NORTH PIER #3 ELEVATION
BRIDGE "A"
A
S1
NORTH PIER #1 ELEVATION
BRIDGE "A"
8’X12’ PANEL 8’X12’ PANEL
4’X8’PANEL
4’X8’PANEL2’−6"PANEL
AR250
AR250
AR250
B
S1
PIER COLUMN #2 ELEVATION
BRIDGE "A"
8’X12’ PANEL8’X12’ PANEL
4’X8’PANEL
4’X8’PANEL2’−6"PANEL
AR250
AR250
AR250
8’X12’ PANEL
4’X8’PANEL
AR250
8’X12’ PANEL
4’X8’PANEL
AR250
AR250
8’X12’ PANEL
4’X8’PANEL
AR250
8’X12’ PANEL
4’X8’PANEL
AR250
AR250
8’X12’ PANEL
4’X8’PANEL
8’X12’ PANEL
4’X8’PANEL
AR250
AR250
AR250
8’X12’ PANEL
4’X8’PANEL
AR250
8’X12’ PANEL
4’X8’PANEL
AR250
AR250
8’X12’ PANEL
4’X8’PANEL
AR250
8’X12’ PANEL
4’X8’PANEL
AR250
AR250
8’ FORM
8’ FORM
8’ FORM
8’ FORM
D
S1
PIER COLUMN FORM PLAN TYP.
BRIDGE "A"
AR250
AR250
PROJECT:
LOCATION:
AIC = ARTICULATED INSIDE CORNER
AOC = ARTICULATED OUTSIDE CORNER
AR = ALIGNMENT RAIL (4" DBL BOX TUBE)
BAR = BRACE AS REQUIRED (BY CONT'R)
BLK = BULKHEAD AS REQUIRED (BY CONT'R)
BO = BOX OUT AS REQUIRED (BY CONTR'R)
BOF = BOTTOM OF FORM
CB = CORNER BRACKET
CS = CROSS STIFFENER
EJ = EXPANSION JOINT
F = FILLER BUILT BY CONT'R
FN = FLANGE NUT 100
FS = FLANGE SCREW (7")
H = HORIZINTAL
IC = INSIDE CORNER
ISC = INSIDE STRIPPING CORNER
IU = INNER UNIT (20mm ROD)
JBF = JOB BUILT FILLER BY CONTRACTOR
MPP = MULTI-PURPOSE PANEL
NTS = NOT TO SCALE
OCA = OUTSIDE CORNER ANGLE
P = PANEL
PFA = PIPE FORM ALIGNER
PB = POUR BREAK
SCB = SCAFFOLD BRACKET
SHB = SHE BOLT
S/P = STEEL PLY
TOC = TOP OF CONCRETE
TOF = TOP OF FORM
TT = TAPER TIE
FAX:(405) 755−1142PH:(405) 751−0880
Oklahoma City, Ok. 73114
12409 HOLMBOE AVE.
Construction Specialties, Ltd.
WEB: www.ellisforms.com
CONTRACTOR:
Pour height, Pour rate, Temperature, use of superplactizers and
retarding admixtures significantly affect the actual concrete
pressure.
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOADS
AND APPROVE DWG. IF THERE ARE ANY DISCREPENCIES, IT IS THE
CONTRACTOR’S RESPONSIBILTY TO NOTIFY ELLIS CONSTRUCTION
SPECIALTIES BEFORE SHIPMENT OF MATERIAL.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONTRACTOR APPROVAL
PRELIMINARY DETAILS ONLY − NOT FOR CONSTRUCTION
ISSUED FOR INFORMATION PURPOSES ONLY
DRAWING STATUS
1) Deviation in whole or part from this drawing and these general
notes shall relieve Ellis Construction Specialties of responsibility,
liability, and claim attributable to such deviation.
2) This drawing is provided as an aid in illustrating proper erection
of equipment only. It is the responsibility of the contractor to verify
all dimensions and details of this layout and to properly integrate
this drawing with the latest construction drawings in order to ensure
safe and accurate completion of the overall project objectives.
3) The customer bears the sole responsibility for ensuring that any
erection or use of the goods shown on these drawings confirms to
all laws, ordinances, local codes, state codes, and the Federal
Occupational Safety & Health Administration (OSHA) and project
specifications and for checking the accuracy of field details and
dimensions.
4) Do NOT use design pressures in excess of 2000 psf or 150 x
height of fresh concrete in forms, whichever is less. REFER to
chart in Ellis Technical Instructional Manual.
5) Assembly locks at outside and inside corners are required per
joint. 4’high: 2 locks, 8’ high: 3 locks, 12’ high: 5 locks. Above 12’
high: 1 assembly lock per 1’−6" in height, above 16’ high: 1
assembly lock per 1’−0" in height for first 8’ then 1’−6" o.c. For
height exceeding 16’ refer to the Ellis Technical Instructional
Manual.
41
N.T.S.
MANHATTAN
I−35 & LINDSEY BRIDGE "A"
NORMAN, OK.
08/17/16 XXXXX
A
S2
NORTH PIER #1 PLAN
BRIDGE "A"
B
S2
NORTH PIER #1 ELEVATION
BRIDGE "A"
8’X12’PANEL
4’X8’ PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL2’−6"PANEL
AR250
4’ FORM
4’ FORM
AR250
PIER COLUMN TYP. SECTION
BRIDGE "A"
8’FORM
8’FORM
2’FORM
2’FORM
AR180
AR180
PROJECT:
LOCATION:
AIC = ARTICULATED INSIDE CORNER
AOC = ARTICULATED OUTSIDE CORNER
AR = ALIGNMENT RAIL (4" DBL BOX TUBE)
BAR = BRACE AS REQUIRED (BY CONT'R)
BLK = BULKHEAD AS REQUIRED (BY CONT'R)
BO = BOX OUT AS REQUIRED (BY CONTR'R)
BOF = BOTTOM OF FORM
CB = CORNER BRACKET
CS = CROSS STIFFENER
EJ = EXPANSION JOINT
F = FILLER BUILT BY CONT'R
FN = FLANGE NUT 100
FS = FLANGE SCREW (7")
H = HORIZINTAL
IC = INSIDE CORNER
ISC = INSIDE STRIPPING CORNER
IU = INNER UNIT (20mm ROD)
JBF = JOB BUILT FILLER BY CONTRACTOR
