Implementation of
Construction Project with
Detailed Contract Documents
Soe Minn Sett
Myanmar Transitional Platform
1 March 2014
UMFCCI, Yangon
Key Team Player in following airport projects:-
Changi Airport (Singapore)
Sembawang Airbase (Singapore)
Seletar Airport (Singapore)
New Phu Quoc International Project (Vietnam)
Can Tho International Airport (Vietnam)
Buon Ma Thout Airport (Vietnam)
Benazir Bhutto International Airport (Islamabad, Pakistan)
Naypyitaw Airport (Myanmar)
Melbourne Airport (Australia)
Hambantota International Airport (Sri Lanka)
Soe Minn Sett
B.E (Civil),
M.Sc (Transportation Engineering)
1) LEGAL FRAME WORK
2) FORM OF CONTRACT
3) RESULT OF DETAILED CONTRACT DOCUMENTS
3
CONTENT
Myanmar Transitional Platform
4
Ref: Imperial Gazetteer of India, v. 9, p. 213.
LEGAL FRAME WORK
BRITISH BURMA MUNICIPAL ACT, 1874
BURMA MUNICIPAL ACT, 1884
Ref: “A Collection of The Acts published by the Governor General of India in Council in the year 1885”
Myanmar Transitional Platform
5
LEGAL FRAME WORK
Rangoon City Municipal Act (1922)
Rangoon City Municipal Act (1956)
Myanmar Transitional Platform
6
Yangon City Development Committee
LEGAL FRAME WORK
Myanmar Transitional Platform
7
CURRENT PRACTICE
City Development Committee
Myanmar Transitional Platform
8
CURRENT PRACTICE
Ministry of Construction
Myanmar Transitional Platform
9
Contract Law
LEGAL FRAME WORK
-Myanmar Contract Act, 1872
(formerly known as “Indian Contract Act”)
- Sale of Goods Act, 1930
Same as Australian, English, Hong Kong and Singapore law.
three major differences:
(i) Consideration may be given by a person who is not a person to the contract;
(ii) Past consideration (that is, payment/performance prior to entering into the
contract) is valid consideration
(iii) Consideration is not presumed in the case of a contract under seal.
Myanmar Transitional Platform
LEGAL FRAME WORK
10
Typical Contract Agreement Document
(Private Sector Project)
- Contract agreements were
drafted on Stamp paper and
signed by both parties.
- May witness by Lawyers
- Mentioned payment term
- General description of project
deliverable (Eg. 8 stories R.C
building, 20’ x 50’ Warehouse Steel
Structure building etc)
Myanmar Transitional Platform
LEGAL FRAME WORK
11
Typical Contract Agreement Document
(Private Sector Project)
Myanmar Transitional Platform
LEGAL FRAME WORK
12
Typical Contract Agreement Document
(Government Sector Project)
Myanmar Transitional Platform
13
LEGAL FRAME WORK
Myanmar Transitional Platform
Photo Courtesy : Swe Oo’s Facebook PUBLIC share
FORM OF CONTRACT
14
PRINCIPAL STAGES OF CONSTRUCTION PROCESS
14
Project
Brief
Decision
to Build
Evaluation
& Award
Completion &
Maintenance
Design
Drawings
Tender Documentation
-Conditions of Contract
-Drawings
-BQs
-Specifications
Tender
Invitation
Construction
Works
Letter of
Intent/Award
Contract
Documents
Myanmar Transitional Platform
FORM OF CONTRACT
15
Standard form of Contract Documents
1. Articles of Agreement
2. Conditions of Contract
(regulate to practice)
3. Plans and Drawings
4. Bill of Quantities
5. Specification
(recommend to practice)
Myanmar Transitional Platform
16
Common Standard Form of Condition of Contract
 Joint Contracts Tribunal (JCT)
 International Federation of Consulting Engineers (FIDIC)
 NEC Engineering and Construction Contract (NEC)
 Singapore Institute of Architect (SIA)
 Association of Consultant Architects (ACA)
 Public Sector Standard Conditions of Contract for Construction Works
