Wee Kim Wee School of Communication and Information

                                  Division of Knowledge Management

                                  Business Intelligence (Assignment 1)




Information capture - other than structured data from core transactional processing systems, BI Analysis
                                      and Intelligence Proposition




                                             Submitted By


                              THANGAVELU MUTHU KUMAAR (G1101765E)

                                 BALASUBRAMANIAN DIVYA (G1101736H)

                                    SELVARAJU NIRMALA (G1101760J)
The changing nature of communication channels in enterprises, new ways of technology integration with
traditional processing, affordability of simple programming devices or interfaces like QR codes, bar codes,
RFID and bio metrics, robustness of wireless network infrastructure and massive capabilities of data centres
have facilitated to the growth of this information era. It is a challenging task to collect the information from
multiple sources of enterprises, interpret with appropriate context to transform it into knowledge to help in
decision making. The distinct steps described by Gilad and Gilad (1985) provides a best systems approach and
help in running through the goal of intelligence transformation from information which is other than the
traditional internal processing data (like sentiments and opinions expressed in internet and social media, social
network analysis, SME reports, internal audit reports, market research, news agencies, consultant and analyst
reports). These data are typically from external sources existing in structured and unstructured data. Similar kind
of web 2.0 interaction data in enterprise portals, Enterprise Applications usage, internal social network analysis,
chats and Expert information can be internal sources which have not been looked upon in most organizations
presently. They tend to be more in unstructured forms as they are directly contributed by people as in web 2.0.

Information to Intelligence Mapping with BI Process:

The degree of intelligence derived by the enterprises by acting upon accessible information with BI processes
determines the level of optimum usage of the existing resources and an understanding of their stands in the
market place which guides organizations in scaling their success.




Figure 1: Information to Intelligence Mapping (Gilad and Gilad, 1985)

Collection:

Sources and Types of Information:

The business management depends on BI solutions, to make delicate decisions, as well as to modify or adjust
the business strategies and business process and to achieve competitive advantage and improve business
operation and profitability.
The reasons why organisations depend on information are, to carry out strategic planning, intelligent recording
and relaying, controlling and monitoring, measuring and decision-making.

Information needs are clearly different at different levels of management - the strategic, tactical, and operative
levels (Uusi-Rauva, 1994).

Operative Intelligence requires more of internal information that is detailed, specific and historical
(McGonagle and Vella, 1996). This information comes mostly from core transactional systems and it is mostly
structured in nature. These are used for operations monitoring, setting standards for processes, quality control
and production related activities. Some of the sources of internal structured information are from functional and
integrative technology services like Radio frequency (RF) technologies, Computer-aided design (CAD) systems,
Demand forecasting management (DFM), Collaborative planning, forecasting, and replenishment (CFRP)
systems, Manufacturing execution systems (MES), Order management systems (OMS), Product data
management (PDM) systems, Supply chain event management (SCEM) systems, Geo-coded Service tracking
systems, Transportation management systems (TMS), Warehouse management systems (WMS) , Enterprise
resource planning (ERP) systems, Enterprise Application Integration (EAI) systems, Enterprise Knowledge
Portal (EKP) Systems, Customer/supplier relationship management (CRM/SRM), Supply chain planning (SCP)
systems (Krmac EV, 2011) .

Strategic intelligence is often derived from movement of market, competitors and customers. They help the
organization to plan their business strategies – market expansions, new product launch, benchmarking standards,
policy restructuring, mergers and acquisitions. These sources of information are mostly external to the
organization and more of broad, integrated and upcoming in nature (McGonagle and Vella, 1996). They are
obtained from market research and consulting firms like Mckinsey, Nielsen, Ipsos, Ernst and Young and similar
others. They may be structured or unstructured. Also this information can be obtained from internet with web
crawlers to capture the relevant customer trends and sentiments, economic and financial news, and competitor’s
innovation, branding and marketing strategies. This information from new s feeds, user comments on social
media is unstructured where there is a high reliance on text and context mining techniques to extract the useful
information to transform into intelligence.

