Agency Strategic Goals
1. Fly the Shuttle as safely as possible until its retirement,
   not later than 2010.
2. Bring a new Crew Exploration Vehicle into service as
   soon as possible after Shuttle retirement.
3. Develop a balanced overall program of science,
   exploration, and aeronautics consistent with the
   redirection of the human spaceflight program to focus on
   exploration.
4. Complete the International Space Station in a manner
   consistent with NASA's International partner
   commitments and the needs of human exploration.
5. Encourage the pursuit of appropriate partnerships with
   the emerging commercial space sector.
6. Establish a lunar return program having the maximum
   possible utility for later missions to Mars and other
   destinations.
Agency Challenges
• NASA’s missions present intense technical, financial
  and management challenges
• Operating environment extremely constrained from
  cost and schedule perspectives
• External requirements exacerbate problem
Bottom Line
• Increased performance in all systems is a
  must, especially throughout the institutional
  base
• Centers are where the “rubber meets the
  road.”
• Mission managers, institutional managers
  and Centers must work smart, and in concert.
Mission Support Functions*
Mission support functions include the following:
    •   Procurement
    •   Resources Management
    •   Finance & Task Order
    •   Legal
    •   Real and Personal Property
    •   Export Compliance
    •   Security
    –   Human Resources
    –   Facilities and Assets
    –   Public Affairs
    –   Technical Documentation
    –   Configuration Management
    –   Information Management
    –   NEPA Compliance

    It is critical that these functions be performed effectively and
        efficiently and jointly with mission to permit mission success

    * JPL Chart
Mission Support
                   Functions*
•   Mission support functions generally have in common the
    following characteristics:
    • Do not perform the technical work of the project, but do provide the
      supporting environment (infrastructure) which allows the technical
      work to go on.
    • Require specific discipline expertise (often professionals).
    • Require compliance with laws, treaties, Executive Orders, and
      regulations.
    • Involve interfacing and often negotiating with regulatory authorities.

•   Mission support functions are best performed when there is an
    early and continuous close connection between project
    personnel and mission support personnel.

*JPL Chart
Mission Support*
•   Mission support organizations provide services to the institution
    as a whole and to the individual flight projects.
     • Needs of the former are tend to be more uniform with time
        and not time critical
     • Needs of the latter tend to be episodic and almost always
        time critical
•   Two sets of customers for mission support functions may have
    conflicting goals, timeframes and strategies, causing disorder in
    the system.



* JPL Chart
Percentage of Cost Locked In by Phase
                                               Lifecycle Cost
                                                             Operations and Support
                              System Acquisition
             $                                Production
                          System
                           R&D
      100
       95                                          Lifecycle cost
       85                                          locked in
       70                                                                                Lifecycle cost
                                                                                         expended
        50
                                                                                                  Disposal
                                                                             60%                   Cost?
        10                  10%                    30%
                                                                                                          Time
   Concept                              Production and              Initial                   Out of
 Exploration                            Development                 Operational               Service
       Concept and            Full Scale                            Capability
          Validation          Development
From W. J. Larson & L. K. Pranke (1999) Human Spaceflight: Mission Analysis and Design
Institutional Risks Threaten
    NASA’s Ability to Conduct Mission

                                          Encroachment            Public
       Resource
       Scarcity &                                                Concerns
                             Activity
     Cost Escalation
                           Restrictions
                                                 Operational
                                                   Costs
Episodic

Constant
                                                           • Environmental laws &
 • Aging infrastructure                                    regs increasing in
 • Facility requirements
 • Resource inefficiency         MISSION                   number and stringency
                                                           • Enclaves of
 • Well-being concerns                                     preservation
                                                           • External requirements
Environmental Regulation Growth




Source: J. A. Cusumano, New Technology for the Environment, Chemtech, 1992, 22(8), 482–489
       P. T. Anastas, Meeting the Challenges of Sustainability through Green Chemistry, Journal of
       Green Chemistry, 2003, 5(2), G29-G34.
CLEAN AIR ACT
                              ENDANGERED SPECIES ACT
       NATIONAL HISTORIC
       PRESERVATION ACT
                              E.O.11990 PROTECTION OF
                                     WETLANDS
COASTAL ZONE MANAGEMENT ACT
                                  MARINE MAMMAL
     NOISE CONTROL ACT            PROTECTION ACT

      CLEAN WATER ACT          E.O.11988 FLOODPLAIN
                                   MANAGEMENT
Environmental Risks to Mission

