SlideShare a Scribd company logo
Facility Maintenance
Management
Introduction
 Property Managers are under ever increasing
pressure to keep their buildings Operating and
Maintenance costs to a minimum, however they
often lack the time or experience to check every
cost or ensure that the systems are working
correctly or efficiently.
 BD&O offer a complete Building Services Facility
Management Service where we manage the
Maintenance and Energy use of the Building
Services keeping operating costs to a minimum.
What we do
 BD&O can prepare an effective operating and
Building Maintenance Plan for your buildings
and monitor all costs. We can provide a
monthly report to the Client detailing all
expenditure and running costs.
 By Developing an Effective Operating and
Maintenance Plan and by Managing the
servicing and maintenance throughout the
life cycle of the system we reduce the
Operating and Maintenance costs and
increase the life cycle of the systems.
What we do
 We prepare tender documents for all
maintenance works and monitor the works are
carried out correctly. We keep detailed records of
how the building is being operated, and are able
to produce all necessary reports that the
Property Managers requires.
 BD&O produce an annual plan for any
Preventative Maintenance that is required which
details the costs involved and the time frame, so
that the work can be programmed with the least
disruption to the tenants.
What we do
 Where Energy Efficient Measures have been carried out we
are able to monitor and verify the energy savings incurred
and demonstrate their effectiveness. Without tracking data
there is no way to determine the performance of the
building, the quality of the O&M practices, or the payback
of the capital investments made,
 As a business plan requires financial statements an energy
plan requires monthly reports to track its performance. We
carry out all the necessary performance tracking of the
systems and provide the necessary information so that the
Building Manager can report to Senior Management.
Benefits
 By implementing a Building Energy Management
System (BEMS) we can effectively monitor the
system which can be automatically programmed
to e-mail the Property Managers with all the
electrical and water meter readings on the
prescribed day of the month.
 In addition we are able to receive notification of
any systems failure so that prompt rectification
can take place. We are also able to change the
set points over the web interface controlling
occupant comfort and changing temperature
settings to reduce energy use.
What we use
 The use of a BEMS can give a history or
trend of how the systems have operated
over the prescribed period graphically
illustrating when and how energy was
used and how the systems operated
allowing you to answer any queries or
complaints that your tenants may have.

More Related Content

What's hot

Whats new
Whats newWhats new
Enerit ISO 50001 Audit Management Presentation
Enerit ISO 50001 Audit Management PresentationEnerit ISO 50001 Audit Management Presentation
Enerit ISO 50001 Audit Management Presentation
Arantico Ltd
 
Enerit ISO 50001 Administration Guide
Enerit ISO 50001 Administration GuideEnerit ISO 50001 Administration Guide
Enerit ISO 50001 Administration Guide
Arantico Ltd
 
Puestos de trabajo de la empresa
Puestos de trabajo de la empresaPuestos de trabajo de la empresa
Puestos de trabajo de la empresaHarolMunoz1
 
Enerit ISO 50001 Improvement Opportunities Training Presentation
Enerit ISO 50001 Improvement Opportunities Training PresentationEnerit ISO 50001 Improvement Opportunities Training Presentation
Enerit ISO 50001 Improvement Opportunities Training Presentation
Arantico Ltd
 
Jill_A_Smith_Resume
Jill_A_Smith_ResumeJill_A_Smith_Resume
Jill_A_Smith_ResumeJill Smith
 
Audit Funding Program Update
Audit Funding Program UpdateAudit Funding Program Update
Audit Funding Program Update
Anne Patenaude
 
Whats new
Whats newWhats new
Job Description SCADA & Automation Site Egnineer
Job Description SCADA & Automation Site EgnineerJob Description SCADA & Automation Site Egnineer
Job Description SCADA & Automation Site Egnineermusab ali
 
Enerit ISO 50001 Meetings Module Training Presentation
Enerit ISO 50001 Meetings Module Training PresentationEnerit ISO 50001 Meetings Module Training Presentation
Enerit ISO 50001 Meetings Module Training Presentation
Arantico Ltd
 
Energy Efficiency Consulting
Energy Efficiency ConsultingEnergy Efficiency Consulting
Energy Efficiency Consulting
Mexico Energy Partners
 
