best practices (Stage-Gate, RUP, etc),
                  Workforce Optimization (Capacity Planning, Resource
                   Leveling, etc), and
                  Project and Product Portfolio Management Best Practices




Transforming Innovation                              © 2009 ALYNDe, LLC                                                                 19




                                                                                                                       ALYNDe LLC
 These Choices Impact Your Strategy

  Strategy: “The pattern or plan that
  integrates an organization’s major
                                                                     high                                  Operational
  goals, policies and action sequences
  into a cohesive whole. A well-                                                                           Effectiveness
                                                                              Business Unit 2
                                             Strategic Advantage




  formulated strategy helps to marshal
  and allocate an organization’s
  resources into a unique and viable                                                                Business Unit 1

  posture based on its relative internal                                                                   Business Unit 3
                                                                      Value




  competencies, shortcomings,
  anticipated changes in the
  environment and contingent moves by
  intelligent opponents.” *

                                                                                         Business Unit 5
   Strategic Advantage: Attained when                                                                           Business Unit 4
   action sequences fit the organization                             low
   and when business processes support
                                                                              high       Relative cost position                   low
   and enforce objectives within a
   measurable Governance
   Framework. This framework must                                                    Operational Effectiveness
   support all roles with information that
   is needed to make decisions based
   upon relevant and timely metrics.
                                                                   *J.B. (James) Quinn – (Quinn, J. (1980) “Strategies for
                                                                   change: Logical Incrementalism”, Irwin, Homewood)
Transforming Innovation                              © 2009 ALYNDe, LLC                                                                 20




                                                                                                                                             10
So, Why is Portfolio Management
                                                                                                                       ALYNDe LLC
 Important?
   Because…
    Strategy is affected by choosing                                high                                  Operational
     which activities to perform and how
                                                                                                           Effectiveness
     to measure them                                                          Business Unit 2




                                               Strategic Advantage
    Strategic advantage occurs from
     the fit and alignment of those                                                                 Business Unit 1

     activities to your business                                                                           Business Unit 3




                                                                     Value
     strategy
    Operational Effectiveness is
     achieved by performing the right
     activities at the right time with the
     right people to achieve desired                                                     Business Unit 5
     performance results                                                                                        Business Unit 4
                                                                     low
                                                                             high        Relative cost position                   low


                                                                                     Operational Effectiveness

        Effective solutions impact both Strategic Advantage and Operational Effectiveness.
                            “It’s hard to manage what you can’t measure”

Transforming Innovation                               © 2009 ALYNDe, LLC                                                                21




                                                                                                                       ALYNDe LLC
 An Ideal Desired-State Situation
  “Allows you to plan today rather
  than respond tomorrow...”
                                                                     high                                  Operational
    Processes, technology and people
     across business units are aligned in                                                                  Effectiveness
                                                                             Business Unit 2
                                             Strategic Advantage




     a coordinated environment to
     deliver high value at a low cost
                                                                                                    Business Unit 1
    Deliberate strategy to achieve
     improvement is sustainable                                                                            Business Unit 3
                                                                     Value




                                                                                           All Business Units
    Operating Systems in place to avert
     potential threats to competitive
     position and financial performance
    A Portfolio Management Framework
     transforms operating data into                                                      Business Unit 5
                                                                                                                Business Unit 4
     Insight                                                         low
                                                                             high        Relative cost position                   low


                                                                                    Operational Effectiveness

            Effective Business and IT alignment impacts both Strategic Advantage and
                                    Operational Effectiveness.