•  Under federal law, all NASA activities with a potential to affect
   the environmental must meet the requirements of the National
   Environmental Policy Act (NEPA)
• NEPA Requires:
    – Environmental evaluation for all activities
    – Environmental Assessment (EA)
    – Environmental Impact Statement
• EIS normally takes 18 months to 2 years to prepare, requires
   close coordination with State and local officials and the public
• NEPA is an intensely procedural process
• If you follow the process, you do not have to select the
   environmentally “best “ alternative
Risk Mitigation Strategy: Perform EIS now, at the Program level
   (e.g. for Constellation); projects can be added later using EAs
Benefit: Costs less, more efficient, saves time
Category Risks to Future NASA Missions
   Societal Trend                    Risks to NASA                       Risk Mitigation
Increased urbanization        Increased population density          Negotiate with local and state
                              around centers precludes activities   community for mutual
                              that support mission.                 agreeable buffer use.
Increased regulation          Hazardous and toxic material may      Material substitution where
                              create future liabilities. Many       possible. New material
                              currently available materials         development.
                              cannot be used.
Potable water scarcity        Unable to fulfill missions at         Rain water use, gray water use,
(NM, VA, CA, & FL)            facilities in NM, VA, CA, & FL.       water recycling, and improved
                                                                    efficiency.
Consumption of                Increased and unpredictable cost      Start investment in renewable
nonrenewable energy           for energy. Decreased ability to      energy such as wind and solar
                              perform mission.                      power
Increased environmental       Unanticipated regulation reduces      Move beyond regulation to
concerns                      options and increases cost for        proactive management of
                              response                              environmental risks
Resource scarcity             Material cost will increase or        Invest in technology
(materials)                   materials will become unavailable.    development for sustainability.

                        The goal of I & A Risk Management is to increase
                       NASA’s capacity to perform its exploration missions
Challenges
•   Reduce institutional threats to mission
•   Drive down overall operations costs, both institutional and
    mission costs
•   Expand NASA’s capacity to achieve mission with constrained
    resources in the context of managing uncertainties across
    complex systems
•   Use reductions in operations costs as a funding wedge to
    purchase more mission in the future
•   Increase institutional trade space to enhance Agency
    performance
What Does This Mean?
• In order to execute NASA’s challenging missions
  successfully in highly constrained environment, we
  must squeeze every iota of performance out of the
  institutional base to:
   – Increase the size of the decisional trade space across the
     institutional base
   – Leverage resources Agency-wide
   – Enhance institutional capacity to support mission
   – Sustain NASA’s mission
Managing Institutional Risk
• Program and Project Managers should:
  – Understand and plan for institutional
    requirements as early as possible in the
    program plan (pre-phase A)
  – Establish and document institutional needs
  – Consult early and often with appropriate
    institutional manager
  – Clearly identify, track and work jointly to
    mitigate institutional risks over time
NASA




Mission Directorates   Mission Support Offices   NASA Centers




                                                                2
Office of Infrastructure and Administration
                                Assistant Administrator
                                                                                 Institutional
                             Deputy Assistant Administrator                          Risk
                 Deputy Assistant Administrator for HQ Operations (Vacant)       Assessment
                           Deputy Director for HQ Operations


      Agency Management


                                                     Facilities
   Shared         Aircraft       Environmental                       Logistics         Management
                                                   Engineering &
  Capability    Management        Management                        Management          Systems
                                                   Real Property
Asset Program    Division          Division                          Division           Division
                                                     Division




     Headquarters Operations


    Equal                                        HQ Facilities &                        Human
                  Information      Business                           Career
 Opportunity
                 Technology &                    Administrative                        Resources
  & Diversity
                Communications
                                  Management                        Management
 Management                                        Services                           Management
                    Division       Division                          Division
   Division                                        Division                             Division
Office of Infrastructure and
          Administration
• Manages the institutional support of mission
• Works with mission to identify institutional
  risks to programs and projects
• In many cases, manages the institutional
  risks for mission
• Brings knowledge, experience and leverage
  with regulators to the table
• Negotiates waivers and exemptions where
  external regulations threatens mission
I & A Goals

– Reduce institutional risk to mission
– Assure that I & A resources and assets are
  available to mission when needed to enable
  mission and the Vision for Space Exploration
  (VSE)
– Eliminate future infrastructure risk to mission
  through the proactive deployment of sustainable
  practices (e.g. materials assurance)
I & A Risk Categories

•   Operations and Infrastructure (e.g. Deteriorating Facilities)
•   Emerging Regulations (e.g. Perchlorate)
•   Encroachment on Mission (e.g.Deep Space Network)
•   Materials Systems Engineering (Ozone depleting substances --
    shuttle foam and propellant binder)
•   Environmental Liability/Cleanup Costs (White Sands/
    groundwater contaminants, TCE)
•   Natural Events (e.g. Hurricanes,)
•   Regional Climate Variability (weather conditions, availability of
    launch and return windows, possible sea level change)
Proactive Risk Management
• I & A reduces risk to mission through:
  – Infrastructure availability assurance
  – Materials availability assurance
  – Influencing development of national and foreign
    regulations
  – Developing partnerships for materials substitution
  – Mitigating facilities encroachment
  – Implementing Integrated Asset Management
Organizational Interfaces

Facilities/Assets                          Environmental
Construction     Shared capabilities    Availability of materials
                 and assets              Emerging regulations
Revitalization
Acquisition                                      Encroachment

Disposal                                            Restoration
                                                          NEPA



