TV Repack – RF & Antenna
Transition Strategies
K e it h Pe lle t ie r, O c t obe r, 2 0 1 5
• Timeline
• Towers
• Antennas
• Transmission Line
• RF Systems
• Transition Scenarios
O ve r v i e w
2
Repack / Transition Timeline
≥ 9 months
3
Clearing Goal for 84 MHz
Rank DMA Size Ave # cleared Std Dev
1 NewYork, NY 23 10.2 1.2
2 Philadelphia, PA 23 8.3 1.3
3 Chicago, IL 21 8.1 1.3
4 San Francisco-
Oakland, CA
23 7.9 1.2
5 Boston, MA 17 7.1 1.2
6 Los Angeles, CA 27 6.9 0.98
Michael Kearns and Lili Dworkin
“A Computational Study of Feasible Repackings in the FCC IncentiveAuctions”
4
Size of Repack ?
• 1600 to 1700 eligible stations
• 200 + need to move toVHF / channel share or go dark
• 1000 +/- 200 will be involved in the re-pack
• To clear channel 37 and above all states are impacted
except Alaska and possibly Wyoming
5
Towers
• TIA-222 Rev G
6
Towers
• TIA-222 Rev G
Ice
Wind Speed
Topography
Shape Factors
Get structural
analysis
Need detailed
site information
7
Towers
• BasicWind Speed
• Antenna Elevation onTower
• Design Ice
• Tower Height
• Structure Class
• Exposure Category
• Topographic Category
• Height of Crest Above AverageTerrain
• Seismic Spectral Response Acceleration
8
Site Criteria Needed for 222-G Antenna Proposal:
Much More Site Design Information is Required from
Broadcasters and/or Tower Engineers in 222-G
8
Replication
• OET-69 “dipole factor”
ܲ௥ ൌ ܲ௧
‫ܩ‬௧‫ܩ‬௥ߣଶ
ሺ4ߨܴሻଶ
1 MW ERP AT CH49WILL BE ALLOCATED 622 KW ERP AT CH 25
‫ݔ‬ ൌ	
ߣ௟
ߣ௨
ൗ
dB = 10 log x
2
9
Towers – Antenna Wind-load
10
Example: ChannelChanges
Channel 51
TFU-30JTH-R O4
Ø10.75” Pipe
27 Gain
(EPA) = 42.4 ft2
W = 3800 lbs.
45.2 ft.
Channel 24
TFU-30JTH-R O4
Ø14” Pipe
27 Gain
(EPA) = 68.7 ft2
W = 7000 lbs.
58.3 ft.
Same Gain Antenna Most Likely Not Required Due to Reduction in ERP 10
Towers – Antenna Wind-load
11
Example: ChannelChanges
Channel 51
TFU-30JTH-R O4
Ø10.75” Pipe
27 (14.13dB)Gain
(EPA) = 42.4 ft2
W = 3800 lbs.
45.2 ft.
Channel 24
TFU-22JTH-R O4
Ø10.75” Pipe
20 (13.01 dB) Gain
(EPA) = 45.0 ft2
W = 3600 lbs.
43.5 ft.
Due to Reduction in ERP for CH 24, Same Transmitter can be used
1 MW ERP
Input Power = 37 kW
588 kW ERP
Input Power = 29.4 kW
11
Antennas
• Pylon
• Narrowband
• Moving down in channel =
larger antenna (possibly)
• Some may allow adjacent
channel operation
• Less ERP required
at lower channels
to replicate
coverage
• Antenna not
necessarily longer
Replace
12
Antennas
• Panel
• Broadband
• All stations have common
pattern
• Number of channels can be
limited by Power
• Owned by “vertical real-
estate” companies
• Broadcaster going dark may
open up space on panel
Re-use
• Joining a Panel
• FCC is not considering movingTx location during “re-pack” phase of the auction
• Application to move to a newTx site will be done post auction
13
Multi-Channel Pylon
Example of a broadband slotted coaxial antenna design
WNYT Glens Falls, NY TLP-12W/VP-R (SP) channels 39 & 45
• 12 layer antenna with 4 way split
• Manufactured in ½” wall aluminum
• Elliptically polarized
Multi-sectional phase cancellation
LowerQ from thin wall
Leveraging Babinet’s principle
Channels 38 to 47 under 1.1:1 14
Coaxial line “stick” length, 3 MHz Guard Band
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
20
19 ¾
19 ½
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
20
19 ¾
19 ½
Prohibited Channel per catalog
15
Coaxial line “stick” length, 1.5 MHz Guard Band
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
20
19 ¾
19 ½
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
20
19 ¾
19 ½
Prohibited Channel per catalog
16
Transmission line
• Get a line sweep
• 6 1/8” line 20’ stick
length
• Ch 16 and 20 are OK
(<1.03:1)