(PSSCOC)
 Master Format (Construction Specification Institute, CSI)
FORM OF CONTRACT
Myanmar Transitional Platform
17
Common Standard Form of Condition of Contract
FORM OF CONTRACT
Myanmar Transitional Platform
18
Common Standard Form of Condition of Contract
FORM OF CONTRACT
19
Common Standard Form of Condition of Contract
FORM OF CONTRACT
Myanmar Transitional Platform
20
Common Standard Form of Condition of Contract
FORM OF CONTRACT
Myanmar Transitional Platform
21
Common Standard Form of Condition of Contract
FORM OF CONTRACT
Myanmar Transitional Platform
22
PSSCOC
Public Sector Standard Conditions of Contract for Construction Works
1. Definitions and Interpretation
2 . Superintending Officer and
Superintending Officer's Representative
3. Contract Documents
4. General Obligations of the Contractor
5. Sub-Surface and Ground Conditions
6. Permanent Works Designed by the
Contractor
7. Notices and Fees
8. Setting Out
9. Programme for the Works
10. Quality in Construction
11. Administration
12. Possession of Site And
Commencement Of Works
13. Suspension
14. Time for Completion
15. Expediting Progress of Works
16. Liquidated Damages
17. Substantial Completion
18. Defects
19. Variations to the Works
20. Valuation of Variations
21. Measurement
22. Claims for Loss and Expense
23. Procedure for Claims
24. Construction Equipment
Temporary Works Materials and
Goods
25. General Responsibilities
26. Indemnity Provisions
27. Insurance for Personal Injury, Work
Injury Compensation and Property
Damage
28. Insurance of the Works
29. Damage to Property of Employer or
Government
30. Assignment and Subcontracting
31. Termination by The Employer
32. Progress Payments and Final Account
33. Fluctuations
34. Final Completion Certificate
35. Settlement of Disputes
36. Recovery by the Employer
37. Governing Law & Notices
FORM OF CONTRACT
Myanmar Transitional Platform
23
Technical Specification
Specifications
FORM OF CONTRACT
Myanmar Transitional Platform
24
Technical Specification
Specifications
FORM OF CONTRACT
Myanmar Transitional Platform
25
Specifications
Specification Format
-National Building Specification Format
(UK Based System)
-Master Format (Construction Specification Institute, CSI)
(US Based System)
- PWD/CPG General Specification
FORM OF CONTRACT
Myanmar Transitional Platform
26
Specifications
Particular Requirement
FORM OF CONTRACT
NBS Master Format
Myanmar Transitional Platform
27
Technical Specification
Specifications
FORM OF CONTRACT
NBS Master Format
Myanmar Transitional Platform
28
 Publish Standard Condition of Contract by relevant
Authorities
(for Public and Private Sectors)
 Regulate to practice the published Standard
Condition of Contract
 Practice to include Detailed Specification
(Consultants, License Engineers, Professional Engineers)
RECOMMENDATION
Myanmar Transitional Platform
29
 Clear understanding of respective responsible of each party
(Benefit to both Employer and Employee)
 Prevent ambiguity and un-necessary Arbitration at Court
(lost time and money)
 Property is “General Public Investment”
(Contribute GDP)
 Preparation for “Next Generation of Construction Industrial”
(Set up the industrial practice and standard to prevent
from Nasty International Contractor who want to take
advantages on lack of industrialise inexperience)
RESULT OF PRACTICING DETAILED CONTRACT DOCUMENT
Myanmar Transitional Platform
Thank You
30
Soe Min Sett
Email : smsett@gmail.com
Myanmar Transitional Platform

