Mumbai’s Film City studio
design details
SO UN D	
  STAGE	
  #	
  7
PLAN AT LOWER GROUND LVL (+ 90.47M)
LOADING AND
UNLOADING PLATFORM
GENTS
TOILET
LADIES
TOILET
LOW VOLT
ROOM
ELECTRICAL ROOM
LIFT LOBBY
UP
WORKSHOP AREA
CANOPY ABOVE
EXISTING RETAINING WALL
HANDICAP
TOILET
STUDIO EXECUTIVE
OFFICE
600mm X 200mm
cutout in slab above
600mm X 200mm
cutout in slab above
CHW RISER
TOTAL NO OF SEATING 144
PANTRY
STORE/WASH
CREW
LOCKERS
Changing
Area
600 900 900
Handwash
Changing
Area
FOOTWASH
WORKER'S
TOILET
OFFICE
OFFICE
janitor
EARTH FILLING
RCC Retaining wall
Stair to Gr level
Console
Line of RCC retaining wall
at footing level
Nische-1 for Sprinkler
& Hydrant pipe
Masonry wall to be
constructed after
services installation
Nische-2 for PHE
pipes
Masonry wall to be
constructed after
services installation
Nische-4 for PHE
pipes
Masonry wall to b
constructed after
services installati
Nische-2 for PHE
pipes
Masonry wall to be
constructed after
services installation
Shaft for rerouting
services from ceiling
SCHEDULE OF OPENINGS
FOR WINDOWS
CODE (W) X (H) (CILL FROM UFL)
W1 = 1800X1200 900mm
W2 = 1200X1200 900mm
W3 = 600 X1200 900mm
W7 = 1725X2400 0mm
W8 = 450X3200 0mm
W9 = 1500X3200 0mm
SCHEDULE OF OPENINGS
FOR DOORS
CODE= (W) X (H)
D1 = 1500X2100
D2 = 1200X2100
D3 = 900 X2100
D4 = 750X2100
D5 = 450X1200
UP
2300
LIFT
13 PAX
rolling shutter
G. JANITOR
L. JANITOR
Full height
Bund wall
115 thk Bund
wall upto ht
of 1.2m
115 thk Bund wall
upto ht of 1.2m
115 thk Bund wall
upto ht of 1.2m
115 thk Bund wall
upto ht of 1.2m
REFER DETAIL
DWG OF
STAIRCASE
CANOPY ABOVE
CANOPY ABOVE
SERVER
ROOM
300mm X 200mm &
600mm X 200mm
cutout in slab
UP
rolling shutter
Shaft for rerouting
services from ceiling
PROPOSED
RETAINING WALL
Handwash
600mm X 200mm
cutout in slab above
MAIN LT PANEL
BATTER RACK OF INVERTER
(1000MM X 300MM)
UPS
B/CI/C
INV
CAPACITOR BANK
(670 kVAR)
O/GO/G
SERVICE BLDG PNLMDF
RACK
W/S
CCTV, ACCESS
CONTROL, BMS
EQUIP. CABINET
BATTER RACK OF UPS
(1000MM X 300MM)
Sound stage
SUPPORT BLDG-5
SO UN D	
  STAGE	
  #	
  7
PLAN AT GROUND LVL (94.85M)
LOBBY
COSTUME ROOM
JR. ARTIST MAKEUP
PRODUCTION OFFICE
FH-­‐HOSE
REELelectrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
TOILET
SOUND LOCK
LOBBY FOR7A
DN
CANOPY ABOVE
LOADING AND
UNLOADING PLATFORM
CANOPY ABOVE
VERANDAH
LVL + 0.00M-
JR. ARTIST MAKEUP
COSTUME ROOM
PHE & CHW
PRODUCTION
OFFICE
Exhaust
PLB/CWP
Exhaust
Exhaust
PLB/CWP
300mm Sunk
in Toilet
ExhaustPLB/CWP
Exhaust
PLB/
CWP
c
c
Line of Catwalk AboveLine of Catwalk Above
SOUND LOCK
LOBBY FOR7C
UP
DN
300mm Sunk
in Toilet
TOILETTOILET
300mm Sunk
in Toilet
CWP
RISER
F I R E L A N E F I R E L A N E
TOILET
300mm Sunk
in Toilet
PASSAGE PASSAGEPASSAGEPASSAGE
150 Ø Sleevesfor
PCR cable entry
150 Ø Sleevesfor
PCRcable entry
UP
D4
B5S-2
B5S-1
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
585
VOID VOID VOID VOID VOID VOID VOID VOID
Canopy above stair
entryEXTERNAL COLUMN
TO BE MADE SQUARE
EXTERNAL COLUMN
TO BE MADE SQUARE
EXTERNAL COLUMN
TO BE MADE SQUARE
SUPPORT BLDG-5
SO UN D	
  STAGE	
  #	
  7
PLAN AT FIRST LVL (98.15M)
UP
DN
PRIVATE DINING
LOUNGE
LOBBY
LVL. +3.65M
MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM
electrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
PHE
& CHW
EXHAUST
DUCT
low volt panel duct FH-­‐HOSE
REEL
600mm X 200mm
cutout in slab
EXHAUSTDUCT
PRODUCTION OFFICE
DN
UPB5S-2
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
Pantry Toilet
300mm Sunk in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
Exhaust
PLB/CWP
Exhaust
PLB/CWP
Exhaust
PLB/CWP
ExhaustPLB/CWP
Line of Catwalk AboveLine of Catwalk Above
Roof above Sound Lock
Entry(3.30mtr)
CWP
RISER
Void
300mm
Sunk300mm Sunk
in Toilet
300mm Sunk
in Toilet
B5S-1
700
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
PANTRY
SD1
VOID VOID VOID VOID VOID VOID VOID VOID
TOTAL NO OF SEATING 54
c
c
SO UN D	
  STAGE	
  #	
  7
PLAN AT SECOND LVL (101.45M)
SUPPORT BLDG-5
LOBBY
MAKEUP ROOM
UP
DN
electrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
low volt panel duct FH-­‐HOSE
REEL
600mm X 200mm
cutout in slab
UP
DN
LVL. +7.3 M
TERRACE ABOVE TERRACE ABOVETERRACE ABOVE
MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
Exhaust
PLB/CWP
Exhaust
PLB/CWP
Exhaust
PLB/CWP
ExhaustPLB/CWP
CWP
RISER
Line of CatwalkLine of Catwalk
R.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.Duct
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
Void