Transforming Innovation                               © 2009 ALYNDe, LLC                                                                22




                                                                                                                                             11
ALYNDe LLC


   The Value Proposition for Comprehensive Innovation
   Lifecycle Management




Comprehensive Innovation Management                                                                    ALYNDe LLC
 Framework Structure



                                                 Solution Framework

              Innovation           Project and                                    NPD
                                                         Portfolio                                  Integration
              Governance            Program                                    Lifecycle
                                                        Management                                   Services
                                   Management                                 Management


              Quality & Process Innovation: Portfolio Management, Six Sigma, Product Lifecycle Management Capability
              Maturity Indexing, Innovation Lifecycle Management, Stage-Gate.™

              Capabilities Framework: Competence Development & Process Excellence, PMI & OPMI®, Lean Six Sigma
              (LSS)


              Industry Standards: IEEE, ISO, DoD, SEI CMM and CMMI ®, GAAP (SOP 98-1)

              Technology Enablers & Alliance Partners: Product Evaluation, Delivery Support & Development.

            Built on a foundation of fully integrated solutions designed to drive the creation
             of measurable business value through the timely and efficient deployment of
                            enabling methods, process, and technologies.

Transforming Innovation                                © 2009 ALYNDe, LLC                                              24




                                                                                                                            12
Comprehensive Innovation Management                                                                 ALYNDe LLC
  ILM solutions are “Frameworks”




                                                      t




                                                                      Pe
                                                    en




                                                                         rfo Bud
                                                 em




                                                                            r m ge
                                               ag




                                                                               an tin
                                             an




                                                                                 ce g
                                            M




                                                                                   -b
                                            io
                                                          Value



                                         ol




                                                                                      as
                                                          From

                                     rtf




                                                                                        ed
                                   Po                      ILM                      Value from
                                                                                       PPM


                                                 Execution Management


         Innovation Lifecycle Management (ILM) is based upon a framework of fully
         integrated Application Components designed to drive the creation of measurable
         business value.

         This is accomplished through the timely and cost effective deployment of
         enabling processes, technologies and resources.
 Transforming Innovation                              © 2009 ALYNDe, LLC                                                    25




 Comprehensive Innovation Management                                                                 ALYNDe LLC
  ILM Framework - Value Proposition

             What you need to do…                                                       What you are able to do…

             Improve visibility of all                                             Improve alignment of
                                                      t




                                                                      Pe
                                                    en




                proposed and active                                                strategy, targets and budgets
                                                                         rfo Bud
                                                 em




                        investments
                                                                                             Improve collaboration
                                                                            r m ge
                                               ag




         Objectively prioritize                                                              among planning, budgeting,
                                                                               an tin
                                             an




       and select investments                                                                financial, and program staff
                                                                                 ce g
                                            M




                                                                                   -b
                                            io




    Align investments with                                Value
                                                                                                 Capture full costs of all
                                         ol




                                                                                      as




                  strategy                                From
                                     rtf




                                                                                                 resources identified with
                                                                                        ed




                                                           ILM
                                   Po




Improve portfolio balance                                                                        achieving goals and
                                                                                                 objectives
     Measure investment
                results                                                                           Establish linkages
                                                                                                  between results and
                                                 Execution Management                             resources



                                                  What you really can do…

        Efficiently allocate critical resources
        Improve quality and predictability through standard processes and leading practices
        Manage program schedules and costs & Identify and mitigate risks and issues

 Transforming Innovation                              © 2009 ALYNDe, LLC                                                    26




                                                                                                                                 13
ALYNDe LLC


  Solution Management Approach and Common Challenges




  Solution Management Approach                                                         ALYNDe LLC


4 fundamental principles:

   1.    Structure change in manageable steps
               Each implementation phase should deliver measurable benefits and build toward your
                overall objectives
   2.    Implement each step-change quickly
               Faster user adoption, reduced risk and quicker business benefits
   3.    Transfer knowledge with collaborative workshops
               Each phase is delivered through workshops with clearly defined objectives, scope and
                deliverables to ensure effective knowledge transfer to your user teams
   4.    Address all aspects of business change
               Successful change programs address organizational, cultural, and technical aspects.
                Effective workshops ensure that each area is aligned to specific business objectives of
                the change program




Transforming Innovation                         © 2009 ALYNDe, LLC                                        35