MPP = MULTI-PURPOSE PANEL
NTS = NOT TO SCALE
OCA = OUTSIDE CORNER ANGLE
P = PANEL
PFA = PIPE FORM ALIGNER
PB = POUR BREAK
SCB = SCAFFOLD BRACKET
SHB = SHE BOLT
S/P = STEEL PLY
TOC = TOP OF CONCRETE
TOF = TOP OF FORM
TT = TAPER TIE
FAX:(405) 755−1142PH:(405) 751−0880
Oklahoma City, Ok. 73114
12409 HOLMBOE AVE.
Construction Specialties, Ltd.
WEB: www.ellisforms.com
CONTRACTOR:
Pour height, Pour rate, Temperature, use of superplactizers and
retarding admixtures significantly affect the actual concrete
pressure.
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOADS
AND APPROVE DWG. IF THERE ARE ANY DISCREPENCIES, IT IS THE
CONTRACTOR’S RESPONSIBILTY TO NOTIFY ELLIS CONSTRUCTION
SPECIALTIES BEFORE SHIPMENT OF MATERIAL.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONTRACTOR APPROVAL
PRELIMINARY DETAILS ONLY − NOT FOR CONSTRUCTION
ISSUED FOR INFORMATION PURPOSES ONLY
DRAWING STATUS
1) Deviation in whole or part from this drawing and these general
notes shall relieve Ellis Construction Specialties of responsibility,
liability, and claim attributable to such deviation.
2) This drawing is provided as an aid in illustrating proper erection
of equipment only. It is the responsibility of the contractor to verify
all dimensions and details of this layout and to properly integrate
this drawing with the latest construction drawings in order to ensure
safe and accurate completion of the overall project objectives.
3) The customer bears the sole responsibility for ensuring that any
erection or use of the goods shown on these drawings confirms to
all laws, ordinances, local codes, state codes, and the Federal
Occupational Safety & Health Administration (OSHA) and project
specifications and for checking the accuracy of field details and
dimensions.
4) Do NOT use design pressures in excess of 2000 psf or 150 x
height of fresh concrete in forms, whichever is less. REFER to
chart in Ellis Technical Instructional Manual.
5) Assembly locks at outside and inside corners are required per
joint. 4’high: 2 locks, 8’ high: 3 locks, 12’ high: 5 locks. Above 12’
high: 1 assembly lock per 1’−6" in height, above 16’ high: 1
assembly lock per 1’−0" in height for first 8’ then 1’−6" o.c. For
height exceeding 16’ refer to the Ellis Technical Instructional
Manual.
42
N.T.S.
MANHATTAN
I−35 & LINDSEY BRIDGE "A"
NORMAN, OK.
08/17/16 XXXXX
A
S3
NORTH PIER #2 PLAN
BRIDGE "A"
B
S3
NORTH PIER #2 ELEVATION
BRIDGE "A"
8’X12’PANEL
8’X12’PANEL
2’−6"PANEL
8’X12’PANEL2’−6"PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
4’X8’ PANEL
AR180
AR250
4’ FORM
4’ FORM
AR250
PIER COLUMN TYP. SECTION
BRIDGE "A"
8’FORM
8’FORM
2’FORM
2’FORM
AR180
AR180
PROJECT:
LOCATION:
AIC = ARTICULATED INSIDE CORNER
AOC = ARTICULATED OUTSIDE CORNER
AR = ALIGNMENT RAIL (4" DBL BOX TUBE)
BAR = BRACE AS REQUIRED (BY CONT'R)
BLK = BULKHEAD AS REQUIRED (BY CONT'R)
BO = BOX OUT AS REQUIRED (BY CONTR'R)
BOF = BOTTOM OF FORM
CB = CORNER BRACKET
CS = CROSS STIFFENER
EJ = EXPANSION JOINT
F = FILLER BUILT BY CONT'R
FN = FLANGE NUT 100
FS = FLANGE SCREW (7")
H = HORIZINTAL
IC = INSIDE CORNER
ISC = INSIDE STRIPPING CORNER
IU = INNER UNIT (20mm ROD)
JBF = JOB BUILT FILLER BY CONTRACTOR
MPP = MULTI-PURPOSE PANEL
NTS = NOT TO SCALE
OCA = OUTSIDE CORNER ANGLE
P = PANEL
PFA = PIPE FORM ALIGNER
PB = POUR BREAK
SCB = SCAFFOLD BRACKET
SHB = SHE BOLT
S/P = STEEL PLY
TOC = TOP OF CONCRETE
TOF = TOP OF FORM
TT = TAPER TIE
FAX:(405) 755−1142PH:(405) 751−0880
Oklahoma City, Ok. 73114
12409 HOLMBOE AVE.
Construction Specialties, Ltd.
WEB: www.ellisforms.com
CONTRACTOR:
Pour height, Pour rate, Temperature, use of superplactizers and
retarding admixtures significantly affect the actual concrete
pressure.
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOADS
AND APPROVE DWG. IF THERE ARE ANY DISCREPENCIES, IT IS THE
CONTRACTOR’S RESPONSIBILTY TO NOTIFY ELLIS CONSTRUCTION
SPECIALTIES BEFORE SHIPMENT OF MATERIAL.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONTRACTOR APPROVAL
PRELIMINARY DETAILS ONLY − NOT FOR CONSTRUCTION
ISSUED FOR INFORMATION PURPOSES ONLY
DRAWING STATUS
1) Deviation in whole or part from this drawing and these general
notes shall relieve Ellis Construction Specialties of responsibility,
liability, and claim attributable to such deviation.
2) This drawing is provided as an aid in illustrating proper erection