ExhaustPLB/CWP
1725
B5S-2B5S-1
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
200
VOID VOID VOID VOID VOID VOID VOID
c
c
Sound stage
SO UN D	
  STAGE	
  #	
  7
PLAN AT LOWER GROUND LVL (+ 90.47M)
LOADING AND
UNLOADING PLATFORM
GENTS
TOILET
LADIES
TOILET
LOW VOLT
ROOM
ELECTRICAL ROOM
LIFT LOBBY
UP
WORKSHOP AREA
CANOPY ABOVE
EXISTING RETAINING WALL
HANDICAP
TOILET
STUDIO EXECUTIVE
OFFICE
600mm X 200mm
cutout in slab above
600mm X 200mm
cutout in slab above
CHW RISER
TOTAL NO OF SEATING 144
PANTRY
STORE/WASH
CREW
LOCKERS
Changing
Area
600 900 900
Handwash
Changing
Area
FOOTWASH
WORKER'S
TOILET
OFFICE
OFFICE
janitor
Console
Shaft for rerouting
services from ceiling
UP
2300
LIFT
13 PAX
rolling shutter
G. JANITOR
L. JANITOR
Full height
Bund wall
115 thk Bund
wall upto ht
of 1.2m
115 thk Bund wall
upto ht of 1.2m
115 thk Bund wall
upto ht of 1.2m
115 thk Bund wall
upto ht of 1.2m
REFER DETAIL
DWG OF
STAIRCASE
CANOPY ABOVE
CANOPY ABOVE
SERVER
ROOM
rolling shutter
Shaft for rerouting
services from ceiling
ROPOSED
ETAINING WALL
Handwash
600mm X 200mm
cutout in slab above
MAIN LT PANEL
BATTER RACK OF INVERTER
(1000MM X 300MM)
UPS
B/CI/C
INV
CAPACITOR BANK
(670 kVAR)
O/GO/G
SERVICE BLDG PNLMDF
RACK
W/S
CCTV, ACCESS
CONTROL, BMS
EQUIP. CABINET
BATTER RACK OF UPS
(1000MM X 300MM)
Sound stage
Star lift lobby
Star lift lobby
Star lift
lobby
cafeteria
SUPPORT BLDG-5
SO UN D	
  STAGE	
  #	
  7
PLAN AT GROUND LVL (94.85M)
LOBBY
COSTUME ROOM
JR. ARTIST MAKEUP
PRODUCTION OFFICE
FH-­‐HOSE
REELelectrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
TOILET
SOUND LOCK
LOBBY FOR7A
DN
CANOPY ABOVE
LOADING AND
UNLOADING PLATFORM
CANOPY ABOVE
VERANDAH
LVL + 0.00M-
JR. ARTIST MAKEUP
COSTUME ROOM
PHE & CHW
PRODUCTION
OFFICE
Exhaust
PLB/CWP
Exhaust
Exhaust
PLB/CWP
300mm Sunk
in Toilet
ExhaustPLB/CWP
Exhaust
PLB/
CWP
c
c
Line of Catwalk AboveLine of Catwalk Above
SOUND LOCK
LOBBY FOR7C
UP
DN
300mm Sunk
in Toilet
TOILETTOILET
300mm Sunk
in Toilet
CWP
RISER
F I R E L A N E F I R E L A N E
TOILET
300mm Sunk
in Toilet
PASSAGE PASSAGEPASSAGEPASSAGE
150 Ø Sleevesfor
PCR cable entry
150 Ø Sleevesfor
PCRcable entry
UP
D4
B5S-2
B5S-1
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
585
VOID VOID VOID VOID VOID VOID VOID VOID
Canopy above stair
entryEXTERNAL COLUMN
TO BE MADE SQUARE
EXTERNAL COLUMN
TO BE MADE SQUARE
EXTERNAL COLUMN
TO BE MADE SQUARE
SUPPORT BLDG-5
SO UN D	
  STAGE	
  #	
  7
PLAN AT FIRST LVL (98.15M)
UP
DN
PRIVATE DINING
LOUNGE
LOBBY
LVL. +3.65M
MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM
electrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
PHE
& CHW
EXHAUST
DUCT
low volt panel duct FH-­‐HOSE
REEL
600mm X 200mm
cutout in slab
EXHAUSTDUCT
PRODUCTION OFFICE
DN
UPB5S-2
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
Pantry Toilet
300mm Sunk in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
Exhaust
PLB/CWP
Exhaust
PLB/CWP
Exhaust
PLB/CWP
ExhaustPLB/CWP
Line of Catwalk AboveLine of Catwalk Above
Roof above Sound Lock
Entry(3.30mtr)
CWP
RISER
Void
300mm
Sunk300mm Sunk
in Toilet
300mm Sunk
in Toilet
B5S-1
700
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
PANTRY
SD1
VOID VOID VOID VOID VOID VOID VOID VOID
TOTAL NO OF SEATING 54
c
c
SO UN D	
  STAGE	
  #	
  7
PLAN AT SECOND LVL (101.45M)
SUPPORT BLDG-5
LOBBY
MAKEUP ROOM
UP
DN
electrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
low volt panel duct FH-­‐HOSE
REEL
600mm X 200mm
cutout in slab
UP
DN
LVL. +7.3 M
TERRACE ABOVE TERRACE ABOVETERRACE ABOVE
MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
Exhaust
PLB/CWP
Exhaust
PLB/CWP
Exhaust
PLB/CWP
ExhaustPLB/CWP
CWP
RISER
Line of CatwalkLine of Catwalk
R.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.Duct
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
Void
ExhaustPLB/CWP
1725
B5S-2B5S-1
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
200
VOID VOID VOID VOID VOID VOID VOID
c
c
SUPPORT BLDG-5
LOBBY
COSTUME ROOM
JR. ARTIST MAKEUP
PRODUCTION OFFICE
FH-­‐HOSE
REELelectrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
TOILET
SOUND LOCK
LOBBY FOR7A
DN
CANOPY ABOVE
VERANDAH
LVL + 0.00M-
JR. ARTIST MAKEUP
COSTUME ROOM
PHE & CHW
PRODUCTION
OFFICE
Exhaust
PLB/CWP
Exhaust
Exhaust
PLB/CWP
300mm Sunk
in Toilet
ExhaustPLB/CWP
Exhaust
PLB/
CWP
Line of Catwalk AboveLine of Catwalk Above
SOUND LOCK
LOBBY FOR7C
UP
DN
300mm Sunk
in Toilet
TOILETTOILET
300mm Sunk
in Toilet
CWP
RISER