Logistics
                             Mission                 Aircraft

Long-lead items                                     Research

                                                     Training
Specialty material purchases
                                       Mission Management
I & A Risk Distribution and Priority
                                 Distribution of I&A Risks


                         5   0          4         3          3         3




          (Likelihood)
           Probability
                         4   0          0         2          8         2
                         3   0          0         2          0         0
                         2   0          0         0          0         0
                         1   0          0         0          1         0

                             1          2         3          4         5

                                            Impact
                                     (Consequence, severity)


                                                                           Operations and Infrastructure

      Percentage Risks per Category                                        Em erging Regulations

          12%                               19%
                                                                           Encroachm ent on Mission

  8%                                                                       Encroachm ent on Mission - Host
 4%                                                              15%       Tenant Relationships
                                                                           Materials / Sytem s Engineering


                                                                           Environm ental, Historic, and
                                                                           Archeological

                                                        8%                 Liability / Cleanup Costs
        27%
                                             8%                            Natural Events
Institutional Risks
                     Risk Timing Window
                    10
                      8
                      6
            ks
     of Ris            4
 #
                       2
                       0
                        s)
                   Day          rrin
                                    g)
                                                 s)
                80          ecu               ear
            (<1                                           ear
                                                             s)
        ate            g (R              -3 Y                         ear
                                                                          s)
    edi            oin               ays              -6 Y                             s)
 mm             n-g            0D                   (3           30
                                                                    Y              ear
I             O             (18               term            (6-             50
                                                                                 Y
                         rm               ng-              SE              0-1
                    r-te               Lo                 V             (3
                Nea                                                 SG
Percent Recommendations By Type

           (36)                                        (30)
           44%                                         36%




                                   (17)
                                   20%
   Process Change   Technology Application   Management Improvement


NOTE: 80 % of risks are mitigated if we talk to one another
What We Manage For Mission
•   Military Base Closure/Realignment (# 899)
    – Risk Consequence: Possible unavailability of infrastructure
      or services required for Center operation in support of
      mission, leading to cost and schedule risk
•   EPA Risk Assessments (#897)
    – Risk Consequence: Forced material substitutions, cost and
      schedule risk
•   Encroachment on NASA Centers (#898)
    – Risk Consequence: Inability to perform mission at Centers
What We Manage For Mission
•   Unfunded Liability of Past Hazardous Materials (#903)
     – Risk Consequence: Further clean-up may be needed, resulting in
       less budget for mission
•   Grants and National Environmental Policy Act (NEPA) Requirements
    (#902)
     – Risk Consequence: NEPA review is required for all grants; lack of
       review can stop projects and facilities, causing risk to project cost
       and schedule
•   Aging /Obsolescence of Agency Business Systems (# 945)
     – Risk Consequence: Inability to identify and quantify resources
       means NASA may not be able to obtain what it needs, when we
       need it. May cause schedule cost and performance issues for
       mission
What We Manage For Mission
•   Rising Energy Costs (#946)
     – Risk Consequence: Increasing energy costs will continue to
       erode mission budget


•   KSC Vulnerability to Natural Disasters (#941)
     – Risk Consequence: Manned spaceflight launch activities could be
       suspended for extended periods of time
What Mission Manages With
                Us
•   NEPA and Historic Preservation (#901)
     – Risk Consequence: If the NEPA process is not followed in the early
       design phases of programs and projects, there is a high potential
       for court action to delay or shut down the project/program
       (Schedule, cost and budget-- e.g. KECK Interferometer sp)

•   Identification of Life Cycle Costs (Design for Operations)
     – Risk Consequence: Failure to identify true life cycle costs
       (including disposition and remediation) related to infrastructure in
       the early phases of exploration planning increases the possibility of
       schedule delays, increased life cycle costs, increased
       environmental liability, and increased costs for remediation (at
       direct cost to the program)
What Mission Manages With
                Us
•   Interfaces, Requirements and Constraints for Ground Infrastructure

     – Risk Consequence: When interfaces, requirements and constraints for
       ground infrastructure are developed late in the systems engineering
       process, and the schedule and cost requirements are underestimated,
       projects suffer from inadequate budget estimates, schedule delays for
       infrastructure modifications, and negative impacts to life cycle costs and
       performance.


•   Material Substitutions Within Critical Flight Systems and Components

     – Risk Consequence: Failure to communicate materials substitutions up the
       vendor supply chain may compromise performance and safety of critical
       flight components and subsystems resulting in schedule delays and added
       costs.
What Mission Manages With
                Us
•   Materials Substitution in Systems Design

     – Risk Consequence: Failure to identify materials and processes which are
       not hazardous to the environment or to human health puts project schedule
       and cost at risk; materials known to be hazardous must be reduced during
       a program’s life cycle.


