SlideShare a Scribd company logo
1 of 29
Download to read offline
Implementation of
Construction Project with
Detailed Contract Documents

1 March 2014
UMFCCI, Yangon

Soe Minn Sett
Myanmar Transitional Platform
Key Team Player in following airport projects:Changi Airport (Singapore)
Sembawang Airbase (Singapore)
Seletar Airport (Singapore)
New Phu Quoc International Project (Vietnam)
Can Tho International Airport (Vietnam)
Buon Ma Thout Airport (Vietnam)

Soe Minn Sett

B.E (Civil),
M.Sc (Transportation Engineering)

Benazir Bhutto International Airport (Islamabad, Pakistan)
Naypyitaw Airport (Myanmar)
Melbourne Airport (Australia)
Hambantota International Airport (Sri Lanka)
CONTENT
1) LEGAL FRAME WORK
2) FORM OF CONTRACT
3) RESULT OF DETAILED CONTRACT DOCUMENTS

Myanmar Transitional Platform

3
LEGAL FRAME WORK

BRITISH BURMA MUNICIPAL ACT, 1874

Ref: Imperial Gazetteer of India, v. 9, p. 213.

BURMA MUNICIPAL ACT, 1884

Ref: “A Collection of The Acts published by the Governor General of India in Council in the year 1885”

Myanmar Transitional Platform

4
LEGAL FRAME WORK

Rangoon City Municipal Act (1922)

Rangoon City Municipal Act (1956)

Myanmar Transitional Platform

5
LEGAL FRAME WORK

Yangon City Development Committee

Myanmar Transitional Platform

6
CURRENT PRACTICE

City Development Committee

Myanmar Transitional Platform

7
CURRENT PRACTICE

Ministry of Construction

Myanmar Transitional Platform

8
LEGAL FRAME WORK

Contract Law
-Myanmar Contract Act, 1872

(formerly known as “Indian Contract Act”)
- Sale of Goods Act, 1930
Same as Australian, English, Hong Kong and Singapore law.
three major differences:
(i) Consideration may be given by a person who is not a person to the contract;
(ii) Past consideration (that is, payment/performance prior to entering into the
contract) is valid consideration
(iii) Consideration is not presumed in the case of a contract under seal.

Myanmar Transitional Platform

9
LEGAL FRAME WORK

Typical Contract Agreement Document
(Private Sector Project)

- Contract agreements were
drafted on Stamp paper and
signed by both parties.
- May witness by Lawyers
- Mentioned payment term
- General description of project
deliverable (Eg. 8 stories R.C
building, 20’ x 50’ Warehouse Steel
Structure building etc)

Myanmar Transitional Platform

10
LEGAL FRAME WORK

Typical Contract Agreement Document
(Private Sector Project)

Myanmar Transitional Platform

11
LEGAL FRAME WORK

Typical Contract Agreement Document
(Government Sector Project)

Myanmar Transitional Platform

12
LEGAL FRAME WORK

Photo Courtesy : Swe Oo’s Facebook PUBLIC share

Myanmar Transitional Platform

13
FORM OF CONTRACT

PRINCIPAL STAGES OF CONSTRUCTION PROCESS
Decision
to Build

Project
Brief

Completion &
Maintenance

Design
Drawings

Construction
Works

Contract
Documents

Myanmar Transitional Platform

Tender Documentation
-Conditions of Contract
-Drawings
-BQs
-Specifications

Evaluation
& Award

Tender
Invitation

Letter of
Intent/Award
14
FORM OF CONTRACT

Standard form of Contract Documents
1. Articles of Agreement
2. Conditions of Contract
(regulate to practice)

3. Plans and Drawings
4. Bill of Quantities
5. Specification

(recommend to practice)

Myanmar Transitional Platform

15
FORM OF CONTRACT

Common Standard Form of Condition of Contract


Joint Contracts Tribunal (JCT)



International Federation of Consulting Engineers (FIDIC)



NEC Engineering and Construction Contract (NEC)



Singapore Institute of Architect (SIA)



Association of Consultant Architects (ACA)



Public Sector Standard Conditions of Contract for Construction Works
(PSSCOC)



Master Format (Construction Specification Institute, CSI)

Myanmar Transitional Platform

16
FORM OF CONTRACT

Common Standard Form of Condition of Contract

Myanmar Transitional Platform

17
FORM OF CONTRACT

Common Standard Form of Condition of Contract

18
FORM OF CONTRACT

Common Standard Form of Condition of Contract

Myanmar Transitional Platform

19
FORM OF CONTRACT

Common Standard Form of Condition of Contract

Myanmar Transitional Platform

20
FORM OF CONTRACT

Common Standard Form of Condition of Contract

Myanmar Transitional Platform

21
FORM OF CONTRACT

PSSCOC

Public Sector Standard Conditions of Contract for Construction Works
1. Definitions and Interpretation