Tactical Intelligence is a balance between strategic and operational moves with slightly more internal sources
than external. These sources are used to manage risks in the operational monitoring stage such as demand
forecasting, logistics optimization, process improvement, economies of scale. These sources also include
significant sources of external conditions like weather patterns or environmental conditions in the raw materials
supplier region, political conditions in the operating regions and supply demand management with sales
channels which can exist in unstructured as well as structured forms

The data from different kind of information systems other than core transactional processing systems like
Executive Support Systems helping the senior management with more external and less internal information
sources (highly structured with appropriate returns) to base their strategic decisions, Management information
systems helping in aligning information about people, process and technology to business, typically internal
(more structured and less unstructured forms), Decision-support systems helping management make decisions
in uncertainty about the possible outcomes for which sources can be external or internal existing in mostly
structured information rather than unstructured , Knowledge Management Systems helping businesses create
and share information which has its sources internal and is typically unstructured, Office Automation Systems
trying to improve the productivity of employees who need to process data and information and they are again
internal sources which are but structured (Mahesh Raisinghani, 2004).
The various internal and sources for an enterprise analyzed with Business Information Cube Framework
(Hannula & Pirttimäki 2004) are listed down as in table 1 (Appendix)

This information can further be analyzed based on their form of existence (Structured and unstructured) with the
framework of Hervonen (2004) for information classification.

Evaluation:

Why Organizations limit themselves to the internal structured Information:

There is a well known dark-side to the information technology and the communication revolution; those would
be information overload and attention fragmentation. These factors are strongly considered as afflictions by the
senior executives because they need uninterrupted time to assess and process the information collected.
Research conducted on various disciplines seems to prove that the performance of an individual is influenced
with the amount of information they receive up to a certain saturation point; beyond that point the performance
rapidly declines.




Figure 2. Information overload as inverted U-Curve.

Qualities of Information:

Despite the amount of information, the nature of the information also contributes to the ‘overload’ attribute of
the information. The nature of the information includes: Level of ambiguity of the information, Level of novelty
of the information, complexity, intensity, conciseness, consistency, comprehensibility. In addition to this there
are other dimensions the quality of information should have that determines its usefulness to the organization -
Inherent qualities and the pragmatic qualities. The inherent quality is the correctness of the data or the
information, whereas the pragmatic quality is the relevancy of the data to the context of the organization and its
need for that information.

Though the technology in present day makes a wide range of information accessible, it is important to analyse
the business environment extensively to know what is and what is not required at that point of time (Choo,
2002). After selecting the right information, there is a need to assess the existing information gap and map how
the new information transformed into intelligence can help in decision support.

Storage, Analysis and Dissemination:

The evaluated data is moved to data warehouse and is then used to analyze and synthesize the information from
the many different sources, emulate on its implications to the organizations, apply guesses and judgements, and
make strategic decisions to make best use of it.

The reporting environment of a BI tool helps us to visualize the data typically into Spreadsheets with Query,
reporting and data visualization tools and OLAP (On-Line Analytical Processing) with increasingly popular
Data, Text, Sentiment, Opinion and Web mining components. Powell (1996) calls the refinement process a BI
value chain which is cyclical and ongoing in nature

Real time BI analysis, mobile and cloud based BI solutions can also help in solving many operational
challenges. For example, this helped British Petroleum in their innovative ways of Oil Exploration, Production,
Processing initiatives and in transforming their conventional operations to sustain their competitive edge.

 o    Oil Rigs  Digital Oil Platforms - 3D and 4D Seismic imaging, Augmented Reality based simulation

 o    Oil Recovery  Optimized Oil Recovery and Refining - Real time monitoring of mature fields

Typical BI applications

In general, BI solutions help in breaking the Information Silos spanning geographies - within and across internal
department systems (Legacy mainframes, ERP, CRM), Supplier systems and Customer systems. Some of the
specific examples are as follows