F I R E L A N E F I R E L A N E
TOILET
300mm Sunk
in Toilet
PASSAGE PASSAGEPASSAGEPASSAGE
UP
D4
B5S-2
B5S-1
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
585
VOID VOID VOID VOID VOID VOID VOID VOID
Canopy above stair
entryEXTERNAL COLUMN
TO BE MADE SQUARE
EXTERNAL COLUMN
TO BE MADE SQUARE
EXTERNAL COLUMN
TO BE MADE SQUARE
Line of Catwalk AboveLine of Catwalk Above
Roof above Sound Lock
Entry(3.30mtr)
Sound stage
SUPPORT BLDG-5
SO UN D	
  STAGE	
  #	
  7
PLAN AT GROUND LVL (94.85M)
LOBBY
COSTUME ROOM
JR. ARTIST MAKEUP
PRODUCTION OFFICE
FH-­‐HOSE
REELelectrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
TOILET
SOUND LOCK
LOBBY FOR7A
DN
CANOPY ABOVE
LOADING AND
UNLOADING PLATFORM
CANOPY ABOVE
VERANDAH
LVL + 0.00M-
JR. ARTIST MAKEUP
COSTUME ROOM
PHE & CHW
PRODUCTION
OFFICE
Exhaust
PLB/CWP
Exhaust
Exhaust
PLB/CWP
300mm Sunk
in Toilet
ExhaustPLB/CWP
Exhaust
PLB/
CWP
c
c
Line of Catwalk AboveLine of Catwalk Above
SOUND LOCK
LOBBY FOR7C
UP
DN
300mm Sunk
in Toilet
TOILETTOILET
300mm Sunk
in Toilet
CWP
RISER
F I R E L A N E F I R E L A N E
TOILET
300mm Sunk
in Toilet
PASSAGE PASSAGEPASSAGEPASSAGE
150 Ø Sleevesfor
PCR cable entry
150 Ø Sleevesfor
PCRcable entry
UP
D4
B5S-2
B5S-1
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
585
VOID VOID VOID VOID VOID VOID VOID VOID
Canopy above stair
entryEXTERNAL COLUMN
TO BE MADE SQUARE
EXTERNAL COLUMN
TO BE MADE SQUARE
EXTERNAL COLUMN
TO BE MADE SQUARE
SUPPORT BLDG-5
SO UN D	
  STAGE	
  #	
  7
PLAN AT FIRST LVL (98.15M)
UP
DN
PRIVATE DINING
LOUNGE
LOBBY
LVL. +3.65M
MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM
electrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
PHE
& CHW
EXHAUST
DUCT
low volt panel duct FH-­‐HOSE
REEL
600mm X 200mm
cutout in slab
EXHAUSTDUCT
PRODUCTION OFFICE
DN
UPB5S-2
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
Pantry Toilet
300mm Sunk in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
Exhaust
PLB/CWP
Exhaust
PLB/CWP
Exhaust
PLB/CWP
ExhaustPLB/CWP
Line of Catwalk AboveLine of Catwalk Above
Roof above Sound Lock
Entry(3.30mtr)
CWP
RISER
Void
300mm
Sunk300mm Sunk
in Toilet
300mm Sunk
in Toilet
B5S-1
700
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
PANTRY
SD1
VOID VOID VOID VOID VOID VOID VOID VOID
TOTAL NO OF SEATING 54
c
c
SO UN D	
  STAGE	
  #	
  7
PLAN AT SECOND LVL (101.45M)
SUPPORT BLDG-5
LOBBY
MAKEUP ROOM
UP
DN
electrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
low volt panel duct FH-­‐HOSE
REEL
600mm X 200mm
cutout in slab
UP
DN
LVL. +7.3 M
TERRACE ABOVE TERRACE ABOVETERRACE ABOVE
MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
Exhaust
PLB/CWP
Exhaust
PLB/CWP
Exhaust
PLB/CWP
ExhaustPLB/CWP
CWP
RISER
Line of CatwalkLine of Catwalk
R.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.Duct
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
Void
ExhaustPLB/CWP
1725
B5S-2B5S-1
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
200
VOID VOID VOID VOID VOID VOID VOID
c
c
LOBBY
COSTUME ROOM
FH-­‐HOSE
REELelectrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
SOUND LOCK
LOBBY FOR7A
CANOPY ABOVE
VERANDAH
LVL + 0.00M-
JR. ARTIST MAKEUP
COSTUME ROOM
PHE & CHW
PRODUCTION
OFFICE
Exhaust
PLB/CWP
Exhaust
PLB
Line of Catwalk Above
SOUND LOCK
LOBBY FOR7C
UP
DN
TOILET
300mm Sunk
in Toilet
CWP
RISER
F I R E L A N E
TOILET
300mm Sunk
in Toilet
PASSAGEPASSAGEPASSAGE
D4
B5S-1
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
VOID VOID VOID VOID VOID
Canopy above stair
entryEXTERNAL COLUMN
TO BE MADE SQUARE
EXTERNAL COLUMN
TO BE MADE SQUARE
Sound stage
Junior artist
make-uo room
SUPPORT BLDG-5
SO UN D	
  STAGE	
  #	
  7
PLAN AT FIRST LVL (98.15M)
UP
DN
PRIVATE DINING
LOUNGE
LOBBY
LVL. +3.65M
MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM
electrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
PHE
& CHW
EXHAUST
DUCT
low volt panel duct FH-­‐HOSE
REEL
600mm X 200mm
cutout in slab
EXHAUSTDUCT
PRODUCTION OFFICE
DN
UPB5S-2
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
Pantry Toilet
300mm Sunk in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
Exhaust
PLB/CWP
Exhaust
PLB/CWP
Exhaust
PLB/CWP
ExhaustPLB/CWP
Line of Catwalk AboveLine of Catwalk Above
Roof above Sound Lock
Entry(3.30mtr)
CWP
RISER
Void
300mm
Sunk300mm Sunk
in Toilet
300mm Sunk
in Toilet
B5S-1
700
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
PANTRY
SD1
VOID VOID VOID VOID VOID VOID VOID VOID
TOTAL NO OF SEATING 54