Maybe Re-use
Sweep curtesy Ed Murlatt and associates
Channels 14 to 24
1.5 MHz Guard
3.0 MHz Guard
17
RF Systems
• High Power RF System Components (25kW-80 kW)
WR1150
Ch44-69
WR1500
Ch18-48
WR1800
Ch14-17
18
RF Systems
• High Power RF System Components
Coax to
Waveguide
Transitions
Narrowband
Replace
19
RF Systems
• High Power RF System Components
Waveguide
Magic Tee
Combiner
New Slabs
Required
Re-tune
20
RF Systems
• High Power RF System Components
Waffle Iron
Low Pass
Filter
Re-tune
21
RF Systems
• High Power RF System Components
Constant
Impedance
Band-pass
Filter
Replace
Lower Channel Equals Larger Foot Print
22
RF Systems
• High Power RF System Components
Waveguide
Switch
and Coaxial
Water-load
Re-tune
23
RF Systems
• Medium Power RF System
Components (10kW-25 kW)
All components are broadband except
waveguide filter
Replace filter
Re-use all else
24
RF Systems – Practical Considerations
• Field re-tuning not practical
– Limited qualified talent
– Some parts may need to be replace
• If you have a two tube system
– Re-tune one tube and operate into new CIF
– Send all other system parts for refurbishment
25
Transition Scenarios
FLASH CUTFLASH CUTFLASH CUTFLASH CUT
• On air with original channel today
• On air with new channel tomorrow
GOT BACKUP?GOT BACKUP?GOT BACKUP?GOT BACKUP?
STAGEDSTAGEDSTAGEDSTAGED
NEED TEMPORARY
TRASMISSION FACILITY
26
Transition Scenario’s - Staged
• Eliminates Nationwide Flash Cut
• Potential Relieve for Tower Crews
27
If you have backup
• Operate off backup site while work is done at
main site to get ready for new channel
• Expect several months of back-up
operation
• Reliable back-up is important
• Back-up Antenna Must be Broadband
28
Analog antenna still up?
• Operate off current digital channel
• Replace analog antenna (top mount)
29
Currently no Aux Antenna ?
• New side mount on new channel
• Replace top mount post cut over
• Side mount becomes backup
• If re-using Tx line tower a top channel splitter can
be used to feed side mount
• Side mount can go at separate site and be used as
part of SFN or as backup post transition
• Put up side mount on current channel
30
Candelabra ?
• Candelabra – New full power antenna
• New Stacked antenna with another broadcaster
• Space available by broadcaster going off air ?
• SpaceAvailable by Old AnalogAntenna
31
Dual Channel Slot?
• Several dual channel slots went up during DTV conversion
• These are currently operating on one channel only
• Antenna, line and combiner are ready for broadcaster in
market repacked to that adjacent channel
• Operation from same aperture on adjacent channel will
mitigate interference
• Apply to FCC to change broadcast site
32
Panel?
• Join existing or new panel as tenant
• Space made available by broadcaster going off air ?
• Will require combiner work
• New manifold combiner
• Possible broadband port addition or module
replacement in CIF
• Vertical real estate company owns and upgrade hardware,
broadcasters lease
33
New Multi-Channel Pylon
9 % = ch14-21 (8 channels)
ch30-38 (9 channels)
ch34-42 (9 channels)
ch42-51 (10 channels)
Channels 38 to 47 under 1.1:1
34
ATSC 3.0
• AddV-Pol to help mobile reception
• Single Frequency Network (SFN) topology
35
Conclusions
• A temporary or back up transmission facility will be
required
• Antennas will most likely have to be replaced
• Good chance that transmission line can be re-used
• Some RF system components can be re-used
• Don’t plan on field re-tuning (resource limited)
• Least expensive option would be to move to existing
transmission site if it is available in the market
36
IEEE BTS Symposium 2015 Repack Considerations by K.Pelletier