More Related Content

Similar to Implementation of construction project with detailed contract documents r1

Report on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaReport on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaNarayan Gupta
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management PlanAnuragBhat7
 
@ETCONp Construction Exam 8 .DOCX
@ETCONp Construction Exam 8  .DOCX@ETCONp Construction Exam 8  .DOCX
@ETCONp Construction Exam 8 .DOCXMekonnenAyal
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Lasantha Perera
 
م.19- مبادرة #تواصل_تطوير - الصيغ النموذجية لعقود المقاولات والتشييد
م.19- مبادرة #تواصل_تطوير - الصيغ النموذجية لعقود المقاولات والتشييدم.19- مبادرة #تواصل_تطوير - الصيغ النموذجية لعقود المقاولات والتشييد
م.19- مبادرة #تواصل_تطوير - الصيغ النموذجية لعقود المقاولات والتشييدEgyptian Engineers Association
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CVTawfig Adham
 
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Antonio Coladarce
 
A Comparative Analysis on Design of Rigid Runway Pavements
A Comparative Analysis on Design of Rigid Runway PavementsA Comparative Analysis on Design of Rigid Runway Pavements
A Comparative Analysis on Design of Rigid Runway PavementsYash Gang
 
11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen AntovAssen Antov
 
Vishrantwadi & Ghorpadi Tender documents
Vishrantwadi & Ghorpadi Tender documentsVishrantwadi & Ghorpadi Tender documents
Vishrantwadi & Ghorpadi Tender documentsSachinPawar510423
 
Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017DarrenTofu
 
CV Vinod Kumar Technip
CV Vinod Kumar TechnipCV Vinod Kumar Technip
CV Vinod Kumar TechnipVINOD KUMAR
 

Similar to Implementation of construction project with detailed contract documents r1 (20)

Report on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaReport on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL Patna
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management Plan
 
@ETCONp Construction Exam 8 .DOCX
@ETCONp Construction Exam 8  .DOCX@ETCONp Construction Exam 8  .DOCX
@ETCONp Construction Exam 8 .DOCX
 
Fidic db-yellow-book
Fidic db-yellow-bookFidic db-yellow-book
Fidic db-yellow-book
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016
 
FIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshopFIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshop
 
Standard Forms of Construction Contracts
Standard Forms of Construction ContractsStandard Forms of Construction Contracts
Standard Forms of Construction Contracts
 
م.19- مبادرة #تواصل_تطوير - الصيغ النموذجية لعقود المقاولات والتشييد
م.19- مبادرة #تواصل_تطوير - الصيغ النموذجية لعقود المقاولات والتشييدم.19- مبادرة #تواصل_تطوير - الصيغ النموذجية لعقود المقاولات والتشييد
م.19- مبادرة #تواصل_تطوير - الصيغ النموذجية لعقود المقاولات والتشييد
 
Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016
 
FIDIC 2017 Yellow and Silver in EPC and PPP Contracts
FIDIC 2017 Yellow and Silver in EPC and PPP ContractsFIDIC 2017 Yellow and Silver in EPC and PPP Contracts
FIDIC 2017 Yellow and Silver in EPC and PPP Contracts
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
 
A Comparative Analysis on Design of Rigid Runway Pavements
A Comparative Analysis on Design of Rigid Runway PavementsA Comparative Analysis on Design of Rigid Runway Pavements
A Comparative Analysis on Design of Rigid Runway Pavements
 
11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov11.05 - 11.15 Asen Antov
11.05 - 11.15 Asen Antov
 
TOPIC6.pdf
TOPIC6.pdfTOPIC6.pdf
TOPIC6.pdf
 
Anthony pangras latest
Anthony pangras latestAnthony pangras latest
Anthony pangras latest
 
Vishrantwadi & Ghorpadi Tender documents
Vishrantwadi & Ghorpadi Tender documentsVishrantwadi & Ghorpadi Tender documents
Vishrantwadi & Ghorpadi Tender documents
 
Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017
 
CV Vinod Kumar Technip
CV Vinod Kumar TechnipCV Vinod Kumar Technip
CV Vinod Kumar Technip
 
Arunkumar_Proc & Contr_25.12.2014
Arunkumar_Proc & Contr_25.12.2014Arunkumar_Proc & Contr_25.12.2014
Arunkumar_Proc & Contr_25.12.2014
 

More from thinthinaung2005

ပညာသင္ၾကားရျခင္း၏ အဓိကရည္ရြယ္ခ်က္
ပညာသင္ၾကားရျခင္း၏ အဓိကရည္ရြယ္ခ်က္ပညာသင္ၾကားရျခင္း၏ အဓိကရည္ရြယ္ခ်က္
ပညာသင္ၾကားရျခင္း၏ အဓိကရည္ရြယ္ခ်က္thinthinaung2005
 
Ko win mg training slide 24122012
Ko win mg training slide 24122012Ko win mg training slide 24122012
Ko win mg training slide 24122012thinthinaung2005
 
Ko tza how to apply industrial safety standard in myanmar 241212
Ko tza how to apply industrial safety standard in myanmar 241212Ko tza how to apply industrial safety standard in myanmar 241212
Ko tza how to apply industrial safety standard in myanmar 241212thinthinaung2005
 
Construction safety seminar
Construction safety seminarConstruction safety seminar
Construction safety seminarthinthinaung2005
 