of equipment only. It is the responsibility of the contractor to verify
all dimensions and details of this layout and to properly integrate
this drawing with the latest construction drawings in order to ensure
safe and accurate completion of the overall project objectives.
3) The customer bears the sole responsibility for ensuring that any
erection or use of the goods shown on these drawings confirms to
all laws, ordinances, local codes, state codes, and the Federal
Occupational Safety & Health Administration (OSHA) and project
specifications and for checking the accuracy of field details and
dimensions.
4) Do NOT use design pressures in excess of 2000 psf or 150 x
height of fresh concrete in forms, whichever is less. REFER to
chart in Ellis Technical Instructional Manual.
5) Assembly locks at outside and inside corners are required per
joint. 4’high: 2 locks, 8’ high: 3 locks, 12’ high: 5 locks. Above 12’
high: 1 assembly lock per 1’−6" in height, above 16’ high: 1
assembly lock per 1’−0" in height for first 8’ then 1’−6" o.c. For
height exceeding 16’ refer to the Ellis Technical Instructional
Manual.
43
N.T.S.
MANHATTAN
I−35 & LINDSEY BRIDGE "A"
NORMAN, OK.
08/17/16 XXXXX
A
S4
NORTH PIER #3 PLAN
BRIDGE "A"
B
S4
NORTH PIER #3 ELEVATION
BRIDGE "A"
8’X12’PANEL
4’X8’ PANEL
2’−6"PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
8’X12’PANEL
4’ FORM
4’ FORM
AR250
AR250
PIER COLUMN TYP. SECTION
BRIDGE "A"
8’FORM
8’FORM
2’FORM
2’FORM
AR180
AR180
PROJECT:
LOCATION:
AIC = ARTICULATED INSIDE CORNER
AOC = ARTICULATED OUTSIDE CORNER
AR = ALIGNMENT RAIL (4" DBL BOX TUBE)
BAR = BRACE AS REQUIRED (BY CONT'R)
BLK = BULKHEAD AS REQUIRED (BY CONT'R)
BO = BOX OUT AS REQUIRED (BY CONTR'R)
BOF = BOTTOM OF FORM
CB = CORNER BRACKET
CS = CROSS STIFFENER
EJ = EXPANSION JOINT
F = FILLER BUILT BY CONT'R
FN = FLANGE NUT 100
FS = FLANGE SCREW (7")
H = HORIZINTAL
IC = INSIDE CORNER
ISC = INSIDE STRIPPING CORNER
IU = INNER UNIT (20mm ROD)
JBF = JOB BUILT FILLER BY CONTRACTOR
MPP = MULTI-PURPOSE PANEL
NTS = NOT TO SCALE
OCA = OUTSIDE CORNER ANGLE
P = PANEL
PFA = PIPE FORM ALIGNER
PB = POUR BREAK
SCB = SCAFFOLD BRACKET
SHB = SHE BOLT
S/P = STEEL PLY
TOC = TOP OF CONCRETE
TOF = TOP OF FORM
TT = TAPER TIE
FAX:(405) 755−1142PH:(405) 751−0880
Oklahoma City, Ok. 73114
12409 HOLMBOE AVE.
Construction Specialties, Ltd.
WEB: www.ellisforms.com
CONTRACTOR:
Pour height, Pour rate, Temperature, use of superplactizers and
retarding admixtures significantly affect the actual concrete
pressure.
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOADS
AND APPROVE DWG. IF THERE ARE ANY DISCREPENCIES, IT IS THE
CONTRACTOR’S RESPONSIBILTY TO NOTIFY ELLIS CONSTRUCTION
SPECIALTIES BEFORE SHIPMENT OF MATERIAL.
ISSUED FOR CONSTRUCTION
ISSUED FOR CONTRACTOR APPROVAL
PRELIMINARY DETAILS ONLY − NOT FOR CONSTRUCTION
ISSUED FOR INFORMATION PURPOSES ONLY
DRAWING STATUS
1) Deviation in whole or part from this drawing and these general
notes shall relieve Ellis Construction Specialties of responsibility,
liability, and claim attributable to such deviation.
2) This drawing is provided as an aid in illustrating proper erection
of equipment only. It is the responsibility of the contractor to verify
all dimensions and details of this layout and to properly integrate
this drawing with the latest construction drawings in order to ensure
safe and accurate completion of the overall project objectives.
3) The customer bears the sole responsibility for ensuring that any
erection or use of the goods shown on these drawings confirms to
all laws, ordinances, local codes, state codes, and the Federal
Occupational Safety & Health Administration (OSHA) and project
specifications and for checking the accuracy of field details and
dimensions.
4) Do NOT use design pressures in excess of 2000 psf or 150 x
height of fresh concrete in forms, whichever is less. REFER to
chart in Ellis Technical Instructional Manual.
5) Assembly locks at outside and inside corners are required per
joint. 4’high: 2 locks, 8’ high: 3 locks, 12’ high: 5 locks. Above 12’
high: 1 assembly lock per 1’−6" in height, above 16’ high: 1
assembly lock per 1’−0" in height for first 8’ then 1’−6" o.c. For
height exceeding 16’ refer to the Ellis Technical Instructional
Manual.
44
N.T.S.
MANHATTAN
I−35 & LINDSEY BRIDGE "A"
NORMAN, OK.
08/17/16 XXXXX