More Related Content

What's hot

GPS time transfer
GPS time transferGPS time transfer
GPS time transfer
Yatish Bathla
 
Ieee 802.11.n
Ieee 802.11.nIeee 802.11.n
Ieee 802.11.n
Sai Shankar
 
175 annex vsat
175 annex vsat175 annex vsat
175 annex vsat
traoman
 
CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003
CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003
CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003
Catalin Octavian Popescu, P.E.
 
1 cm72 1e
1 cm72 1e1 cm72 1e
1 cm72 1e
Adil Syed Ali
 
5G NR parameters
5G NR parameters5G NR parameters
5G NR parameters
Sasi Reddy
 
3g counter & timer
3g counter & timer3g counter & timer
3g counter & timer
TABREZ KHAN
 
Ibs planning-vms2-v2
Ibs planning-vms2-v2Ibs planning-vms2-v2
Ibs planning-vms2-v2
Kamil Ali Saiyed
 
Satellite Downlink Budget Analysis
Satellite Downlink Budget AnalysisSatellite Downlink Budget Analysis
Satellite Downlink Budget Analysis
Partho Choudhury
 
Link budget satalite for calculation system
Link budget satalite for calculation systemLink budget satalite for calculation system
Link budget satalite for calculation system
University of Technology
 
DOORDHARSHAN
DOORDHARSHANDOORDHARSHAN
Field measurement tools Engineer EMERSON EDUARDO RODRIGUES
Field measurement tools Engineer EMERSON EDUARDO RODRIGUESField measurement tools Engineer EMERSON EDUARDO RODRIGUES
Field measurement tools Engineer EMERSON EDUARDO RODRIGUES
EMERSON EDUARDO RODRIGUES
 
Gsm1368
Gsm1368Gsm1368
Gsm1368
sasidhar
 
Cell PCH state - Some Questions Answered
Cell PCH state - Some Questions AnsweredCell PCH state - Some Questions Answered
Cell PCH state - Some Questions Answered
Faraz Husain
 
05 a rrm ul dl scheduler
05 a rrm ul dl scheduler05 a rrm ul dl scheduler
05 a rrm ul dl scheduler
EMERSON EDUARDO RODRIGUES
 
Portable Ground Receving Station
Portable Ground Receving StationPortable Ground Receving Station
Portable Ground Receving Station
Jude Ogbonna
 
Link budget calculation
Link budget calculationLink budget calculation
Link budget calculation
sitimunirah88
 
Satellite link design
Satellite link designSatellite link design
Satellite Communication
Satellite CommunicationSatellite Communication
Satellite Communication
Ahmed Ayman
 

What's hot (19)

GPS time transfer
GPS time transferGPS time transfer
GPS time transfer
 
Ieee 802.11.n
Ieee 802.11.nIeee 802.11.n
Ieee 802.11.n
 
175 annex vsat
175 annex vsat175 annex vsat
175 annex vsat
 
CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003
CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003
CN Tower 2.5kw Digital & 10 Kw Analog Uhf 2003
 
1 cm72 1e
1 cm72 1e1 cm72 1e
1 cm72 1e
 
5G NR parameters
5G NR parameters5G NR parameters
5G NR parameters
 
3g counter & timer
3g counter & timer3g counter & timer
3g counter & timer
 
Ibs planning-vms2-v2
Ibs planning-vms2-v2Ibs planning-vms2-v2
Ibs planning-vms2-v2
 
Satellite Downlink Budget Analysis
Satellite Downlink Budget AnalysisSatellite Downlink Budget Analysis
Satellite Downlink Budget Analysis
 
Link budget satalite for calculation system
Link budget satalite for calculation systemLink budget satalite for calculation system
Link budget satalite for calculation system
 
