Artful Conception Company Profile
In a Nutshell About Us
company profile
Head Quarters Design offers clients an effective amalgamation of graphic design and
creative writing services. Original concepts, striking designs, and pithy texts combine to establish
our clients’ digital footprint and corporate identity.
Headed by Carmen Frazer, we are a full-service graphic design and content studio
that works closely with clients to understand their needs and vision, and remain within budget.
We focus on eliminating guesswork and providing our clients with clarity in every step of the
marketing process. Our aim is to inspire confidence in your brand as it grows and evolves
to new heights in a world where technology is ever-changing and constantly expanding.
Contact
tel: 021 557 2497 | email: headquarters@pixie.co.za
website: www.head-quarters-design.com
The Horizon Our Principles
company profile
Vision
To bring about positive change, sustainable lifestyle awareness, and progressive thinking
through artful conception and effective communication.
We see ourselves working with entrepreneurs, artisans, and businesses who share similar philanthropic and
environmentally responsible principles. Our beliefs are firmly grounded in the desire to contribute to positive change
in whatever way we can.
Social Conscience
We have a passion for running a design studio that is firmly rooted in environmentally responsible practices.Wherever
possible, we work in collaboration with host providers that are 100% green. In reducing our carbon footprint we pass
this principle on to our clients, bringing the notion of energy efficiency full circle.
Root & Branch Design DUO
company profile
Carmen Frazer - Creative Director
Carmen is equipped with 25 years of experience in the graphic design industry. Highly
professional, self-motivated and confident, she is a master of conceptualization and
out-of-the-box thinking. Her excellent interpersonal skills enable her to brainstorm with clients
and effectively manage her teams, motivating them to boost their efforts and strive for
professional excellence.
Creative zest and an eye for detail led to her nomination for LEGENDS,The Media24 Excellence
Awards in the Graphic Artist category.
Head Quarters Design (1997 – 2006) – Creative Director/Owner
Media 24 (2006 – 2008) – Graphic Artist
Tray International (2009 – 2014) – Head of Design
HQD was originally founded in
Johannesburg in 1997 by Carmen
Frazer, running successfully for over
8 years. Relocating to Cape Town in
2006 with her new husband and
young family, Carmen opted for the
immediate stability of a permanent
position at Media24 and later Tray
International.
During this 7 year period her skills
expanded to a point where she was
promoted first to Senior Designer
and then to Head of Design, leading
a team of designers in a fast-paced
environment to produce marketing
material for 150 branches around
the globe.
With this arsenal of skill and
newfound confidence, the
opportunity to re-launch HQD
presented itself at the end of 2014.
Simoné Streck - Content & Communication Coordinator
Armed with a degree majoring in Linguistics and English Literature, Simoné is a wordsmith
constantly looking for an opportunity to flex her creative muscles. Her freelancing career began
while in the throes of completing her studies, as a means of breaking into the industry at an
early age. Her ability to combine professionalism, accuracy, and imaginative wording leads to
content that is both authoritative and engaging.
Her work has been featured in digital magazines and she is currently working towards the
publishing of her first lengthy manuscript.
Freelancer (2009 – 2015) - Copywriter/Ghostwriter/Blogger
EF Education First (2012 – 2013) - Team Leader
UNISA (2013 – 2015) - 1st year English Educator
The Whole Nine Yards Our Services
company profile
At HQD we think hard and work harder to create quality experiences, smarter solutions, and superior branding through
spirited creativity and detailed craftsmanship.
Branding & Identity
- Logo Design
- Corporate Stationery
- Brochures
- Packaging Design
- Digital Presentation Templates
- POS
- Vehicle Branding
- Signage
Web
- Responsive Web Design &
Maintenance
- Online Advertising & Banners
- SEO Optomisation
- Keyword Research
- eMail Marketing
- Blog Design & Management
Content & Communication
- Blog Writing
- Web Content Writing
- Professional Writing
- Proofreading & Editing
- eNewsletters
- Company Profiles
- Annual Reports
- Communication on Progress Reports
- Social Media Management
Marketing & Events
- Exhibitions & Expos
- Digital & Printed Marketing Solutions
- Pull-up Banners
Outsourcing
We handpick teams from within our network of talented people who
share our proactive mindset in the fields of visual and written
communication.