Annexure "A"
Annexure "A"Annexure "A"
Annexure "A"
Syed Younus
 
Enerit ISO 50001 Administration Training Presentation
Enerit ISO 50001 Administration Training PresentationEnerit ISO 50001 Administration Training Presentation
Enerit ISO 50001 Administration Training Presentation
Arantico Ltd
 
On the job with an instrumentation technician
On the job with an instrumentation technicianOn the job with an instrumentation technician
On the job with an instrumentation technician
James Analyst
 

What's hot (16)

Whats new
Whats newWhats new
Whats new
 
Enerit ISO 50001 Audit Management Presentation
Enerit ISO 50001 Audit Management PresentationEnerit ISO 50001 Audit Management Presentation
Enerit ISO 50001 Audit Management Presentation
 
Enerit ISO 50001 Administration Guide
Enerit ISO 50001 Administration GuideEnerit ISO 50001 Administration Guide
Enerit ISO 50001 Administration Guide
 
Puestos de trabajo de la empresa
Puestos de trabajo de la empresaPuestos de trabajo de la empresa
Puestos de trabajo de la empresa
 
Enerit ISO 50001 Improvement Opportunities Training Presentation
Enerit ISO 50001 Improvement Opportunities Training PresentationEnerit ISO 50001 Improvement Opportunities Training Presentation
Enerit ISO 50001 Improvement Opportunities Training Presentation
 
Jill_A_Smith_Resume
Jill_A_Smith_ResumeJill_A_Smith_Resume
Jill_A_Smith_Resume
 
Audit Funding Program Update
Audit Funding Program UpdateAudit Funding Program Update
Audit Funding Program Update
 
Whats new
Whats newWhats new
Whats new
 
Job Description SCADA & Automation Site Egnineer
Job Description SCADA & Automation Site EgnineerJob Description SCADA & Automation Site Egnineer
Job Description SCADA & Automation Site Egnineer
 
Energy Manager Certificate
Energy Manager CertificateEnergy Manager Certificate
Energy Manager Certificate
 
Enerit ISO 50001 Meetings Module Training Presentation
Enerit ISO 50001 Meetings Module Training PresentationEnerit ISO 50001 Meetings Module Training Presentation
Enerit ISO 50001 Meetings Module Training Presentation
 
Energy Efficiency Consulting
Energy Efficiency ConsultingEnergy Efficiency Consulting
Energy Efficiency Consulting
 
Ashley E Smith
Ashley E Smith Ashley E Smith
Ashley E Smith
 
Annexure "A"
Annexure "A"Annexure "A"
Annexure "A"
 
Enerit ISO 50001 Administration Training Presentation
Enerit ISO 50001 Administration Training PresentationEnerit ISO 50001 Administration Training Presentation
Enerit ISO 50001 Administration Training Presentation
 
On the job with an instrumentation technician
On the job with an instrumentation technicianOn the job with an instrumentation technician
On the job with an instrumentation technician
 

Viewers also liked

INTERGRAPH PPM
INTERGRAPH PPMINTERGRAPH PPM
INTERGRAPH PPMnsivaku
 
Are your customers working too hard?
Are your customers working too hard?Are your customers working too hard?
Are your customers working too hard?
Webmaster Ipsos
 
Maidan Summit 2011 - C Chandramohan, Planning Commission
Maidan Summit 2011 - C Chandramohan, Planning CommissionMaidan Summit 2011 - C Chandramohan, Planning Commission
Maidan Summit 2011 - C Chandramohan, Planning Commission
Maidan.in
 
Analysis of water hammer forming on the sheet metal (2)
Analysis of water hammer forming on the sheet metal (2)Analysis of water hammer forming on the sheet metal (2)
Analysis of water hammer forming on the sheet metal (2)Alexander Decker
 
2805_Worland-2805 - The Interoperability Advantage
2805_Worland-2805 - The Interoperability Advantage2805_Worland-2805 - The Interoperability Advantage
2805_Worland-2805 - The Interoperability AdvantageMatt Worland
 
Consumer rights
Consumer rightsConsumer rights
Consumer rights
Supriyo Dey
 
Base ring analysis
Base ring analysisBase ring analysis
Base ring analysis
Amit Narayan Nitnaware
 
