1. DORE’ DORE’ A STUDY ON IMPLEMENTING THE CELLULAR DESIGN PROCESS IN THE ORGANISATION.
2.
3.
4.
5.
6. PRODUCT DESIGN VERSUS PROCESS DESIGN (In Sewing & Finishing) CAN’T BE CALCULATED CAN’T BE CALCULATED FACTORY MACHINE UTILIZATION 7 SAME SAME FACTORY LABOUR UTILIZATION 6 CAN’T BE CALCULATED CAN’T BE CALCULATED FACTORY CYCLE TIME (MIN/PC) 5 2.10 0.14 PERCENTAGE VALUE ADDED TIME (%) 4 1 PER 20 WORKERS 1 NO OF BINS WITH EACH WORKER 3 2 29 NO OF BINS IN THE PROCESS* 2 48 720 WIP INVENTORY (PCS) 1 PROPOSED LAYOUT PRESENT LAYOUT TO CALCULATE: SRL NO
7.
8.
9.
10.
11.
12. SUM OF TASK TIME 14 MIN TOTAL TIME 4, 5 2 MIN 6 4 2 MIN 5 2 , 3 1 MIN 4 1 1 MIN 3 1 1 MIN 2 none 7 MIN 1 IMMEDIATE PREDESSOR TIME (MIN) WORK TASK
13.
14.
15.
16.
17.
18.
19.
20. SUM OF TASK TIME 11 MIN TOTAL TIME 4 2 MIN 5 2 or 3 1 MIN 4 1 1 MIN 2 or 3 none 7 MIN 1 IMMEDIATE PREDESSOR TIME (MIN) WORK TASK
21. Calculations. No. Of work Stations = sum of task time/cycle time or 11/ 12= .91 or 1 11 min. Total task time 9.00% 1 11 1, 2 or 3, 4, 5 A IDLENESS IDLE TIME TOTAL TIME TASKS WORK STATIONS