         Logistics Optimization: Achieving a cost-effective means of transport. (Business intelligence software
         can facilitate a fast and easy selection of the best means of transport considering a vast number of
         factors in selecting the means of transport are physical characteristics of the load, the number of loads
         to be moved, the distance to be covered, the required speed of movement, the required proof of
         delivery, cost of building/dismantling loads, packaging costs, space requirements, interface with other
         storage, transport and handling systems and housekeeping issues) and considering also historic data
         and past experience.)
         Operational standard and Quality maintenance: Evaluating the operations performed in the
         company (generating reports), evaluating strategic factors (internal and external) and identifying
         patterns of business and operational behaviour (using data mining techniques).Implement dashboards
         and scoreboards so that executives and supervisors can quickly recognize operational exceptions or key
         performance indicators (KPI) that fall outside of accepted ranges. Some of the important KPIs could be
         planning accuracy, capacity utilization, resource utilization, load balancing, route utilization,
         scheduling accuracy, vehicle availability, vehicle loading time, average transit time, cost of
         transportation per ton, on time vehicle arrival, vehicle unloading time, order receipt accuracy,
         percentage of goods damaged, total order delivery time, on time deliveries, goods delivery rate,
         transportation costs and others.

Challenges in the intelligence transformation:

Technology acceptance at different levels of users, Human Information Behaviour in information consumption,
Security considerations and access to information, Difficulty in extracting data from internet with Natural
Language Processing, word sense disambiguation, costs and time in implementing cross organizational
infrastructure and rapid obsolescence of technology are some of the key challenges in collecting and
transforming the information and which sometimes prevents the organizations in realizing the true value of
Business Intelligence Solutions.
References:

Mahesh Raisinghani (2004), Business intelligence in the digital economy: opportunities, limitations, and risks,
    Hershey PA : Idea Group Pub., c2004

Gilad, B. and Gilad, T. (1985), A Systems Approach to Business Intelligence. Business Horizons. Vol. 28, No. 5,
     pp. 65-70

Krmac Evelin Vatovec (2011), Intelligent Value Chain Networks: Business Intelligence and Other ICT Tools and
    Technologies in Supply/Demand Chains, University of Ljubljana, Faculty of Maritime Studies and Transport

McGonagle, J. J. and Vella, C. M. (1996), A New Archetype for Competitive Intelligence. Quorum Books,
     Westport, CT.

Choo, C. W. (2002), Information Management for the Intelligent Organization: The Art of Scanning the
     Environment. 3rd Edition. Information Today, Medford, NJ.


Hannula, M. & Pirttimäki, V (2004), A Cube of Business Information. The SCIP 04 Annual International
    Conference & Exhibit, March 22 – 25, Boston, Massachusetts, USA.

Gilad, B. and Herring, J. P. (2004), The Art and Science of Business Intelligence Analysis. Part A: Business
     Intelligence Theory, Principles, Practices, and Uses. JAI Press, Greenwich, CT, pp. 159-180.
Appendix

    Type                 Qualitative                                         Quantitative

             Source      Internal                  External                  Internal              External
Subject
Internal                 Information ,             Social network data,      Process Audit         Agency/ Analysts/
                         Manufacturing and         Agency/ Analysts/         Reports, Quality      Research reports,
                         Quality control           Research reports,         Management/           Investment hedging
                         Systems and               University/ Research      Assurance             reports, Market
                         maintenance logs,         databases,                Reports,              share / Sales
                         employee surveys,         government agency         Production            volume fluctuation
                         Enterprise 2.0 data,      policy data, Scientific   Reports, Reports      reports
                         Intellectual Property     publications, Social      on liquidity, cash
                         Audit Reports,            Media, promotional        flow and
                         Information Security      campaigns , trade         investments,
                         Audit, Customer           events, social            financial
                         service/ Call centre      contracts, Patent         statements,
                         reports, Records of the   Applications,             Marketing, Sales,
                         people employed by        environmental,            Organic growth
                         the business, Tacit       health & safety           and market value
                         knowledge and             regulation and            reports,
                         practices of SMEs         employment laws           Data on the costs
                         captured in meetings,                               associated with
                         discussions                                         business
                                                                             processes
External                 Infrastructure and        Newsfeeds,                Bank/ financial       Market Research
                         equipment Lease           Government reports,       institutions          Agency/ Analysts/
                         reports, Third party      Supplier, Partners,       transactional         Research reports
                         expert (Consulting        Distributors, Retailer    reports, Insurance    about competitors
                         firms) audit/ advisory    surveys and reports,      transactional         and market, World
                         services, General         Agency/ Analysts/         reports, Supplier,    Bank/IMF/ News
                         Broking services          Research reports          Retailer, Partners,   Agency like
                         reports, Sustainability   about competitors         Distributors          Bloomberg
                         compliance reports,       and market, Press         transactional         Economic
                                                   releases, Bench           reports, Electronic   indicators data,
                                                   marking standards of      broking services      Meteorological data
                                                   competitors               reports

           Table 1. Business Information Cube Framework




           Fig: 3 Business Information Classification (adapted from Hervonen, 2004).

