HOW TO CHOOSE THE RIGHT THEME

& CUSTOMIZE IT THE RIGHT WAY

(BY USING A CHILD THEME)
GEOFF MYERS PRESENTS
BEFORE WE BEGIN…
ABOUT GEOFF MYERS
▸ Founded SimDex LLC in 2004 in Saint Paul, MN
▸ Web Solutions for Small + Medium Sized Businesses
▸ Consulting, Design, Development, Marketing, Maintenance, Hosting
▸ Specialty is Custom Web Applications and Integrations (WordPress,
PHP, JavaScript, 3rd Party APIs, etc.)
▸ 10+ Years WordPress Experience
▸ 75+ WordPress Sites Designed, Developed, Marketed, Maintained
▸ Bachelor's in Computer Science
▸ Get In Touch: geoff@simdex.org | simdex.org | 414.455.6675
HOW TO CHOOSE

THE RIGHT THEME
PART 1 OF 2:
Experience Level: Beginner–Intermediate
HOW TO CHOOSE THE RIGHT THEME
WHAT SHOULD I CONSIDER WHEN RESEARCHING A THEME?
1. Features + Functionality
2. User Interface + Experience (UI/UX)
3. Customization + Flexibility
4. Responsive Design + Mobile Friendliness
5. Search Engine Optimization (SEO)
6. Performance + Speed
7. Security + Stability
8. Developer + Community Support
HOW TO CHOOSE THE RIGHT THEME
1. FEATURES + FUNCTIONALITY
▸ Included Page Templates + Post Formats
▸ Custom Post Types + Taxonomies (portfolio, listings, testimonials…)
▸ Industry Specific Features (real estate, education…)
▸ Included Widgets + Shortcodes
▸ Advanced Search + Navigation
▸ Social Media Integration

(Facebook, Twitter, etc.)
▸ Other 3rd Party Integrations

(MailChimp, Google Analytics, etc.)
HOW TO CHOOSE THE RIGHT THEME
2. USER INTERFACE + EXPERIENCE (UI/UX)
▸ Familiar Design Conventions
▸ Simplicity + Ease of Use
▸ Logical User Flows
▸ Content Focused
▸ Clear Calls to Action (CTAs)
▸ Design Consistency
▸ Responsive Design (more later…)
HOW TO CHOOSE THE RIGHT THEME
3. CUSTOMIZATION + FLEXIBILITY
▸ Theme Design Options (universal parameters)
▸ Page Design Options (individual post parameters)
▸ Header + Footer + Sidebars
▸ Widget + Menu Areas (top, left, etc.)
▸ Custom CSS + JavaScript Code
▸ Visual Page Builder (more later…)
▸ Child Themes (more later…)
HOW TO CHOOSE THE RIGHT THEME
4. RESPONSIVE DESIGN + MOBILE FRIENDLINESS
▸ User Experience Optimized for All Screens + Networks
▸ Separate Layouts (desktop, notebook, tablet, smartphone)
▸ Fluid Grid System
▸ Flexible + Scalable Images
▸ Mobile Navigation Menus
▸ Touch Friendly UI Elements

(buttons, tabs, forms, etc.)
HOW TO CHOOSE THE RIGHT THEME
5. SEARCH ENGINE OPTIMIZATION (SEO)
▸ High Quality Code (follows best practices)
▸ Clear Separation of Content + Design
▸ Custom Meta Titles + Descriptions
▸ Site Map
▸ SEO Plugins (Yoast SEO,

All in One SEO Pack,

Google XML Sitemaps)
▸ Performance + Speed (next slide…)
HOW TO CHOOSE THE RIGHT THEME
6. PERFORMANCE + SPEED
▸ Unnecessary Features + Functionality
▸ Code Optimization + Minification
▸ Image Optimization
▸ Testing Tools (Google PageSpeed,