                                                                                                               14
Common Challenges for IT Organizations                                      ALYNDe LLC


            Running IT as a business demonstrates that IT can provide value-add in
             customer facing, internal facing and shareholder facing functions reliably and at
             competitive prices (compared to external providers)


            Effective portfolio management helps to maximize the financial return on new
             Innovation investments and actively manages the “tail” of Innovation—the
             replacement/retirement of legacy products and services that have reached the
             end of their useful lives


            Alignment of business and IT so that IT delivers the right services to the
             business at the highest quality and most competitive cost to support
             “differentiation through innovation”


            Providing complete, accurate, meaningful and consistent reporting to
             customer, internal (corporate, business units, project teams), and shareholder
             constituents




Transforming Innovation                    © 2009 ALYNDe, LLC                                    36




  Common Challenges for IT Organizations                                      ALYNDe LLC


            Shortening cycle times and reducing costs of key innovation processes
             through automation, self-service and elimination of manual, paper-based business
             transactions – creating a lean operational infrastructure that strives to
             eliminate non value-added work.


            Diffusion and adoption of common information systems which increase
             common business processes across the company, reduce information latency,
             increase information flow and allow for an “apples-to-apples” comparison of
             disparate businesses in a complete, accurate and timely manner without manual
             intervention or “one-off” reconciliation processes and reports


            Managing regulatory adherence and compliance transparently so that
             performance audits are “non-events”


            Providing “one version of the truth“ by supporting key business performance
             drivers, business intelligence maturity, information architecture and stewardship
             of information standards




Transforming Innovation                    © 2009 ALYNDe, LLC                                    37




                                                                                                      15
Thank You!                                                                              ALYNDe LLC

This presentation was prepared by:



                             ALYNDe LLC
                                                    Glenn A. Bunker
                                                        Partner

                              1978 Stafford Place                     Tel: 770.565.4366
                              Marietta, GA 30062                      Fax: 770.565.4366
                                                                   Mobile: 770.377.7061
                                                      E-mail: glenn.bunker@alynde.com




Transforming Innovation                     © 2009 ALYNDe, LLC                                     39