Information to Intelligence (BI Context)

  • 1.
    Wee Kim WeeSchool of Communication and Information Division of Knowledge Management Business Intelligence (Assignment 1) Information capture - other than structured data from core transactional processing systems, BI Analysis and Intelligence Proposition Submitted By THANGAVELU MUTHU KUMAAR (G1101765E) BALASUBRAMANIAN DIVYA (G1101736H) SELVARAJU NIRMALA (G1101760J)
  • 2.
    The changing natureof communication channels in enterprises, new ways of technology integration with traditional processing, affordability of simple programming devices or interfaces like QR codes, bar codes, RFID and bio metrics, robustness of wireless network infrastructure and massive capabilities of data centres have facilitated to the growth of this information era. It is a challenging task to collect the information from multiple sources of enterprises, interpret with appropriate context to transform it into knowledge to help in decision making. The distinct steps described by Gilad and Gilad (1985) provides a best systems approach and help in running through the goal of intelligence transformation from information which is other than the traditional internal processing data (like sentiments and opinions expressed in internet and social media, social network analysis, SME reports, internal audit reports, market research, news agencies, consultant and analyst reports). These data are typically from external sources existing in structured and unstructured data. Similar kind of web 2.0 interaction data in enterprise portals, Enterprise Applications usage, internal social network analysis, chats and Expert information can be internal sources which have not been looked upon in most organizations presently. They tend to be more in unstructured forms as they are directly contributed by people as in web 2.0. Information to Intelligence Mapping with BI Process: The degree of intelligence derived by the enterprises by acting upon accessible information with BI processes determines the level of optimum usage of the existing resources and an understanding of their stands in the market place which guides organizations in scaling their success. Figure 1: Information to Intelligence Mapping (Gilad and Gilad, 1985) Collection: Sources and Types of Information: The business management depends on BI solutions, to make delicate decisions, as well as to modify or adjust the business strategies and business process and to achieve competitive advantage and improve business operation and profitability.
  • 3.
    The reasons whyorganisations depend on information are, to carry out strategic planning, intelligent recording and relaying, controlling and monitoring, measuring and decision-making. Information needs are clearly different at different levels of management - the strategic, tactical, and operative levels (Uusi-Rauva, 1994). Operative Intelligence requires more of internal information that is detailed, specific and historical (McGonagle and Vella, 1996). This information comes mostly from core transactional systems and it is mostly structured in nature. These are used for operations monitoring, setting standards for processes, quality control and production related activities. Some of the sources of internal structured information are from functional and integrative technology services like Radio frequency (RF) technologies, Computer-aided design (CAD) systems, Demand forecasting management (DFM), Collaborative planning, forecasting, and replenishment (CFRP) systems, Manufacturing execution systems (MES), Order management systems (OMS), Product data management (PDM) systems, Supply chain event management (SCEM) systems, Geo-coded Service tracking systems, Transportation management systems (TMS), Warehouse management systems (WMS) , Enterprise resource planning (ERP) systems, Enterprise Application Integration (EAI) systems, Enterprise Knowledge Portal (EKP) Systems, Customer/supplier relationship management (CRM/SRM), Supply chain planning (SCP) systems (Krmac EV, 2011) . Strategic intelligence is often derived from movement of market, competitors and customers. They help the organization to plan their business strategies – market expansions, new product launch, benchmarking standards, policy restructuring, mergers and acquisitions. These sources of information are mostly external to the organization and more of broad, integrated and upcoming in nature (McGonagle and Vella, 1996). They are obtained from market research and consulting firms like Mckinsey, Nielsen, Ipsos, Ernst and Young and similar others. They may be structured or unstructured. Also this information can be obtained from internet with web crawlers to capture the relevant customer trends and sentiments, economic and financial news, and competitor’s innovation, branding and marketing strategies. This information from new s feeds, user comments on social media is unstructured where there is a high reliance on text and context mining techniques to extract the useful information to transform into intelligence. Tactical Intelligence is a balance between strategic and operational moves with slightly more internal sources than external. These sources are used to