Developing Effective Work Procedures Training - 3 days
Developing Effective Work Procedures Training - 3 daysDeveloping Effective Work Procedures Training - 3 days
Developing Effective Work Procedures Training - 3 days
Ricky Smith CMRP, CMRT
 
Resume_Pranat Mishra
Resume_Pranat MishraResume_Pranat Mishra
Resume_Pranat Mishrapranat mishra
 
Marathon preparation for beginners
Marathon preparation for beginnersMarathon preparation for beginners
Marathon preparation for beginners
PanaEk Warawit
 
Running
RunningRunning
Running
Jeaza Sandoy
 
Safety awareness on near miss
Safety awareness on near missSafety awareness on near miss
Safety awareness on near missAshok Singh
 
Enterprise Asset Management
Enterprise Asset ManagementEnterprise Asset Management
Enterprise Asset Management
Anand Subramaniam
 
Melissa Keroack: Why You Should Stretch
Melissa Keroack: Why You Should StretchMelissa Keroack: Why You Should Stretch
Melissa Keroack: Why You Should Stretch
Melissa Keroack
 
Chris brooks storage tanks inspection, maintenance and failure
Chris brooks   storage tanks inspection, maintenance and failureChris brooks   storage tanks inspection, maintenance and failure
Chris brooks storage tanks inspection, maintenance and failure
Sreekumar K S
 
presentation on mobile cranes
presentation on mobile cranespresentation on mobile cranes
presentation on mobile cranes
vipin balan
 

Viewers also liked (20)

Mosquito
MosquitoMosquito
Mosquito
 
INTERGRAPH PPM
INTERGRAPH PPMINTERGRAPH PPM
INTERGRAPH PPM
 
Are your customers working too hard?
Are your customers working too hard?Are your customers working too hard?
Are your customers working too hard?
 
Maidan Summit 2011 - C Chandramohan, Planning Commission
Maidan Summit 2011 - C Chandramohan, Planning CommissionMaidan Summit 2011 - C Chandramohan, Planning Commission
Maidan Summit 2011 - C Chandramohan, Planning Commission
 
Analysis of water hammer forming on the sheet metal (2)
Analysis of water hammer forming on the sheet metal (2)Analysis of water hammer forming on the sheet metal (2)
Analysis of water hammer forming on the sheet metal (2)
 
fea_best_practices
fea_best_practicesfea_best_practices
fea_best_practices
 
2805_Worland-2805 - The Interoperability Advantage
2805_Worland-2805 - The Interoperability Advantage2805_Worland-2805 - The Interoperability Advantage
2805_Worland-2805 - The Interoperability Advantage
 
Consumer rights
Consumer rightsConsumer rights
Consumer rights
 
Base ring analysis
Base ring analysisBase ring analysis
Base ring analysis
 
Developing Effective Work Procedures Training - 3 days
Developing Effective Work Procedures Training - 3 daysDeveloping Effective Work Procedures Training - 3 days
Developing Effective Work Procedures Training - 3 days
 
Resume_Pranat Mishra
Resume_Pranat MishraResume_Pranat Mishra
Resume_Pranat Mishra
 
Marathon preparation for beginners
Marathon preparation for beginnersMarathon preparation for beginners
Marathon preparation for beginners
 
Running
RunningRunning
Running
 
Safety awareness on near miss
Safety awareness on near missSafety awareness on near miss
Safety awareness on near miss
 
Employee discipline
Employee disciplineEmployee discipline
Employee discipline
 
Enterprise Asset Management
Enterprise Asset ManagementEnterprise Asset Management
Enterprise Asset Management
 
Melissa Keroack: Why You Should Stretch
Melissa Keroack: Why You Should StretchMelissa Keroack: Why You Should Stretch
Melissa Keroack: Why You Should Stretch
 
Chris brooks storage tanks inspection, maintenance and failure
Chris brooks   storage tanks inspection, maintenance and failureChris brooks   storage tanks inspection, maintenance and failure
Chris brooks storage tanks inspection, maintenance and failure
 
presentation on mobile cranes
presentation on mobile cranespresentation on mobile cranes
presentation on mobile cranes
 