GTmetrix, Pingdom)
▸ Caching Plugins (WP Rocket,

W3 Total Cache, WP Super Cache)
HOW TO CHOOSE THE RIGHT THEME
7. SECURITY + STABILITY
▸ Updated Often (active development)
▸ Modern Technologies
▸ Large User Base (popular)
▸ Simpler is Usually More Secure
▸ Security Plugins (Sucuri,

iThemes Security, Wordfence)
▸ Developer + Community Support

(next slide…)
HOW TO CHOOSE THE RIGHT THEME
8. DEVELOPER + COMMUNITY SUPPORT
▸ Active Development
▸ Developer Support (usually paid annually)
▸ Frequent Updates
▸ Healthy + Growing Community
▸ High Quality Documentation
▸ Popularity Helps
▸ I Can Help You Too (simdex.org)
HOW TO CHOOSE THE RIGHT THEME
ADDITIONAL TIPS + RECOMMENDATIONS
▸ Look at User Ratings + Reviews
▸ Beware of Bloatware

(themes trying to be everything to everyone)
▸ Don't Be Afraid to Experiment

(you can always switch themes later)
▸ Remember Content is #1
HOW TO CHOOSE THE RIGHT THEME
WHERE SHOULD I GO TO FIND A WORDPRESS THEME? (PART 1)
▸ WordPress Theme Directory (wordpress.org/themes) ★
▸ WooCommerce / WooThemes (woocommerce.com) ★
▸ Elegant Themes (elegantthemes.com)
▸ StudioPress (studiopress.com) ★
▸ Envato Market / ThemeForest

(themeforest.net)
HOW TO CHOOSE THE RIGHT THEME
WHERE SHOULD I GO TO FIND A WORDPRESS THEME? (PART 2)
▸ AppThemes (appthemes.com)
▸ CSSIgniter (cssigniter.com)
▸ Dessign (dessign.net)
▸ Elmastudio (elmastudio.de)
▸ Graph Paper Press (graphpaperpress.com)
▸ Obox Themes (oboxthemes.com)
▸ Themezilla (themezilla.com)
▸ Themify (themify.me)
HOW TO CHOOSE THE RIGHT THEME
WHAT ARE YOUR FAVORITE WORDPRESS THEMES?
▸ Genesis Framework by StudioPress (studiopress.com)
▸ Storefront Framework by WooCommerce (woocommerce.com)
▸ X by Themeco (theme.co)
▸ GeneratePress (generatepress.com)
▸ OceanWP (oceanwp.org)
▸ Divi by Elegant Themes

(elegantthemes.com)
HOW TO CHOOSE THE RIGHT THEME
WHAT IS A VISUAL PAGE BUILDER? WHAT ARE EXAMPLES?
▸ Visual GUI with drag + drop interface
▸ Quickly + easily build multicolumn layouts
▸ Little to no HTML or CSS coding required
▸ Examples
▸ Beaver Builder (Pro)
▸ Cornerstone by Themeco ★
▸ Divi Builder by Elegant Themes
▸ Elementor (Pro) ★
▸ Visual Composer by WPBakery
THAT CONCLUDES PART 1.
BEFORE PART 2…
Questions?
Get In Touch:

geoff@simdex.org

simdex.org

414.455.6675
HOW TO CUSTOMIZE THEMES THE RIGHT WAY

(BY USING CHILD THEMES)
PART 2 OF 2:
Experience Level: Intermediate–Advanced
HOW TO CUSTOMIZE THEMES THE RIGHT WAY (BY USING CHILD THEMES)
WHAT IS A CHILD THEME? WHY SHOULD I USE ONE?
▸ Inherits Attributes from Parent Theme by Default
▸ Overrides Styles + Functions of Parent Theme
▸ Relies on Parent Theme to Function
▸ Does Not Modify Parent Theme
▸ Updates to Parent Theme Don’t