manage risks in the operational monitoring stage such as demand forecasting, logistics optimization, process improvement, economies of scale. These sources also include significant sources of external conditions like weather patterns or environmental conditions in the raw materials supplier region, political conditions in the operating regions and supply demand management with sales channels which can exist in unstructured as well as structured forms The data from different kind of information systems other than core transactional processing systems like Executive Support Systems helping the senior management with more external and less internal information sources (highly structured with appropriate returns) to base their strategic decisions, Management information systems helping in aligning information about people, process and technology to business, typically internal (more structured and less unstructured forms), Decision-support systems helping management make decisions in uncertainty about the possible outcomes for which sources can be external or internal existing in mostly structured information rather than unstructured , Knowledge Management Systems helping businesses create and share information which has its sources internal and is typically unstructured, Office Automation Systems trying to improve the productivity of employees who need to process data and information and they are again internal sources which are but structured (Mahesh Raisinghani, 2004).
  • 4.
    The various internaland sources for an enterprise analyzed with Business Information Cube Framework (Hannula & Pirttimäki 2004) are listed down as in table 1 (Appendix) This information can further be analyzed based on their form of existence (Structured and unstructured) with the framework of Hervonen (2004) for information classification. Evaluation: Why Organizations limit themselves to the internal structured Information: There is a well known dark-side to the information technology and the communication revolution; those would be information overload and attention fragmentation. These factors are strongly considered as afflictions by the senior executives because they need uninterrupted time to assess and process the information collected. Research conducted on various disciplines seems to prove that the performance of an individual is influenced with the amount of information they receive up to a certain saturation point; beyond that point the performance rapidly declines. Figure 2. Information overload as inverted U-Curve. Qualities of Information: Despite the amount of information, the nature of the information also contributes to the ‘overload’ attribute of the information. The nature of the information includes: Level of ambiguity of the information, Level of novelty of the information, complexity, intensity, conciseness, consistency, comprehensibility. In addition to this there are other dimensions the quality of information should have that determines its usefulness to the organization - Inherent qualities and the pragmatic qualities. The inherent quality is the correctness of the data or the information, whereas the pragmatic quality is the relevancy of the data to the context of the organization and its need for that information. Though the technology in present day makes a wide range of information accessible, it is important to analyse the business environment extensively to know what is and what is not required at that point of time (Choo, 2002). After selecting the right information, there is a need to assess the existing information gap and map how the new information transformed into intelligence can help in decision support. Storage, Analysis and Dissemination: The evaluated data is moved to data warehouse and is then used to analyze and synthesize the information from the many different sources, emulate on its implications to the organizations, apply guesses and judgements, and make strategic decisions to make best use of it. The reporting environment of a BI tool helps us to visualize the data typically into Spreadsheets with Query, reporting and data visualization tools and OLAP (On-Line Analytical Processing) with increasingly popular
  • 5.
    Data, Text, Sentiment,Opinion and Web mining components. Powell (1996) calls the refinement process a BI value chain which is cyclical and ongoing in nature Real time BI analysis, mobile and cloud based BI solutions can also help in solving many operational challenges. For example, this helped British Petroleum in their innovative ways of Oil Exploration, Production, Processing initiatives and in transforming their conventional operations to sustain their competitive edge. o Oil Rigs  Digital Oil Platforms - 3D and 4D Seismic imaging, Augmented Reality based simulation o Oil Recovery  Optimized Oil Recovery and Refining - Real time monitoring of mature fields Typical BI applications In general, BI solutions help in breaking the Information Silos spanning geographies - within and across internal department systems (Legacy mainframes, ERP, CRM), Supplier systems and Customer systems. Some of the specific examples are as follows Logistics Optimization: Achieving a cost-effective means of