c
c
SO UN D	
  STAGE	
  #	
  7
PLAN AT SECOND LVL (101.45M)
SUPPORT BLDG-5
LOBBY
MAKEUP ROOM
UP
DN
electrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
low volt panel duct FH-­‐HOSE
REEL
600mm X 200mm
cutout in slab
UP
DN
LVL. +7.3 M
TERRACE ABOVE TERRACE ABOVETERRACE ABOVE
MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
Exhaust
PLB/CWP
Exhaust
PLB/CWP
Exhaust
PLB/CWP
ExhaustPLB/CWP
CWP
RISER
Line of CatwalkLine of Catwalk
R.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.Duct
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
Void
ExhaustPLB/CWP
1725
B5S-2B5S-1
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
200
VOID VOID VOID VOID VOID VOID VOID
c
c
SUPPORT BLDG-5
LOBBY
COSTUME ROOM
JR. ARTIST MAKEUP
PRODUCTION OFFICE
FH-­‐HOSE
REELelectrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
TOILET
SOUND LOCK
LOBBY FOR7A
DN
CANOPY ABOVE
VERANDAH
LVL + 0.00M-
JR. ARTIST MAKEUP
COSTUME ROOM
PHE & CHW
PRODUCTION
OFFICE
Exhaust
PLB/CWP
Exhaust
Exhaust
PLB/CWP
300mm Sunk
in Toilet
ExhaustPLB/CWP
Exhaust
PLB/
CWP
Line of Catwalk AboveLine of Catwalk Above
SOUND LOCK
LOBBY FOR7C
UP
DN
300mm Sunk
in Toilet
TOILETTOILET
300mm Sunk
in Toilet
CWP
RISER
F I R E L A N E F I R E L A N E
TOILET
300mm Sunk
in Toilet
PASSAGE PASSAGEPASSAGEPASSAGE
UP
D4
B5S-2
B5S-1
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
585
VOID VOID VOID VOID VOID VOID VOID VOID
Canopy above stair
entryEXTERNAL COLUMN
TO BE MADE SQUARE
EXTERNAL COLUMN
TO BE MADE SQUARE
EXTERNAL COLUMN
TO BE MADE SQUARE
SUPPORT BLDG-5
UP
DN
PRIVATE DINING
LOUNGE
LOBBY
LVL. +3.65M
MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM
electrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
PHE
& CHW
EXHAUST
DUCT
low volt panel duct FH-­‐HOSE
REEL
600mm X 200mm
cutout in slab
EXHAUSTDUCT
PRODUCTION OFFICE
DN
UPB5S-2
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
Pantry Toilet
300mm Sunk in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
Exhaust
PLB/CWP
Exhaust
PLB/CWP
Exhaust
PLB/CWP
ExhaustPLB/CWP
Line of Catwalk AboveLine of Catwalk Above
Roof above Sound Lock
Entry(3.30mtr)
CWP
RISER
Void
300mm
Sunk300mm Sunk
in Toilet
300mm Sunk
in Toilet
B5S-1
700
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
PANTRY
SD1
VOID VOID VOID VOID VOID VOID VOID VOID
TOTAL NO OF SEATING 54
Sound stage
Star lounge
SO UN D	
  STAGE	
  #	
  7
PLAN AT SECOND LVL (101.45M)
SUPPORT BLDG-5
LOBBY
MAKEUP ROOM
UP
DN
electrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
low volt panel duct FH-­‐HOSE
REEL
600mm X 200mm
cutout in slab
UP
DN
LVL. +7.3 M
TERRACE ABOVE TERRACE ABOVETERRACE ABOVE
MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
Exhaust
PLB/CWP
Exhaust
PLB/CWP
Exhaust
PLB/CWP
ExhaustPLB/CWP
CWP
RISER
Line of CatwalkLine of Catwalk
R.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.Duct
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
Void
ExhaustPLB/CWP
1725
B5S-2B5S-1
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
200
VOID VOID VOID VOID VOID VOID VOID
c
c
SUPPORT BLDG-5
UP
DN
PRIVATE DINING
LOUNGE
LOBBY
LVL. +3.65M
MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM
electrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
PHE
& CHW
EXHAUST
DUCT
low volt panel duct FH-­‐HOSE
REEL
600mm X 200mm
cutout in slab
EXHAUSTDUCT
PRODUCTION OFFICE
DN
UPB5S-2
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
Pantry Toilet
300mm Sunk in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
Exhaust
PLB/CWP
Exhaust
PLB/CWP
Exhaust
PLB/CWP
ExhaustPLB/CWP
CWP
RISER
Void
300mm
Sunk300mm Sunk
in Toilet
300mm Sunk
in Toilet
B5S-1
700
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
PANTRY
SD1
VOID VOID VOID VOID VOID VOID VOID VOID
TOTAL NO OF SEATING 54
SUPPORT BLDG-5
LOBBY
MAKEUP ROOM
UP
DN
electrical DB full htstorage
600mm X 200mm
cutout in slab
600mm X 200mm
cutout in slab
low volt panel duct FH-­‐HOSE
REEL
600mm X 200mm
cutout in slab
UP
DN
LVL. +7.3 M
TERRACE ABOVE TERRACE ABOVETERRACE ABOVE
MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM
MAKEUP ROOM
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
300mm Sunk
in Toilet
Exhaust
PLB/CWP
Exhaust
PLB/CWP
Exhaust
PLB/CWP
ExhaustPLB/CWP
CWP
RISER
Line of CatwalkLine of Catwalk
R.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.Duct
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
RCC Catwalkslab to be
demolished for RA Duct area.
