How to Implement & Manage an
Energy Management Program
This short e-book describes the key elements in implementing
and managing an energy and environmental management
program

October 2011
Introduction
Companies of all sizes face      the program for continuous
many challenges in rolling out   improvement will maximize
a energy and environmental       adoption and drive on-going
program that maximizes           tangible best results.
adoption and delivers best
results. Key questions always    This short e-book will outline
emerge - Who is responsible      the key elements of
for the program? Who bares       implementing and managing
the costs? Who reaps the         a successful portfolio-wide
benefits?                        energy and environmental
                                 program.
Our experience has shown
that choosing the proper
implementation
approach, involving all
aspects of the organization
and managing
The Importance of Data
Data types, such as       tracking the success
energy data, facility     of the program.
data, behavioural         Ensuring you have a
data and KPI data,        robust data
are absolutely            foundation in place
essential to              before the program
developing                is implemented is
achievable targets,       essential for program
prioritizing energy       success.
efficiency initiatives,
engaging customers
and employees and
Key Elements
This e-book will highlight the key elements involved in
implementing and managing an energy and environmental
program. The elements include:

        1. Choosing your
        implementation approach

           2. Identifying resource
           requirements

              3. Implementation: where to get
              started?

                 4. Continuous management of
                 program

                    5. Monitor & verification plan
Implementation Approach
There are many different ways that a program can be successfully
implemented, but at a high level there is a configuration of two key
concepts, the directive and prescriptive approach. The table below summaries
these two approaches:
                        DIRECTIVE                            PRESCRIPTIVE

Description             Commonly referred to as the          This implementation approach focuses
                        ‘command and control’ approach,      on achieving specific targets and
                        this implementation method           objectives, but without rigid operating
                        focuses on determining a distinct    instructions on how to get there.
                        plan of action, with well
                        documented activities and order in
                        which they are to be completed.
Centralization Versus Facility Level Rights

Knowledge Base          Centralized                          Shared

Decision Rights         Centralized                          Facility Level

Investment Rights       Centralized                          Shared

Characteristics

When to use...           Small Organizations                  Large Organizations
                         Easy to Manage                       Empowered Site Managers
                         Homogenous Buildings                 Heterogeneous Buildings
                         Low Admin Requirements               High Admin Requirements
Identifying Resource Requirements
Regardless of your approach, there are certain resource requirements
that need to be addressed prior to program implementation. These
resources are identified and described on the next two pages.

Commitment       Refers to the degree in which your organization will
                 throw its weight behind a program in order to achieve
                 its targets. This manifests itself in several ways, from
                 the policies and mandates that executives will
                 personally subscribe to and reinforce, to the
                 implementation personnel that will be allocated to
                 successfully meeting targets, to the financial
                 resources available to spend on expenditures and
                 capital in order to achieve success.
Organization     Refers to the way resources (people and otherwise)
                 are aligned in order to support an energy and
                 environmental program, and the change that it will
                 bring once underway.
Identifying Resource Requirements continued...

Data         Data management is just as it sounds, ensuring data
Management   is available, accurate, and timely. This is crucial as
             without a robust data collection and analysis program,
             tracking results and then making decisions on these
             results can be inhibited.
Execution    Questions to consider from a resource perspective
             for execution include whether there is enough time
             and money spent on effectively tracking results. Is
             there enough resources in place to help ensure the
             activities required to achieve results happen in a
             timely and effective manner (aka project
             management)? Is there appropriate time and energy
             is being spent on communicating results and
             gathering stakeholder feedback?
Implementation: Getting Started
One of the most difficult parts
of implementing an energy         1. What training/orientation
and environment program is           may be required to get
getting it started. A program        buy-in from my
launch spells a change in            stakeholders?
behaviour for at least some of
your stakeholders, which can
lead to a natural resistance      2. How do I build quick
point.                               successes to re-inforce
                                     buy-in?