                                                                                                        16

Innovation And It Alignment 121510 Abbreviated

  • 1.
    ALYNDe LLC “Managing The Pace of Change and Complexity of Innovation by Aligning Your Business Strategy and IT Factory to Achieve Results” By: Glenn A. Bunker Partner Agenda ALYNDe LLC  Review Marketplace Dynamics  Leadership Challenges: Understanding Your Strategic Direction  The Value Proposition for Innovation Lifecycle Management  Solution Management Approach and Common Challenges Transforming Innovation © 2009 ALYNDe, LLC 2 1
  • 2.
    ALYNDe LLC Review Marketplace Dynamics Introduction ALYNDe LLC Key contributors see Innovation Lifecycle Management (ILM) activities a little differently:  The Strategist sees ILM solutions as a way to improve the allocation of resources across the enterprise and to develop a strategically correct portfolio to support the corporate vision.  Finance looks to ILM solutions to improve the allocation of scarce financial resources more effectively while optimally achieving maximum shareholder value.  IT views ILM solutions as a means to prioritize and select the right projects to support business strategy, foster accountability and deliver results with a highly skilled but constrained workforce.  Business Units (LOB’s) see ILM solutions as the framework within which to manage the processes, collaboration and work needed to deliver products to customers faster - improving time to market performance, operational effectiveness and ROI. CEO’s, CIO’s, COO’s, CFO’s and LOB Executives should look to ILM frameworks to deliver big wins with positive financial impacts within a climate of rapid change. Transforming Innovation © 2009 ALYNDe, LLC 4 2
  • 3.
    There Are PressuresFor Change… ALYNDe LLC External Pressures Pace of Technology Resource Issues Change Margin Zone (Supply and Demand Constraints for Skilled Workers) Constrained Performance Workforce Pressures Internal Pressures Business Climate Mergers & (New Markets, Acquisitions Innovation Complexity) Reduced Budgets New Competitors Regulatory Transforming Innovation © 2009 ALYNDe, LLC 5 Causing Operational Concerns... ALYNDe LLC Including:  Disruptions to launch schedules and budgets for new business solutions, regulatory changes and demand complexity (managing dynamic demand)  Poor project planning, management and communications regarding issues that affect timely delivery of programs, products and services (time to market)  Shortages of critical resource skills, especially for emerging technologies, methodologies and business processes; Lack of tools for human resource capacity planning and optimization (workforce management)  Inefficient, “silo’ed” and redundant program and project management tools and procedures (program and project management)  Ineffective knowledge capture, search and distribution capability to improve problem solving and team performance (knowledge management) Transforming Innovation © 2009 ALYNDe, LLC 6 3
  • 4.
    Forcing Consideration OfSolutions That... ALYNDe LLC Enable partners, employees, managers and executives to perform everyday activities themselves, anytime and anywhere in order to:  Create a culture that is comfortable with collaboration  Establish the concept of an integrated/virtual community  Manage the impact and complexity of innovation on your competitive posture  Streamline decision-making processes for new development opportunities  Allow management to focus on executing the company’s overall business strategy with the support of an agile IT operation  … Support “proactive” vs. “reactive” decision-making The ultimate goal is to combine Process, People, Portfolio and Project Management best practices to help people improve the way they do their jobs. Transforming Innovation © 2009 ALYNDe, LLC 7 ALYNDe LLC Leadership Challenges: Understanding Your Strategic Direction 4
  • 5.
    Leadership Challenges ALYNDe LLC Executive Leadership is facing increasing pressure to control costs and improve operational performance for future business growth and profitability External Forces – Customers, Planning, Building & Integrating Competitors & Technology Business Solutions Trends  Define effective strategic planning and  Capitalize on emerging technologies governance processes. to achieve a competitive advantage.  Meet capital planning requirements for  Provide IT-enabled products and effective innovation. services before competitors. Create an ILM  Break down business unit silos and  Adapt to changing business models Framework for identify common applications and IT and partnerships. Managing services needed to eliminate NVA work. Organizational Performance Measuring & Reporting Controlling & Managing Improvement Operations  Calculate the return on investment for proposed IT investments by determining  Manage Product/Service portfolios the expected business and technology and IT investments needed for costs and benefits. effective support.  Establish an Innovation Management  Identify strategic cost savings. Office to monitor status and manage  Define and monitor performance risks. metrics and service level agreements.  Develop an effective Governance program that involves business and Transforming Innovation © 2009 ALYNDe, LLC technology leaders. 9 Can You Identify With This Manager? ALYNDe LLC Transforming Innovation © 2009 ALYNDe, LLC 10 5