DOORDHARSHAN
DOORDHARSHANDOORDHARSHAN
DOORDHARSHAN
 
Field measurement tools Engineer EMERSON EDUARDO RODRIGUES
Field measurement tools Engineer EMERSON EDUARDO RODRIGUESField measurement tools Engineer EMERSON EDUARDO RODRIGUES
Field measurement tools Engineer EMERSON EDUARDO RODRIGUES
 
Gsm1368
Gsm1368Gsm1368
Gsm1368
 
Cell PCH state - Some Questions Answered
Cell PCH state - Some Questions AnsweredCell PCH state - Some Questions Answered
Cell PCH state - Some Questions Answered
 
05 a rrm ul dl scheduler
05 a rrm ul dl scheduler05 a rrm ul dl scheduler
05 a rrm ul dl scheduler
 
Portable Ground Receving Station
Portable Ground Receving StationPortable Ground Receving Station
Portable Ground Receving Station
 
Link budget calculation
Link budget calculationLink budget calculation
Link budget calculation
 
Satellite link design
Satellite link designSatellite link design
Satellite link design
 
Satellite Communication
Satellite CommunicationSatellite Communication
Satellite Communication
 

Viewers also liked

Microwave & satellites
Microwave & satellitesMicrowave & satellites
Microwave & satellites
Sai Sankar Gochhayat
 
Radio Link budget
Radio Link budgetRadio Link budget
Radio Link budget
Spiros Louvros
 
Fm
FmFm
Copper and copper alloys
Copper and copper alloysCopper and copper alloys
Copper and copper alloys
Abdul Rahman
 
Introduction to Microwaves,Satellite commn,Radar systemsMicrowaves
Introduction to  Microwaves,Satellite commn,Radar systemsMicrowavesIntroduction to  Microwaves,Satellite commn,Radar systemsMicrowaves
Introduction to Microwaves,Satellite commn,Radar systemsMicrowaves
Dr.YNM
 
Presentation On Copper, Cu
Presentation On Copper, CuPresentation On Copper, Cu
Presentation On Copper, Cu
cthame1
 

Viewers also liked (6)

Microwave & satellites
Microwave & satellitesMicrowave & satellites
Microwave & satellites
 
Radio Link budget
Radio Link budgetRadio Link budget
Radio Link budget
 
Fm
FmFm
Fm
 
Copper and copper alloys
Copper and copper alloysCopper and copper alloys
Copper and copper alloys
 
Introduction to Microwaves,Satellite commn,Radar systemsMicrowaves
Introduction to  Microwaves,Satellite commn,Radar systemsMicrowavesIntroduction to  Microwaves,Satellite commn,Radar systemsMicrowaves
Introduction to Microwaves,Satellite commn,Radar systemsMicrowaves
 
Presentation On Copper, Cu
Presentation On Copper, CuPresentation On Copper, Cu
Presentation On Copper, Cu
 

Similar to IEEE BTS Symposium 2015 Repack Considerations by K.Pelletier

TV Repack & ATSC 3.0: SFN & Future proofing antennas
TV Repack & ATSC 3.0:  SFN & Future proofing antennasTV Repack & ATSC 3.0:  SFN & Future proofing antennas
TV Repack & ATSC 3.0: SFN & Future proofing antennas
kmsavage
 
How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...
How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...
How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...
RadioFrequencySystems
 
PLCC.ppt
PLCC.pptPLCC.ppt
PLCC.ppt
thomas victor
 
RFS Advanced Passive Components for UHF Broadcast Spectrum Reallocation
RFS Advanced Passive Components for UHF Broadcast Spectrum ReallocationRFS Advanced Passive Components for UHF Broadcast Spectrum Reallocation
RFS Advanced Passive Components for UHF Broadcast Spectrum Reallocation
CReynhoutSVM
 
Advanced Passive Components for UHF Broadcast Spectrum Reallocation
Advanced Passive Components for UHF Broadcast Spectrum ReallocationAdvanced Passive Components for UHF Broadcast Spectrum Reallocation
Advanced Passive Components for UHF Broadcast Spectrum Reallocation
RadioFrequencySystems
 