Overwrite Customizations
▸ Easy to Update + Maintain
HOW TO CUSTOMIZE THEMES THE RIGHT WAY (BY USING CHILD THEMES)
THE “I LOVE CODE” APPROACH
1. Create new folder in …/wp-content/themes/ called
{parent-theme}-child (or whatever you want)
2. Create two new plain text files*

in {parent-theme}-child called

style.css and functions.php
*UTF-8 character encoding recommended
HOW TO CUSTOMIZE THEMES THE RIGHT WAY (BY USING CHILD THEMES)
THE “I LOVE CODE” APPROACH
3. Add the following header to style.css, then edit:
/*
Theme Name: Twenty Fifteen Child
Theme URI: http://example.com/twenty-fifteen-child/
Description: Twenty Fifteen Child Theme
Author: John Doe
Author URI: http://example.com
Template: twentyfifteen
Version: 1.0.0
License: GNU General Public License v2 or later
License URI: http://www.gnu.org/licenses/gpl-2.0.html
Tags: light, dark, two-columns, right-sidebar, responsive-layout
Text Domain: twenty-fifteen-child
*/
/* your custom CSS begins here */
HOW TO CUSTOMIZE THEMES THE RIGHT WAY (BY USING CHILD THEMES)
THE “I LOVE CODE” APPROACH
4. Add the following to the top of functions.php, then edit:
<?php



add_action( 'wp_enqueue_scripts', 'my_parent_theme_css' );
function my_parent_theme_css() {
wp_enqueue_style( 'parent-style', get_template_directory_uri() . '/style.css' );
// copy and edit the line above for each stylesheet included in your parent theme
wp_enqueue_style( 'child-style', get_stylesheet_uri(), array( 'parent-style' ) );
}
// your custom PHP begins here
HOW TO CUSTOMIZE THEMES THE RIGHT WAY (BY USING CHILD THEMES)
THE “I LOVE CODE” APPROACH
5. Activate child theme in WordPress admin
6. Copy desired template file(s) from parent theme folder to child
theme folder*
7. Modify copied template file(s) within child theme folder
‣ WordPress will first look in child theme folder for template files
and use them if they exist, otherwise parent theme’s templates
will be used
‣ Refer to WordPress theme template hierarchy for development
reference (next slide…)
*preserve directory hierarchy (relative file paths)
wphierarchy.com
WordPress Theme Template Hierarchy
HOW TO CUSTOMIZE THEMES THE RIGHT WAY (BY USING CHILD THEMES)
THE “I HATE CODE” APPROACH: CHILD THEME CONFIGURATOR
1. Download and install Child Theme Configurator:

https://wordpress.org/plugins/child-theme-configurator/
2. Follow these step-by-step instructions:

http://www.childthemeconfigurator.com/how-to-use/
3. Add all custom CSS to styles.css within your child theme:

…/wp-content/themes/your-child-theme/style.css
4. Add all custom PHP to functions.php within your child theme:

…/wp-content/themes/your-child-theme/functions.php
5. Activate child theme in WordPress admin
6. Advanced: Copy desired template file(s) from parent theme folder to
child theme folder then modify copied template file(s)
HOW TO CUSTOMIZE THEMES THE RIGHT WAY (BY USING CHILD THEMES)
THE “I HATE CODE” APPROACH: CHILD THEME CONFIGURATOR
Demo
THAT’S IT FOR NOW…
THANK YOU!
Questions?
Get In Touch:

geoff@simdex.org

simdex.org

414.455.6675
THAT’S IT FOR NOW…
THIS PRESENTATION IS AVAILABLE ONLINE:
simdex.org/themes
Get In Touch:

geoff@simdex.org

simdex.org

414.455.6675

How to Choose the Right Theme & Customize It the Right Way (By Using a Child Theme)