  • 6.
    “Managing is HarderThan it Looks…” ALYNDe LLC Integrating and over-customizing Managing simultaneous rollout of multiple systems/processes to fit current initiatives & scope creep beyond stove pipes organizational capability to execute Consolidating data from Automating methodology, disparate systems and workflows & processes different sources Manage the entire investment Managing investment portfolio portfolio & relevant information costs, benefits & capacity Managing demand & performing Lack of critical skills at the ‘real time’ what if analysis and right time due to poor simulations resource planning Identify losing project and Improve quality of decisions & product candidates (go/kill reduce decision lead times gating criteria) Transforming Innovation © 2009 ALYNDe, LLC 11 Given These Challenges, What Is Your ALYNDe LLC Strategic Direction? To meet these business challenges while exceeding performance goals, an Innovation Lifecycle Management Framework is needed to enable Operational Excellence, Customer Intimacy and Product Innovation strategies to levels consistent with your business objectives. Let your portfolio metrics reflect your emphasis… Transforming Innovation © 2009 ALYNDe, LLC 12 6
  • 7.
    Given These Challenges,What Is Your ALYNDe LLC Strategic Direction?  Low (total) price  Low (total) price  Emphasis on efficiency and reliability  Emphasis on efficiency and reliability  Hassle-free service  Hassle-free service  Standardized processes and operations  Standardized processes and operations  Management systems that measure and monitor transactions  Management systems that measure and monitor transactions Operational Excellence Customer Intimacy Product Innovation  Organization built around the customer rather  Organization built around the customer rather  Focus on invention, creativity and  Focus on invention, creativity and than the market than the market experimentation experimentation  Emphasis on flexibility and responsiveness  Emphasis on flexibility and responsiveness  Willing to make one’s own products obsolete  Willing to make one’s own products obsolete  Business structure that delegates decision  Business structure that delegates decision  Loosely-knit organization based on teams  Loosely-knit organization based on teams making to the field making to the field  Management systems that are results driven  Management systems that are results driven  Culture that embraces specific rather than  Culture that embraces specific rather than general solutions general solutions  A culture that encourages innovation  A culture that encourages innovation Transforming Innovation © 2009 ALYNDe, LLC 13 Questions Regarding Your Strategic Direction… ALYNDe LLC Lost in the process of reacting to market forces and organizational challenges is the need to extend your strategic plans to a level of measurable operational effectiveness.  First and foremost, what existing processes, methods and/or tools give you confidence in your ability to meet or exceed performance objectives?  What do you find to be the greatest challenges regarding your ability to meet and/or exceed performance objectives? Are there innovation management, product development, resource planning & utilization, cross-departmental strategy coordination, process/workflow enablement and/or program management concerns?  What are your experiences to date with organizational Portfolio, Program, Project and Resource Management solutions? Positive? Beneficial? Ineffective? Transforming Innovation © 2009 ALYNDe, LLC 14 7
  • 8.
    Questions Regarding YourStrategic Direction… ALYNDe LLC Lost in the process of reacting to market forces and organizational challenges is the need to extend your strategic plans to a level of measurable operational effectiveness.  How would you grade your ability to link your organization’s strategic goals to the various work initiatives (product development programs, IT projects, application development, service management) that are planned? ...in process?  Do you have a well-defined IT Governance model that highlights the status of cost take-out or revenue-generating initiatives and the subsequent actions that deliver differentiated products and services to your customers?  Do your project teams have the ability to collaborate? …Inform Management? …Measure Performance? Transforming Innovation © 2009 ALYNDe, LLC 15 Questions Regarding Your Strategic Direction… ALYNDe LLC Lost in the process of reacting to market forces and organizational challenges is the need to extend your strategic plans to a level of measurable operational effectiveness.  How would you grade your position as a “1st-Mover” within the markets/segments you serve?  Are consistent valuation methods and measures being used to determine such things as: 1. earned-value performance, 2. stage-gate performance, 3. financial impacts to on-going programs, and 4. post-delivery results for each program, project or service initiative?  Can your organization “load balance” the workforce for an optimal mix of internal (employee) and external (contractor, supplier, partner) personnel based upon cost and demand requirements? Transforming Innovation © 2009 ALYNDe, LLC 16 8
