Figure 1 shows a sketch of the control panel of a nuclear power plant. The actual panel is
very large covering the whole wall of the control room and contains many sub-panels and
controls. The locations of some controls at the two ends of the panel are shown in figure
CS.1, although it should be noted that the panel is much wider than the illustration.
Figure CS.1 - nuclear reactor main control panel
A few of the sub-panels are important for this case study:
Alarm Control panel
Emergency Shutdown panel
Emergency Confirm panel
Reactor Targets display
Manual Override panel
Numeric Keypad for the Manual Override panel
2
2
Details of the first three of these are shown in figure CS.2 and details of the last three in
figure CS.3.
Figure CS.2 - alarm and emergency sub-panels
3
3
Figure CS.3 - reactor targets display and manual override
How it works
Alarm State
The system can be in one of three alarm states: GREEN, AMBER or RED.
(i) GREEN alarm state means everything is operating normally
(ii) AMBER alarm state is for when there is a minor problem with reactor operation. Workers
in the reactor area are warned and take additional precautions, but no external services are
involved.
(iii) RED alarm state is raised when the reactor is operating outside normal parameters and
there is a possibility of external contamination. The police and other emergency services are
alerted.
Typically AMBER state is raised once or twice a week and red state only a few times a year
(so far only false alarms!). Raising a RED alarm unnecessarily causes significant
inconvenience and cost both to the station staff and the external emergency services.
4
4
Original design of the alarm control panel
When the plant was commissioned, the alarm system controls worked as follows.
The current alarm state is indicated by which of the coloured lights on the Alarm
Control panel is lit.. The '+' and '–' buttons on this panel increase or decrease the alarm state.
Figure 4 shows a state transition network of the effects of the '+' and '–' buttons on the state
as the system was initially installed.
Figure CS.4 – STN for alarm state
Emergency Shutdown
When there is a very serious problem the operator can press the large red button
labelled IMMEDIATE SHUTDOWN COMMENCE on the Emergency Shutdown panel,
which initiates an emergency shutdown. This needs to be confirmed by pressing
the CONFIRM button on the Emergency Confirm panel. (This is to prevent accidental
shutdown of the plant.) The CONFIRM button is normally green, but glows red after
the IMMEDIATE SHUTDOWN COMMENCE button has been pressed to remind the
operator.
Emergency shutdown causes explosive bolts to blow that drive control rods into the reactor
completely stopping the nuclear reaction. Restarting the reactor after emergency shutdown
may take several weeks and costs many millions of pounds in lost production and
replacement of parts damaged during the shutdown procedure.
Reactor targets and manual override
The Reactor Targets panel shows the current target state of several reactor operating
parameters. These are normally set by an automatic control system to values that ensure
optimal energy production.
In an extreme emergency the operator may need to control these targets. The Manual
Override panel allows this.
5
5
Manual override is only enabled in RED alarm state.
To override a particular target the operator selects the desired target (Pressure, Temperature
or Flow Rate) from a dropdown menu, types in the desired value using a numeric keypad and
then confirms the value using the SET button. (The SET button is necessary to prevent part-
typed numbers being treated as the new value.)
RevisedAlarm Control Operation
Some while after the plant was running a consultant suggested changing the operation of
the Alarm Control panel and the software and hardware was revised in line with his
recommendations. The current design works as follows.
Raising the alarm state from Green to Amber and back uses the '+' and '–' buttons as before.
However now to raise the state from Amber to Red it is necessary to both press '+' and also
confirm this by pressing the CONFIRM button on the Emergency Confirm panel.
Figure 5 shows the state transition network of the revised system.
Figure CS.5 – STN for revised alarm state
Emergency Scenario
Jenny, the Nuclear Power Plant operator has normal sight and no physical or perceptual
impairments. Her shift started at 11pm and it is now 5am in the morning. So far the plant has
been operating within normal parameters and the current alarm state is therefore green
1. Jenny notices the core reaction rate has risen very rapidly
2. she realises she must immediately change the reactor target pressure to correct this
3. she goes to the Alarm Control Panel on the far right of the main reactor control panel
and presses '+' twice (as it is starting off in green state)
4. the Emergency Confirm button glows red
5. she moves across to the Manual Override panel on the far left of the main reactor
control panel
6. she selects 'Pressure' from the pull down on the Manual Override panel
6
6
7. she types the new value '6000' using the keypad
8. she notices that the number on the Reactor Targets panel has not changed
9. she realises she forgot to press the SET button on the Manual Override panel
10. she presses the SET button
11. the value still doesn't change
12. an automatic audio warning sounds "60 seconds to core meltdown"
13. she presses the SET button repeatedly
14. still the value doesn't change
15. she starts again, selects 'Pressure' from the pulldown, types 6000 and presses SET
16. still the value doesn't change
17. the audio warning says "30 seconds to core meltdown"
18. Jenny runs across the room to the Emergency Shutdown panel
19. "20 seconds to core meltdown"
20. she presses "Immediate Emergency Commence" button
21. the emergency confirm button glows red
22. "10 seconds to core meltdown"
23. she presses the "Emergency Confirm" button
24. she hears the crash of the explosive bolts sending the control rods into the reactor
25. the audio system announces "reactor shutdown successful"
Answer the following questions related to above the scenario
Question1:
Commentonthe userof colorin the AlarmControl,EmergencyShutdownandEmergencyConfirm
panels(Figure CS.2– forfigures,see the webscenario).
Question2:
Commentonthe use of layoutandotherelementsinthe control panels(FiguresCS.1,CS.2and CS.3),
includingthe wayinwhichvariousvisual elementssupportorhinderlogical groupingandsequence.
Question3:
Workingthroughthe accidentscenario,explainwhythe variousproblemsarise.
Question4:
Suggestpotential waysof improvingthe interface toavoidasimilarproblemrecurring.