An Introduction and Overview of MATV Technology
An Introduction and Overview of MATV TechnologyAn Introduction and Overview of MATV Technology
An Introduction and Overview of MATV Technology
rAVe [PUBS]
 
Clase 5 (1) (1).pdf
Clase 5 (1) (1).pdfClase 5 (1) (1).pdf
Clase 5 (1) (1).pdf
davidcahuana10
 
Basic of Satellite Communication
Basic of Satellite CommunicationBasic of Satellite Communication
Basic of Satellite Communication
ABHINAV GUPTA
 
Track 2 session 6 - st dev con 2016 - wireless charging technologies
Track 2   session 6 - st dev con 2016 - wireless charging technologies Track 2   session 6 - st dev con 2016 - wireless charging technologies
Track 2 session 6 - st dev con 2016 - wireless charging technologies
ST_World
 
Intro to-matv
Intro to-matvIntro to-matv
Intro to-matv
Asif Usmani
 
DINOOP R INTC1517518.pptx
DINOOP R  INTC1517518.pptxDINOOP R  INTC1517518.pptx
DINOOP R INTC1517518.pptx
Sunesh N.V
 
Ieee 802.11.n
Ieee 802.11.nIeee 802.11.n
Ieee 802.11.n
Hari Krishnan
 
RF Basics, RF for Non-RF Engineers.pdf
RF Basics, RF for Non-RF Engineers.pdfRF Basics, RF for Non-RF Engineers.pdf
RF Basics, RF for Non-RF Engineers.pdf
atsnoida3
 
A_Tutorial_on_Radar_System_Engineering.pptx
A_Tutorial_on_Radar_System_Engineering.pptxA_Tutorial_on_Radar_System_Engineering.pptx
A_Tutorial_on_Radar_System_Engineering.pptx
LusiaRakhmawati1
 
Shanghai Breakout: 802.11ac Wi-Fi Fundamentals
Shanghai Breakout: 802.11ac Wi-Fi FundamentalsShanghai Breakout: 802.11ac Wi-Fi Fundamentals
Shanghai Breakout: 802.11ac Wi-Fi Fundamentals
Aruba, a Hewlett Packard Enterprise company
 
A Tutorial on Radar System Engineering
A Tutorial on Radar System EngineeringA Tutorial on Radar System Engineering
A Tutorial on Radar System Engineering
TBSS Group
 
C06 - The Wireless Channel.pptx
C06 - The Wireless Channel.pptxC06 - The Wireless Channel.pptx
C06 - The Wireless Channel.pptx
NithyaDorairajan
 
Air shimla radio
Air shimla radioAir shimla radio
Air shimla radio
Bhavna Sharma
 
Bandwidth optimization
Bandwidth optimizationBandwidth optimization
Bandwidth optimization
Jeetendra Ahirwar
 
Interference issue between 3550 3700 m hz to domsat earth-station
Interference issue between 3550 3700 m hz to domsat earth-stationInterference issue between 3550 3700 m hz to domsat earth-station
Interference issue between 3550 3700 m hz to domsat earth-station
Kachun Wong
 

Similar to IEEE BTS Symposium 2015 Repack Considerations by K.Pelletier (20)

TV Repack & ATSC 3.0: SFN & Future proofing antennas
TV Repack & ATSC 3.0:  SFN & Future proofing antennasTV Repack & ATSC 3.0:  SFN & Future proofing antennas
TV Repack & ATSC 3.0: SFN & Future proofing antennas
 
How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...
How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...
How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...
 