•   Frequency Protection at Goldstone

     – Risk Consequence: Failure to plan for incompatibility of Fort Irwin’s
       expanded use of spectrum with requirements of the Deep Space Network
       co-located at Fort Irwin threaten NASA’s DSN capability.
Pilot Risk Management Initiative
•   I & A developed pilot risk initiative with Exploration Systems
    Mission Directorate (ESMD) to explore management strategies
    carefully designed to systematically identify and reduce
    institutional risk to mission
•   Spring 2005, formed a Risk Management Team and mapped
    institutional risks to mission, using formal risk management and
    analysis tools
     – 26 I & A risks to mission identified
•   Winter, 2005-Spring 2006, I& A partnered with ESMD and
    entered I & A risks into ESMD Risk Management Database; I &
    A serves on ESMD Risk Management Board
•   Risk mitigation activities currently underway across the
    Institutional Base through the implementation of the Mission
    Support Implementation Plan.
ARM Screen Capture of I & A Risks




                a
                T
                Q
Top I & A Risks in ESMD
 Active Risk Manager (ARM)
Risk ID                Risk Title          zzz
          Encroachment on NASA
 898                                       5x5
          Centers/Facilties
 901      NEPA & Historic Preservation     5x5
          Aging/Obsolescence of Agency
 945                                       5x3
          Institutional Business Systems
 902      Grants & NEPA Requirements       4x4

More Related Content

What's hot

Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerryNASAPMC
 
Ortiz.james
Ortiz.jamesOrtiz.james
Ortiz.jamesNASAPMC
 
Keer.beth
Keer.bethKeer.beth
Keer.bethNASAPMC
 
Carol.mullenax
Carol.mullenaxCarol.mullenax
Carol.mullenaxNASAPMC
 
Lau.cheevon
Lau.cheevonLau.cheevon
Lau.cheevonNASAPMC
 
Dickerson mark
Dickerson markDickerson mark
Dickerson markNASAPMC
 
Kirsch.mike
Kirsch.mikeKirsch.mike
Kirsch.mikeNASAPMC
 
Borchardt.poole.majerowicz
Borchardt.poole.majerowiczBorchardt.poole.majerowicz
Borchardt.poole.majerowiczNASAPMC
 
Bilardo vincent
Bilardo vincentBilardo vincent
Bilardo vincentNASAPMC
 
Smalley stigberg petze
Smalley stigberg petzeSmalley stigberg petze
Smalley stigberg petzeNASAPMC
 
Kelly crumbley
Kelly crumbleyKelly crumbley
Kelly crumbleyNASAPMC
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.yNASAPMC
 
Bilardo.vince
Bilardo.vinceBilardo.vince
Bilardo.vinceNASAPMC
 
Richards.robert
Richards.robertRichards.robert
Richards.robertNASAPMC
 
Hartford.wayne wh1
Hartford.wayne wh1Hartford.wayne wh1
Hartford.wayne wh1NASAPMC
 
Amer bill steve
Amer bill steveAmer bill steve
Amer bill steveNASAPMC
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreysNASAPMC
 
William.tippin.update
William.tippin.updateWilliam.tippin.update
William.tippin.updateNASAPMC
 
Daisy.mueller
Daisy.muellerDaisy.mueller
Daisy.muellerNASAPMC
 
Bryson jonathan
Bryson jonathanBryson jonathan
Bryson jonathanNASAPMC
 

What's hot (20)

Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
 
Ortiz.james
Ortiz.jamesOrtiz.james
Ortiz.james
 
Keer.beth
Keer.bethKeer.beth
Keer.beth
 
Carol.mullenax
Carol.mullenaxCarol.mullenax
Carol.mullenax
 
Lau.cheevon
Lau.cheevonLau.cheevon
Lau.cheevon
 
Dickerson mark
Dickerson markDickerson mark
Dickerson mark
 
Kirsch.mike
Kirsch.mikeKirsch.mike
Kirsch.mike
 
Borchardt.poole.majerowicz
Borchardt.poole.majerowiczBorchardt.poole.majerowicz
Borchardt.poole.majerowicz
 
Bilardo vincent
Bilardo vincentBilardo vincent
Bilardo vincent
 
Smalley stigberg petze
Smalley stigberg petzeSmalley stigberg petze
Smalley stigberg petze
 
Kelly crumbley
Kelly crumbleyKelly crumbley
Kelly crumbley
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.y
 
Bilardo.vince
Bilardo.vinceBilardo.vince
Bilardo.vince
 
Richards.robert
Richards.robertRichards.robert
Richards.robert
 
Hartford.wayne wh1
Hartford.wayne wh1Hartford.wayne wh1
Hartford.wayne wh1
 
Amer bill steve
Amer bill steveAmer bill steve
Amer bill steve
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
 
William.tippin.update
William.tippin.updateWilliam.tippin.update
William.tippin.update
 
Daisy.mueller
Daisy.muellerDaisy.mueller
Daisy.mueller
 
Bryson jonathan
Bryson jonathanBryson jonathan
Bryson jonathan
 

Similar to Hoyt diana

Biess-INEAP-Presentation.pptx
Biess-INEAP-Presentation.pptxBiess-INEAP-Presentation.pptx
Biess-INEAP-Presentation.pptxssuser1c2a8a1
 
