PRODUCTIVITY IMPROVEMENT IN TEXTILE SECTOR
Introduction :
The efficiency of a person or machine or an industry is convert inputs into
useful output is named as productivity . Productivity is calculated by the
output ( Production ) of per person in a particular period . That’s mean ,
Productivity = total output / man power / working hour.
As example
For garments sewing section , If total production is 2000 pcs / day in 10
hours and no of man power used is 29. Then productivity will be ,
2000/29/10 = 6.89. If we get more 100 pcs production by using same man
power ant time , then productivity will be , 2100/29/10 = 7.24.
In a garments or textile industry it must necessary to increase their
productivity so that they can get more profit by using same man power in
same time .
My ambition:
According to my 2 years job experience I understood that productivity
improvement is most important for textile industry . That’s why I want to
take higher education so that I can gather more and more knowledge about
productivity improvement . In textile sector , China is in number one position
. So that my aim is after higher education I will involve myself there and
gather practical knowledge about productivity . So that I can implement all of
those knowledge in my country and develop my textile sector .
Objects :
Productivity is directly related to motion. Much motion is the fact to less
productivity and less motion is fact to more productivity . To get more
productivity I focused on motion . Like , when I changed cutting production
flow , I observed that worker are using excess motion . So that they took
much time than standard. Before changing lay out, at first I motivated them
about their excess motion . I advised them to make habit for reduce motion.
After a certain period they did that and realized that excess motion is
responsible for their physical fatigue . when they apply my method
continuously then I through my main plan that is changing lay out . Now they
are habituated about new method .As a result they can produced more
production by same time . That’s mean productivity increased. I think in your
country there have many method like this to improve productivity which is
totally unknown to me and also out country.
What I did in my job carrier :
I have around 2 years job experience in garments sector . Now I am working
at Turag Garments & Hosiery Mills Ltd. As IE executive and Asst. Manager
( Acting ) of garments cutting section . In this factory my senior manager
give me opportunity to something innovative . He use me in printing section,
sewing section, finishing section and also cutting section . In printing section
, there ware no body to developed or do something innovative . When I took
charge for printing I got some plan to
 Increase productivity
 Increase Table efficiency
 SMV based target
 Reduce excess process
 Reduce basic process time.
By the help of almighty Allah , I successfully complete my vision in printing
section . Here I want to give only one example of my activity .
Our printing ( screen Printing) table was 60 feet’s long for production . Most
of the time printing feet from each side ( 2 Feet’s from both )ware use for
storage of printing materials. I thought that if I can manage alternative
storage for those materials , we can consume those 2 feet’s where we can get
at lest 4 garments for printing . Do you know how ? It’s a simple case . just
insert 2 ( both side ) small partex board under the table . Easily I saved 2
feet’s for production . By saving this , we can get more 4 pcs production per
printing . If we can print 20 times print per day then we can get = 20*4 or 80
pcs production per table . Our printing table ware 17. That’s mean I become
able to produce 17*80 = 1360 Pcs production per day by using this method .
Figure : Table rearrangement and increase table efficiency
Figure : Benefits of table rearrangement
Also In cutting section I get new plan . One of this is reduce excess motion .
To get success in cutting, I had to change cutting production lay out . After
change lay out of production flow we became able to reduce 13% access
motion .
Figure: Implementation of new process in cutting section .
Conclusion:
As a Textile engineer I am strongly concentrated to developed my working
station by implement more and more new thinking / theory / method which
will must be profitable for my organization and as well as my country .
Thanks in advanced
Md. Faridul Islam Rumman
Southeast University
Dept. Of Textile Engineering
Batch- 19th
ID- 2012000400116

More Related Content

What's hot

Production process of Shirt
 Production process of Shirt Production process of Shirt
Production process of ShirtJotan Banik
 
Garments production system
Garments production systemGarments production system
Garments production systemamnapervaiz14
 
Operation research project work
Operation research project workOperation research project work
Operation research project workRavi Prakash
 
Final plant layout
Final plant layoutFinal plant layout
Final plant layoutradit12
 
Supply Chain of J. (Junaid Jamshed)
Supply Chain of J. (Junaid Jamshed)Supply Chain of J. (Junaid Jamshed)
Supply Chain of J. (Junaid Jamshed)Usman Ikram
 
SPREADING LABOUR REDUCTION AND REVISED WORKING PROCEDURE
SPREADING LABOUR REDUCTION AND REVISED WORKING PROCEDURESPREADING LABOUR REDUCTION AND REVISED WORKING PROCEDURE
SPREADING LABOUR REDUCTION AND REVISED WORKING PROCEDUREpriyangaraja1
 