Void
ExhaustPLB/CWP
1725
B5S-2B5S-1
SERVER
ROOM
600mm X200mm
cutout in slab
300mm X200mm
cutout in slab
LIFT
13 PAX
200
VOID VOID VOID VOID VOID VOID VOID
Sound stage
MAKEUP ROOM
MAKEUP ROOM
300mm Sunk
in Toilet
300mm Sunk
in Toilet
Exhaust
PLB/CWP
CWP
RISER
R.A.DucR.A.Duct
RCC Catwalkslab to be
demolished for RA Duct area.
VOID VOID
c
Star make up room
MAKEUP ROOM
300mm Sunk
in Toilet
Exhaust
PLB/CWP
LCD
Star make up room
MAKEUP ROOM
MAKEUP ROOM
300mm Sunk
in Toilet
300mm Sunk
in Toilet
Exhaust
PLB/CWP
CWP
RISER
R.A.DucR.A.Duct
RCC Catwalkslab to be
demolished for RA Duct area.
VOID VOID
c
Star make up room
Star make up room
MAKEUP ROOM
MAKEUP ROOM
300mm Sunk
in Toilet
300mm Sunk
in Toilet
Exhaust
PLB/CWP
CWP
RISER
R.A.DucR.A.Duct
RCC Catwalkslab to be
demolished for RA Duct area.
VOID VOID
c
Opt 2

India’s !st & only Hollywood benchmarked studio facility

  • 1.
    Mumbai’s Film Citystudio design details
  • 3.
    SO UN D  STAGE  #  7 PLAN AT LOWER GROUND LVL (+ 90.47M) LOADING AND UNLOADING PLATFORM GENTS TOILET LADIES TOILET LOW VOLT ROOM ELECTRICAL ROOM LIFT LOBBY UP WORKSHOP AREA CANOPY ABOVE EXISTING RETAINING WALL HANDICAP TOILET STUDIO EXECUTIVE OFFICE 600mm X 200mm cutout in slab above 600mm X 200mm cutout in slab above CHW RISER TOTAL NO OF SEATING 144 PANTRY STORE/WASH CREW LOCKERS Changing Area 600 900 900 Handwash Changing Area FOOTWASH WORKER'S TOILET OFFICE OFFICE janitor EARTH FILLING RCC Retaining wall Stair to Gr level Console Line of RCC retaining wall at footing level Nische-1 for Sprinkler & Hydrant pipe Masonry wall to be constructed after services installation Nische-2 for PHE pipes Masonry wall to be constructed after services installation Nische-4 for PHE pipes Masonry wall to b constructed after services installati Nische-2 for PHE pipes Masonry wall to be constructed after services installation Shaft for rerouting services from ceiling SCHEDULE OF OPENINGS FOR WINDOWS CODE (W) X (H) (CILL FROM UFL) W1 = 1800X1200 900mm W2 = 1200X1200 900mm W3 = 600 X1200 900mm W7 = 1725X2400 0mm W8 = 450X3200 0mm W9 = 1500X3200 0mm SCHEDULE OF OPENINGS FOR DOORS CODE= (W) X (H) D1 = 1500X2100 D2 = 1200X2100 D3 = 900 X2100 D4 = 750X2100 D5 = 450X1200 UP 2300 LIFT 13 PAX rolling shutter G. JANITOR L. JANITOR Full height Bund wall 115 thk Bund wall upto ht of 1.2m 115 thk Bund wall upto ht of 1.2m 115 thk Bund wall upto ht of 1.2m 115 thk Bund wall upto ht of 1.2m REFER DETAIL DWG OF STAIRCASE CANOPY ABOVE CANOPY ABOVE SERVER ROOM 300mm X 200mm & 600mm X 200mm cutout in slab UP rolling shutter Shaft for rerouting services from ceiling PROPOSED RETAINING WALL Handwash 600mm X 200mm cutout in slab above MAIN LT PANEL BATTER RACK OF INVERTER (1000MM X 300MM) UPS B/CI/C INV CAPACITOR BANK (670 kVAR) O/GO/G SERVICE BLDG PNLMDF RACK W/S CCTV, ACCESS CONTROL, BMS EQUIP. CABINET BATTER RACK OF UPS (1000MM X 300MM) Sound stage
  • 4.
    SUPPORT BLDG-5 SO UND  STAGE  #  7 PLAN AT GROUND LVL (94.85M) LOBBY COSTUME ROOM JR. ARTIST MAKEUP PRODUCTION OFFICE FH-­‐HOSE REELelectrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab TOILET SOUND LOCK LOBBY FOR7A DN CANOPY ABOVE LOADING AND UNLOADING PLATFORM CANOPY ABOVE VERANDAH LVL + 0.00M- JR. ARTIST MAKEUP COSTUME ROOM PHE & CHW PRODUCTION OFFICE Exhaust PLB/CWP Exhaust Exhaust PLB/CWP 300mm Sunk in Toilet ExhaustPLB/CWP Exhaust PLB/ CWP c c Line of Catwalk AboveLine of Catwalk Above SOUND LOCK LOBBY FOR7C UP DN 300mm Sunk in Toilet TOILETTOILET 300mm Sunk in Toilet CWP RISER F I R E L A N E F I R E L A N E TOILET 300mm Sunk in Toilet PASSAGE PASSAGEPASSAGEPASSAGE 150 Ø Sleevesfor PCR cable entry 150 Ø Sleevesfor PCRcable entry UP D4 B5S-2 B5S-1 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX 585 VOID VOID VOID VOID VOID VOID VOID VOID Canopy above stair entryEXTERNAL COLUMN TO BE MADE SQUARE EXTERNAL COLUMN TO BE MADE SQUARE EXTERNAL COLUMN TO BE MADE SQUARE SUPPORT BLDG-5 SO UN D  STAGE  #  7 PLAN AT FIRST LVL (98.15M) UP DN PRIVATE DINING LOUNGE LOBBY LVL. +3.65M MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM electrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab PHE & CHW EXHAUST DUCT low volt panel duct FH-­‐HOSE REEL 600mm X 200mm cutout in slab EXHAUSTDUCT PRODUCTION OFFICE DN UPB5S-2 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk Pantry Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet Exhaust PLB/CWP Exhaust PLB/CWP Exhaust PLB/CWP ExhaustPLB/CWP Line of Catwalk AboveLine of Catwalk Above Roof above Sound Lock Entry(3.30mtr) CWP RISER Void 300mm Sunk300mm Sunk in Toilet 300mm Sunk in Toilet B5S-1 700 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX PANTRY SD1 VOID VOID VOID VOID VOID VOID VOID VOID TOTAL NO OF SEATING 54 c c SO UN D  STAGE  #  7 PLAN AT SECOND LVL (101.45M) SUPPORT BLDG-5 LOBBY MAKEUP ROOM UP DN electrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab low volt panel duct FH-­‐HOSE REEL 600mm X 200mm cutout in slab UP DN LVL. +7.3 M TERRACE ABOVE TERRACE ABOVETERRACE ABOVE MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet Exhaust PLB/CWP Exhaust PLB/CWP Exhaust PLB/CWP ExhaustPLB/CWP CWP RISER Line of CatwalkLine of Catwalk R.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.Duct RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. Void ExhaustPLB/CWP 1725 B5S-2B5S-1 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX 200 VOID VOID VOID VOID VOID VOID VOID c c Sound stage
  • 5.