To overcome this, there are
three key questions to            3. How do I integrate this
consider and address prior to        program into my business
launch.                              as usual mindset?
Continuous Management
After you have rolled out your   to ensure your program is
program the next step is to      achieving set goals and
continuously manage the          targets.
performance of it. To do this
you will evaluate the core        Reward & Recognition
aspects of the program and
reward stakeholders for
completion of major              It’s important to recognize
milestones.                      and reward major milestones
                                 in the program, whether it’s
                                 performance based or goal
 Continuous Evaluation
                                 and objective achievement.
                                 This means rewarding all
During the continuous            stakeholders involved in the
evaluation phase changing or     program, including but not
updating your original           limited to, yourself, customers
program strategy may happen      and employees.
Monitor & Verification Plan
The best program has little      to make sure your program is
value if not measured in         on track. This is a continuous
some fashion. A good             process and should leverage
measurement and verification     software to automate this
process will allow effective     process.
management of activities in
the long term.                                        1. Design
                                                     Performance
                                                       Criteria

The diagram to the right
outlines five steps to follow    5. Feedback                              2. Gather
when measuring the success      Into Program                                 Data

of your program. The first
three steps can be completed
in the design phase while the
last two steps will provide a
method for verifying results             4. Verify
                                         Savings
                                                                   3. Analyze
                                                                      Data
To successfully implement and
manage an energy and
environmental program you
must:
 Engage the right
  implementation approach
  for your organization
 Identify the correct
  resources
 Continuously manage your
  program with recognition
  and feedback
 Monitor and verify results
  on an on-going basis
Burlington, ON                      Montreal, QC                       Vancouver, BC                       Charlotte, NC                     All rights reserved.
5420 N. Service Road                276 Rue Saint-Jacques              422 Richards St.                    15720 John J Delaney Dr.          © Energy Advantage Inc.
Suite 501                           Bureau 802                         Suite 300                           Suite 300
Phone: (905) 319 1717               Phone: (514) 843 4665              Phone: (877) 702 3992               Phone: (800) 354 1266

Monterrey, México                  New Delhi, India                    Dubai, UAE                           www.energyadvantage.com
EQUUS Parque Corporativo           Newbridge Business Center           Maktoum Street                       contactus@energyadvantage.com
Ricardo Margain 444                1st & 2nd Floor, Tower B            Concorde Office Tower                www.energyadvantage.com/blog
Col Valle del Campestre            INOX Tower, Plot No. 17             2nd Floor, Office no. 205
San Pedro Garza García             Sector 16A, Noida 201301            P.O. Box 1630
Nuevo León , CP: 66265             Phone: +91 9810387133               Phone: +971 4 2249977
Phone: +52 (181) 4780 2049

Energy Advantage Inc. provides total energy and environmental management solutions to our customers’ sustainability challenges, delivering them ‘best results’ in
managing their risk, reducing their costs, and enhancing their reputation within the markets and communities they serve.

More Related Content

What's hot

Program Management Outsourcing: Challenges & Factors Contributing to Success
Program Management Outsourcing: Challenges & Factors Contributing to SuccessProgram Management Outsourcing: Challenges & Factors Contributing to Success
Program Management Outsourcing: Challenges & Factors Contributing to SuccessMoataz Y. Hussein
 
The Role of the Architect in ERP and PDM System Deployment
The Role of the Architect in ERP and PDM System DeploymentThe Role of the Architect in ERP and PDM System Deployment
The Role of the Architect in ERP and PDM System DeploymentGlen Alleman
 
Dornell.izella
Dornell.izellaDornell.izella
Dornell.izellaNASAPMC
 
EFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENTEFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENTAssignment Studio
 
Efficacy of Project Management,
Efficacy of Project Management, Efficacy of Project Management,
Efficacy of Project Management, Assignment Studio
 
Project charterexample (1) (1)
Project charterexample (1) (1)Project charterexample (1) (1)
Project charterexample (1) (1)owaishazara
 
You don’t need agile to avoid the seven deadly sins of pm
You don’t need agile to avoid the seven deadly sins of pmYou don’t need agile to avoid the seven deadly sins of pm
You don’t need agile to avoid the seven deadly sins of pmGlen Alleman
 
Project Management Discipline - Brown Bag CXB V03 Jun 2009 SAN
Project Management Discipline - Brown Bag CXB V03 Jun 2009 SANProject Management Discipline - Brown Bag CXB V03 Jun 2009 SAN
Project Management Discipline - Brown Bag CXB V03 Jun 2009 SANcj_barbosa
 

What's hot (17)

B301
B301B301
B301
 
B301
B301B301
B301
 
B301
B301B301
B301
 
B318 web
B318 webB318 web
B318 web
 
Program Management Outsourcing: Challenges & Factors Contributing to Success
Program Management Outsourcing: Challenges & Factors Contributing to SuccessProgram Management Outsourcing: Challenges & Factors Contributing to Success
Program Management Outsourcing: Challenges & Factors Contributing to Success
 