  • 9.
    Answers to TheseQuestions Force Strategic ALYNDe LLC Choices… You will confront a set of cascading strategic choices... What are your goals and aspirations? Where will you compete? How will you win in your chosen markets? What capabilities must be in place to win? What management systems are required? Transforming Innovation © 2009 ALYNDe, LLC 17 Answers to These Questions Force Strategic ALYNDe LLC Choices… You will confront a set of cascading strategic choices... Understanding these choices means:  Your Strategy will become the pattern or plan that integrates your major goals, policies and action sequences into a cohesive measurement-enabled Framework …and positions your business within your competitive markets …in order to create a sustainable competitive advantage.  Where do you play? - Industry Segment(s) - Narrow vs. Broad Focus  How will you win? - Value Proposition - Sources of Competitive Advantage (Operational Effectiveness, Product Innovation, Customer Intimacy?)  How best to configure your portfolio management framework to measure business performance against strategy to deliver value to targeted customers as efficiently and effectively as possible? Transforming Innovation © 2009 ALYNDe, LLC 18 9
  • 10.
    Answers to TheseQuestions Force Strategic ALYNDe LLC Choices… You will confront a set of cascading strategic choices... You should confront these choices to develop actionable strategies supported by:  Enterprise and IT Governance Frameworks (CoBIT, ITIL, etc),  Effective Innovation Management, Application and Product Development best practices (Stage-Gate, RUP, etc),  Workforce Optimization (Capacity Planning, Resource Leveling, etc), and  Project and Product Portfolio Management Best Practices Transforming Innovation © 2009 ALYNDe, LLC 19 ALYNDe LLC These Choices Impact Your Strategy Strategy: “The pattern or plan that integrates an organization’s major high Operational goals, policies and action sequences into a cohesive whole. A well- Effectiveness Business Unit 2 Strategic Advantage formulated strategy helps to marshal and allocate an organization’s resources into a unique and viable Business Unit 1 posture based on its relative internal Business Unit 3 Value competencies, shortcomings, anticipated changes in the environment and contingent moves by intelligent opponents.” * Business Unit 5 Strategic Advantage: Attained when Business Unit 4 action sequences fit the organization low and when business processes support high Relative cost position low and enforce objectives within a measurable Governance Framework. This framework must Operational Effectiveness support all roles with information that is needed to make decisions based upon relevant and timely metrics. *J.B. (James) Quinn – (Quinn, J. (1980) “Strategies for change: Logical Incrementalism”, Irwin, Homewood) Transforming Innovation © 2009 ALYNDe, LLC 20 10
  • 11.
    So, Why isPortfolio Management ALYNDe LLC Important? Because…  Strategy is affected by choosing high Operational which activities to perform and how Effectiveness to measure them Business Unit 2 Strategic Advantage  Strategic advantage occurs from the fit and alignment of those Business Unit 1 activities to your business Business Unit 3 Value strategy  Operational Effectiveness is achieved by performing the right activities at the right time with the right people to achieve desired Business Unit 5 performance results Business Unit 4 low high Relative cost position low Operational Effectiveness Effective solutions impact both Strategic Advantage and Operational Effectiveness. “It’s hard to manage what you can’t measure” Transforming Innovation © 2009 ALYNDe, LLC 21 ALYNDe LLC An Ideal Desired-State Situation “Allows you to plan today rather than respond tomorrow...” high Operational  Processes, technology and people across business units are aligned in Effectiveness Business Unit 2 Strategic Advantage a coordinated environment to deliver high value at a low cost Business Unit 1  Deliberate strategy to achieve improvement is sustainable Business Unit 3 Value All Business Units  Operating Systems in place to avert potential threats to competitive position and financial performance  A Portfolio Management Framework transforms operating data into Business Unit 5 Business Unit 4 Insight low high Relative cost position low Operational Effectiveness Effective Business and IT alignment impacts both Strategic Advantage and Operational Effectiveness. Transforming Innovation © 2009 ALYNDe, LLC 22 11
  • 12.