    SO UN D  STAGE  #  7 PLAN AT LOWER GROUND LVL (+ 90.47M) LOADING AND UNLOADING PLATFORM GENTS TOILET LADIES TOILET LOW VOLT ROOM ELECTRICAL ROOM LIFT LOBBY UP WORKSHOP AREA CANOPY ABOVE EXISTING RETAINING WALL HANDICAP TOILET STUDIO EXECUTIVE OFFICE 600mm X 200mm cutout in slab above 600mm X 200mm cutout in slab above CHW RISER TOTAL NO OF SEATING 144 PANTRY STORE/WASH CREW LOCKERS Changing Area 600 900 900 Handwash Changing Area FOOTWASH WORKER'S TOILET OFFICE OFFICE janitor Console Shaft for rerouting services from ceiling UP 2300 LIFT 13 PAX rolling shutter G. JANITOR L. JANITOR Full height Bund wall 115 thk Bund wall upto ht of 1.2m 115 thk Bund wall upto ht of 1.2m 115 thk Bund wall upto ht of 1.2m 115 thk Bund wall upto ht of 1.2m REFER DETAIL DWG OF STAIRCASE CANOPY ABOVE CANOPY ABOVE SERVER ROOM rolling shutter Shaft for rerouting services from ceiling ROPOSED ETAINING WALL Handwash 600mm X 200mm cutout in slab above MAIN LT PANEL BATTER RACK OF INVERTER (1000MM X 300MM) UPS B/CI/C INV CAPACITOR BANK (670 kVAR) O/GO/G SERVICE BLDG PNLMDF RACK W/S CCTV, ACCESS CONTROL, BMS EQUIP. CABINET BATTER RACK OF UPS (1000MM X 300MM) Sound stage
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
    SUPPORT BLDG-5 SO UND  STAGE  #  7 PLAN AT GROUND LVL (94.85M) LOBBY COSTUME ROOM JR. ARTIST MAKEUP PRODUCTION OFFICE FH-­‐HOSE REELelectrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab TOILET SOUND LOCK LOBBY FOR7A DN CANOPY ABOVE LOADING AND UNLOADING PLATFORM CANOPY ABOVE VERANDAH LVL + 0.00M- JR. ARTIST MAKEUP COSTUME ROOM PHE & CHW PRODUCTION OFFICE Exhaust PLB/CWP Exhaust Exhaust PLB/CWP 300mm Sunk in Toilet ExhaustPLB/CWP Exhaust PLB/ CWP c c Line of Catwalk AboveLine of Catwalk Above SOUND LOCK LOBBY FOR7C UP DN 300mm Sunk in Toilet TOILETTOILET 300mm Sunk in Toilet CWP RISER F I R E L A N E F I R E L A N E TOILET 300mm Sunk in Toilet PASSAGE PASSAGEPASSAGEPASSAGE 150 Ø Sleevesfor PCR cable entry 150 Ø Sleevesfor PCRcable entry UP D4 B5S-2 B5S-1 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX 585 VOID VOID VOID VOID VOID VOID VOID VOID Canopy above stair entryEXTERNAL COLUMN TO BE MADE SQUARE EXTERNAL COLUMN TO BE MADE SQUARE EXTERNAL COLUMN TO BE MADE SQUARE SUPPORT BLDG-5 SO UN D  STAGE  #  7 PLAN AT FIRST LVL (98.15M) UP DN PRIVATE DINING LOUNGE LOBBY LVL. +3.65M MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM electrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab PHE & CHW EXHAUST DUCT low volt panel duct FH-­‐HOSE REEL 600mm X 200mm cutout in slab EXHAUSTDUCT PRODUCTION OFFICE DN UPB5S-2 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk Pantry Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet Exhaust PLB/CWP Exhaust PLB/CWP Exhaust PLB/CWP ExhaustPLB/CWP Line of Catwalk AboveLine of Catwalk Above Roof above Sound Lock Entry(3.30mtr) CWP RISER Void 300mm Sunk300mm Sunk in Toilet 300mm Sunk in Toilet B5S-1 700 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX PANTRY SD1 VOID VOID VOID VOID VOID VOID VOID VOID TOTAL NO OF SEATING 54 c c SO UN D  STAGE  #  7 PLAN AT SECOND LVL (101.45M) SUPPORT BLDG-5 LOBBY MAKEUP ROOM UP DN electrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab low volt panel duct FH-­‐HOSE REEL 600mm X 200mm cutout in slab UP DN LVL. +7.3 M TERRACE ABOVE TERRACE ABOVETERRACE ABOVE MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet Exhaust PLB/CWP Exhaust PLB/CWP Exhaust PLB/CWP ExhaustPLB/CWP CWP RISER Line of CatwalkLine of Catwalk R.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.Duct RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. Void ExhaustPLB/CWP 1725 B5S-2B5S-1 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX 200 VOID VOID VOID VOID VOID VOID VOID c c SUPPORT BLDG-5 LOBBY COSTUME ROOM JR. ARTIST MAKEUP PRODUCTION OFFICE FH-­‐HOSE REELelectrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab TOILET SOUND LOCK LOBBY FOR7A DN CANOPY ABOVE VERANDAH LVL + 0.00M- JR. ARTIST MAKEUP COSTUME ROOM PHE & CHW PRODUCTION OFFICE Exhaust PLB/CWP Exhaust Exhaust PLB/CWP 300mm Sunk in Toilet ExhaustPLB/CWP Exhaust PLB/ CWP Line of Catwalk AboveLine of Catwalk Above SOUND LOCK LOBBY FOR7C UP DN 300mm Sunk in Toilet TOILETTOILET 300mm Sunk in Toilet CWP RISER F I R E L A N E F I R E L A N E TOILET 300mm Sunk in Toilet PASSAGE PASSAGEPASSAGEPASSAGE UP D4 B5S-2 B5S-1 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX 585 VOID VOID VOID VOID VOID VOID VOID VOID Canopy above stair entryEXTERNAL COLUMN TO BE MADE SQUARE EXTERNAL COLUMN TO BE MADE SQUARE EXTERNAL COLUMN TO BE MADE SQUARE Line of Catwalk AboveLine of Catwalk Above Roof above Sound Lock Entry(3.30mtr) Sound stage
  • 11.