Production Line Setup in Knit Garments Manufacturing Factories
Production Line Setup in Knit Garments Manufacturing FactoriesProduction Line Setup in Knit Garments Manufacturing Factories
Production Line Setup in Knit Garments Manufacturing FactoriesMd. Mazadul Hasan Shishir
 
Garment manufacturing process fabric to finished product
Garment manufacturing process fabric to finished productGarment manufacturing process fabric to finished product
Garment manufacturing process fabric to finished productPrasanta Sarkar
 
Present scenario of the apparel manufacturing industry
Present scenario of the apparel manufacturing industryPresent scenario of the apparel manufacturing industry
Present scenario of the apparel manufacturing industryHindustan University
 

What's hot (11)

Production process of Shirt
 Production process of Shirt Production process of Shirt
Production process of Shirt
 
Garments production system
Garments production systemGarments production system
Garments production system
 
Operation research project work
Operation research project workOperation research project work
Operation research project work
 
Methodology
MethodologyMethodology
Methodology
 
Final plant layout
Final plant layoutFinal plant layout
Final plant layout
 
Supply Chain of J. (Junaid Jamshed)
Supply Chain of J. (Junaid Jamshed)Supply Chain of J. (Junaid Jamshed)
Supply Chain of J. (Junaid Jamshed)
 
SPREADING LABOUR REDUCTION AND REVISED WORKING PROCEDURE
SPREADING LABOUR REDUCTION AND REVISED WORKING PROCEDURESPREADING LABOUR REDUCTION AND REVISED WORKING PROCEDURE
SPREADING LABOUR REDUCTION AND REVISED WORKING PROCEDURE
 
IE Qu & Ans
IE Qu & AnsIE Qu & Ans
IE Qu & Ans
 
Production Line Setup in Knit Garments Manufacturing Factories
Production Line Setup in Knit Garments Manufacturing FactoriesProduction Line Setup in Knit Garments Manufacturing Factories
Production Line Setup in Knit Garments Manufacturing Factories
 
Garment manufacturing process fabric to finished product
Garment manufacturing process fabric to finished productGarment manufacturing process fabric to finished product
Garment manufacturing process fabric to finished product
 
Present scenario of the apparel manufacturing industry
Present scenario of the apparel manufacturing industryPresent scenario of the apparel manufacturing industry
Present scenario of the apparel manufacturing industry
 

Similar to Boost Textile Productivity Through Process Improvement

9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdfNittamallik216
 
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6dezyneecole
 
Dore%2520dore%5 B1%5 D[1]
Dore%2520dore%5 B1%5 D[1]Dore%2520dore%5 B1%5 D[1]
Dore%2520dore%5 B1%5 D[1]Gagan306
 
Mba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1sMba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1sChainon
 
Executive summary of production and productivity
Executive summary of production and productivityExecutive summary of production and productivity
Executive summary of production and productivityPacific Cotton
 
Productivity,competitiveness,strategy
Productivity,competitiveness,strategyProductivity,competitiveness,strategy
Productivity,competitiveness,strategyRaffaelChristopherCa
 
Productivity how to boost your current production
Productivity   how to boost your current productionProductivity   how to boost your current production
Productivity how to boost your current productionShakil Ahmad
 
Chapter 4 production and productivity (revised)
Chapter 4 production and productivity (revised)Chapter 4 production and productivity (revised)
Chapter 4 production and productivity (revised)Brian Balayan
 
Improving Productivity by Lean
Improving Productivity by LeanImproving Productivity by Lean
Improving Productivity by LeanANITHA BALA
 
Industrial Management m.tech SE 2.12.22.pptx
Industrial Management m.tech SE 2.12.22.pptxIndustrial Management m.tech SE 2.12.22.pptx
Industrial Management m.tech SE 2.12.22.pptxaryyaka99
 
Productivity improvement through better planning
Productivity improvement through better planningProductivity improvement through better planning
Productivity improvement through better planningZakir Husain
 
Training & Development of Supervisors
Training & Development of SupervisorsTraining & Development of Supervisors
Training & Development of SupervisorsShubham Singh
 

Similar to Boost Textile Productivity Through Process Improvement (20)

9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf
 
Dore Dore case study
Dore Dore case studyDore Dore case study
Dore Dore case study
 
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
Richa Tilwani ,Second Year Fashion Design Student NSQF Level -6
 