  • 1.
    HOW TO CHOOSETHE RIGHT THEME
 & CUSTOMIZE IT THE RIGHT WAY
 (BY USING A CHILD THEME) GEOFF MYERS PRESENTS
  • 2.
    BEFORE WE BEGIN… ABOUTGEOFF MYERS ▸ Founded SimDex LLC in 2004 in Saint Paul, MN ▸ Web Solutions for Small + Medium Sized Businesses ▸ Consulting, Design, Development, Marketing, Maintenance, Hosting ▸ Specialty is Custom Web Applications and Integrations (WordPress, PHP, JavaScript, 3rd Party APIs, etc.) ▸ 10+ Years WordPress Experience ▸ 75+ WordPress Sites Designed, Developed, Marketed, Maintained ▸ Bachelor's in Computer Science ▸ Get In Touch: geoff@simdex.org | simdex.org | 414.455.6675
  • 3.
    HOW TO CHOOSE
 THERIGHT THEME PART 1 OF 2: Experience Level: Beginner–Intermediate
  • 4.
    HOW TO CHOOSETHE RIGHT THEME WHAT SHOULD I CONSIDER WHEN RESEARCHING A THEME? 1. Features + Functionality 2. User Interface + Experience (UI/UX) 3. Customization + Flexibility 4. Responsive Design + Mobile Friendliness 5. Search Engine Optimization (SEO) 6. Performance + Speed 7. Security + Stability 8. Developer + Community Support
  • 5.
    HOW TO CHOOSETHE RIGHT THEME 1. FEATURES + FUNCTIONALITY ▸ Included Page Templates + Post Formats ▸ Custom Post Types + Taxonomies (portfolio, listings, testimonials…) ▸ Industry Specific Features (real estate, education…) ▸ Included Widgets + Shortcodes ▸ Advanced Search + Navigation ▸ Social Media Integration
 (Facebook, Twitter, etc.) ▸ Other 3rd Party Integrations
 (MailChimp, Google Analytics, etc.)
  • 6.
    HOW TO CHOOSETHE RIGHT THEME 2. USER INTERFACE + EXPERIENCE (UI/UX) ▸ Familiar Design Conventions ▸ Simplicity + Ease of Use ▸ Logical User Flows ▸ Content Focused ▸ Clear Calls to Action (CTAs) ▸ Design Consistency ▸ Responsive Design (more later…)
  • 7.
    HOW TO CHOOSETHE RIGHT THEME 3. CUSTOMIZATION + FLEXIBILITY ▸ Theme Design Options (universal parameters) ▸ Page Design Options (individual post parameters) ▸ Header + Footer + Sidebars ▸ Widget + Menu Areas (top, left, etc.) ▸ Custom CSS + JavaScript Code ▸ Visual Page Builder (more later…) ▸ Child Themes (more later…)
  • 8.
    HOW TO CHOOSETHE RIGHT THEME 4. RESPONSIVE DESIGN + MOBILE FRIENDLINESS ▸ User Experience Optimized for All Screens + Networks ▸ Separate Layouts (desktop, notebook, tablet, smartphone) ▸ Fluid Grid System ▸ Flexible + Scalable Images ▸ Mobile Navigation Menus ▸ Touch Friendly UI Elements
 (buttons, tabs, forms, etc.)
  • 9.
    HOW TO CHOOSETHE RIGHT THEME 5. SEARCH ENGINE OPTIMIZATION (SEO) ▸ High Quality Code (follows best practices) ▸ Clear Separation of Content + Design ▸ Custom Meta Titles + Descriptions ▸ Site Map ▸ SEO Plugins (Yoast SEO,
 All in One SEO Pack,
 Google XML Sitemaps) ▸ Performance + Speed (next slide…)
  • 10.
    HOW TO CHOOSETHE RIGHT THEME 6. PERFORMANCE + SPEED ▸ Unnecessary Features + Functionality ▸ Code Optimization + Minification ▸ Image Optimization ▸ Testing Tools (Google PageSpeed,
 GTmetrix, Pingdom) ▸ Caching Plugins (WP Rocket,
 W3 Total Cache, WP Super Cache)
  • 11.
    HOW TO CHOOSETHE RIGHT THEME 7. SECURITY + STABILITY ▸ Updated Often (active development) ▸ Modern Technologies ▸ Large User Base (popular) ▸ Simpler is Usually More Secure ▸ Security Plugins (Sucuri,
 iThemes Security, Wordfence) ▸ Developer + Community Support
 (next slide…)
  • 12.
    HOW TO CHOOSETHE RIGHT THEME 8. DEVELOPER + COMMUNITY SUPPORT ▸ Active Development ▸ Developer Support (usually paid annually) ▸ Frequent Updates ▸ Healthy + Growing Community ▸ High Quality Documentation ▸ Popularity Helps ▸ I Can Help You Too (simdex.org)