transport. (Business intelligence software can facilitate a fast and easy selection of the best means of transport considering a vast number of factors in selecting the means of transport are physical characteristics of the load, the number of loads to be moved, the distance to be covered, the required speed of movement, the required proof of delivery, cost of building/dismantling loads, packaging costs, space requirements, interface with other storage, transport and handling systems and housekeeping issues) and considering also historic data and past experience.) Operational standard and Quality maintenance: Evaluating the operations performed in the company (generating reports), evaluating strategic factors (internal and external) and identifying patterns of business and operational behaviour (using data mining techniques).Implement dashboards and scoreboards so that executives and supervisors can quickly recognize operational exceptions or key performance indicators (KPI) that fall outside of accepted ranges. Some of the important KPIs could be planning accuracy, capacity utilization, resource utilization, load balancing, route utilization, scheduling accuracy, vehicle availability, vehicle loading time, average transit time, cost of transportation per ton, on time vehicle arrival, vehicle unloading time, order receipt accuracy, percentage of goods damaged, total order delivery time, on time deliveries, goods delivery rate, transportation costs and others. Challenges in the intelligence transformation: Technology acceptance at different levels of users, Human Information Behaviour in information consumption, Security considerations and access to information, Difficulty in extracting data from internet with Natural Language Processing, word sense disambiguation, costs and time in implementing cross organizational infrastructure and rapid obsolescence of technology are some of the key challenges in collecting and transforming the information and which sometimes prevents the organizations in realizing the true value of Business Intelligence Solutions.
  • 6.
    References: Mahesh Raisinghani (2004),Business intelligence in the digital economy: opportunities, limitations, and risks, Hershey PA : Idea Group Pub., c2004 Gilad, B. and Gilad, T. (1985), A Systems Approach to Business Intelligence. Business Horizons. Vol. 28, No. 5, pp. 65-70 Krmac Evelin Vatovec (2011), Intelligent Value Chain Networks: Business Intelligence and Other ICT Tools and Technologies in Supply/Demand Chains, University of Ljubljana, Faculty of Maritime Studies and Transport McGonagle, J. J. and Vella, C. M. (1996), A New Archetype for Competitive Intelligence. Quorum Books, Westport, CT. Choo, C. W. (2002), Information Management for the Intelligent Organization: The Art of Scanning the Environment. 3rd Edition. Information Today, Medford, NJ. Hannula, M. & Pirttimäki, V (2004), A Cube of Business Information. The SCIP 04 Annual International Conference & Exhibit, March 22 – 25, Boston, Massachusetts, USA. Gilad, B. and Herring, J. P. (2004), The Art and Science of Business Intelligence Analysis. Part A: Business Intelligence Theory, Principles, Practices, and Uses. JAI Press, Greenwich, CT, pp. 159-180.
  • 7.
    Appendix Type Qualitative Quantitative Source Internal External Internal External Subject Internal Information , Social network data, Process Audit Agency/ Analysts/ Manufacturing and Agency/ Analysts/ Reports, Quality Research reports, Quality control Research reports, Management/ Investment hedging Systems and University/ Research Assurance reports, Market maintenance logs, databases, Reports, share / Sales employee surveys, government agency Production volume fluctuation Enterprise 2.0 data, policy data, Scientific Reports, Reports reports Intellectual Property publications, Social on liquidity, cash Audit Reports, Media, promotional flow and Information Security campaigns , trade investments, Audit, Customer events, social financial service/ Call centre contracts, Patent statements, reports, Records of the Applications, Marketing, Sales, people employed by environmental, Organic growth the business, Tacit health & safety and market value knowledge and regulation and reports, practices of SMEs employment laws Data on the costs captured in meetings, associated with discussions business processes External Infrastructure and Newsfeeds, Bank/ financial Market Research equipment Lease Government reports, institutions Agency/ Analysts/ reports, Third party Supplier, Partners, transactional Research reports expert (Consulting Distributors, Retailer reports, Insurance about competitors firms) audit/ advisory surveys and reports, transactional and market, World services, General Agency/ Analysts/ reports, Supplier, Bank/IMF/ News Broking services Research reports Retailer, Partners, Agency like reports, Sustainability about competitors Distributors Bloomberg compliance reports, and market, Press transactional Economic releases, Bench reports, Electronic indicators data, marking standards of broking services Meteorological data competitors reports Table 1. Business Information Cube Framework Fig: 3 Business Information Classification (adapted from Hervonen, 2004).