လယ္ယာလုပ္ငန္းအႏၱရာယ္ကင္းေရး
လယ္ယာလုပ္ငန္းအႏၱရာယ္ကင္းေရးလယ္ယာလုပ္ငန္းအႏၱရာယ္ကင္းေရး
လယ္ယာလုပ္ငန္းအႏၱရာယ္ကင္းေရးthinthinaung2005
 
Setting up for emergency life saving in myanmar
Setting up for emergency life saving in myanmarSetting up for emergency life saving in myanmar
Setting up for emergency life saving in myanmarthinthinaung2005
 
Mtp food safety slides_final
Mtp food safety slides_finalMtp food safety slides_final
Mtp food safety slides_finalthinthinaung2005
 
Migration policy for domestic workers tmw rev a
Migration policy for domestic workers tmw rev aMigration policy for domestic workers tmw rev a
Migration policy for domestic workers tmw rev athinthinaung2005
 
Developing networks and workgroups final
Developing networks and workgroups finalDeveloping networks and workgroups final
Developing networks and workgroups finalthinthinaung2005
 
Data and health policy final
Data and health policy finalData and health policy final
Data and health policy finalthinthinaung2005
 
Anti corruption mission possible - u minn thu (final 30 apr2013)
Anti corruption   mission possible - u minn thu (final 30 apr2013)Anti corruption   mission possible - u minn thu (final 30 apr2013)
Anti corruption mission possible - u minn thu (final 30 apr2013)thinthinaung2005
 
08 quality control system on building in myanmar
08   quality control system on building in myanmar08   quality control system on building in myanmar
08 quality control system on building in myanmarthinthinaung2005
 
05 msda presentation for pd
05   msda presentation for pd05   msda presentation for pd
05 msda presentation for pdthinthinaung2005
 
Safe food for local and global consumption saint
Safe food for local and global consumption saintSafe food for local and global consumption saint
Safe food for local and global consumption saintthinthinaung2005
 
Presentation foia dr tt win
Presentation foia dr tt winPresentation foia dr tt win
Presentation foia dr tt winthinthinaung2005
 
Myanmar transition platform (r1)
Myanmar transition platform (r1)Myanmar transition platform (r1)
Myanmar transition platform (r1)thinthinaung2005
 
Foreign manpower employment act aye nyein
Foreign manpower employment act aye nyeinForeign manpower employment act aye nyein
Foreign manpower employment act aye nyeinthinthinaung2005
 

More from thinthinaung2005 (17)

ပညာသင္ၾကားရျခင္း၏ အဓိကရည္ရြယ္ခ်က္
ပညာသင္ၾကားရျခင္း၏ အဓိကရည္ရြယ္ခ်က္ပညာသင္ၾကားရျခင္း၏ အဓိကရည္ရြယ္ခ်က္
ပညာသင္ၾကားရျခင္း၏ အဓိကရည္ရြယ္ခ်က္
 
Ko win mg training slide 24122012
Ko win mg training slide 24122012Ko win mg training slide 24122012
Ko win mg training slide 24122012
 
Ko tza how to apply industrial safety standard in myanmar 241212
Ko tza how to apply industrial safety standard in myanmar 241212Ko tza how to apply industrial safety standard in myanmar 241212
Ko tza how to apply industrial safety standard in myanmar 241212
 
Construction safety seminar
Construction safety seminarConstruction safety seminar
Construction safety seminar
 
လယ္ယာလုပ္ငန္းအႏၱရာယ္ကင္းေရး
လယ္ယာလုပ္ငန္းအႏၱရာယ္ကင္းေရးလယ္ယာလုပ္ငန္းအႏၱရာယ္ကင္းေရး
လယ္ယာလုပ္ငန္းအႏၱရာယ္ကင္းေရး
 
Setting up for emergency life saving in myanmar
Setting up for emergency life saving in myanmarSetting up for emergency life saving in myanmar
Setting up for emergency life saving in myanmar
 
Mtp food safety slides_final
Mtp food safety slides_finalMtp food safety slides_final
Mtp food safety slides_final
 
Migration policy for domestic workers tmw rev a
Migration policy for domestic workers tmw rev aMigration policy for domestic workers tmw rev a
Migration policy for domestic workers tmw rev a
 
Developing networks and workgroups final
Developing networks and workgroups finalDeveloping networks and workgroups final
Developing networks and workgroups final
 
Data and health policy final
Data and health policy finalData and health policy final
Data and health policy final
 