Shoulder to the Wheel Clients
company profile
Below is an exhaustive list of brands previously worked on:
Mobilitas
AGS International Moving Group
Stuttaford Van Lines
Pickfords
FROESCH
Executive Relocations
Archiv System
Pelichet
Budget Car Hire
Hymax
Remax
Tiger Brands
ABSA
American Express
Bateman
MacSteel
Savanna Game Lodge
Ulusaba Game Lodge (Virgin Group)
Virgin Active
SABC - International Sales
Ken Forrester Wines
National Positions
The Content Authority
Epione
UNISA
Fathermag.com
At HQD, we make sure that our clients receive the highest quality work and attentiveness required to boost results. We build strong
professional relationships with our clients, working with them to achieve their goals.
We are currently working with the following companies:
Monarch Relocations
Renov8
Down to Brass Tacks Cost structure
company profile
Artwork & Designs
All projects are quoted on a “per job” basis.
Estimates
Project costs are estimated after receiving a full and detailed brief from the client. Quotes are based on hourly rates and commencement of studio work will
begin once approved.
Print Management
Printing quotes will only be acquired from reputable printers. Once clients approve artwork for printing, HQD is not liable for any errors.All printwork is subject to
a management fee.
Amendments
Clients are entitled to unlimited amendments per design job, bearing in mind all changes to be charged at our hourly rate.
A maximum of 3 content additions may be made on any final draft of a writing job. Grammar/style requests to be discussed during the drafting and editing
processes.
Payment Terms
A 50% deposit is required before the commencement of studio work.The remaining balance is to be paid upon receipt of completed projects with a 7-day
extension for recurring clients.
Call-Out Charges
Travel expenses will be charged at an additional cost.
Stock Images
Fees for images will be supplied on request and will depend on the supplier’s predetermined usage policies.
Delivery
Courier charges are applicable when necessary.

HQD_CompanyProfile2015

  • 1.
  • 2.
    In a NutshellAbout Us company profile Head Quarters Design offers clients an effective amalgamation of graphic design and creative writing services. Original concepts, striking designs, and pithy texts combine to establish our clients’ digital footprint and corporate identity. Headed by Carmen Frazer, we are a full-service graphic design and content studio that works closely with clients to understand their needs and vision, and remain within budget. We focus on eliminating guesswork and providing our clients with clarity in every step of the marketing process. Our aim is to inspire confidence in your brand as it grows and evolves to new heights in a world where technology is ever-changing and constantly expanding. Contact tel: 021 557 2497 | email: headquarters@pixie.co.za website: www.head-quarters-design.com
  • 3.
    The Horizon OurPrinciples company profile Vision To bring about positive change, sustainable lifestyle awareness, and progressive thinking through artful conception and effective communication. We see ourselves working with entrepreneurs, artisans, and businesses who share similar philanthropic and environmentally responsible principles. Our beliefs are firmly grounded in the desire to contribute to positive change in whatever way we can. Social Conscience We have a passion for running a design studio that is firmly rooted in environmentally responsible practices.Wherever possible, we work in collaboration with host providers that are 100% green. In reducing our carbon footprint we pass this principle on to our clients, bringing the notion of energy efficiency full circle.
  • 4.