Discipline
DisciplineDiscipline
Discipline
 

Similar to High perfomance buildings

Main manager brochure 2014
Main manager brochure 2014Main manager brochure 2014
Main manager brochure 2014
Steve Owen MBA CBIFM
 
MainManager Specifications
MainManager SpecificationsMainManager Specifications
MainManager Specifications
Steve Owen MBA CBIFM
 
Switch to Results in Commercial Buildings by Wipro EcoEnergy
Switch to Results in Commercial Buildings by Wipro EcoEnergySwitch to Results in Commercial Buildings by Wipro EcoEnergy
Switch to Results in Commercial Buildings by Wipro EcoEnergy
Shreeja Sahadevan
 
Movicon Pro.Energy English
Movicon Pro.Energy EnglishMovicon Pro.Energy English
Movicon Pro.Energy English
PROGEA s.r.l.
 
Pro.Energy eng
Pro.Energy engPro.Energy eng
Pro.Energy eng
Simona Giosa
 
Hotel energy management systems
Hotel energy management systemsHotel energy management systems
Hotel energy management systemsDoron Danon
 
Switch to-results-in-hotels
Switch to-results-in-hotelsSwitch to-results-in-hotels
Switch to-results-in-hotels
siya4
 
Switch to Results in Hotels
Switch to Results in HotelsSwitch to Results in Hotels
Switch to Results in Hotels
aayamkhatri
 
Switch to Results in Hotels
Switch to Results in HotelsSwitch to Results in Hotels
Switch to Results in Hotels
Aabha Sejpal
 
Switch to-results-in-hotels
Switch to-results-in-hotelsSwitch to-results-in-hotels
Switch to-results-in-hotels
malini87
 
Switch to Results in Hotels
Switch to Results in HotelsSwitch to Results in Hotels
Switch to Results in Hotels
Jack Watson
 
Energy Efficiency in Hotels by Wipro Ecoenergy
Energy Efficiency in Hotels by Wipro EcoenergyEnergy Efficiency in Hotels by Wipro Ecoenergy
Energy Efficiency in Hotels by Wipro Ecoenergy
Shreeja Sahadevan
 
Efficiently Switch to Results in Restaurants
Efficiently Switch to Results in RestaurantsEfficiently Switch to Results in Restaurants
Efficiently Switch to Results in Restaurants
Shreeja Sahadevan
 
Switch to Results in Restaurants
Switch to Results in RestaurantsSwitch to Results in Restaurants
Switch to Results in Restaurants
aayamkhatri
 
Switch to-results-in-restaurants
Switch to-results-in-restaurantsSwitch to-results-in-restaurants
Switch to-results-in-restaurants
malini87
 
Switch to Results in Restaurants
Switch to Results in RestaurantsSwitch to Results in Restaurants
Switch to Results in Restaurants
Beth Miller
 
Switch to Results in Restaurants
Switch to Results in RestaurantsSwitch to Results in Restaurants
Switch to Results in Restaurants
Nidhi Vora
 
Switch to-results-in-restaurants
Switch to-results-in-restaurantsSwitch to-results-in-restaurants
Switch to-results-in-restaurants
siya4
 
Utilities monitoring
Utilities monitoringUtilities monitoring
Utilities monitoring
footprint
 

Similar to High perfomance buildings (20)

ProTec BEMS Brochure
ProTec BEMS BrochureProTec BEMS Brochure
ProTec BEMS Brochure
 
Main manager brochure 2014
Main manager brochure 2014Main manager brochure 2014
Main manager brochure 2014
 
MainManager Specifications
MainManager SpecificationsMainManager Specifications
MainManager Specifications
 
Switch to Results in Commercial Buildings by Wipro EcoEnergy
Switch to Results in Commercial Buildings by Wipro EcoEnergySwitch to Results in Commercial Buildings by Wipro EcoEnergy
Switch to Results in Commercial Buildings by Wipro EcoEnergy
 
Movicon Pro.Energy English
Movicon Pro.Energy EnglishMovicon Pro.Energy English
Movicon Pro.Energy English
 
Pro.Energy eng
Pro.Energy engPro.Energy eng
Pro.Energy eng
 
Hotel energy management systems
Hotel energy management systemsHotel energy management systems
Hotel energy management systems
 