T351
T351T351
T351
 
Trn 06
Trn 06Trn 06
Trn 06
 
The Role of the Architect in ERP and PDM System Deployment
The Role of the Architect in ERP and PDM System DeploymentThe Role of the Architect in ERP and PDM System Deployment
The Role of the Architect in ERP and PDM System Deployment
 
S265
S265S265
S265
 
Dornell.izella
Dornell.izellaDornell.izella
Dornell.izella
 
M Sc Report19 03 09
M Sc Report19 03 09M Sc Report19 03 09
M Sc Report19 03 09
 
EFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENTEFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENT
 
Efficacy of Project Management,
Efficacy of Project Management, Efficacy of Project Management,
Efficacy of Project Management,
 
E136
E136E136
E136
 
Project charterexample (1) (1)
Project charterexample (1) (1)Project charterexample (1) (1)
Project charterexample (1) (1)
 
You don’t need agile to avoid the seven deadly sins of pm
You don’t need agile to avoid the seven deadly sins of pmYou don’t need agile to avoid the seven deadly sins of pm
You don’t need agile to avoid the seven deadly sins of pm
 
Project Management Discipline - Brown Bag CXB V03 Jun 2009 SAN
Project Management Discipline - Brown Bag CXB V03 Jun 2009 SANProject Management Discipline - Brown Bag CXB V03 Jun 2009 SAN
Project Management Discipline - Brown Bag CXB V03 Jun 2009 SAN
 

Similar to How to Implement & Manage an Energy Management Program

Results Based Monitoring and Evaluation
Results Based Monitoring and EvaluationResults Based Monitoring and Evaluation
Results Based Monitoring and EvaluationMadhawa Waidyaratna
 
Zamfaran training for chairmen 4
Zamfaran training for chairmen 4Zamfaran training for chairmen 4
Zamfaran training for chairmen 4Maishanu Malami
 
How to Build a Business Case and Measure the Effects of Leadership Developmen...
How to Build a Business Case and Measure the Effects of Leadership Developmen...How to Build a Business Case and Measure the Effects of Leadership Developmen...
How to Build a Business Case and Measure the Effects of Leadership Developmen...Human Capital Media
 
Project Management Goals.pptx
Project Management Goals.pptxProject Management Goals.pptx
Project Management Goals.pptxHussainUllah4
 
Increasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value ManagementIncreasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value ManagementGlen Alleman
 
Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason Uyder
 
Project Benefit Validation - Lean Six Sigma
Project Benefit  Validation - Lean Six SigmaProject Benefit  Validation - Lean Six Sigma
Project Benefit Validation - Lean Six SigmaWillowTree Advisors
 
How Monitoring the Development of Digital Transformation Programs.pdf
How Monitoring the Development of Digital Transformation Programs.pdfHow Monitoring the Development of Digital Transformation Programs.pdf
How Monitoring the Development of Digital Transformation Programs.pdfJose thomas
 
Deliverables based planning handbook
Deliverables based planning handbookDeliverables based planning handbook
Deliverables based planning handbookGlen Alleman
 
Steps to a successful performance management implementation
Steps to a successful performance management implementationSteps to a successful performance management implementation
Steps to a successful performance management implementationaemu123456
 
A Leaders Guide to Building a Renewable Program - Chapter 1
A Leaders Guide to Building a Renewable Program - Chapter 1A Leaders Guide to Building a Renewable Program - Chapter 1
A Leaders Guide to Building a Renewable Program - Chapter 1Erik Lindquist, P.Eng.
 
The 9 vector view of human performance
The 9 vector view of  human performanceThe 9 vector view of  human performance
The 9 vector view of human performanceArun Kumar
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement BprRoy Antony Arnold G
 
Value destruction: why most projects fail to realise the benefits used to mak...
Value destruction: why most projects fail to realise the benefits used to mak...Value destruction: why most projects fail to realise the benefits used to mak...
Value destruction: why most projects fail to realise the benefits used to mak...Association for Project Management
 
Breaking the Project Failure Cycle
Breaking the Project Failure CycleBreaking the Project Failure Cycle
Breaking the Project Failure CycleGlen Alleman
 
Establishing a Software Measurement Process
Establishing a Software Measurement ProcessEstablishing a Software Measurement Process
Establishing a Software Measurement Processaliraza786
 

Similar to How to Implement & Manage an Energy Management Program (20)

Results Based Monitoring and Evaluation
Results Based Monitoring and EvaluationResults Based Monitoring and Evaluation
Results Based Monitoring and Evaluation
 
Zamfaran training for chairmen 4
Zamfaran training for chairmen 4Zamfaran training for chairmen 4
Zamfaran training for chairmen 4
 
How to Build a Business Case and Measure the Effects of Leadership Developmen...
How to Build a Business Case and Measure the Effects of Leadership Developmen...How to Build a Business Case and Measure the Effects of Leadership Developmen...
How to Build a Business Case and Measure the Effects of Leadership Developmen...
 