    ALYNDe LLC The Value Proposition for Comprehensive Innovation Lifecycle Management Comprehensive Innovation Management ALYNDe LLC Framework Structure Solution Framework Innovation Project and NPD Portfolio Integration Governance Program Lifecycle Management Services Management Management Quality & Process Innovation: Portfolio Management, Six Sigma, Product Lifecycle Management Capability Maturity Indexing, Innovation Lifecycle Management, Stage-Gate.™ Capabilities Framework: Competence Development & Process Excellence, PMI & OPMI®, Lean Six Sigma (LSS) Industry Standards: IEEE, ISO, DoD, SEI CMM and CMMI ®, GAAP (SOP 98-1) Technology Enablers & Alliance Partners: Product Evaluation, Delivery Support & Development. Built on a foundation of fully integrated solutions designed to drive the creation of measurable business value through the timely and efficient deployment of enabling methods, process, and technologies. Transforming Innovation © 2009 ALYNDe, LLC 24 12
  • 13.
    Comprehensive Innovation Management ALYNDe LLC ILM solutions are “Frameworks” t Pe en rfo Bud em r m ge ag an tin an ce g M -b io Value ol as From rtf ed Po ILM Value from PPM Execution Management Innovation Lifecycle Management (ILM) is based upon a framework of fully integrated Application Components designed to drive the creation of measurable business value. This is accomplished through the timely and cost effective deployment of enabling processes, technologies and resources. Transforming Innovation © 2009 ALYNDe, LLC 25 Comprehensive Innovation Management ALYNDe LLC ILM Framework - Value Proposition What you need to do… What you are able to do… Improve visibility of all Improve alignment of t Pe en proposed and active strategy, targets and budgets rfo Bud em investments Improve collaboration r m ge ag Objectively prioritize among planning, budgeting, an tin an and select investments financial, and program staff ce g M -b io Align investments with Value Capture full costs of all ol as strategy From rtf resources identified with ed ILM Po Improve portfolio balance achieving goals and objectives Measure investment results Establish linkages between results and Execution Management resources What you really can do… Efficiently allocate critical resources Improve quality and predictability through standard processes and leading practices Manage program schedules and costs & Identify and mitigate risks and issues Transforming Innovation © 2009 ALYNDe, LLC 26 13
  • 14.
    ALYNDe LLC Solution Management Approach and Common Challenges Solution Management Approach ALYNDe LLC 4 fundamental principles: 1. Structure change in manageable steps  Each implementation phase should deliver measurable benefits and build toward your overall objectives 2. Implement each step-change quickly  Faster user adoption, reduced risk and quicker business benefits 3. Transfer knowledge with collaborative workshops  Each phase is delivered through workshops with clearly defined objectives, scope and deliverables to ensure effective knowledge transfer to your user teams 4. Address all aspects of business change  Successful change programs address organizational, cultural, and technical aspects. Effective workshops ensure that each area is aligned to specific business objectives of the change program Transforming Innovation © 2009 ALYNDe, LLC 35 14
  • 15.
    Common Challenges forIT Organizations ALYNDe LLC  Running IT as a business demonstrates that IT can provide value-add in customer facing, internal facing and shareholder facing functions reliably and at competitive prices (compared to external providers)  Effective portfolio management helps to maximize the financial return on new Innovation investments and actively manages the “tail” of Innovation—the replacement/retirement of legacy products and services that have reached the end of their useful lives  Alignment of business and IT so that IT delivers the right services to the business at the highest quality and most competitive cost to support “differentiation through innovation”  Providing complete, accurate, meaningful and consistent reporting to customer, internal (corporate, business units, project teams), and shareholder constituents Transforming Innovation © 2009 ALYNDe, LLC 36 Common Challenges for IT Organizations ALYNDe LLC  Shortening cycle times and reducing costs of key innovation processes through automation, self-service and elimination of manual, paper-based business transactions – creating a lean operational infrastructure that strives to eliminate non value-added work.  Diffusion and adoption of common information systems which increase common business processes across the company, reduce information latency, increase information flow and allow for an “apples-to-apples” comparison of disparate businesses in a complete, accurate and timely manner without manual intervention or “one-off” reconciliation processes and reports  Managing regulatory adherence and compliance transparently so that performance audits are “non-events”  Providing “one version of the truth“ by supporting key business performance drivers, business intelligence maturity, information architecture and stewardship of information standards Transforming Innovation © 2009 ALYNDe, LLC 37 15
  • 16.
    Thank You! ALYNDe LLC This presentation was prepared by: ALYNDe LLC Glenn A. Bunker Partner 1978 Stafford Place Tel: 770.565.4366 Marietta, GA 30062 Fax: 770.565.4366 Mobile: 770.377.7061 E-mail: glenn.bunker@alynde.com Transforming Innovation © 2009 ALYNDe, LLC 39 16