Dore%2520dore%5 B1%5 D[1]
Dore%2520dore%5 B1%5 D[1]Dore%2520dore%5 B1%5 D[1]
Dore%2520dore%5 B1%5 D[1]
 
Mba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1sMba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1s
 
Executive summary of production and productivity
Executive summary of production and productivityExecutive summary of production and productivity
Executive summary of production and productivity
 
WORK study& LINE BALANCING
WORK study& LINE BALANCING WORK study& LINE BALANCING
WORK study& LINE BALANCING
 
Productivity,competitiveness,strategy
Productivity,competitiveness,strategyProductivity,competitiveness,strategy
Productivity,competitiveness,strategy
 
Kpi
KpiKpi
Kpi
 
Productivity
ProductivityProductivity
Productivity
 
Productivity how to boost your current production
Productivity   how to boost your current productionProductivity   how to boost your current production
Productivity how to boost your current production
 
Chapter 4 production and productivity (revised)
Chapter 4 production and productivity (revised)Chapter 4 production and productivity (revised)
Chapter 4 production and productivity (revised)
 
Project Reportof Velocity Apparelz Nort Africa
Project Reportof Velocity Apparelz  Nort AfricaProject Reportof Velocity Apparelz  Nort Africa
Project Reportof Velocity Apparelz Nort Africa
 
Improving Productivity by Lean
Improving Productivity by LeanImproving Productivity by Lean
Improving Productivity by Lean
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
 
Industrial Management m.tech SE 2.12.22.pptx
Industrial Management m.tech SE 2.12.22.pptxIndustrial Management m.tech SE 2.12.22.pptx
Industrial Management m.tech SE 2.12.22.pptx
 
Productivity improvement through better planning
Productivity improvement through better planningProductivity improvement through better planning
Productivity improvement through better planning
 
Lesson 9--production[1]
Lesson 9--production[1]Lesson 9--production[1]
Lesson 9--production[1]
 
Training & Development of Supervisors
Training & Development of SupervisorsTraining & Development of Supervisors
Training & Development of Supervisors
 
IE working procedure
IE working procedureIE working procedure
IE working procedure
 

More from Rumman Samrat

Fire retardant fabric
Fire retardant fabric Fire retardant fabric
Fire retardant fabric Rumman Samrat
 
Color changing fabric
Color changing fabricColor changing fabric
Color changing fabricRumman Samrat
 
Half zipper hood jacket
Half zipper hood jacketHalf zipper hood jacket
Half zipper hood jacketRumman Samrat
 
Thread consumption of a basic t shirt
Thread consumption  of a basic t shirtThread consumption  of a basic t shirt
Thread consumption of a basic t shirtRumman Samrat
 
Guidline for internee students ( gmt)
Guidline for internee students ( gmt)Guidline for internee students ( gmt)
Guidline for internee students ( gmt)Rumman Samrat
 
Thread Consumption of Jacket
Thread Consumption of JacketThread Consumption of Jacket
Thread Consumption of JacketRumman Samrat
 
Operation bulletin of Jacket ( Knit ) with man power , machine , S.M.V and ot...
Operation bulletin of Jacket ( Knit ) with man power , machine , S.M.V and ot...Operation bulletin of Jacket ( Knit ) with man power , machine , S.M.V and ot...
Operation bulletin of Jacket ( Knit ) with man power , machine , S.M.V and ot...Rumman Samrat
 
Industrial Attachment of Norban Comtex Ltd.
Industrial Attachment of Norban Comtex Ltd.Industrial Attachment of Norban Comtex Ltd.
Industrial Attachment of Norban Comtex Ltd.Rumman Samrat
 
Fabric wastage and sewing fault analysis
Fabric wastage and sewing fault analysisFabric wastage and sewing fault analysis
Fabric wastage and sewing fault analysisRumman Samrat
 

More from Rumman Samrat (11)

Functional fiber
Functional fiber Functional fiber
Functional fiber
 
Fire retardant fabric
Fire retardant fabric Fire retardant fabric
Fire retardant fabric
 
Color changing fabric
Color changing fabricColor changing fabric
Color changing fabric
 
Half zipper hood jacket
Half zipper hood jacketHalf zipper hood jacket
Half zipper hood jacket
 
Thread consumption of a basic t shirt
Thread consumption  of a basic t shirtThread consumption  of a basic t shirt
Thread consumption of a basic t shirt
 
Guidline for internee students ( gmt)
Guidline for internee students ( gmt)Guidline for internee students ( gmt)
Guidline for internee students ( gmt)
 
Thread Consumption of Jacket
Thread Consumption of JacketThread Consumption of Jacket
Thread Consumption of Jacket
 
Operation bulletin of Jacket ( Knit ) with man power , machine , S.M.V and ot...
Operation bulletin of Jacket ( Knit ) with man power , machine , S.M.V and ot...Operation bulletin of Jacket ( Knit ) with man power , machine , S.M.V and ot...
Operation bulletin of Jacket ( Knit ) with man power , machine , S.M.V and ot...
 