Anti corruption mission possible - u minn thu (final 30 apr2013)
Anti corruption   mission possible - u minn thu (final 30 apr2013)Anti corruption   mission possible - u minn thu (final 30 apr2013)
Anti corruption mission possible - u minn thu (final 30 apr2013)
 
08 quality control system on building in myanmar
08   quality control system on building in myanmar08   quality control system on building in myanmar
08 quality control system on building in myanmar
 
05 msda presentation for pd
05   msda presentation for pd05   msda presentation for pd
05 msda presentation for pd
 
Safe food for local and global consumption saint
Safe food for local and global consumption saintSafe food for local and global consumption saint
Safe food for local and global consumption saint
 
Presentation foia dr tt win
Presentation foia dr tt winPresentation foia dr tt win
Presentation foia dr tt win
 
Myanmar transition platform (r1)
Myanmar transition platform (r1)Myanmar transition platform (r1)
Myanmar transition platform (r1)
 
Foreign manpower employment act aye nyein
Foreign manpower employment act aye nyeinForeign manpower employment act aye nyein
Foreign manpower employment act aye nyein
 

Recently uploaded

Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 

Recently uploaded (20)

Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 

Implementation of construction project with detailed contract documents r1

  • 1. Implementation of Construction Project with Detailed Contract Documents Soe Minn Sett Myanmar Transitional Platform 1 March 2014 UMFCCI, Yangon
  • 2. Key Team Player in following airport projects:- Changi Airport (Singapore) Sembawang Airbase (Singapore) Seletar Airport (Singapore) New Phu Quoc International Project (Vietnam) Can Tho International Airport (Vietnam) Buon Ma Thout Airport (Vietnam) Benazir Bhutto International Airport (Islamabad, Pakistan) Naypyitaw Airport (Myanmar) Melbourne Airport (Australia) Hambantota International Airport (Sri Lanka) Soe Minn Sett B.E (Civil), M.Sc (Transportation Engineering)
  • 3. 1) LEGAL FRAME WORK 2) FORM OF CONTRACT 3) RESULT OF DETAILED CONTRACT DOCUMENTS 3 CONTENT Myanmar Transitional Platform
  • 4. 4 Ref: Imperial Gazetteer of India, v. 9, p. 213. LEGAL FRAME WORK BRITISH BURMA MUNICIPAL ACT, 1874 BURMA MUNICIPAL ACT, 1884 Ref: “A Collection of The Acts published by the Governor General of India in Council in the year 1885” Myanmar Transitional Platform
  • 5. 5 LEGAL FRAME WORK Rangoon City Municipal Act (1922) Rangoon City Municipal Act (1956) Myanmar Transitional Platform
  • 6. 6 Yangon City Development Committee LEGAL FRAME WORK Myanmar Transitional Platform
  • 7. 7 CURRENT PRACTICE City Development Committee Myanmar Transitional Platform
  • 8. 8 CURRENT PRACTICE Ministry of Construction Myanmar Transitional Platform
  • 9. 9 Contract Law LEGAL FRAME WORK -Myanmar Contract Act, 1872 (formerly known as “Indian Contract Act”) - Sale of Goods Act, 1930 Same as Australian, English, Hong Kong and Singapore law. three major differences: (i) Consideration may be given by a person who is not a person to the contract; (ii) Past consideration (that is, payment/performance prior to entering into the contract) is valid consideration (iii) Consideration is not presumed in the case of a contract under seal. Myanmar Transitional Platform
  • 10. LEGAL FRAME WORK 10 Typical Contract Agreement Document (Private Sector Project) - Contract agreements were drafted on Stamp paper and signed by both parties. - May witness by Lawyers - Mentioned payment term - General description of project deliverable (Eg. 8 stories R.C building, 20’ x 50’ Warehouse Steel Structure building etc) Myanmar Transitional Platform
  • 11. LEGAL FRAME WORK 11 Typical Contract Agreement Document (Private Sector Project) Myanmar Transitional Platform
  • 12. LEGAL FRAME WORK 12 Typical Contract Agreement Document (Government Sector Project) Myanmar Transitional Platform
  • 13. 13 LEGAL FRAME WORK Myanmar Transitional Platform Photo Courtesy : Swe Oo’s Facebook PUBLIC share
  • 14. FORM OF CONTRACT 14 PRINCIPAL STAGES OF CONSTRUCTION PROCESS 14 Project Brief Decision to Build Evaluation & Award Completion & Maintenance Design Drawings Tender Documentation -Conditions of Contract -Drawings -BQs -Specifications Tender Invitation Construction Works Letter of Intent/Award Contract Documents Myanmar Transitional Platform
