PRODUCTIVITY
How to boost your current
production
At first we have to know what are the fundamental needs
to make a garments. The fundamental needs are
1. Men
2. Machine
3.Metarial
4. Method.
If we boost those needs then production will be boost
automatically .
CAUSE EFFECT
Now we will discuss about those fundamental needs one by
one and also describe how can boost those needs.
MEN MACHINE
METARIAL METHOD
OUTPUT
MEN
Definition : -
Any one involve with the garments making process. Great
people make great products. Increase the efficiency of your
work force by following some best practices in man power
management.
How to Boost: -
a) Make the GET-PUT motion shorter – Men's best short
motion is finger motion and best longer motion is full
body motion . So make your Lay-Out based on shorter
motion.
b) Reduce sewing Bust – At sewing time need to train the
people to complete their tusk by single bust.
c) Remove unnecessary motion – At sewing time some
people use hand wheel to set needle for positioning ,
unnecessary body jerking , parts folding and aligning twice
or more - this is a inherent work content . Need train the
people to avoid this work.
d) Rhythm – Train the people to complete their task as
rhythmic way. Best rhythm create less fatigue. If you do
your job as rhythmic way you will get less fatigue.
MACHINE
Definition : -
Any equipment , tools etc. required to accomplish the job.
Design , Installation and Maintenance of durable precise
machines reduce waste , save money and creates more precise
products.
How to Boost: -
a) Do the machine servicing as routine way – Need the
machine servicing must . Also need to hang the machine
maintenance chart all of the machine . Then everybody
can identify as the machine is ok or not.
b) Get maximum performance from your machine :- To get
more speed from your machine adjust motor pulley ,
folder , gage , pressure foot based on fabric and style.
MATERIAL
Definition : -
Raw materials such as fabric , thread , lining etc. used to
produce the final products.
How to Boost: -
a) Critical path analysis :- Strongly follow-up the critical path
i.e. your material should be in-house as scheduled time .
Make sure your line have sufficient work.
b) Inventory :- Apply the best inventory practices . Wrong
inventory create unstable production.
METHOD
Definition : - How the process is performed for doing it such as
policies , procedures , rules , regulation and law.
How to Boost: -
a) Continuous feeding : This is the first method to increase
line productivity. Idle minutes make the worker Lazy.
Continuous work make the worker faster and faster .
b) Reduce unnecessary movement in your line lay-out :- Have
to avoid unnecessary movement i.e. Searching , Walking ,
transport etc. As for example if all parts coming serially
then no need searching to match parts to attach.
c) Set correct man / machine for defined operation :- it’s a
necessary roles . Unsuitable man / machine create low
efficiency.
d) Daily set plan for production and quality :- Have to set
preplan how to achieve production target and maintain
the asking quality level.
e) Worker motivation :- To get less absenteeism and more
productivity you need to motivate the worker.
f ) Operation balancing :- By using capacity study Everybody
can identified what is the individual process capacity
.From this we found some operation have below and some
operation have over capacity . Need to balance from over
to below.
g ) Job accountability :- All Factory staffs are responsible for
production. Must record the lost minute . Need to call a
meeting for open discussion to minimize the lost minute –
it will be daily or weekly.
h ) Real time production monitoring and chasing :- In
production floor every second is valuable . Need to record
hourly production and find out the root cause of low
production and also make a corrective action to resolve
this. Always try to chess your production time to time , it
should be hourly not end of the day.
THANKS
About Me :
Tabassum hasan ahmad
Asst. Manager ( IE & Planning )
Trust Trousers LTD.
Mirpur-12
Dhaka - 1216

More Related Content

Viewers also liked (7)

DESIGNS BY SIMIRAAJ FOR WORLD OF WEARABLE ART CONTEST
DESIGNS BY SIMIRAAJ FOR WORLD OF WEARABLE ART CONTESTDESIGNS BY SIMIRAAJ FOR WORLD OF WEARABLE ART CONTEST
DESIGNS BY SIMIRAAJ FOR WORLD OF WEARABLE ART CONTEST
 
Presentation1 material master data
Presentation1 material master dataPresentation1 material master data
Presentation1 material master data
 
Increasing Efficiency of Speed Modules
Increasing Efficiency of Speed ModulesIncreasing Efficiency of Speed Modules
Increasing Efficiency of Speed Modules
 
Chapter 4b
Chapter 4bChapter 4b
Chapter 4b
 
Garment industry
Garment industryGarment industry
Garment industry
 
Quality Control Of Garment
Quality Control Of Garment Quality Control Of Garment
Quality Control Of Garment
 
Apparel manufacturing process
Apparel manufacturing processApparel manufacturing process
Apparel manufacturing process
 

Similar to Productivity how to boost your current production

9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf
Nittamallik216
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
MohammedLahssaini1
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
Alan Desrocher
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
Karina Islam
 

Similar to Productivity how to boost your current production (20)