Project Management Goals.pptx
Project Management Goals.pptxProject Management Goals.pptx
Project Management Goals.pptx
 
Increasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value ManagementIncreasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value Management
 
Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12
 
Project Benefit Validation - Lean Six Sigma
Project Benefit  Validation - Lean Six SigmaProject Benefit  Validation - Lean Six Sigma
Project Benefit Validation - Lean Six Sigma
 
DPPM2
DPPM2DPPM2
DPPM2
 
How Monitoring the Development of Digital Transformation Programs.pdf
How Monitoring the Development of Digital Transformation Programs.pdfHow Monitoring the Development of Digital Transformation Programs.pdf
How Monitoring the Development of Digital Transformation Programs.pdf
 
project management essentials
project management essentialsproject management essentials
project management essentials
 
Deliverables based planning handbook
Deliverables based planning handbookDeliverables based planning handbook
Deliverables based planning handbook
 
Roi Certification Kraków May 2017
Roi Certification Kraków May 2017Roi Certification Kraków May 2017
Roi Certification Kraków May 2017
 
Steps to a successful performance management implementation
Steps to a successful performance management implementationSteps to a successful performance management implementation
Steps to a successful performance management implementation
 
A Leaders Guide to Building a Renewable Program - Chapter 1
A Leaders Guide to Building a Renewable Program - Chapter 1A Leaders Guide to Building a Renewable Program - Chapter 1
A Leaders Guide to Building a Renewable Program - Chapter 1
 
The 9 vector view of human performance
The 9 vector view of  human performanceThe 9 vector view of  human performance
The 9 vector view of human performance
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement Bpr
 
Value destruction: why most projects fail to realise the benefits used to mak...
Value destruction: why most projects fail to realise the benefits used to mak...Value destruction: why most projects fail to realise the benefits used to mak...
Value destruction: why most projects fail to realise the benefits used to mak...
 
Breaking the Project Failure Cycle
Breaking the Project Failure CycleBreaking the Project Failure Cycle
Breaking the Project Failure Cycle
 
Establishing a Software Measurement Process
Establishing a Software Measurement ProcessEstablishing a Software Measurement Process
Establishing a Software Measurement Process
 
LRAFB_Project Profile
LRAFB_Project ProfileLRAFB_Project Profile
LRAFB_Project Profile
 

More from Energy Advantage

Building Simulations | Understanding Your Energy Profile
Building Simulations | Understanding Your Energy ProfileBuilding Simulations | Understanding Your Energy Profile
Building Simulations | Understanding Your Energy ProfileEnergy Advantage
 
Building Simulations | Understanding Your Building's Energy Profile
Building Simulations | Understanding Your Building's Energy ProfileBuilding Simulations | Understanding Your Building's Energy Profile
Building Simulations | Understanding Your Building's Energy ProfileEnergy Advantage
 
Sustainability Management Brochure
Sustainability Management BrochureSustainability Management Brochure
Sustainability Management BrochureEnergy Advantage
 
Data Management and Reporting Brochure
Data Management and Reporting BrochureData Management and Reporting Brochure
Data Management and Reporting BrochureEnergy Advantage
 
Carbon Management Insights
Carbon Management InsightsCarbon Management Insights
Carbon Management InsightsEnergy Advantage
 
Retail Grocery Energy & Environmental Challenges
Retail Grocery Energy & Environmental ChallengesRetail Grocery Energy & Environmental Challenges
Retail Grocery Energy & Environmental ChallengesEnergy Advantage
 
Energy & Environmental Management Program - The Importance of Corporate Commi...
Energy & Environmental Management Program - The Importance of Corporate Commi...Energy & Environmental Management Program - The Importance of Corporate Commi...
Energy & Environmental Management Program - The Importance of Corporate Commi...Energy Advantage
 

More from Energy Advantage (7)

Building Simulations | Understanding Your Energy Profile
Building Simulations | Understanding Your Energy ProfileBuilding Simulations | Understanding Your Energy Profile
Building Simulations | Understanding Your Energy Profile
 