Biess ted
Biess tedBiess ted
Biess tedNASAPMC
 
ICWES15 - Engineering Sustainability - A Systems Approach. Presented by Ms Lo...
ICWES15 - Engineering Sustainability - A Systems Approach. Presented by Ms Lo...ICWES15 - Engineering Sustainability - A Systems Approach. Presented by Ms Lo...
ICWES15 - Engineering Sustainability - A Systems Approach. Presented by Ms Lo...Engineers Australia
 
The Nile Basin Development Challenge: A component of the CGIAR Challenge Pro...
The Nile Basin Development Challenge: A component of  the CGIAR Challenge Pro...The Nile Basin Development Challenge: A component of  the CGIAR Challenge Pro...
The Nile Basin Development Challenge: A component of the CGIAR Challenge Pro...ILRI
 
Updates in the Valuation of Ecosystem Services
Updates in the Valuation of Ecosystem ServicesUpdates in the Valuation of Ecosystem Services
Updates in the Valuation of Ecosystem ServicesSustainable Brands
 
ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving  ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving Akachidike (AkaChi) Kanu
 
John.lyver safety
John.lyver safetyJohn.lyver safety
John.lyver safetyNASAPMC
 
Taylor, Michael J Resume
Taylor, Michael J   ResumeTaylor, Michael J   Resume
Taylor, Michael J Resumemjtaylor52
 
Svarcas.rita
Svarcas.ritaSvarcas.rita
Svarcas.ritaNASAPMC
 
ERCI Capabilities Summary
ERCI Capabilities SummaryERCI Capabilities Summary
ERCI Capabilities Summaryjohnrosengard
 
Shinn.s.hunter.h
Shinn.s.hunter.hShinn.s.hunter.h
Shinn.s.hunter.hNASAPMC
 
Hunter.h.shinn.s
Hunter.h.shinn.sHunter.h.shinn.s
Hunter.h.shinn.sNASAPMC
 
Strategic technology roadmap for space x
Strategic technology roadmap for space xStrategic technology roadmap for space x
Strategic technology roadmap for space xCarles Debart
 
Dumbacher
DumbacherDumbacher
DumbacherNASAPMC
 
Airspace Redesign and Airport Planning
Airspace Redesign and Airport PlanningAirspace Redesign and Airport Planning
Airspace Redesign and Airport PlanningJawad Rachami
 
Greening our Planet, our Industry, our Community and our Company – a goal we ...
Greening our Planet, our Industry, our Community and our Company – a goal we ...Greening our Planet, our Industry, our Community and our Company – a goal we ...
Greening our Planet, our Industry, our Community and our Company – a goal we ...Rally Software
 
MGD Onshoring
MGD OnshoringMGD Onshoring
MGD OnshoringMaggie
 

Similar to Hoyt diana (20)

Biess-INEAP-Presentation.pptx
Biess-INEAP-Presentation.pptxBiess-INEAP-Presentation.pptx
Biess-INEAP-Presentation.pptx
 
Dominguez sustainability seminar
Dominguez   sustainability seminarDominguez   sustainability seminar
Dominguez sustainability seminar
 
Biess ted
Biess tedBiess ted
Biess ted
 
1. introduction
1. introduction1. introduction
1. introduction
 
ICWES15 - Engineering Sustainability - A Systems Approach. Presented by Ms Lo...
ICWES15 - Engineering Sustainability - A Systems Approach. Presented by Ms Lo...ICWES15 - Engineering Sustainability - A Systems Approach. Presented by Ms Lo...
ICWES15 - Engineering Sustainability - A Systems Approach. Presented by Ms Lo...
 
The Nile Basin Development Challenge: A component of the CGIAR Challenge Pro...
The Nile Basin Development Challenge: A component of  the CGIAR Challenge Pro...The Nile Basin Development Challenge: A component of  the CGIAR Challenge Pro...
The Nile Basin Development Challenge: A component of the CGIAR Challenge Pro...
 
Updates in the Valuation of Ecosystem Services
Updates in the Valuation of Ecosystem ServicesUpdates in the Valuation of Ecosystem Services
Updates in the Valuation of Ecosystem Services
 
A Green Budget for Europe Cohesion Policy contributions by Patrick ten Brink ...
A Green Budget for Europe Cohesion Policy contributions by Patrick ten Brink ...A Green Budget for Europe Cohesion Policy contributions by Patrick ten Brink ...
A Green Budget for Europe Cohesion Policy contributions by Patrick ten Brink ...
 
ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving  ChE: 1st Principles Approach to Problem Solving
ChE: 1st Principles Approach to Problem Solving
 
John.lyver safety
John.lyver safetyJohn.lyver safety
John.lyver safety
 
Taylor, Michael J Resume
Taylor, Michael J   ResumeTaylor, Michael J   Resume
Taylor, Michael J Resume
 
Svarcas.rita
Svarcas.ritaSvarcas.rita
Svarcas.rita
 
ERCI Capabilities Summary
ERCI Capabilities SummaryERCI Capabilities Summary
ERCI Capabilities Summary
 
Shinn.s.hunter.h
Shinn.s.hunter.hShinn.s.hunter.h
Shinn.s.hunter.h
 
Hunter.h.shinn.s
Hunter.h.shinn.sHunter.h.shinn.s
Hunter.h.shinn.s
 
Strategic technology roadmap for space x
Strategic technology roadmap for space xStrategic technology roadmap for space x
Strategic technology roadmap for space x
 
Dumbacher
DumbacherDumbacher
Dumbacher
 
Airspace Redesign and Airport Planning
Airspace Redesign and Airport PlanningAirspace Redesign and Airport Planning
Airspace Redesign and Airport Planning
 
Greening our Planet, our Industry, our Community and our Company – a goal we ...
Greening our Planet, our Industry, our Community and our Company – a goal we ...Greening our Planet, our Industry, our Community and our Company – a goal we ...
Greening our Planet, our Industry, our Community and our Company – a goal we ...
 
MGD Onshoring
MGD OnshoringMGD Onshoring
MGD Onshoring
 

More from NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 

More from NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

Recently uploaded

From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 

Recently uploaded (20)