  • 15. FORM OF CONTRACT 15 Standard form of Contract Documents 1. Articles of Agreement 2. Conditions of Contract (regulate to practice) 3. Plans and Drawings 4. Bill of Quantities 5. Specification (recommend to practice) Myanmar Transitional Platform
  • 16. 16 Common Standard Form of Condition of Contract  Joint Contracts Tribunal (JCT)  International Federation of Consulting Engineers (FIDIC)  NEC Engineering and Construction Contract (NEC)  Singapore Institute of Architect (SIA)  Association of Consultant Architects (ACA)  Public Sector Standard Conditions of Contract for Construction Works (PSSCOC)  Master Format (Construction Specification Institute, CSI) FORM OF CONTRACT Myanmar Transitional Platform
  • 17. 17 Common Standard Form of Condition of Contract FORM OF CONTRACT Myanmar Transitional Platform
  • 18. 18 Common Standard Form of Condition of Contract FORM OF CONTRACT
  • 19. 19 Common Standard Form of Condition of Contract FORM OF CONTRACT Myanmar Transitional Platform
  • 20. 20 Common Standard Form of Condition of Contract FORM OF CONTRACT Myanmar Transitional Platform
  • 21. 21 Common Standard Form of Condition of Contract FORM OF CONTRACT Myanmar Transitional Platform
  • 22. 22 PSSCOC Public Sector Standard Conditions of Contract for Construction Works 1. Definitions and Interpretation 2 . Superintending Officer and Superintending Officer's Representative 3. Contract Documents 4. General Obligations of the Contractor 5. Sub-Surface and Ground Conditions 6. Permanent Works Designed by the Contractor 7. Notices and Fees 8. Setting Out 9. Programme for the Works 10. Quality in Construction 11. Administration 12. Possession of Site And Commencement Of Works 13. Suspension 14. Time for Completion 15. Expediting Progress of Works 16. Liquidated Damages 17. Substantial Completion 18. Defects 19. Variations to the Works 20. Valuation of Variations 21. Measurement 22. Claims for Loss and Expense 23. Procedure for Claims 24. Construction Equipment Temporary Works Materials and Goods 25. General Responsibilities 26. Indemnity Provisions 27. Insurance for Personal Injury, Work Injury Compensation and Property Damage 28. Insurance of the Works 29. Damage to Property of Employer or Government 30. Assignment and Subcontracting 31. Termination by The Employer 32. Progress Payments and Final Account 33. Fluctuations 34. Final Completion Certificate 35. Settlement of Disputes 36. Recovery by the Employer 37. Governing Law & Notices FORM OF CONTRACT Myanmar Transitional Platform
  • 23. 23 Technical Specification Specifications FORM OF CONTRACT Myanmar Transitional Platform
  • 24. 24 Technical Specification Specifications FORM OF CONTRACT Myanmar Transitional Platform
  • 25. 25 Specifications Specification Format -National Building Specification Format (UK Based System) -Master Format (Construction Specification Institute, CSI) (US Based System) - PWD/CPG General Specification FORM OF CONTRACT Myanmar Transitional Platform
  • 26. 26 Specifications Particular Requirement FORM OF CONTRACT NBS Master Format Myanmar Transitional Platform
  • 27. 27 Technical Specification Specifications FORM OF CONTRACT NBS Master Format Myanmar Transitional Platform
  • 28. 28  Publish Standard Condition of Contract by relevant Authorities (for Public and Private Sectors)  Regulate to practice the published Standard Condition of Contract  Practice to include Detailed Specification (Consultants, License Engineers, Professional Engineers) RECOMMENDATION Myanmar Transitional Platform
  • 29. 29  Clear understanding of respective responsible of each party (Benefit to both Employer and Employee)  Prevent ambiguity and un-necessary Arbitration at Court (lost time and money)  Property is “General Public Investment” (Contribute GDP)  Preparation for “Next Generation of Construction Industrial” (Set up the industrial practice and standard to prevent from Nasty International Contractor who want to take advantages on lack of industrialise inexperience) RESULT OF PRACTICING DETAILED CONTRACT DOCUMENT Myanmar Transitional Platform
  • 30. Thank You 30 Soe Min Sett Email : smsett@gmail.com Myanmar Transitional Platform