Basic t shirt
Basic t shirtBasic t shirt
Basic t shirt
 
Industrial Attachment of Norban Comtex Ltd.
Industrial Attachment of Norban Comtex Ltd.Industrial Attachment of Norban Comtex Ltd.
Industrial Attachment of Norban Comtex Ltd.
 
Fabric wastage and sewing fault analysis
Fabric wastage and sewing fault analysisFabric wastage and sewing fault analysis
Fabric wastage and sewing fault analysis
 

Recently uploaded

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 

Recently uploaded (20)

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 

Boost Textile Productivity Through Process Improvement

  • 1. PRODUCTIVITY IMPROVEMENT IN TEXTILE SECTOR Introduction : The efficiency of a person or machine or an industry is convert inputs into useful output is named as productivity . Productivity is calculated by the output ( Production ) of per person in a particular period . That’s mean , Productivity = total output / man power / working hour. As example For garments sewing section , If total production is 2000 pcs / day in 10 hours and no of man power used is 29. Then productivity will be , 2000/29/10 = 6.89. If we get more 100 pcs production by using same man power ant time , then productivity will be , 2100/29/10 = 7.24. In a garments or textile industry it must necessary to increase their productivity so that they can get more profit by using same man power in same time . My ambition: According to my 2 years job experience I understood that productivity improvement is most important for textile industry . That’s why I want to take higher education so that I can gather more and more knowledge about productivity improvement . In textile sector , China is in number one position . So that my aim is after higher education I will involve myself there and gather practical knowledge about productivity . So that I can implement all of those knowledge in my country and develop my textile sector . Objects : Productivity is directly related to motion. Much motion is the fact to less productivity and less motion is fact to more productivity . To get more productivity I focused on motion . Like , when I changed cutting production
  • 2. flow , I observed that worker are using excess motion . So that they took much time than standard. Before changing lay out, at first I motivated them about their excess motion . I advised them to make habit for reduce motion. After a certain period they did that and realized that excess motion is responsible for their physical fatigue . when they apply my method continuously then I through my main plan that is changing lay out . Now they are habituated about new method .As a result they can produced more production by same time . That’s mean productivity increased. I think in your country there have many method like this to improve productivity which is totally unknown to me and also out country. What I did in my job carrier : I have around 2 years job experience in garments sector . Now I am working at Turag Garments & Hosiery Mills Ltd. As IE executive and Asst. Manager ( Acting ) of garments cutting section . In this factory my senior manager give me opportunity to something innovative . He use me in printing section, sewing section, finishing section and also cutting section . In printing section , there ware no body to developed or do something innovative . When I took charge for printing I got some plan to  Increase productivity  Increase Table efficiency  SMV based target  Reduce excess process  Reduce basic process time. By the help of almighty Allah , I successfully complete my vision in printing section . Here I want to give only one example of my activity . Our printing ( screen Printing) table was 60 feet’s long for production . Most of the time printing feet from each side ( 2 Feet’s from both )ware use for storage of printing materials. I thought that if I can manage alternative storage for those materials , we can consume those 2 feet’s where we can get at lest 4 garments for printing . Do you know how ? It’s a simple case . just
  • 3. insert 2 ( both side ) small partex board under the table . Easily I saved 2 feet’s for production . By saving this , we can get more 4 pcs production per printing . If we can print 20 times print per day then we can get = 20*4 or 80 pcs production per table . Our printing table ware 17. That’s mean I become able to produce 17*80 = 1360 Pcs production per day by using this method . Figure : Table rearrangement and increase table efficiency Figure : Benefits of table rearrangement
  • 4. Also In cutting section I get new plan . One of this is reduce excess motion . To get success in cutting, I had to change cutting production lay out . After change lay out of production flow we became able to reduce 13% access motion . Figure: Implementation of new process in cutting section . Conclusion: As a Textile engineer I am strongly concentrated to developed my working station by implement more and more new thinking / theory / method which will must be profitable for my organization and as well as my country . Thanks in advanced Md. Faridul Islam Rumman Southeast University Dept. Of Textile Engineering Batch- 19th ID- 2012000400116