From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 

Hoyt diana

  • 1. Managing Institutional Risk to Mission Diana P. Hoyt, Manager Policy Development and Risk Assessment Office of Infrastructure and Administration NASA Headquarters, February, 2007
  • 2. Agency Strategic Goals 1. Fly the Shuttle as safely as possible until its retirement, not later than 2010. 2. Bring a new Crew Exploration Vehicle into service as soon as possible after Shuttle retirement. 3. Develop a balanced overall program of science, exploration, and aeronautics consistent with the redirection of the human spaceflight program to focus on exploration. 4. Complete the International Space Station in a manner consistent with NASA's International partner commitments and the needs of human exploration. 5. Encourage the pursuit of appropriate partnerships with the emerging commercial space sector. 6. Establish a lunar return program having the maximum possible utility for later missions to Mars and other destinations.
  • 3. Agency Challenges • NASA’s missions present intense technical, financial and management challenges • Operating environment extremely constrained from cost and schedule perspectives • External requirements exacerbate problem
  • 4. Bottom Line • Increased performance in all systems is a must, especially throughout the institutional base • Centers are where the “rubber meets the road.” • Mission managers, institutional managers and Centers must work smart, and in concert.
  • 5. Mission Support Functions* Mission support functions include the following: • Procurement • Resources Management • Finance & Task Order • Legal • Real and Personal Property • Export Compliance • Security – Human Resources – Facilities and Assets – Public Affairs – Technical Documentation – Configuration Management – Information Management – NEPA Compliance It is critical that these functions be performed effectively and efficiently and jointly with mission to permit mission success * JPL Chart
  • 6. Mission Support Functions* • Mission support functions generally have in common the following characteristics: • Do not perform the technical work of the project, but do provide the supporting environment (infrastructure) which allows the technical work to go on. • Require specific discipline expertise (often professionals). • Require compliance with laws, treaties, Executive Orders, and regulations. • Involve interfacing and often negotiating with regulatory authorities. • Mission support functions are best performed when there is an early and continuous close connection between project personnel and mission support personnel. *JPL Chart
  • 7. Mission Support* • Mission support organizations provide services to the institution as a whole and to the individual flight projects. • Needs of the former are tend to be more uniform with time and not time critical • Needs of the latter tend to be episodic and almost always time critical • Two sets of customers for mission support functions may have conflicting goals, timeframes and strategies, causing disorder in the system. * JPL Chart
  • 8. Percentage of Cost Locked In by Phase Lifecycle Cost Operations and Support System Acquisition $ Production System R&D 100 95 Lifecycle cost 85 locked in 70 Lifecycle cost expended 50 Disposal 60% Cost? 10 10% 30% Time Concept Production and Initial Out of Exploration Development Operational Service Concept and Full Scale Capability Validation Development From W. J. Larson & L. K. Pranke (1999) Human Spaceflight: Mission Analysis and Design
  • 9. Institutional Risks Threaten NASA’s Ability to Conduct Mission Encroachment Public Resource Scarcity & Concerns Activity Cost Escalation Restrictions Operational Costs Episodic Constant • Environmental laws & • Aging infrastructure regs increasing in • Facility requirements • Resource inefficiency MISSION number and stringency • Enclaves of • Well-being concerns preservation • External requirements
  • 10. Environmental Regulation Growth Source: J. A. Cusumano, New Technology for the Environment, Chemtech, 1992, 22(8), 482–489 P. T. Anastas, Meeting the Challenges of Sustainability through Green Chemistry, Journal of Green Chemistry, 2003, 5(2), G29-G34.
  • 11. CLEAN AIR ACT ENDANGERED SPECIES ACT NATIONAL HISTORIC PRESERVATION ACT E.O.11990 PROTECTION OF WETLANDS COASTAL ZONE MANAGEMENT ACT MARINE MAMMAL NOISE CONTROL ACT PROTECTION ACT CLEAN WATER ACT E.O.11988 FLOODPLAIN MANAGEMENT
  • 12. Environmental Risks to Mission • Under federal law, all NASA activities with a potential to affect the environmental must meet the requirements of the National Environmental Policy Act (NEPA) • NEPA Requires: – Environmental evaluation for all activities – Environmental Assessment (EA) – Environmental Impact Statement • EIS normally takes 18 months to 2 years to prepare, requires close coordination with State and local officials and the public • NEPA is an intensely procedural process • If you follow the process, you do not have to select the environmentally “best “ alternative Risk Mitigation Strategy: Perform EIS now, at the Program level (e.g. for Constellation); projects can be added later using EAs Benefit: Costs less, more efficient, saves time
  • 13. Category Risks to Future NASA Missions Societal Trend Risks to NASA Risk Mitigation Increased urbanization Increased population density Negotiate with local and state around centers precludes activities community for mutual that support mission. agreeable buffer use. Increased regulation Hazardous and toxic material may Material substitution where create future liabilities. Many possible. New material currently available materials development. cannot be used. Potable water scarcity Unable to fulfill missions at Rain water use, gray water use, (NM, VA, CA, & FL) facilities in NM, VA, CA, & FL. water recycling, and improved efficiency. Consumption of Increased and unpredictable cost Start investment in renewable nonrenewable energy for energy. Decreased ability to energy such as wind and solar perform mission. power Increased environmental Unanticipated regulation reduces Move beyond regulation to concerns options and increases cost for proactive management of response environmental risks Resource scarcity Material cost will increase or Invest in technology (materials) materials will become unavailable. development for sustainability. The goal of I & A Risk Management is to increase NASA’s capacity to perform its exploration missions
  • 14. Challenges • Reduce institutional threats to mission • Drive down overall operations costs, both institutional and mission costs • Expand NASA’s capacity to achieve mission with constrained resources in the context of managing uncertainties across complex systems • Use reductions in operations costs as a funding wedge to purchase more mission in the future • Increase institutional trade space to enhance Agency performance
  • 15. What Does This Mean? • In order to execute NASA’s challenging missions successfully in highly constrained environment, we must squeeze every iota of performance out of the institutional base to: – Increase the size of the decisional trade space across the institutional base – Leverage resources Agency-wide – Enhance institutional capacity to support mission – Sustain NASA’s mission
  • 16. Managing Institutional Risk • Program and Project Managers should: – Understand and plan for institutional requirements as early as possible in the program plan (pre-phase A) – Establish and document institutional needs – Consult early and often with appropriate institutional manager – Clearly identify, track and work jointly to mitigate institutional risks over time
  • 17. NASA Mission Directorates Mission Support Offices NASA Centers 2