More Related Content

What's hot

Linked In Portfolio Presentation - Residential- wspecs
Linked In Portfolio Presentation - Residential- wspecsLinked In Portfolio Presentation - Residential- wspecs
Linked In Portfolio Presentation - Residential- wspecs
Claire Gudmanz
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson House
Grant Hepburn
 
sem 2.5 measured drawings
sem 2.5 measured drawingssem 2.5 measured drawings
sem 2.5 measured drawings
YeeQun
 
Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)
Sean Roper
 
Irranaitivu R.C.T.M.S-Drawing file (Ori)_NoCopy
Irranaitivu R.C.T.M.S-Drawing file (Ori)_NoCopyIrranaitivu R.C.T.M.S-Drawing file (Ori)_NoCopy
Irranaitivu R.C.T.M.S-Drawing file (Ori)_NoCopy
Vj NiroSh
 
Dick Smith
Dick SmithDick Smith
Dick Smith
Mike Darwich
 
Demo Mansion sheet plans
Demo Mansion sheet plansDemo Mansion sheet plans
Demo Mansion sheet plans
Miguel Zamarripa
 
Doors winodws toilets
Doors winodws toiletsDoors winodws toilets
Doors winodws toilets
Bhagya Silva
 
Senior Capstone Project - Aegir Olsen
Senior Capstone Project - Aegir OlsenSenior Capstone Project - Aegir Olsen
Senior Capstone Project - Aegir Olsen
Aegir Olsen
 
KASSIN GYM
KASSIN GYMKASSIN GYM
KASSIN GYM
Sean Roper
 
15-106 3
15-106 315-106 3
15-106 3
Paul Roberts
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
Jan Malesela
 
( DOOR TYPE-08)
( DOOR TYPE-08)( DOOR TYPE-08)
( DOOR TYPE-08)
SAEED alam
 
portfolio june 24 finished portfolio
portfolio june 24 finished portfolioportfolio june 24 finished portfolio
portfolio june 24 finished portfolio
Andrew Johnson
 
W1125 B THIRD FLOOR
W1125 B THIRD FLOORW1125 B THIRD FLOOR
W1125 B THIRD FLOOR
Simon Brooks
 

What's hot (15)

Linked In Portfolio Presentation - Residential- wspecs
Linked In Portfolio Presentation - Residential- wspecsLinked In Portfolio Presentation - Residential- wspecs
Linked In Portfolio Presentation - Residential- wspecs
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson House
 
sem 2.5 measured drawings
sem 2.5 measured drawingssem 2.5 measured drawings
sem 2.5 measured drawings
 
Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)Kassin (Sean Portfolio Set)
Kassin (Sean Portfolio Set)
 
Irranaitivu R.C.T.M.S-Drawing file (Ori)_NoCopy
Irranaitivu R.C.T.M.S-Drawing file (Ori)_NoCopyIrranaitivu R.C.T.M.S-Drawing file (Ori)_NoCopy
Irranaitivu R.C.T.M.S-Drawing file (Ori)_NoCopy
 
Dick Smith
Dick SmithDick Smith
Dick Smith
 
Demo Mansion sheet plans
Demo Mansion sheet plansDemo Mansion sheet plans
Demo Mansion sheet plans
 
Doors winodws toilets
Doors winodws toiletsDoors winodws toilets
Doors winodws toilets
 
Senior Capstone Project - Aegir Olsen
Senior Capstone Project - Aegir OlsenSenior Capstone Project - Aegir Olsen
Senior Capstone Project - Aegir Olsen
 
KASSIN GYM
KASSIN GYMKASSIN GYM
KASSIN GYM
 
15-106 3
15-106 315-106 3
15-106 3
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
( DOOR TYPE-08)
( DOOR TYPE-08)( DOOR TYPE-08)
( DOOR TYPE-08)
 
portfolio june 24 finished portfolio
portfolio june 24 finished portfolioportfolio june 24 finished portfolio
portfolio june 24 finished portfolio
 
W1125 B THIRD FLOOR
W1125 B THIRD FLOORW1125 B THIRD FLOOR
W1125 B THIRD FLOOR
 

Viewers also liked

Revista Cultura Catarina
Revista Cultura CatarinaRevista Cultura Catarina
Revista Cultura Catarina
Adriana Calazans
 
CV-EN
CV-ENCV-EN
Eurooppalaiset verkkosäännöt markkinasäännöt
Eurooppalaiset verkkosäännöt    markkinasäännötEurooppalaiset verkkosäännöt    markkinasäännöt
Eurooppalaiset verkkosäännöt markkinasäännöt
Fingrid Oyj
 
Colorado custom iron works ppt
Colorado custom iron works pptColorado custom iron works ppt
Colorado custom iron works ppt
ColoradoCustomIron
 
Product Brochure: Top 5 Country B2C E-Commerce Sales Forecasts: 2016 to 2020
Product Brochure: Top 5 Country B2C E-Commerce Sales Forecasts: 2016 to 2020Product Brochure: Top 5 Country B2C E-Commerce Sales Forecasts: 2016 to 2020
Product Brochure: Top 5 Country B2C E-Commerce Sales Forecasts: 2016 to 2020
yStats.com
 
Eurooppalaiset verkkosäännöt yleistä
Eurooppalaiset verkkosäännöt   yleistäEurooppalaiset verkkosäännöt   yleistä
Eurooppalaiset verkkosäännöt yleistä
Fingrid Oyj
 
Millwright
MillwrightMillwright
Millwright
Moyeedul Haque
 
Use of IoT in increasing opeartional efficiency in manufacturing plants- a ca...
Use of IoT in increasing opeartional efficiency in manufacturing plants- a ca...Use of IoT in increasing opeartional efficiency in manufacturing plants- a ca...
Use of IoT in increasing opeartional efficiency in manufacturing plants- a ca...
Manish Saxena
 
3 lengte en breetelyne
3 lengte en breetelyne3 lengte en breetelyne
3 lengte en breetelyne
Vickey De Jager
 
Johtajalla kasvun paikka: Jukka Ruusunen
Johtajalla kasvun paikka: Jukka RuusunenJohtajalla kasvun paikka: Jukka Ruusunen
Johtajalla kasvun paikka: Jukka Ruusunen
Fingrid Oyj
 
презентация изготовления пирожков
презентация изготовления пирожковпрезентация изготовления пирожков
презентация изготовления пирожков
FoodRussiaSchool
 
Talven tehotilanne - hiilitiedon seminaari 2016
Talven tehotilanne - hiilitiedon seminaari 2016Talven tehotilanne - hiilitiedon seminaari 2016
Talven tehotilanne - hiilitiedon seminaari 2016
Fingrid Oyj
 
Role of amyloidosis in dementia for animals
Role of amyloidosis in dementia  for animalsRole of amyloidosis in dementia  for animals
Role of amyloidosis in dementia for animals
Md Fayezur Rahaman
 