    SUPPORT BLDG-5 SO UND  STAGE  #  7 PLAN AT GROUND LVL (94.85M) LOBBY COSTUME ROOM JR. ARTIST MAKEUP PRODUCTION OFFICE FH-­‐HOSE REELelectrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab TOILET SOUND LOCK LOBBY FOR7A DN CANOPY ABOVE LOADING AND UNLOADING PLATFORM CANOPY ABOVE VERANDAH LVL + 0.00M- JR. ARTIST MAKEUP COSTUME ROOM PHE & CHW PRODUCTION OFFICE Exhaust PLB/CWP Exhaust Exhaust PLB/CWP 300mm Sunk in Toilet ExhaustPLB/CWP Exhaust PLB/ CWP c c Line of Catwalk AboveLine of Catwalk Above SOUND LOCK LOBBY FOR7C UP DN 300mm Sunk in Toilet TOILETTOILET 300mm Sunk in Toilet CWP RISER F I R E L A N E F I R E L A N E TOILET 300mm Sunk in Toilet PASSAGE PASSAGEPASSAGEPASSAGE 150 Ø Sleevesfor PCR cable entry 150 Ø Sleevesfor PCRcable entry UP D4 B5S-2 B5S-1 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX 585 VOID VOID VOID VOID VOID VOID VOID VOID Canopy above stair entryEXTERNAL COLUMN TO BE MADE SQUARE EXTERNAL COLUMN TO BE MADE SQUARE EXTERNAL COLUMN TO BE MADE SQUARE SUPPORT BLDG-5 SO UN D  STAGE  #  7 PLAN AT FIRST LVL (98.15M) UP DN PRIVATE DINING LOUNGE LOBBY LVL. +3.65M MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM electrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab PHE & CHW EXHAUST DUCT low volt panel duct FH-­‐HOSE REEL 600mm X 200mm cutout in slab EXHAUSTDUCT PRODUCTION OFFICE DN UPB5S-2 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk Pantry Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet Exhaust PLB/CWP Exhaust PLB/CWP Exhaust PLB/CWP ExhaustPLB/CWP Line of Catwalk AboveLine of Catwalk Above Roof above Sound Lock Entry(3.30mtr) CWP RISER Void 300mm Sunk300mm Sunk in Toilet 300mm Sunk in Toilet B5S-1 700 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX PANTRY SD1 VOID VOID VOID VOID VOID VOID VOID VOID TOTAL NO OF SEATING 54 c c SO UN D  STAGE  #  7 PLAN AT SECOND LVL (101.45M) SUPPORT BLDG-5 LOBBY MAKEUP ROOM UP DN electrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab low volt panel duct FH-­‐HOSE REEL 600mm X 200mm cutout in slab UP DN LVL. +7.3 M TERRACE ABOVE TERRACE ABOVETERRACE ABOVE MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet Exhaust PLB/CWP Exhaust PLB/CWP Exhaust PLB/CWP ExhaustPLB/CWP CWP RISER Line of CatwalkLine of Catwalk R.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.Duct RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. Void ExhaustPLB/CWP 1725 B5S-2B5S-1 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX 200 VOID VOID VOID VOID VOID VOID VOID c c LOBBY COSTUME ROOM FH-­‐HOSE REELelectrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab SOUND LOCK LOBBY FOR7A CANOPY ABOVE VERANDAH LVL + 0.00M- JR. ARTIST MAKEUP COSTUME ROOM PHE & CHW PRODUCTION OFFICE Exhaust PLB/CWP Exhaust PLB Line of Catwalk Above SOUND LOCK LOBBY FOR7C UP DN TOILET 300mm Sunk in Toilet CWP RISER F I R E L A N E TOILET 300mm Sunk in Toilet PASSAGEPASSAGEPASSAGE D4 B5S-1 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX VOID VOID VOID VOID VOID Canopy above stair entryEXTERNAL COLUMN TO BE MADE SQUARE EXTERNAL COLUMN TO BE MADE SQUARE Sound stage
  • 12.
  • 13.