PLCC.ppt
PLCC.pptPLCC.ppt
PLCC.ppt
 
RFS Advanced Passive Components for UHF Broadcast Spectrum Reallocation
RFS Advanced Passive Components for UHF Broadcast Spectrum ReallocationRFS Advanced Passive Components for UHF Broadcast Spectrum Reallocation
RFS Advanced Passive Components for UHF Broadcast Spectrum Reallocation
 
Advanced Passive Components for UHF Broadcast Spectrum Reallocation
Advanced Passive Components for UHF Broadcast Spectrum ReallocationAdvanced Passive Components for UHF Broadcast Spectrum Reallocation
Advanced Passive Components for UHF Broadcast Spectrum Reallocation
 
An Introduction and Overview of MATV Technology
An Introduction and Overview of MATV TechnologyAn Introduction and Overview of MATV Technology
An Introduction and Overview of MATV Technology
 
Clase 5 (1) (1).pdf
Clase 5 (1) (1).pdfClase 5 (1) (1).pdf
Clase 5 (1) (1).pdf
 
Basic of Satellite Communication
Basic of Satellite CommunicationBasic of Satellite Communication
Basic of Satellite Communication
 
Track 2 session 6 - st dev con 2016 - wireless charging technologies
Track 2   session 6 - st dev con 2016 - wireless charging technologies Track 2   session 6 - st dev con 2016 - wireless charging technologies
Track 2 session 6 - st dev con 2016 - wireless charging technologies
 
Intro to-matv
Intro to-matvIntro to-matv
Intro to-matv
 
DINOOP R INTC1517518.pptx
DINOOP R  INTC1517518.pptxDINOOP R  INTC1517518.pptx
DINOOP R INTC1517518.pptx
 
Ieee 802.11.n
Ieee 802.11.nIeee 802.11.n
Ieee 802.11.n
 
RF Basics, RF for Non-RF Engineers.pdf
RF Basics, RF for Non-RF Engineers.pdfRF Basics, RF for Non-RF Engineers.pdf
RF Basics, RF for Non-RF Engineers.pdf
 
A_Tutorial_on_Radar_System_Engineering.pptx
A_Tutorial_on_Radar_System_Engineering.pptxA_Tutorial_on_Radar_System_Engineering.pptx
A_Tutorial_on_Radar_System_Engineering.pptx
 
Shanghai Breakout: 802.11ac Wi-Fi Fundamentals
Shanghai Breakout: 802.11ac Wi-Fi FundamentalsShanghai Breakout: 802.11ac Wi-Fi Fundamentals
Shanghai Breakout: 802.11ac Wi-Fi Fundamentals
 
A Tutorial on Radar System Engineering
A Tutorial on Radar System EngineeringA Tutorial on Radar System Engineering
A Tutorial on Radar System Engineering
 
C06 - The Wireless Channel.pptx
C06 - The Wireless Channel.pptxC06 - The Wireless Channel.pptx
C06 - The Wireless Channel.pptx
 
Air shimla radio
Air shimla radioAir shimla radio
Air shimla radio
 
Bandwidth optimization
Bandwidth optimizationBandwidth optimization
Bandwidth optimization
 
Interference issue between 3550 3700 m hz to domsat earth-station
Interference issue between 3550 3700 m hz to domsat earth-stationInterference issue between 3550 3700 m hz to domsat earth-station
Interference issue between 3550 3700 m hz to domsat earth-station
 

Recently uploaded

Full-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalizationFull-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalization
Zilliz
 
Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
tolgahangng
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
innovationoecd
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
Kumud Singh
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
Matthew Sinclair
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
SOFTTECHHUB
 
Best 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERPBest 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERP
Pixlogix Infotech
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
Alpen-Adria-Universität
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
Tomaz Bratanic
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
Neo4j
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
DianaGray10
 
Building Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and MilvusBuilding Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and Milvus
Zilliz
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
danishmna97
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
KAMESHS29
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems S.M.S.A.
 
Programming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup SlidesProgramming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup Slides
Zilliz
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
Quotidiano Piemontese
 

Recently uploaded (20)

Full-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalizationFull-RAG: A modern architecture for hyper-personalization
Full-RAG: A modern architecture for hyper-personalization
 
Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
 
Best 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERPBest 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERP
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
 
Building Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and MilvusBuilding Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and Milvus
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
 
Programming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup SlidesProgramming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup Slides
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
 