13. Suspension

26. Indemnity Provisions

2 . Superintending Officer and

14. Time for Completion

27. Insurance for Personal Injury, Work

Superintending Officer's Representative

15. Expediting Progress of Works

Injury Compensation and Property

3. Contract Documents

16. Liquidated Damages

Damage

4. General Obligations of the Contractor

17. Substantial Completion

28. Insurance of the Works

5. Sub-Surface and Ground Conditions

18. Defects

29. Damage to Property of Employer or

6. Permanent Works Designed by the

19. Variations to the Works

Government

Contractor

20. Valuation of Variations

30. Assignment and Subcontracting

7. Notices and Fees

21. Measurement

31. Termination by The Employer

8. Setting Out

22. Claims for Loss and Expense

32. Progress Payments and Final Account

9. Programme for the Works

23. Procedure for Claims

33. Fluctuations

10. Quality in Construction

24. Construction Equipment

34. Final Completion Certificate

11. Administration

Temporary Works Materials and

35. Settlement of Disputes

12. Possession of Site And

Goods

36. Recovery by the Employer

Commencement Of Works

25. General Responsibilities

37. Governing Law & Notices

Myanmar Transitional Platform

22
FORM OF CONTRACT

Specifications
Technical Specification

Myanmar Transitional Platform

23
FORM OF CONTRACT

Specifications
Specification Format

-National Building Specification Format
(UK Based System)
-Master Format (Construction Specification Institute, CSI)

(US Based System)
-

PWD/CPG General Specification

Myanmar Transitional Platform

24
FORM OF CONTRACT

Specifications
Particular Requirement

NBS
Myanmar Transitional Platform

Master Format
25
FORM OF CONTRACT

Specifications
Technical Specification

NBS
Myanmar Transitional Platform

Master Format
26
RECOMMENDATION
 Publish Standard Condition of Contract by relevant
Authorities
(for Public and Private Sectors)

 Regulate to practice the published Standard
Condition of Contract
 Practice to include Detailed Specification
(Consultants, License Engineers, Professional Engineers)

Myanmar Transitional Platform

27
RESULT OF PRACTICING DETAILED CONTRACT DOCUMENT
 Clear understanding of respective responsible of each party
(Benefit to both Employer and Employee)
 Prevent ambiguity and un-necessary Arbitration at Court
(lost time and money)
 Property is “General Public Investment”
(Contribute GDP)
 Preparation for “Next Generation of Construction Industrial”
(Set up the industrial practice and standard to prevent
from Nasty International Contractor who want to take
advantages on lack of industrialise inexperience)
Myanmar Transitional Platform

28
Myanmar Transitional Platform

Thank You
Soe Min Sett
Email : smsett@gmail.com

29

More Related Content

Viewers also liked

Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...
mecocca5
 
Building a Budget Bridge
Building a Budget BridgeBuilding a Budget Bridge
Building a Budget Bridge
buckburch
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
guestdb5e498
 
Construction process
Construction processConstruction process
Construction process
Mazen Al-Qadi
 

Viewers also liked (14)

Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...
 
Building a Budget Bridge
Building a Budget BridgeBuilding a Budget Bridge
Building a Budget Bridge
 
0105terms And Standard Form Contract
0105terms And Standard Form Contract0105terms And Standard Form Contract
0105terms And Standard Form Contract
 
Introduction
IntroductionIntroduction
Introduction
 
Conditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAConditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIA
 
General conditions of_contract_july_2014_22_07_14
General conditions of_contract_july_2014_22_07_14General conditions of_contract_july_2014_22_07_14
General conditions of_contract_july_2014_22_07_14
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Six Sigma and Construction Industry
Six Sigma and Construction IndustrySix Sigma and Construction Industry
Six Sigma and Construction Industry
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
The Implementation of QMS in construction industry
The Implementation of QMS in construction industryThe Implementation of QMS in construction industry
The Implementation of QMS in construction industry
 
Engineering SOP
Engineering SOPEngineering SOP
Engineering SOP
 
ACH 216 Lecture 04b (Bidding) Part 1
ACH 216 Lecture 04b (Bidding) Part 1ACH 216 Lecture 04b (Bidding) Part 1
ACH 216 Lecture 04b (Bidding) Part 1
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
Construction process
Construction processConstruction process
Construction process
 

Similar to Implementation of Construction Project with Detailed Contract Documents

Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016
Lasantha Perera
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
Tawfig Adham
 
Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011
Jian Shen
 
CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16
CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16
CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16
Cong Danh Tran
 

Similar to Implementation of Construction Project with Detailed Contract Documents (20)