Switch to-results-in-hotels
Switch to-results-in-hotelsSwitch to-results-in-hotels
Switch to-results-in-hotels
 
Switch to Results in Hotels
Switch to Results in HotelsSwitch to Results in Hotels
Switch to Results in Hotels
 
Switch to Results in Hotels
Switch to Results in HotelsSwitch to Results in Hotels
Switch to Results in Hotels
 
Switch to-results-in-hotels
Switch to-results-in-hotelsSwitch to-results-in-hotels
Switch to-results-in-hotels
 
Switch to Results in Hotels
Switch to Results in HotelsSwitch to Results in Hotels
Switch to Results in Hotels
 
Energy Efficiency in Hotels by Wipro Ecoenergy
Energy Efficiency in Hotels by Wipro EcoenergyEnergy Efficiency in Hotels by Wipro Ecoenergy
Energy Efficiency in Hotels by Wipro Ecoenergy
 
Efficiently Switch to Results in Restaurants
Efficiently Switch to Results in RestaurantsEfficiently Switch to Results in Restaurants
Efficiently Switch to Results in Restaurants
 
Switch to Results in Restaurants
Switch to Results in RestaurantsSwitch to Results in Restaurants
Switch to Results in Restaurants
 
Switch to-results-in-restaurants
Switch to-results-in-restaurantsSwitch to-results-in-restaurants
Switch to-results-in-restaurants
 
Switch to Results in Restaurants
Switch to Results in RestaurantsSwitch to Results in Restaurants
Switch to Results in Restaurants
 
Switch to Results in Restaurants
Switch to Results in RestaurantsSwitch to Results in Restaurants
Switch to Results in Restaurants
 
Switch to-results-in-restaurants
Switch to-results-in-restaurantsSwitch to-results-in-restaurants
Switch to-results-in-restaurants
 
Utilities monitoring
Utilities monitoringUtilities monitoring
Utilities monitoring
 

Recently uploaded

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 

Recently uploaded (20)

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 

High perfomance buildings

  • 2. Introduction  Property Managers are under ever increasing pressure to keep their buildings Operating and Maintenance costs to a minimum, however they often lack the time or experience to check every cost or ensure that the systems are working correctly or efficiently.  BD&O offer a complete Building Services Facility Management Service where we manage the Maintenance and Energy use of the Building Services keeping operating costs to a minimum.
  • 3. What we do  BD&O can prepare an effective operating and Building Maintenance Plan for your buildings and monitor all costs. We can provide a monthly report to the Client detailing all expenditure and running costs.  By Developing an Effective Operating and Maintenance Plan and by Managing the servicing and maintenance throughout the life cycle of the system we reduce the Operating and Maintenance costs and increase the life cycle of the systems.
  • 4. What we do  We prepare tender documents for all maintenance works and monitor the works are carried out correctly. We keep detailed records of how the building is being operated, and are able to produce all necessary reports that the Property Managers requires.  BD&O produce an annual plan for any Preventative Maintenance that is required which details the costs involved and the time frame, so that the work can be programmed with the least disruption to the tenants.
  • 5. What we do  Where Energy Efficient Measures have been carried out we are able to monitor and verify the energy savings incurred and demonstrate their effectiveness. Without tracking data there is no way to determine the performance of the building, the quality of the O&M practices, or the payback of the capital investments made,  As a business plan requires financial statements an energy plan requires monthly reports to track its performance. We carry out all the necessary performance tracking of the systems and provide the necessary information so that the Building Manager can report to Senior Management.
  • 6. Benefits  By implementing a Building Energy Management System (BEMS) we can effectively monitor the system which can be automatically programmed to e-mail the Property Managers with all the electrical and water meter readings on the prescribed day of the month.  In addition we are able to receive notification of any systems failure so that prompt rectification can take place. We are also able to change the set points over the web interface controlling occupant comfort and changing temperature settings to reduce energy use.
  • 7. What we use  The use of a BEMS can give a history or trend of how the systems have operated over the prescribed period graphically illustrating when and how energy was used and how the systems operated allowing you to answer any queries or complaints that your tenants may have.