IEEE BTS Symposium 2015 Repack Considerations by K.Pelletier

  • 1. TV Repack – RF & Antenna Transition Strategies K e it h Pe lle t ie r, O c t obe r, 2 0 1 5
  • 2. • Timeline • Towers • Antennas • Transmission Line • RF Systems • Transition Scenarios O ve r v i e w 2
  • 3. Repack / Transition Timeline ≥ 9 months 3
  • 4. Clearing Goal for 84 MHz Rank DMA Size Ave # cleared Std Dev 1 NewYork, NY 23 10.2 1.2 2 Philadelphia, PA 23 8.3 1.3 3 Chicago, IL 21 8.1 1.3 4 San Francisco- Oakland, CA 23 7.9 1.2 5 Boston, MA 17 7.1 1.2 6 Los Angeles, CA 27 6.9 0.98 Michael Kearns and Lili Dworkin “A Computational Study of Feasible Repackings in the FCC IncentiveAuctions” 4
  • 5. Size of Repack ? • 1600 to 1700 eligible stations • 200 + need to move toVHF / channel share or go dark • 1000 +/- 200 will be involved in the re-pack • To clear channel 37 and above all states are impacted except Alaska and possibly Wyoming 5
  • 7. Towers • TIA-222 Rev G Ice Wind Speed Topography Shape Factors Get structural analysis Need detailed site information 7
  • 8. Towers • BasicWind Speed • Antenna Elevation onTower • Design Ice • Tower Height • Structure Class • Exposure Category • Topographic Category • Height of Crest Above AverageTerrain • Seismic Spectral Response Acceleration 8 Site Criteria Needed for 222-G Antenna Proposal: Much More Site Design Information is Required from Broadcasters and/or Tower Engineers in 222-G 8
  • 9. Replication • OET-69 “dipole factor” ܲ௥ ൌ ܲ௧ ‫ܩ‬௧‫ܩ‬௥ߣଶ ሺ4ߨܴሻଶ 1 MW ERP AT CH49WILL BE ALLOCATED 622 KW ERP AT CH 25 ‫ݔ‬ ൌ ߣ௟ ߣ௨ ൗ dB = 10 log x 2 9
  • 10. Towers – Antenna Wind-load 10 Example: ChannelChanges Channel 51 TFU-30JTH-R O4 Ø10.75” Pipe 27 Gain (EPA) = 42.4 ft2 W = 3800 lbs. 45.2 ft. Channel 24 TFU-30JTH-R O4 Ø14” Pipe 27 Gain (EPA) = 68.7 ft2 W = 7000 lbs. 58.3 ft. Same Gain Antenna Most Likely Not Required Due to Reduction in ERP 10
  • 11. Towers – Antenna Wind-load 11 Example: ChannelChanges Channel 51 TFU-30JTH-R O4 Ø10.75” Pipe 27 (14.13dB)Gain (EPA) = 42.4 ft2 W = 3800 lbs. 45.2 ft. Channel 24 TFU-22JTH-R O4 Ø10.75” Pipe 20 (13.01 dB) Gain (EPA) = 45.0 ft2 W = 3600 lbs. 43.5 ft. Due to Reduction in ERP for CH 24, Same Transmitter can be used 1 MW ERP Input Power = 37 kW 588 kW ERP Input Power = 29.4 kW 11
  • 12. Antennas • Pylon • Narrowband • Moving down in channel = larger antenna (possibly) • Some may allow adjacent channel operation • Less ERP required at lower channels to replicate coverage • Antenna not necessarily longer Replace 12
  • 13. Antennas • Panel • Broadband • All stations have common pattern • Number of channels can be limited by Power • Owned by “vertical real- estate” companies • Broadcaster going dark may open up space on panel Re-use • Joining a Panel • FCC is not considering movingTx location during “re-pack” phase of the auction • Application to move to a newTx site will be done post auction 13
  • 14. Multi-Channel Pylon Example of a broadband slotted coaxial antenna design WNYT Glens Falls, NY TLP-12W/VP-R (SP) channels 39 & 45 • 12 layer antenna with 4 way split • Manufactured in ½” wall aluminum • Elliptically polarized Multi-sectional phase cancellation LowerQ from thin wall Leveraging Babinet’s principle Channels 38 to 47 under 1.1:1 14
  • 15. Coaxial line “stick” length, 3 MHz Guard Band 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 20 19 ¾ 19 ½ 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 20 19 ¾ 19 ½ Prohibited Channel per catalog 15
  • 16. Coaxial line “stick” length, 1.5 MHz Guard Band 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 20 19 ¾ 19 ½ 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 20 19 ¾ 19 ½ Prohibited Channel per catalog 16