Eurofound and the International Labour Office (2017)
Eurofound and the International Labour Office (2017)Eurofound and the International Labour Office (2017)
Eurofound and the International Labour Office (2017)
Alberto Segalini
 

Viewers also liked (14)

Revista Cultura Catarina
Revista Cultura CatarinaRevista Cultura Catarina
Revista Cultura Catarina
 
CV-EN
CV-ENCV-EN
CV-EN
 
Eurooppalaiset verkkosäännöt markkinasäännöt
Eurooppalaiset verkkosäännöt    markkinasäännötEurooppalaiset verkkosäännöt    markkinasäännöt
Eurooppalaiset verkkosäännöt markkinasäännöt
 
Colorado custom iron works ppt
Colorado custom iron works pptColorado custom iron works ppt
Colorado custom iron works ppt
 
Product Brochure: Top 5 Country B2C E-Commerce Sales Forecasts: 2016 to 2020
Product Brochure: Top 5 Country B2C E-Commerce Sales Forecasts: 2016 to 2020Product Brochure: Top 5 Country B2C E-Commerce Sales Forecasts: 2016 to 2020
Product Brochure: Top 5 Country B2C E-Commerce Sales Forecasts: 2016 to 2020
 
Eurooppalaiset verkkosäännöt yleistä
Eurooppalaiset verkkosäännöt   yleistäEurooppalaiset verkkosäännöt   yleistä
Eurooppalaiset verkkosäännöt yleistä
 
Millwright
MillwrightMillwright
Millwright
 
Use of IoT in increasing opeartional efficiency in manufacturing plants- a ca...
Use of IoT in increasing opeartional efficiency in manufacturing plants- a ca...Use of IoT in increasing opeartional efficiency in manufacturing plants- a ca...
Use of IoT in increasing opeartional efficiency in manufacturing plants- a ca...
 
3 lengte en breetelyne
3 lengte en breetelyne3 lengte en breetelyne
3 lengte en breetelyne
 
Johtajalla kasvun paikka: Jukka Ruusunen
Johtajalla kasvun paikka: Jukka RuusunenJohtajalla kasvun paikka: Jukka Ruusunen
Johtajalla kasvun paikka: Jukka Ruusunen
 
презентация изготовления пирожков
презентация изготовления пирожковпрезентация изготовления пирожков
презентация изготовления пирожков
 
Talven tehotilanne - hiilitiedon seminaari 2016
Talven tehotilanne - hiilitiedon seminaari 2016Talven tehotilanne - hiilitiedon seminaari 2016
Talven tehotilanne - hiilitiedon seminaari 2016
 
Role of amyloidosis in dementia for animals
Role of amyloidosis in dementia  for animalsRole of amyloidosis in dementia  for animals
Role of amyloidosis in dementia for animals
 
Eurofound and the International Labour Office (2017)
Eurofound and the International Labour Office (2017)Eurofound and the International Labour Office (2017)
Eurofound and the International Labour Office (2017)
 

Similar to I-35 & Lindsey Bridge_A_Piers & Caps

Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014
Martin Pauly
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
Min Khant Kyaw
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
Min Khant Kyaw
 
NB1C ANCHOR FLANGE
NB1C ANCHOR FLANGE NB1C ANCHOR FLANGE
NB1C ANCHOR FLANGE
SEO Consultant
 
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings
Todd Mordoh
 
DNB36DWDWB36SB3621SB
DNB36DWDWB36SB3621SBDNB36DWDWB36SB3621SB
DNB36DWDWB36SB3621SB
clayrhr
 
Model 301 instr_inst_maint_manual_103_0007_rev06_10
Model 301 instr_inst_maint_manual_103_0007_rev06_10Model 301 instr_inst_maint_manual_103_0007_rev06_10
Model 301 instr_inst_maint_manual_103_0007_rev06_10
Edwards Verdolini Jr
 
131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE
Lee Yung Anchor
 
TOWER AS BUILT 5 FEB 15
TOWER AS BUILT 5 FEB 15TOWER AS BUILT 5 FEB 15
TOWER AS BUILT 5 FEB 15
Matthew Shaffer
 
Renn CAD samples 2020
Renn CAD samples 2020Renn CAD samples 2020
Renn CAD samples 2020
David Renn
 
FrameWRX Installation Instructions
FrameWRX Installation InstructionsFrameWRX Installation Instructions
FrameWRX Installation Instructions
Installation Manuals - Southwest Solutions Group
 
Section 4 tower-volume-ii_6
Section 4 tower-volume-ii_6Section 4 tower-volume-ii_6
Section 4 tower-volume-ii_6
BUDDHADEV KORA
 
JVC AX-V8000
JVC AX-V8000JVC AX-V8000
JVC AX-V8000
egocentrico22
 
Quad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation GuideQuad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation Guide
Western-Building-Center
 
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
Altamash Khan
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
Yolanda Sewpersad
 
Cad samples
Cad samplesCad samples
Cad samples
Wuillian Medrano
 
Telescopic poles nea
Telescopic poles  neaTelescopic poles  nea
Telescopic poles nea
kapil pudasaini
 
SAMPLE PORTFOLIO
SAMPLE PORTFOLIOSAMPLE PORTFOLIO
SAMPLE PORTFOLIO
Dillon Clarke
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questions
Karthik Banari
 

Similar to I-35 & Lindsey Bridge_A_Piers & Caps (20)

Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
 
NB1C ANCHOR FLANGE
NB1C ANCHOR FLANGE NB1C ANCHOR FLANGE
NB1C ANCHOR FLANGE
 
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings
 
DNB36DWDWB36SB3621SB
DNB36DWDWB36SB3621SBDNB36DWDWB36SB3621SB
DNB36DWDWB36SB3621SB
 
Model 301 instr_inst_maint_manual_103_0007_rev06_10
Model 301 instr_inst_maint_manual_103_0007_rev06_10Model 301 instr_inst_maint_manual_103_0007_rev06_10
Model 301 instr_inst_maint_manual_103_0007_rev06_10
 