9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf
 
Work study manual
Work study manualWork study manual
Work study manual
 
How to Improve Productivity
How to Improve ProductivityHow to Improve Productivity
How to Improve Productivity
 
IE working procedure
IE working procedureIE working procedure
IE working procedure
 
Training & Development of Supervisors
Training & Development of SupervisorsTraining & Development of Supervisors
Training & Development of Supervisors
 
Project Reportof Velocity Apparelz Nort Africa
Project Reportof Velocity Apparelz  Nort AfricaProject Reportof Velocity Apparelz  Nort Africa
Project Reportof Velocity Apparelz Nort Africa
 
Apparel Merchandising
Apparel MerchandisingApparel Merchandising
Apparel Merchandising
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
 
Modern Quality Management System in Apparel Industries.
Modern Quality Management System in Apparel Industries.Modern Quality Management System in Apparel Industries.
Modern Quality Management System in Apparel Industries.
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!About Production Planning Process of a RMG !!!
About Production Planning Process of a RMG !!!
 
APPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNETAPPAREL PRODUCTION MANAGEMNET
APPAREL PRODUCTION MANAGEMNET
 
Training on development of supervisor
Training on development of supervisorTraining on development of supervisor
Training on development of supervisor
 
LEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOLLEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOL
 
Standard operations
Standard operationsStandard operations
Standard operations
 
WORK study& LINE BALANCING
WORK study& LINE BALANCING WORK study& LINE BALANCING
WORK study& LINE BALANCING
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
KapStone Production Supervisor 30 Day Business Plan
KapStone Production Supervisor 30 Day Business PlanKapStone Production Supervisor 30 Day Business Plan
KapStone Production Supervisor 30 Day Business Plan
 

Productivity how to boost your current production

  • 1. PRODUCTIVITY How to boost your current production
  • 2. At first we have to know what are the fundamental needs to make a garments. The fundamental needs are 1. Men 2. Machine 3.Metarial 4. Method. If we boost those needs then production will be boost automatically . CAUSE EFFECT Now we will discuss about those fundamental needs one by one and also describe how can boost those needs. MEN MACHINE METARIAL METHOD OUTPUT
  • 3. MEN Definition : - Any one involve with the garments making process. Great people make great products. Increase the efficiency of your work force by following some best practices in man power management.
  • 4. How to Boost: - a) Make the GET-PUT motion shorter – Men's best short motion is finger motion and best longer motion is full body motion . So make your Lay-Out based on shorter motion. b) Reduce sewing Bust – At sewing time need to train the people to complete their tusk by single bust. c) Remove unnecessary motion – At sewing time some people use hand wheel to set needle for positioning , unnecessary body jerking , parts folding and aligning twice or more - this is a inherent work content . Need train the people to avoid this work. d) Rhythm – Train the people to complete their task as rhythmic way. Best rhythm create less fatigue. If you do your job as rhythmic way you will get less fatigue.
  • 5. MACHINE Definition : - Any equipment , tools etc. required to accomplish the job. Design , Installation and Maintenance of durable precise machines reduce waste , save money and creates more precise products.
  • 6. How to Boost: - a) Do the machine servicing as routine way – Need the machine servicing must . Also need to hang the machine maintenance chart all of the machine . Then everybody can identify as the machine is ok or not. b) Get maximum performance from your machine :- To get more speed from your machine adjust motor pulley , folder , gage , pressure foot based on fabric and style.
  • 7. MATERIAL Definition : - Raw materials such as fabric , thread , lining etc. used to produce the final products.
  • 8. How to Boost: - a) Critical path analysis :- Strongly follow-up the critical path i.e. your material should be in-house as scheduled time . Make sure your line have sufficient work. b) Inventory :- Apply the best inventory practices . Wrong inventory create unstable production.
  • 9. METHOD Definition : - How the process is performed for doing it such as policies , procedures , rules , regulation and law.
  • 10. How to Boost: - a) Continuous feeding : This is the first method to increase line productivity. Idle minutes make the worker Lazy. Continuous work make the worker faster and faster . b) Reduce unnecessary movement in your line lay-out :- Have to avoid unnecessary movement i.e. Searching , Walking , transport etc. As for example if all parts coming serially then no need searching to match parts to attach. c) Set correct man / machine for defined operation :- it’s a necessary roles . Unsuitable man / machine create low efficiency. d) Daily set plan for production and quality :- Have to set preplan how to achieve production target and maintain the asking quality level. e) Worker motivation :- To get less absenteeism and more productivity you need to motivate the worker.
  • 11. f ) Operation balancing :- By using capacity study Everybody can identified what is the individual process capacity .From this we found some operation have below and some operation have over capacity . Need to balance from over to below. g ) Job accountability :- All Factory staffs are responsible for production. Must record the lost minute . Need to call a meeting for open discussion to minimize the lost minute – it will be daily or weekly. h ) Real time production monitoring and chasing :- In production floor every second is valuable . Need to record hourly production and find out the root cause of low production and also make a corrective action to resolve this. Always try to chess your production time to time , it should be hourly not end of the day.