  • 17. Transmission line • Get a line sweep • 6 1/8” line 20’ stick length • Ch 16 and 20 are OK (<1.03:1) Maybe Re-use Sweep curtesy Ed Murlatt and associates Channels 14 to 24 1.5 MHz Guard 3.0 MHz Guard 17
  • 18. RF Systems • High Power RF System Components (25kW-80 kW) WR1150 Ch44-69 WR1500 Ch18-48 WR1800 Ch14-17 18
  • 19. RF Systems • High Power RF System Components Coax to Waveguide Transitions Narrowband Replace 19
  • 20. RF Systems • High Power RF System Components Waveguide Magic Tee Combiner New Slabs Required Re-tune 20
  • 21. RF Systems • High Power RF System Components Waffle Iron Low Pass Filter Re-tune 21
  • 22. RF Systems • High Power RF System Components Constant Impedance Band-pass Filter Replace Lower Channel Equals Larger Foot Print 22
  • 23. RF Systems • High Power RF System Components Waveguide Switch and Coaxial Water-load Re-tune 23
  • 24. RF Systems • Medium Power RF System Components (10kW-25 kW) All components are broadband except waveguide filter Replace filter Re-use all else 24
  • 25. RF Systems – Practical Considerations • Field re-tuning not practical – Limited qualified talent – Some parts may need to be replace • If you have a two tube system – Re-tune one tube and operate into new CIF – Send all other system parts for refurbishment 25
  • 26. Transition Scenarios FLASH CUTFLASH CUTFLASH CUTFLASH CUT • On air with original channel today • On air with new channel tomorrow GOT BACKUP?GOT BACKUP?GOT BACKUP?GOT BACKUP? STAGEDSTAGEDSTAGEDSTAGED NEED TEMPORARY TRASMISSION FACILITY 26
  • 27. Transition Scenario’s - Staged • Eliminates Nationwide Flash Cut • Potential Relieve for Tower Crews 27
  • 28. If you have backup • Operate off backup site while work is done at main site to get ready for new channel • Expect several months of back-up operation • Reliable back-up is important • Back-up Antenna Must be Broadband 28
  • 29. Analog antenna still up? • Operate off current digital channel • Replace analog antenna (top mount) 29
  • 30. Currently no Aux Antenna ? • New side mount on new channel • Replace top mount post cut over • Side mount becomes backup • If re-using Tx line tower a top channel splitter can be used to feed side mount • Side mount can go at separate site and be used as part of SFN or as backup post transition • Put up side mount on current channel 30
  • 31. Candelabra ? • Candelabra – New full power antenna • New Stacked antenna with another broadcaster • Space available by broadcaster going off air ? • SpaceAvailable by Old AnalogAntenna 31
  • 32. Dual Channel Slot? • Several dual channel slots went up during DTV conversion • These are currently operating on one channel only • Antenna, line and combiner are ready for broadcaster in market repacked to that adjacent channel • Operation from same aperture on adjacent channel will mitigate interference • Apply to FCC to change broadcast site 32
  • 33. Panel? • Join existing or new panel as tenant • Space made available by broadcaster going off air ? • Will require combiner work • New manifold combiner • Possible broadband port addition or module replacement in CIF • Vertical real estate company owns and upgrade hardware, broadcasters lease 33
  • 34. New Multi-Channel Pylon 9 % = ch14-21 (8 channels) ch30-38 (9 channels) ch34-42 (9 channels) ch42-51 (10 channels) Channels 38 to 47 under 1.1:1 34
  • 35. ATSC 3.0 • AddV-Pol to help mobile reception • Single Frequency Network (SFN) topology 35
  • 36. Conclusions • A temporary or back up transmission facility will be required • Antennas will most likely have to be replaced • Good chance that transmission line can be re-used • Some RF system components can be re-used • Don’t plan on field re-tuning (resource limited) • Least expensive option would be to move to existing transmission site if it is available in the market 36