  • 13.
    HOW TO CHOOSETHE RIGHT THEME ADDITIONAL TIPS + RECOMMENDATIONS ▸ Look at User Ratings + Reviews ▸ Beware of Bloatware
 (themes trying to be everything to everyone) ▸ Don't Be Afraid to Experiment
 (you can always switch themes later) ▸ Remember Content is #1
  • 14.
    HOW TO CHOOSETHE RIGHT THEME WHERE SHOULD I GO TO FIND A WORDPRESS THEME? (PART 1) ▸ WordPress Theme Directory (wordpress.org/themes) ★ ▸ WooCommerce / WooThemes (woocommerce.com) ★ ▸ Elegant Themes (elegantthemes.com) ▸ StudioPress (studiopress.com) ★ ▸ Envato Market / ThemeForest
 (themeforest.net)
  • 15.
    HOW TO CHOOSETHE RIGHT THEME WHERE SHOULD I GO TO FIND A WORDPRESS THEME? (PART 2) ▸ AppThemes (appthemes.com) ▸ CSSIgniter (cssigniter.com) ▸ Dessign (dessign.net) ▸ Elmastudio (elmastudio.de) ▸ Graph Paper Press (graphpaperpress.com) ▸ Obox Themes (oboxthemes.com) ▸ Themezilla (themezilla.com) ▸ Themify (themify.me)
  • 16.
    HOW TO CHOOSETHE RIGHT THEME WHAT ARE YOUR FAVORITE WORDPRESS THEMES? ▸ Genesis Framework by StudioPress (studiopress.com) ▸ Storefront Framework by WooCommerce (woocommerce.com) ▸ X by Themeco (theme.co) ▸ GeneratePress (generatepress.com) ▸ OceanWP (oceanwp.org) ▸ Divi by Elegant Themes
 (elegantthemes.com)
  • 17.
    HOW TO CHOOSETHE RIGHT THEME WHAT IS A VISUAL PAGE BUILDER? WHAT ARE EXAMPLES? ▸ Visual GUI with drag + drop interface ▸ Quickly + easily build multicolumn layouts ▸ Little to no HTML or CSS coding required ▸ Examples ▸ Beaver Builder (Pro) ▸ Cornerstone by Themeco ★ ▸ Divi Builder by Elegant Themes ▸ Elementor (Pro) ★ ▸ Visual Composer by WPBakery
  • 18.
    THAT CONCLUDES PART1. BEFORE PART 2… Questions? Get In Touch:
 geoff@simdex.org
 simdex.org
 414.455.6675
  • 19.
    HOW TO CUSTOMIZETHEMES THE RIGHT WAY
 (BY USING CHILD THEMES) PART 2 OF 2: Experience Level: Intermediate–Advanced
  • 20.
    HOW TO CUSTOMIZETHEMES THE RIGHT WAY (BY USING CHILD THEMES) WHAT IS A CHILD THEME? WHY SHOULD I USE ONE? ▸ Inherits Attributes from Parent Theme by Default ▸ Overrides Styles + Functions of Parent Theme ▸ Relies on Parent Theme to Function ▸ Does Not Modify Parent Theme ▸ Updates to Parent Theme Don’t
 Overwrite Customizations ▸ Easy to Update + Maintain
  • 21.
    HOW TO CUSTOMIZETHEMES THE RIGHT WAY (BY USING CHILD THEMES) THE “I LOVE CODE” APPROACH 1. Create new folder in …/wp-content/themes/ called {parent-theme}-child (or whatever you want) 2. Create two new plain text files*
 in {parent-theme}-child called
 style.css and functions.php *UTF-8 character encoding recommended
  • 22.
    HOW TO CUSTOMIZETHEMES THE RIGHT WAY (BY USING CHILD THEMES) THE “I LOVE CODE” APPROACH 3. Add the following header to style.css, then edit: /* Theme Name: Twenty Fifteen Child Theme URI: http://example.com/twenty-fifteen-child/ Description: Twenty Fifteen Child Theme Author: John Doe Author URI: http://example.com Template: twentyfifteen Version: 1.0.0 License: GNU General Public License v2 or later License URI: http://www.gnu.org/licenses/gpl-2.0.html Tags: light, dark, two-columns, right-sidebar, responsive-layout Text Domain: twenty-fifteen-child */ /* your custom CSS begins here */
  • 23.
    HOW TO CUSTOMIZETHEMES THE RIGHT WAY (BY USING CHILD THEMES) THE “I LOVE CODE” APPROACH 4. Add the following to the top of functions.php, then edit: <?php
 
