3. MCI Plymouth
• Existing Title 5 System
– Serving 200 Inmates, 15 staff = 13,825 GPD
– Failed Inspection in Sept 2007
• Need - Expanding Population
– Design System to Serve 300 inmates, 21 staff for
31,000 GPD (**100 GPD/Inmate**)
• Reason for MBR - Campus is located
within several Drinking Water Zone IIs
– Effluent Quality to Meet DEP’s Interim
Guidelines on Reclaimed Water
Horsley Witten Group, Inc.
4. Permits
(Plymouth)
• Groundwater Discharge Permit
– Engineering / Hydrogeologic Reports
• MEPA-ENF: >10,000 GPD in Zone II
• MESA- Priority Habitat (8 moths and box
turtle)
• New Source Approval (new water supply
well)
• NOI – less than 100’ of Bumps Pond (well)
Horsley Witten Group, Inc.
5. Existing Influent
(Plymouth)
• Daily Flow – 13,000+ GPD
– 200 inmates
– 15 staff
• BOD – 358* mg/L (120 current longer term
influent data)
• TSS – 210 mg/L
• TKN - 124 mg/L
• Alkalinity 163 mg/L
*24 hour sample during design
Horsley Witten Group, Inc.
6. Design Effluent* (Plymouth)
• Daily Flow – 31,000 GPD
– 300 inmates
– 21 staff
• BOD <30 mg/L
• TSS – 10 mg/L
• Total Nitrogen <10 mg/L
*Based on DEP Interim Guidelines on Reclaimed Water (BRP/DWM/PeP/P00-3)
Horsley Witten Group, Inc.
18. MCI-Norfolk
• Existing 0.486MGD WWTP with Sanitaire
Package Treatment Units (PTUs) to Sand
Filter Beds then surface water discharge
• Interruption of Service Not Option
• Upgrade Required to meet new NPDES
Discharge Permit (discharge by 12/2012)
– BOD 7 mg/L
– Total Ammonia Nitrogen 1 mg/L
– Total Phosphorus 0.1 mg/L (April - Oct)
Horsley Witten Group, Inc.
20. Getting Started
•
•
•
•
•
(Norfolk)
HW hired by DCAM – March 2009
DEP Approved design – November 13, 2009
Bid Date – December 2009
Start Construction – February 2010
Start-up – March 2011
Horsley Witten Group, Inc.
22. Evaluate Technologies/Cost
(Norfolk)
• MBR Selected based on recent success at
Plymouth, and flexibility of installing MBR
without Interruption of Facility Operation
• Membrane - $7.7Million (DCAM accepted
contractor low bid)- *Includes Conversion of EQ
tanks, Headworks, UV, etc.
Horsley Witten Group, Inc.
23. UV
Effluent to UV
Sludge Wasting
Tanks
Existing EQ Tanks
(75,000 gal. each)
Existing
Office/Lab
New WWTP
(10,000 s.f)
0.5 MGD
Headworks
Coarse/Fine Screen
Distribution Box
Convert to Anerobic
Tank (200,000 gal.)
Convert PTU’s to EQ
(400,000 gal. total)
24. Train 1
To Anerobic Tank
Train 2
To Anerobic Tank
Influent
Anoxic Tank, Mixing &
Carbon Addition
Kaiser
Blowers
Aeration
Membrane
RAS
Permeate Pumps
(Under Vacuum)
Effluent to UV
RAS
Sludge Wasting
25. From “Sticks n Bricks” to the Real Thing
Horsley Witten Group, Inc.
30. Questions
• Anyone interested in touring either
facility let us know.
Joe Longo
jlongo@horsleywitten.com
Tom Lee
fplee@horsleywitten.com
508-833-6600
Horsley Witten Group, Inc.