    SUPPORT BLDG-5 SO UND  STAGE  #  7 PLAN AT FIRST LVL (98.15M) UP DN PRIVATE DINING LOUNGE LOBBY LVL. +3.65M MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM electrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab PHE & CHW EXHAUST DUCT low volt panel duct FH-­‐HOSE REEL 600mm X 200mm cutout in slab EXHAUSTDUCT PRODUCTION OFFICE DN UPB5S-2 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk Pantry Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet Exhaust PLB/CWP Exhaust PLB/CWP Exhaust PLB/CWP ExhaustPLB/CWP Line of Catwalk AboveLine of Catwalk Above Roof above Sound Lock Entry(3.30mtr) CWP RISER Void 300mm Sunk300mm Sunk in Toilet 300mm Sunk in Toilet B5S-1 700 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX PANTRY SD1 VOID VOID VOID VOID VOID VOID VOID VOID TOTAL NO OF SEATING 54 c c SO UN D  STAGE  #  7 PLAN AT SECOND LVL (101.45M) SUPPORT BLDG-5 LOBBY MAKEUP ROOM UP DN electrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab low volt panel duct FH-­‐HOSE REEL 600mm X 200mm cutout in slab UP DN LVL. +7.3 M TERRACE ABOVE TERRACE ABOVETERRACE ABOVE MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet Exhaust PLB/CWP Exhaust PLB/CWP Exhaust PLB/CWP ExhaustPLB/CWP CWP RISER Line of CatwalkLine of Catwalk R.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.Duct RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. Void ExhaustPLB/CWP 1725 B5S-2B5S-1 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX 200 VOID VOID VOID VOID VOID VOID VOID c c SUPPORT BLDG-5 LOBBY COSTUME ROOM JR. ARTIST MAKEUP PRODUCTION OFFICE FH-­‐HOSE REELelectrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab TOILET SOUND LOCK LOBBY FOR7A DN CANOPY ABOVE VERANDAH LVL + 0.00M- JR. ARTIST MAKEUP COSTUME ROOM PHE & CHW PRODUCTION OFFICE Exhaust PLB/CWP Exhaust Exhaust PLB/CWP 300mm Sunk in Toilet ExhaustPLB/CWP Exhaust PLB/ CWP Line of Catwalk AboveLine of Catwalk Above SOUND LOCK LOBBY FOR7C UP DN 300mm Sunk in Toilet TOILETTOILET 300mm Sunk in Toilet CWP RISER F I R E L A N E F I R E L A N E TOILET 300mm Sunk in Toilet PASSAGE PASSAGEPASSAGEPASSAGE UP D4 B5S-2 B5S-1 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX 585 VOID VOID VOID VOID VOID VOID VOID VOID Canopy above stair entryEXTERNAL COLUMN TO BE MADE SQUARE EXTERNAL COLUMN TO BE MADE SQUARE EXTERNAL COLUMN TO BE MADE SQUARE SUPPORT BLDG-5 UP DN PRIVATE DINING LOUNGE LOBBY LVL. +3.65M MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM electrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab PHE & CHW EXHAUST DUCT low volt panel duct FH-­‐HOSE REEL 600mm X 200mm cutout in slab EXHAUSTDUCT PRODUCTION OFFICE DN UPB5S-2 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk Pantry Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet Exhaust PLB/CWP Exhaust PLB/CWP Exhaust PLB/CWP ExhaustPLB/CWP Line of Catwalk AboveLine of Catwalk Above Roof above Sound Lock Entry(3.30mtr) CWP RISER Void 300mm Sunk300mm Sunk in Toilet 300mm Sunk in Toilet B5S-1 700 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX PANTRY SD1 VOID VOID VOID VOID VOID VOID VOID VOID TOTAL NO OF SEATING 54 Sound stage
  • 14.
  • 15.
    SO UN D  STAGE  #  7 PLAN AT SECOND LVL (101.45M) SUPPORT BLDG-5 LOBBY MAKEUP ROOM UP DN electrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab low volt panel duct FH-­‐HOSE REEL 600mm X 200mm cutout in slab UP DN LVL. +7.3 M TERRACE ABOVE TERRACE ABOVETERRACE ABOVE MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet Exhaust PLB/CWP Exhaust PLB/CWP Exhaust PLB/CWP ExhaustPLB/CWP CWP RISER Line of CatwalkLine of Catwalk R.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.Duct RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. Void ExhaustPLB/CWP 1725 B5S-2B5S-1 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX 200 VOID VOID VOID VOID VOID VOID VOID c c SUPPORT BLDG-5 UP DN PRIVATE DINING LOUNGE LOBBY LVL. +3.65M MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM electrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab PHE & CHW EXHAUST DUCT low volt panel duct FH-­‐HOSE REEL 600mm X 200mm cutout in slab EXHAUSTDUCT PRODUCTION OFFICE DN UPB5S-2 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk Pantry Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet Exhaust PLB/CWP Exhaust PLB/CWP Exhaust PLB/CWP ExhaustPLB/CWP CWP RISER Void 300mm Sunk300mm Sunk in Toilet 300mm Sunk in Toilet B5S-1 700 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX PANTRY SD1 VOID VOID VOID VOID VOID VOID VOID VOID TOTAL NO OF SEATING 54 SUPPORT BLDG-5 LOBBY MAKEUP ROOM UP DN electrical DB full htstorage 600mm X 200mm cutout in slab 600mm X 200mm cutout in slab low volt panel duct FH-­‐HOSE REEL 600mm X 200mm cutout in slab UP DN LVL. +7.3 M TERRACE ABOVE TERRACE ABOVETERRACE ABOVE MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM MAKEUP ROOM 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet 300mm Sunk in Toilet Exhaust PLB/CWP Exhaust PLB/CWP Exhaust PLB/CWP ExhaustPLB/CWP CWP RISER Line of CatwalkLine of Catwalk R.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.DuctR.A.Duct RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. RCC Catwalkslab to be demolished for RA Duct area. Void ExhaustPLB/CWP 1725 B5S-2B5S-1 SERVER ROOM 600mm X200mm cutout in slab 300mm X200mm cutout in slab LIFT 13 PAX 200 VOID VOID VOID VOID VOID VOID VOID Sound stage
  • 16.
    MAKEUP ROOM MAKEUP ROOM 300mmSunk in Toilet 300mm Sunk in Toilet Exhaust PLB/CWP CWP RISER R.A.DucR.A.Duct RCC Catwalkslab to be demolished for RA Duct area. VOID VOID c Star make up room
  • 17.
    MAKEUP ROOM 300mm Sunk inToilet Exhaust PLB/CWP LCD Star make up room
  • 18.
    MAKEUP ROOM MAKEUP ROOM 300mmSunk in Toilet 300mm Sunk in Toilet Exhaust PLB/CWP CWP RISER R.A.DucR.A.Duct RCC Catwalkslab to be demolished for RA Duct area. VOID VOID c Star make up room
  • 19.
    Star make uproom MAKEUP ROOM MAKEUP ROOM 300mm Sunk in Toilet 300mm Sunk in Toilet Exhaust PLB/CWP CWP RISER R.A.DucR.A.Duct RCC Catwalkslab to be demolished for RA Duct area. VOID VOID c Opt 2