131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE
 
TOWER AS BUILT 5 FEB 15
TOWER AS BUILT 5 FEB 15TOWER AS BUILT 5 FEB 15
TOWER AS BUILT 5 FEB 15
 
Renn CAD samples 2020
Renn CAD samples 2020Renn CAD samples 2020
Renn CAD samples 2020
 
FrameWRX Installation Instructions
FrameWRX Installation InstructionsFrameWRX Installation Instructions
FrameWRX Installation Instructions
 
Section 4 tower-volume-ii_6
Section 4 tower-volume-ii_6Section 4 tower-volume-ii_6
Section 4 tower-volume-ii_6
 
JVC AX-V8000
JVC AX-V8000JVC AX-V8000
JVC AX-V8000
 
Quad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation GuideQuad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation Guide
 
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
Cad samples
Cad samplesCad samples
Cad samples
 
Telescopic poles nea
Telescopic poles  neaTelescopic poles  nea
Telescopic poles nea
 
SAMPLE PORTFOLIO
SAMPLE PORTFOLIOSAMPLE PORTFOLIO
SAMPLE PORTFOLIO
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questions
 

I-35 & Lindsey Bridge_A_Piers & Caps

  • 1. C S1 NORTH PIER #3 ELEVATION BRIDGE "A" A S1 NORTH PIER #1 ELEVATION BRIDGE "A" 8’X12’ PANEL 8’X12’ PANEL 4’X8’PANEL 4’X8’PANEL2’−6"PANEL AR250 AR250 AR250 B S1 PIER COLUMN #2 ELEVATION BRIDGE "A" 8’X12’ PANEL8’X12’ PANEL 4’X8’PANEL 4’X8’PANEL2’−6"PANEL AR250 AR250 AR250 8’X12’ PANEL 4’X8’PANEL AR250 8’X12’ PANEL 4’X8’PANEL AR250 AR250 8’X12’ PANEL 4’X8’PANEL AR250 8’X12’ PANEL 4’X8’PANEL AR250 AR250 8’X12’ PANEL 4’X8’PANEL 8’X12’ PANEL 4’X8’PANEL AR250 AR250 AR250 8’X12’ PANEL 4’X8’PANEL AR250 8’X12’ PANEL 4’X8’PANEL AR250 AR250 8’X12’ PANEL 4’X8’PANEL AR250 8’X12’ PANEL 4’X8’PANEL AR250 AR250 8’ FORM 8’ FORM 8’ FORM 8’ FORM D S1 PIER COLUMN FORM PLAN TYP. BRIDGE "A" AR250 AR250 PROJECT: LOCATION: AIC = ARTICULATED INSIDE CORNER AOC = ARTICULATED OUTSIDE CORNER AR = ALIGNMENT RAIL (4" DBL BOX TUBE) BAR = BRACE AS REQUIRED (BY CONT'R) BLK = BULKHEAD AS REQUIRED (BY CONT'R) BO = BOX OUT AS REQUIRED (BY CONTR'R) BOF = BOTTOM OF FORM CB = CORNER BRACKET CS = CROSS STIFFENER EJ = EXPANSION JOINT F = FILLER BUILT BY CONT'R FN = FLANGE NUT 100 FS = FLANGE SCREW (7") H = HORIZINTAL IC = INSIDE CORNER ISC = INSIDE STRIPPING CORNER IU = INNER UNIT (20mm ROD) JBF = JOB BUILT FILLER BY CONTRACTOR MPP = MULTI-PURPOSE PANEL NTS = NOT TO SCALE OCA = OUTSIDE CORNER ANGLE P = PANEL PFA = PIPE FORM ALIGNER PB = POUR BREAK SCB = SCAFFOLD BRACKET SHB = SHE BOLT S/P = STEEL PLY TOC = TOP OF CONCRETE TOF = TOP OF FORM TT = TAPER TIE FAX:(405) 755−1142PH:(405) 751−0880 Oklahoma City, Ok. 73114 12409 HOLMBOE AVE. Construction Specialties, Ltd. WEB: www.ellisforms.com CONTRACTOR: Pour height, Pour rate, Temperature, use of superplactizers and retarding admixtures significantly affect the actual concrete pressure. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOADS AND APPROVE DWG. IF THERE ARE ANY DISCREPENCIES, IT IS THE CONTRACTOR’S RESPONSIBILTY TO NOTIFY ELLIS CONSTRUCTION SPECIALTIES BEFORE SHIPMENT OF MATERIAL. ISSUED FOR CONSTRUCTION ISSUED FOR CONTRACTOR APPROVAL PRELIMINARY DETAILS ONLY − NOT FOR CONSTRUCTION ISSUED FOR INFORMATION PURPOSES ONLY DRAWING STATUS 1) Deviation in whole or part from this drawing and these general notes shall relieve Ellis Construction Specialties of responsibility, liability, and claim attributable to such deviation. 2) This drawing is provided as an aid in illustrating proper erection of equipment only. It is the responsibility of the contractor to verify all dimensions and details of this layout and to properly integrate this drawing with the latest construction drawings in order to ensure safe and accurate completion of the overall project objectives. 3) The customer bears the sole responsibility for ensuring that any erection or use of the goods shown on these drawings confirms to all laws, ordinances, local codes, state codes, and the Federal Occupational Safety & Health Administration (OSHA) and project specifications and for checking the accuracy of field details and dimensions. 4) Do NOT use design pressures in excess of 2000 psf or 150 x height of fresh concrete in forms, whichever is less. REFER to chart in Ellis Technical Instructional Manual. 5) Assembly locks at outside and inside corners are required per joint. 4’high: 2 locks, 8’ high: 3 locks, 12’ high: 5 locks. Above 12’ high: 1 assembly lock per 1’−6" in height, above 16’ high: 1 assembly lock per 1’−0" in height for first 8’ then 1’−6" o.c. For height exceeding 16’ refer to the Ellis Technical Instructional Manual. 41 N.T.S. MANHATTAN I−35 & LINDSEY BRIDGE "A" NORMAN, OK. 08/17/16 XXXXX