Building Simulations | Understanding Your Building's Energy Profile
Building Simulations | Understanding Your Building's Energy ProfileBuilding Simulations | Understanding Your Building's Energy Profile
Building Simulations | Understanding Your Building's Energy Profile
 
Sustainability Management Brochure
Sustainability Management BrochureSustainability Management Brochure
Sustainability Management Brochure
 
Data Management and Reporting Brochure
Data Management and Reporting BrochureData Management and Reporting Brochure
Data Management and Reporting Brochure
 
Carbon Management Insights
Carbon Management InsightsCarbon Management Insights
Carbon Management Insights
 
Retail Grocery Energy & Environmental Challenges
Retail Grocery Energy & Environmental ChallengesRetail Grocery Energy & Environmental Challenges
Retail Grocery Energy & Environmental Challenges
 
Energy & Environmental Management Program - The Importance of Corporate Commi...
Energy & Environmental Management Program - The Importance of Corporate Commi...Energy & Environmental Management Program - The Importance of Corporate Commi...
Energy & Environmental Management Program - The Importance of Corporate Commi...
 

Recently uploaded

falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiaFalcon Invoice Discounting
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
 
Falcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small BusinessesFalcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small BusinessesFalcon investment
 
Did Paul Haggis Ever Win an Oscar for Best Filmmaker
Did Paul Haggis Ever Win an Oscar for Best FilmmakerDid Paul Haggis Ever Win an Oscar for Best Filmmaker
Did Paul Haggis Ever Win an Oscar for Best Filmmakerstajohn447
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptxrdishurana
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographerofm712785
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback AnalysisSafe PaaS
 
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case StudyTransforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case StudyPMaps Assessments
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanasabutalha2013
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.FelixPerez547899
 
State of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateState of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateRedSeer
 
Hyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings releaseHyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings releaseirhcs
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterNathanBaughman3
 
Cracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxCracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxWorkforce Group
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
 
Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.smalmahmud11
 
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product DiscoveryDesmond Leo
 
IPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best ServiceIPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best ServiceDragon Dream Bar
 

Recently uploaded (20)

falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Falcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small BusinessesFalcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small Businesses
 
Did Paul Haggis Ever Win an Oscar for Best Filmmaker
Did Paul Haggis Ever Win an Oscar for Best FilmmakerDid Paul Haggis Ever Win an Oscar for Best Filmmaker
Did Paul Haggis Ever Win an Oscar for Best Filmmaker
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptx
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case StudyTransforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
Transforming Max Life Insurance with PMaps Job-Fit Assessments- Case Study
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.
 
State of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateState of D2C in India: A Logistics Update
State of D2C in India: A Logistics Update
 
Hyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings releaseHyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings release
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Cracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxCracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptx
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.
 
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
 
IPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best ServiceIPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best Service
 