@ETCONp Construction Exam 8 .DOCX
@ETCONp Construction Exam 8  .DOCX@ETCONp Construction Exam 8  .DOCX
@ETCONp Construction Exam 8 .DOCX
 
Report on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaReport on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL Patna
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management Plan
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016
 
Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016
 
Delhi metro presention
Delhi   metro presentionDelhi   metro presention
Delhi metro presention
 
Qb cem 801
Qb cem 801Qb cem 801
Qb cem 801
 
IRJET- Best Feasible Transportation Route Analysis for Delivering Ready Mixed...
IRJET- Best Feasible Transportation Route Analysis for Delivering Ready Mixed...IRJET- Best Feasible Transportation Route Analysis for Delivering Ready Mixed...
IRJET- Best Feasible Transportation Route Analysis for Delivering Ready Mixed...
 
Curriculum vitae
Curriculum vitae Curriculum vitae
Curriculum vitae
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
Fidic db-yellow-book
Fidic db-yellow-bookFidic db-yellow-book
Fidic db-yellow-book
 
Ac02 nit
Ac02 nitAc02 nit
Ac02 nit
 
Building Control Regulation in Bangkok
Building Control Regulation in BangkokBuilding Control Regulation in Bangkok
Building Control Regulation in Bangkok
 
Flexible digital approach to airport terminal design
Flexible digital approach to airport terminal designFlexible digital approach to airport terminal design
Flexible digital approach to airport terminal design
 
3rd edition IstructE2006 .pdf
3rd edition IstructE2006 .pdf3rd edition IstructE2006 .pdf
3rd edition IstructE2006 .pdf
 
Resume--Shishir
Resume--ShishirResume--Shishir
Resume--Shishir
 
Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011
 
CV-Padmanabh
CV-PadmanabhCV-Padmanabh
CV-Padmanabh
 
CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16
CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16
CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16
 
Training report 2
Training report 2Training report 2
Training report 2
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Recently uploaded (20)

Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 

Implementation of Construction Project with Detailed Contract Documents

  • 1. Implementation of Construction Project with Detailed Contract Documents 1 March 2014 UMFCCI, Yangon Soe Minn Sett Myanmar Transitional Platform
  • 2. Key Team Player in following airport projects:Changi Airport (Singapore) Sembawang Airbase (Singapore) Seletar Airport (Singapore) New Phu Quoc International Project (Vietnam) Can Tho International Airport (Vietnam) Buon Ma Thout Airport (Vietnam) Soe Minn Sett B.E (Civil), M.Sc (Transportation Engineering) Benazir Bhutto International Airport (Islamabad, Pakistan) Naypyitaw Airport (Myanmar) Melbourne Airport (Australia) Hambantota International Airport (Sri Lanka)
  • 3. CONTENT 1) LEGAL FRAME WORK 2) FORM OF CONTRACT 3) RESULT OF DETAILED CONTRACT DOCUMENTS Myanmar Transitional Platform 3
  • 4. LEGAL FRAME WORK BRITISH BURMA MUNICIPAL ACT, 1874 Ref: Imperial Gazetteer of India, v. 9, p. 213. BURMA MUNICIPAL ACT, 1884 Ref: “A Collection of The Acts published by the Governor General of India in Council in the year 1885” Myanmar Transitional Platform 4
  • 5. LEGAL FRAME WORK Rangoon City Municipal Act (1922) Rangoon City Municipal Act (1956) Myanmar Transitional Platform 5
  • 6. LEGAL FRAME WORK Yangon City Development Committee Myanmar Transitional Platform 6
  • 7. CURRENT PRACTICE City Development Committee Myanmar Transitional Platform 7
  • 8. CURRENT PRACTICE Ministry of Construction Myanmar Transitional Platform 8
  • 9. LEGAL FRAME WORK Contract Law -Myanmar Contract Act, 1872 (formerly known as “Indian Contract Act”) - Sale of Goods Act, 1930 Same as Australian, English, Hong Kong and Singapore law. three major differences: (i) Consideration may be given by a person who is not a person to the contract; (ii) Past consideration (that is, payment/performance prior to entering into the contract) is valid consideration (iii) Consideration is not presumed in the case of a contract under seal. Myanmar Transitional Platform 9
  • 10. LEGAL FRAME WORK Typical Contract Agreement Document (Private Sector Project) - Contract agreements were drafted on Stamp paper and signed by both parties. - May witness by Lawyers - Mentioned payment term - General description of project deliverable (Eg. 8 stories R.C building, 20’ x 50’ Warehouse Steel Structure building etc) Myanmar Transitional Platform 10
  • 11. LEGAL FRAME WORK Typical Contract Agreement Document (Private Sector Project) Myanmar Transitional Platform 11
  • 12. LEGAL FRAME WORK Typical Contract Agreement Document (Government Sector Project) Myanmar Transitional Platform 12
  • 13. LEGAL FRAME WORK Photo Courtesy : Swe Oo’s Facebook PUBLIC share Myanmar Transitional Platform 13
  • 14. FORM OF CONTRACT PRINCIPAL STAGES OF CONSTRUCTION PROCESS Decision to Build Project Brief Completion & Maintenance Design Drawings Construction Works Contract Documents Myanmar Transitional Platform Tender Documentation -Conditions of Contract -Drawings -BQs -Specifications Evaluation & Award Tender Invitation Letter of Intent/Award 14
  • 15. FORM OF CONTRACT Standard form of Contract Documents 1. Articles of Agreement 2. Conditions of Contract (regulate to practice) 3. Plans and Drawings 4. Bill of Quantities 5. Specification (recommend to practice) Myanmar Transitional Platform 15
  • 16. FORM OF CONTRACT Common Standard Form of Condition of Contract  Joint Contracts Tribunal (JCT)  International Federation of Consulting Engineers (FIDIC)  NEC Engineering and Construction Contract (NEC)  Singapore Institute of Architect (SIA)  Association of Consultant Architects (ACA)  Public Sector Standard Conditions of Contract for Construction Works (PSSCOC)  Master Format (Construction Specification Institute, CSI) Myanmar Transitional Platform 16
  • 17. FORM OF CONTRACT Common Standard Form of Condition of Contract Myanmar Transitional Platform 17
  • 18. FORM OF CONTRACT Common Standard Form of Condition of Contract 18
  • 19. FORM OF CONTRACT Common Standard Form of Condition of Contract Myanmar Transitional Platform 19
  • 20. FORM OF CONTRACT Common Standard Form of Condition of Contract Myanmar Transitional Platform 20
  • 21. FORM OF CONTRACT Common Standard Form of Condition of Contract Myanmar Transitional Platform 21
  • 22. FORM OF CONTRACT PSSCOC Public Sector Standard Conditions of Contract for Construction Works 1. Definitions and Interpretation 13. Suspension 26. Indemnity Provisions 2 . Superintending Officer and 14. Time for Completion 27. Insurance for Personal Injury, Work Superintending Officer's Representative 15. Expediting Progress of Works Injury Compensation and Property 3. Contract Documents 16. Liquidated Damages Damage 4. General Obligations of the Contractor 17. Substantial Completion 28. Insurance of the Works 5. Sub-Surface and Ground Conditions 18. Defects 29. Damage to Property of Employer or 6. Permanent Works Designed by the 19. Variations to the Works Government Contractor 20. Valuation of Variations 30. Assignment and Subcontracting 7. Notices and Fees 21. Measurement 31. Termination by The Employer 8. Setting Out 22. Claims for Loss and Expense 32. Progress Payments and Final Account 9. Programme for the Works 23. Procedure for Claims 33. Fluctuations 10. Quality in Construction 24. Construction Equipment 34. Final Completion Certificate 11. Administration Temporary Works Materials and 35. Settlement of Disputes 12. Possession of Site And Goods 36. Recovery by the Employer Commencement Of Works 25. General Responsibilities 37. Governing Law & Notices Myanmar Transitional Platform 22
  • 23. FORM OF CONTRACT Specifications Technical Specification Myanmar Transitional Platform 23
  • 24. FORM OF CONTRACT Specifications Specification Format -National Building Specification Format (UK Based System) -Master Format (Construction Specification Institute, CSI) (US Based System) - PWD/CPG General Specification Myanmar Transitional Platform 24
  • 25. FORM OF CONTRACT Specifications Particular Requirement NBS Myanmar Transitional Platform Master Format 25
  • 26. FORM OF CONTRACT Specifications Technical Specification NBS Myanmar Transitional Platform Master Format 26
  • 27. RECOMMENDATION  Publish Standard Condition of Contract by relevant Authorities (for Public and Private Sectors)  Regulate to practice the published Standard Condition of Contract  Practice to include Detailed Specification (Consultants, License Engineers, Professional Engineers) Myanmar Transitional Platform 27
  • 28. RESULT OF PRACTICING DETAILED CONTRACT DOCUMENT  Clear understanding of respective responsible of each party (Benefit to both Employer and Employee)  Prevent ambiguity and un-necessary Arbitration at Court (lost time and money)  Property is “General Public Investment” (Contribute GDP)  Preparation for “Next Generation of Construction Industrial” (Set up the industrial practice and standard to prevent from Nasty International Contractor who want to take advantages on lack of industrialise inexperience) Myanmar Transitional Platform 28
  • 29. Myanmar Transitional Platform Thank You Soe Min Sett Email : smsett@gmail.com 29