 add_action( 'wp_enqueue_scripts', 'my_parent_theme_css' ); function my_parent_theme_css() { wp_enqueue_style( 'parent-style', get_template_directory_uri() . '/style.css' ); // copy and edit the line above for each stylesheet included in your parent theme wp_enqueue_style( 'child-style', get_stylesheet_uri(), array( 'parent-style' ) ); } // your custom PHP begins here
  • 24.
    HOW TO CUSTOMIZETHEMES THE RIGHT WAY (BY USING CHILD THEMES) THE “I LOVE CODE” APPROACH 5. Activate child theme in WordPress admin 6. Copy desired template file(s) from parent theme folder to child theme folder* 7. Modify copied template file(s) within child theme folder ‣ WordPress will first look in child theme folder for template files and use them if they exist, otherwise parent theme’s templates will be used ‣ Refer to WordPress theme template hierarchy for development reference (next slide…) *preserve directory hierarchy (relative file paths)
  • 25.
  • 26.
    HOW TO CUSTOMIZETHEMES THE RIGHT WAY (BY USING CHILD THEMES) THE “I HATE CODE” APPROACH: CHILD THEME CONFIGURATOR 1. Download and install Child Theme Configurator:
 https://wordpress.org/plugins/child-theme-configurator/ 2. Follow these step-by-step instructions:
 http://www.childthemeconfigurator.com/how-to-use/ 3. Add all custom CSS to styles.css within your child theme:
 …/wp-content/themes/your-child-theme/style.css 4. Add all custom PHP to functions.php within your child theme:
 …/wp-content/themes/your-child-theme/functions.php 5. Activate child theme in WordPress admin 6. Advanced: Copy desired template file(s) from parent theme folder to child theme folder then modify copied template file(s)
  • 27.
    HOW TO CUSTOMIZETHEMES THE RIGHT WAY (BY USING CHILD THEMES) THE “I HATE CODE” APPROACH: CHILD THEME CONFIGURATOR Demo
  • 28.
    THAT’S IT FORNOW… THANK YOU! Questions? Get In Touch:
 geoff@simdex.org
 simdex.org
 414.455.6675
  • 29.
    THAT’S IT FORNOW… THIS PRESENTATION IS AVAILABLE ONLINE: simdex.org/themes Get In Touch:
 geoff@simdex.org
 simdex.org
 414.455.6675