How to Implement & Manage an Energy Management Program

  • 1. Informative e-book How to Implement & Manage an Energy Management Program This short e-book describes the key elements in implementing and managing an energy and environmental management program October 2011
  • 2. Introduction Companies of all sizes face the program for continuous many challenges in rolling out improvement will maximize a energy and environmental adoption and drive on-going program that maximizes tangible best results. adoption and delivers best results. Key questions always This short e-book will outline emerge - Who is responsible the key elements of for the program? Who bares implementing and managing the costs? Who reaps the a successful portfolio-wide benefits? energy and environmental program. Our experience has shown that choosing the proper implementation approach, involving all aspects of the organization and managing
  • 3. The Importance of Data Data types, such as tracking the success energy data, facility of the program. data, behavioural Ensuring you have a data and KPI data, robust data are absolutely foundation in place essential to before the program developing is implemented is achievable targets, essential for program prioritizing energy success. efficiency initiatives, engaging customers and employees and
  • 4. Key Elements This e-book will highlight the key elements involved in implementing and managing an energy and environmental program. The elements include: 1. Choosing your implementation approach 2. Identifying resource requirements 3. Implementation: where to get started? 4. Continuous management of program 5. Monitor & verification plan
  • 5. Implementation Approach There are many different ways that a program can be successfully implemented, but at a high level there is a configuration of two key concepts, the directive and prescriptive approach. The table below summaries these two approaches: DIRECTIVE PRESCRIPTIVE Description Commonly referred to as the This implementation approach focuses ‘command and control’ approach, on achieving specific targets and this implementation method objectives, but without rigid operating focuses on determining a distinct instructions on how to get there. plan of action, with well documented activities and order in which they are to be completed. Centralization Versus Facility Level Rights Knowledge Base Centralized Shared Decision Rights Centralized Facility Level Investment Rights Centralized Shared Characteristics When to use... Small Organizations Large Organizations Easy to Manage Empowered Site Managers Homogenous Buildings Heterogeneous Buildings Low Admin Requirements High Admin Requirements
  • 6. Identifying Resource Requirements Regardless of your approach, there are certain resource requirements that need to be addressed prior to program implementation. These resources are identified and described on the next two pages. Commitment Refers to the degree in which your organization will throw its weight behind a program in order to achieve its targets. This manifests itself in several ways, from the policies and mandates that executives will personally subscribe to and reinforce, to the implementation personnel that will be allocated to successfully meeting targets, to the financial resources available to spend on expenditures and capital in order to achieve success. Organization Refers to the way resources (people and otherwise) are aligned in order to support an energy and environmental program, and the change that it will bring once underway.
  • 7. Identifying Resource Requirements continued... Data Data management is just as it sounds, ensuring data Management is available, accurate, and timely. This is crucial as without a robust data collection and analysis program, tracking results and then making decisions on these results can be inhibited. Execution Questions to consider from a resource perspective for execution include whether there is enough time and money spent on effectively tracking results. Is there enough resources in place to help ensure the activities required to achieve results happen in a timely and effective manner (aka project management)? Is there appropriate time and energy is being spent on communicating results and gathering stakeholder feedback?
  • 8. Implementation: Getting Started One of the most difficult parts of implementing an energy 1. What training/orientation and environment program is may be required to get getting it started. A program buy-in from my launch spells a change in stakeholders? behaviour for at least some of your stakeholders, which can lead to a natural resistance 2. How do I build quick point. successes to re-inforce buy-in? To overcome this, there are three key questions to 3. How do I integrate this consider and address prior to program into my business launch. as usual mindset?
  • 9. Continuous Management After you have rolled out your to ensure your program is program the next step is to achieving set goals and continuously manage the targets. performance of it. To do this you will evaluate the core Reward & Recognition aspects of the program and reward stakeholders for completion of major It’s important to recognize milestones. and reward major milestones in the program, whether it’s performance based or goal Continuous Evaluation and objective achievement. This means rewarding all During the continuous stakeholders involved in the evaluation phase changing or program, including but not updating your original limited to, yourself, customers program strategy may happen and employees.
  • 10. Monitor & Verification Plan The best program has little to make sure your program is value if not measured in on track. This is a continuous some fashion. A good process and should leverage measurement and verification software to automate this process will allow effective process. management of activities in the long term. 1. Design Performance Criteria The diagram to the right outlines five steps to follow 5. Feedback 2. Gather when measuring the success Into Program Data of your program. The first three steps can be completed in the design phase while the last two steps will provide a method for verifying results 4. Verify Savings 3. Analyze Data
  • 11. To successfully implement and manage an energy and environmental program you must:  Engage the right implementation approach for your organization  Identify the correct resources  Continuously manage your program with recognition and feedback  Monitor and verify results on an on-going basis
  • 12. Burlington, ON Montreal, QC Vancouver, BC Charlotte, NC All rights reserved. 5420 N. Service Road 276 Rue Saint-Jacques 422 Richards St. 15720 John J Delaney Dr. © Energy Advantage Inc. Suite 501 Bureau 802 Suite 300 Suite 300 Phone: (905) 319 1717 Phone: (514) 843 4665 Phone: (877) 702 3992 Phone: (800) 354 1266 Monterrey, México New Delhi, India Dubai, UAE www.energyadvantage.com EQUUS Parque Corporativo Newbridge Business Center Maktoum Street contactus@energyadvantage.com Ricardo Margain 444 1st & 2nd Floor, Tower B Concorde Office Tower www.energyadvantage.com/blog Col Valle del Campestre INOX Tower, Plot No. 17 2nd Floor, Office no. 205 San Pedro Garza García Sector 16A, Noida 201301 P.O. Box 1630 Nuevo León , CP: 66265 Phone: +91 9810387133 Phone: +971 4 2249977 Phone: +52 (181) 4780 2049 Energy Advantage Inc. provides total energy and environmental management solutions to our customers’ sustainability challenges, delivering them ‘best results’ in managing their risk, reducing their costs, and enhancing their reputation within the markets and communities they serve.