  • 2. A S2 NORTH PIER #1 PLAN BRIDGE "A" B S2 NORTH PIER #1 ELEVATION BRIDGE "A" 8’X12’PANEL 4’X8’ PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL2’−6"PANEL AR250 4’ FORM 4’ FORM AR250 PIER COLUMN TYP. SECTION BRIDGE "A" 8’FORM 8’FORM 2’FORM 2’FORM AR180 AR180 PROJECT: LOCATION: AIC = ARTICULATED INSIDE CORNER AOC = ARTICULATED OUTSIDE CORNER AR = ALIGNMENT RAIL (4" DBL BOX TUBE) BAR = BRACE AS REQUIRED (BY CONT'R) BLK = BULKHEAD AS REQUIRED (BY CONT'R) BO = BOX OUT AS REQUIRED (BY CONTR'R) BOF = BOTTOM OF FORM CB = CORNER BRACKET CS = CROSS STIFFENER EJ = EXPANSION JOINT F = FILLER BUILT BY CONT'R FN = FLANGE NUT 100 FS = FLANGE SCREW (7") H = HORIZINTAL IC = INSIDE CORNER ISC = INSIDE STRIPPING CORNER IU = INNER UNIT (20mm ROD) JBF = JOB BUILT FILLER BY CONTRACTOR MPP = MULTI-PURPOSE PANEL NTS = NOT TO SCALE OCA = OUTSIDE CORNER ANGLE P = PANEL PFA = PIPE FORM ALIGNER PB = POUR BREAK SCB = SCAFFOLD BRACKET SHB = SHE BOLT S/P = STEEL PLY TOC = TOP OF CONCRETE TOF = TOP OF FORM TT = TAPER TIE FAX:(405) 755−1142PH:(405) 751−0880 Oklahoma City, Ok. 73114 12409 HOLMBOE AVE. Construction Specialties, Ltd. WEB: www.ellisforms.com CONTRACTOR: Pour height, Pour rate, Temperature, use of superplactizers and retarding admixtures significantly affect the actual concrete pressure. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOADS AND APPROVE DWG. IF THERE ARE ANY DISCREPENCIES, IT IS THE CONTRACTOR’S RESPONSIBILTY TO NOTIFY ELLIS CONSTRUCTION SPECIALTIES BEFORE SHIPMENT OF MATERIAL. ISSUED FOR CONSTRUCTION ISSUED FOR CONTRACTOR APPROVAL PRELIMINARY DETAILS ONLY − NOT FOR CONSTRUCTION ISSUED FOR INFORMATION PURPOSES ONLY DRAWING STATUS 1) Deviation in whole or part from this drawing and these general notes shall relieve Ellis Construction Specialties of responsibility, liability, and claim attributable to such deviation. 2) This drawing is provided as an aid in illustrating proper erection of equipment only. It is the responsibility of the contractor to verify all dimensions and details of this layout and to properly integrate this drawing with the latest construction drawings in order to ensure safe and accurate completion of the overall project objectives. 3) The customer bears the sole responsibility for ensuring that any erection or use of the goods shown on these drawings confirms to all laws, ordinances, local codes, state codes, and the Federal Occupational Safety & Health Administration (OSHA) and project specifications and for checking the accuracy of field details and dimensions. 4) Do NOT use design pressures in excess of 2000 psf or 150 x height of fresh concrete in forms, whichever is less. REFER to chart in Ellis Technical Instructional Manual. 5) Assembly locks at outside and inside corners are required per joint. 4’high: 2 locks, 8’ high: 3 locks, 12’ high: 5 locks. Above 12’ high: 1 assembly lock per 1’−6" in height, above 16’ high: 1 assembly lock per 1’−0" in height for first 8’ then 1’−6" o.c. For height exceeding 16’ refer to the Ellis Technical Instructional Manual. 42 N.T.S. MANHATTAN I−35 & LINDSEY BRIDGE "A" NORMAN, OK. 08/17/16 XXXXX
  • 3. A S3 NORTH PIER #2 PLAN BRIDGE "A" B S3 NORTH PIER #2 ELEVATION BRIDGE "A" 8’X12’PANEL 8’X12’PANEL 2’−6"PANEL 8’X12’PANEL2’−6"PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 4’X8’ PANEL AR180 AR250 4’ FORM 4’ FORM AR250 PIER COLUMN TYP. SECTION BRIDGE "A" 8’FORM 8’FORM 2’FORM 2’FORM AR180 AR180 PROJECT: LOCATION: AIC = ARTICULATED INSIDE CORNER AOC = ARTICULATED OUTSIDE CORNER AR = ALIGNMENT RAIL (4" DBL BOX TUBE) BAR = BRACE AS REQUIRED (BY CONT'R) BLK = BULKHEAD AS REQUIRED (BY CONT'R) BO = BOX OUT AS REQUIRED (BY CONTR'R) BOF = BOTTOM OF FORM CB = CORNER BRACKET CS = CROSS STIFFENER EJ = EXPANSION JOINT F = FILLER BUILT BY CONT'R FN = FLANGE NUT 100 FS = FLANGE SCREW (7") H = HORIZINTAL IC = INSIDE CORNER ISC = INSIDE STRIPPING CORNER IU = INNER UNIT (20mm ROD) JBF = JOB BUILT FILLER BY CONTRACTOR MPP = MULTI-PURPOSE PANEL NTS = NOT TO SCALE OCA = OUTSIDE CORNER ANGLE P = PANEL PFA = PIPE FORM ALIGNER PB = POUR BREAK SCB = SCAFFOLD BRACKET SHB = SHE BOLT S/P = STEEL PLY TOC = TOP OF CONCRETE TOF = TOP OF FORM TT = TAPER TIE FAX:(405) 755−1142PH:(405) 751−0880 Oklahoma City, Ok. 73114 12409 HOLMBOE AVE. Construction Specialties, Ltd. WEB: www.ellisforms.com CONTRACTOR: Pour height, Pour rate, Temperature, use of superplactizers and retarding admixtures significantly affect the actual concrete pressure. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOADS AND APPROVE DWG. IF THERE ARE ANY DISCREPENCIES, IT IS THE CONTRACTOR’S RESPONSIBILTY TO NOTIFY ELLIS CONSTRUCTION SPECIALTIES BEFORE SHIPMENT OF MATERIAL. ISSUED FOR CONSTRUCTION ISSUED FOR CONTRACTOR APPROVAL PRELIMINARY DETAILS ONLY − NOT FOR CONSTRUCTION ISSUED FOR INFORMATION PURPOSES ONLY DRAWING STATUS 1) Deviation in whole or part from this drawing and these general notes shall relieve Ellis Construction Specialties of responsibility, liability, and claim attributable to such deviation. 