    Root & BranchDesign DUO company profile Carmen Frazer - Creative Director Carmen is equipped with 25 years of experience in the graphic design industry. Highly professional, self-motivated and confident, she is a master of conceptualization and out-of-the-box thinking. Her excellent interpersonal skills enable her to brainstorm with clients and effectively manage her teams, motivating them to boost their efforts and strive for professional excellence. Creative zest and an eye for detail led to her nomination for LEGENDS,The Media24 Excellence Awards in the Graphic Artist category. Head Quarters Design (1997 – 2006) – Creative Director/Owner Media 24 (2006 – 2008) – Graphic Artist Tray International (2009 – 2014) – Head of Design HQD was originally founded in Johannesburg in 1997 by Carmen Frazer, running successfully for over 8 years. Relocating to Cape Town in 2006 with her new husband and young family, Carmen opted for the immediate stability of a permanent position at Media24 and later Tray International. During this 7 year period her skills expanded to a point where she was promoted first to Senior Designer and then to Head of Design, leading a team of designers in a fast-paced environment to produce marketing material for 150 branches around the globe. With this arsenal of skill and newfound confidence, the opportunity to re-launch HQD presented itself at the end of 2014. Simoné Streck - Content & Communication Coordinator Armed with a degree majoring in Linguistics and English Literature, Simoné is a wordsmith constantly looking for an opportunity to flex her creative muscles. Her freelancing career began while in the throes of completing her studies, as a means of breaking into the industry at an early age. Her ability to combine professionalism, accuracy, and imaginative wording leads to content that is both authoritative and engaging. Her work has been featured in digital magazines and she is currently working towards the publishing of her first lengthy manuscript. Freelancer (2009 – 2015) - Copywriter/Ghostwriter/Blogger EF Education First (2012 – 2013) - Team Leader UNISA (2013 – 2015) - 1st year English Educator
  • 5.
    The Whole NineYards Our Services company profile At HQD we think hard and work harder to create quality experiences, smarter solutions, and superior branding through spirited creativity and detailed craftsmanship. Branding & Identity - Logo Design - Corporate Stationery - Brochures - Packaging Design - Digital Presentation Templates - POS - Vehicle Branding - Signage Web - Responsive Web Design & Maintenance - Online Advertising & Banners - SEO Optomisation - Keyword Research - eMail Marketing - Blog Design & Management Content & Communication - Blog Writing - Web Content Writing - Professional Writing - Proofreading & Editing - eNewsletters - Company Profiles - Annual Reports - Communication on Progress Reports - Social Media Management Marketing & Events - Exhibitions & Expos - Digital & Printed Marketing Solutions - Pull-up Banners Outsourcing We handpick teams from within our network of talented people who share our proactive mindset in the fields of visual and written communication.
  • 6.
    Shoulder to theWheel Clients company profile Below is an exhaustive list of brands previously worked on: Mobilitas AGS International Moving Group Stuttaford Van Lines Pickfords FROESCH Executive Relocations Archiv System Pelichet Budget Car Hire Hymax Remax Tiger Brands ABSA American Express Bateman MacSteel Savanna Game Lodge Ulusaba Game Lodge (Virgin Group) Virgin Active SABC - International Sales Ken Forrester Wines National Positions The Content Authority Epione UNISA Fathermag.com At HQD, we make sure that our clients receive the highest quality work and attentiveness required to boost results. We build strong professional relationships with our clients, working with them to achieve their goals. We are currently working with the following companies: Monarch Relocations Renov8
  • 7.
    Down to BrassTacks Cost structure company profile Artwork & Designs All projects are quoted on a “per job” basis. Estimates Project costs are estimated after receiving a full and detailed brief from the client. Quotes are based on hourly rates and commencement of studio work will begin once approved. Print Management Printing quotes will only be acquired from reputable printers. Once clients approve artwork for printing, HQD is not liable for any errors.All printwork is subject to a management fee. Amendments Clients are entitled to unlimited amendments per design job, bearing in mind all changes to be charged at our hourly rate. A maximum of 3 content additions may be made on any final draft of a writing job. Grammar/style requests to be discussed during the drafting and editing processes. Payment Terms A 50% deposit is required before the commencement of studio work.The remaining balance is to be paid upon receipt of completed projects with a 7-day extension for recurring clients. Call-Out Charges Travel expenses will be charged at an additional cost. Stock Images Fees for images will be supplied on request and will depend on the supplier’s predetermined usage policies. Delivery Courier charges are applicable when necessary.