  • 18. Office of Infrastructure and Administration Assistant Administrator Institutional Deputy Assistant Administrator Risk Deputy Assistant Administrator for HQ Operations (Vacant) Assessment Deputy Director for HQ Operations Agency Management Facilities Shared Aircraft Environmental Logistics Management Engineering & Capability Management Management Management Systems Real Property Asset Program Division Division Division Division Division Headquarters Operations Equal HQ Facilities & Human Information Business Career Opportunity Technology & Administrative Resources & Diversity Communications Management Management Management Services Management Division Division Division Division Division Division
  • 19. Office of Infrastructure and Administration • Manages the institutional support of mission • Works with mission to identify institutional risks to programs and projects • In many cases, manages the institutional risks for mission • Brings knowledge, experience and leverage with regulators to the table • Negotiates waivers and exemptions where external regulations threatens mission
  • 20. I & A Goals – Reduce institutional risk to mission – Assure that I & A resources and assets are available to mission when needed to enable mission and the Vision for Space Exploration (VSE) – Eliminate future infrastructure risk to mission through the proactive deployment of sustainable practices (e.g. materials assurance)
  • 21. I & A Risk Categories • Operations and Infrastructure (e.g. Deteriorating Facilities) • Emerging Regulations (e.g. Perchlorate) • Encroachment on Mission (e.g.Deep Space Network) • Materials Systems Engineering (Ozone depleting substances -- shuttle foam and propellant binder) • Environmental Liability/Cleanup Costs (White Sands/ groundwater contaminants, TCE) • Natural Events (e.g. Hurricanes,) • Regional Climate Variability (weather conditions, availability of launch and return windows, possible sea level change)
  • 22. Proactive Risk Management • I & A reduces risk to mission through: – Infrastructure availability assurance – Materials availability assurance – Influencing development of national and foreign regulations – Developing partnerships for materials substitution – Mitigating facilities encroachment – Implementing Integrated Asset Management
  • 23. Organizational Interfaces Facilities/Assets Environmental Construction Shared capabilities Availability of materials and assets Emerging regulations Revitalization Acquisition Encroachment Disposal Restoration NEPA Logistics Mission Aircraft Long-lead items Research Training Specialty material purchases Mission Management
  • 24. I & A Risk Distribution and Priority Distribution of I&A Risks 5 0 4 3 3 3 (Likelihood) Probability 4 0 0 2 8 2 3 0 0 2 0 0 2 0 0 0 0 0 1 0 0 0 1 0 1 2 3 4 5 Impact (Consequence, severity) Operations and Infrastructure Percentage Risks per Category Em erging Regulations 12% 19% Encroachm ent on Mission 8% Encroachm ent on Mission - Host 4% 15% Tenant Relationships Materials / Sytem s Engineering Environm ental, Historic, and Archeological 8% Liability / Cleanup Costs 27% 8% Natural Events
  • 25. Institutional Risks Risk Timing Window 10 8 6 ks of Ris 4 # 2 0 s) Day rrin g) s) 80 ecu ear (<1 ear s) ate g (R -3 Y ear s) edi oin ays -6 Y s) mm n-g 0D (3 30 Y ear I O (18 term (6- 50 Y rm ng- SE 0-1 r-te Lo V (3 Nea SG
  • 26. Percent Recommendations By Type (36) (30) 44% 36% (17) 20% Process Change Technology Application Management Improvement NOTE: 80 % of risks are mitigated if we talk to one another
  • 27. What We Manage For Mission • Military Base Closure/Realignment (# 899) – Risk Consequence: Possible unavailability of infrastructure or services required for Center operation in support of mission, leading to cost and schedule risk • EPA Risk Assessments (#897) – Risk Consequence: Forced material substitutions, cost and schedule risk • Encroachment on NASA Centers (#898) – Risk Consequence: Inability to perform mission at Centers
  • 28. What We Manage For Mission • Unfunded Liability of Past Hazardous Materials (#903) – Risk Consequence: Further clean-up may be needed, resulting in less budget for mission • Grants and National Environmental Policy Act (NEPA) Requirements (#902) – Risk Consequence: NEPA review is required for all grants; lack of review can stop projects and facilities, causing risk to project cost and schedule • Aging /Obsolescence of Agency Business Systems (# 945) – Risk Consequence: Inability to identify and quantify resources means NASA may not be able to obtain what it needs, when we need it. May cause schedule cost and performance issues for mission
  • 29. What We Manage For Mission • Rising Energy Costs (#946) – Risk Consequence: Increasing energy costs will continue to erode mission budget • KSC Vulnerability to Natural Disasters (#941) – Risk Consequence: Manned spaceflight launch activities could be suspended for extended periods of time
  • 30. What Mission Manages With Us • NEPA and Historic Preservation (#901) – Risk Consequence: If the NEPA process is not followed in the early design phases of programs and projects, there is a high potential for court action to delay or shut down the project/program (Schedule, cost and budget-- e.g. KECK Interferometer sp) • Identification of Life Cycle Costs (Design for Operations) – Risk Consequence: Failure to identify true life cycle costs (including disposition and remediation) related to infrastructure in the early phases of exploration planning increases the possibility of schedule delays, increased life cycle costs, increased environmental liability, and increased costs for remediation (at direct cost to the program)
  • 31. What Mission Manages With Us • Interfaces, Requirements and Constraints for Ground Infrastructure – Risk Consequence: When interfaces, requirements and constraints for ground infrastructure are developed late in the systems engineering process, and the schedule and cost requirements are underestimated, projects suffer from inadequate budget estimates, schedule delays for infrastructure modifications, and negative impacts to life cycle costs and performance. • Material Substitutions Within Critical Flight Systems and Components – Risk Consequence: Failure to communicate materials substitutions up the vendor supply chain may compromise performance and safety of critical flight components and subsystems resulting in schedule delays and added costs.
  • 32. What Mission Manages With Us • Materials Substitution in Systems Design – Risk Consequence: Failure to identify materials and processes which are not hazardous to the environment or to human health puts project schedule and cost at risk; materials known to be hazardous must be reduced during a program’s life cycle. • Frequency Protection at Goldstone – Risk Consequence: Failure to plan for incompatibility of Fort Irwin’s expanded use of spectrum with requirements of the Deep Space Network co-located at Fort Irwin threaten NASA’s DSN capability.
  • 33. Pilot Risk Management Initiative • I & A developed pilot risk initiative with Exploration Systems Mission Directorate (ESMD) to explore management strategies carefully designed to systematically identify and reduce institutional risk to mission • Spring 2005, formed a Risk Management Team and mapped institutional risks to mission, using formal risk management and analysis tools – 26 I & A risks to mission identified • Winter, 2005-Spring 2006, I& A partnered with ESMD and entered I & A risks into ESMD Risk Management Database; I & A serves on ESMD Risk Management Board • Risk mitigation activities currently underway across the Institutional Base through the implementation of the Mission Support Implementation Plan.
  • 34. ARM Screen Capture of I & A Risks a T Q
  • 35. Top I & A Risks in ESMD Active Risk Manager (ARM) Risk ID Risk Title zzz Encroachment on NASA 898 5x5 Centers/Facilties 901 NEPA & Historic Preservation 5x5 Aging/Obsolescence of Agency 945 5x3 Institutional Business Systems 902 Grants & NEPA Requirements 4x4