2) This drawing is provided as an aid in illustrating proper erection of equipment only. It is the responsibility of the contractor to verify all dimensions and details of this layout and to properly integrate this drawing with the latest construction drawings in order to ensure safe and accurate completion of the overall project objectives. 3) The customer bears the sole responsibility for ensuring that any erection or use of the goods shown on these drawings confirms to all laws, ordinances, local codes, state codes, and the Federal Occupational Safety & Health Administration (OSHA) and project specifications and for checking the accuracy of field details and dimensions. 4) Do NOT use design pressures in excess of 2000 psf or 150 x height of fresh concrete in forms, whichever is less. REFER to chart in Ellis Technical Instructional Manual. 5) Assembly locks at outside and inside corners are required per joint. 4’high: 2 locks, 8’ high: 3 locks, 12’ high: 5 locks. Above 12’ high: 1 assembly lock per 1’−6" in height, above 16’ high: 1 assembly lock per 1’−0" in height for first 8’ then 1’−6" o.c. For height exceeding 16’ refer to the Ellis Technical Instructional Manual. 43 N.T.S. MANHATTAN I−35 & LINDSEY BRIDGE "A" NORMAN, OK. 08/17/16 XXXXX
  • 4. A S4 NORTH PIER #3 PLAN BRIDGE "A" B S4 NORTH PIER #3 ELEVATION BRIDGE "A" 8’X12’PANEL 4’X8’ PANEL 2’−6"PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 8’X12’PANEL 4’ FORM 4’ FORM AR250 AR250 PIER COLUMN TYP. SECTION BRIDGE "A" 8’FORM 8’FORM 2’FORM 2’FORM AR180 AR180 PROJECT: LOCATION: AIC = ARTICULATED INSIDE CORNER AOC = ARTICULATED OUTSIDE CORNER AR = ALIGNMENT RAIL (4" DBL BOX TUBE) BAR = BRACE AS REQUIRED (BY CONT'R) BLK = BULKHEAD AS REQUIRED (BY CONT'R) BO = BOX OUT AS REQUIRED (BY CONTR'R) BOF = BOTTOM OF FORM CB = CORNER BRACKET CS = CROSS STIFFENER EJ = EXPANSION JOINT F = FILLER BUILT BY CONT'R FN = FLANGE NUT 100 FS = FLANGE SCREW (7") H = HORIZINTAL IC = INSIDE CORNER ISC = INSIDE STRIPPING CORNER IU = INNER UNIT (20mm ROD) JBF = JOB BUILT FILLER BY CONTRACTOR MPP = MULTI-PURPOSE PANEL NTS = NOT TO SCALE OCA = OUTSIDE CORNER ANGLE P = PANEL PFA = PIPE FORM ALIGNER PB = POUR BREAK SCB = SCAFFOLD BRACKET SHB = SHE BOLT S/P = STEEL PLY TOC = TOP OF CONCRETE TOF = TOP OF FORM TT = TAPER TIE FAX:(405) 755−1142PH:(405) 751−0880 Oklahoma City, Ok. 73114 12409 HOLMBOE AVE. Construction Specialties, Ltd. WEB: www.ellisforms.com CONTRACTOR: Pour height, Pour rate, Temperature, use of superplactizers and retarding admixtures significantly affect the actual concrete pressure. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOADS AND APPROVE DWG. IF THERE ARE ANY DISCREPENCIES, IT IS THE CONTRACTOR’S RESPONSIBILTY TO NOTIFY ELLIS CONSTRUCTION SPECIALTIES BEFORE SHIPMENT OF MATERIAL. ISSUED FOR CONSTRUCTION ISSUED FOR CONTRACTOR APPROVAL PRELIMINARY DETAILS ONLY − NOT FOR CONSTRUCTION ISSUED FOR INFORMATION PURPOSES ONLY DRAWING STATUS 1) Deviation in whole or part from this drawing and these general notes shall relieve Ellis Construction Specialties of responsibility, liability, and claim attributable to such deviation. 2) This drawing is provided as an aid in illustrating proper erection of equipment only. It is the responsibility of the contractor to verify all dimensions and details of this layout and to properly integrate this drawing with the latest construction drawings in order to ensure safe and accurate completion of the overall project objectives. 3) The customer bears the sole responsibility for ensuring that any erection or use of the goods shown on these drawings confirms to all laws, ordinances, local codes, state codes, and the Federal Occupational Safety & Health Administration (OSHA) and project specifications and for checking the accuracy of field details and dimensions. 4) Do NOT use design pressures in excess of 2000 psf or 150 x height of fresh concrete in forms, whichever is less. REFER to chart in Ellis Technical Instructional Manual. 5) Assembly locks at outside and inside corners are required per joint. 4’high: 2 locks, 8’ high: 3 locks, 12’ high: 5 locks. Above 12’ high: 1 assembly lock per 1’−6" in height, above 16’ high: 1 assembly lock per 1’−0" in height for first 8’ then 1’−6" o.c. For height exceeding 16’ refer to the Ellis Technical Instructional Manual. 44 N.T.S. MANHATTAN I−35 & LINDSEY BRIDGE "A" NORMAN, OK. 08/17/16 XXXXX