More Related Content

Similar to Hci scanrio-exercise

e3-chap-05-nuclear.ppt
e3-chap-05-nuclear.ppte3-chap-05-nuclear.ppt
e3-chap-05-nuclear.ppt
KingSh2
 
Fire & Gas manual Operation Training.pptx
Fire & Gas manual Operation Training.pptxFire & Gas manual Operation Training.pptx
Fire & Gas manual Operation Training.pptx
ssuser95a3901
 
Medidor digital de presion 680 UserManual.pdf
Medidor digital de presion 680 UserManual.pdfMedidor digital de presion 680 UserManual.pdf
Medidor digital de presion 680 UserManual.pdf
JuanRios958368
 
Erbe icc-80-50-icc-service-manual
Erbe icc-80-50-icc-service-manualErbe icc-80-50-icc-service-manual
Erbe icc-80-50-icc-service-manual
William Narciso Diaz
 
Fadal Power On-Off Operator Manual.pdf
Fadal Power On-Off Operator Manual.pdfFadal Power On-Off Operator Manual.pdf
Fadal Power On-Off Operator Manual.pdf
Independent Technology Service Inc
 
Fadal Operator's Manual
Fadal Operator's ManualFadal Operator's Manual
Fadal Operator's Manual
Independent Technology Service Inc
 
TFL5785 LA County with audio
TFL5785 LA County with audioTFL5785 LA County with audio
TFL5785 LA County with audioWilliam Harding
 
Aeotec Multisensor 7 Manual
Aeotec Multisensor 7 ManualAeotec Multisensor 7 Manual
Aeotec Multisensor 7 Manual
Domotica daVinci
 
Manual SEC_SCS317 secure
Manual SEC_SCS317 secureManual SEC_SCS317 secure
Manual SEC_SCS317 secure
Domotica daVinci
 
Wall Controller 4 Buttons rechargeable Remote Z-Wave Plus - Hank manual
Wall Controller	4 Buttons rechargeable Remote Z-Wave Plus - Hank manualWall Controller	4 Buttons rechargeable Remote Z-Wave Plus - Hank manual
Wall Controller 4 Buttons rechargeable Remote Z-Wave Plus - Hank manual
Domotica daVinci
 
User manual of advanced controller
User manual of advanced controllerUser manual of advanced controller
User manual of advanced controllerEdoardo Morelli
 
Display saune-finlandese-eng
Display saune-finlandese-engDisplay saune-finlandese-eng
Display saune-finlandese-eng
VincenzoMaugeri2
 
الهندسيه الميكانيكيه الشامله hvac 1
الهندسيه   الميكانيكيه  الشامله  hvac  1الهندسيه   الميكانيكيه  الشامله  hvac  1
الهندسيه الميكانيكيه الشامله hvac 1
maymohamed29
 
الهندسيه الميكانيكيه الشامله hvac 1
الهندسيه   الميكانيكيه  الشامله  hvac  1الهندسيه   الميكانيكيه  الشامله  hvac  1
الهندسيه الميكانيكيه الشامله hvac 1
maymohamed29
 
Mh7 eu um v.02
Mh7 eu um v.02Mh7 eu um v.02
Mh7 eu um v.02
Domotica daVinci
 
Manual radiator thermostat -Aeotec
Manual radiator thermostat -AeotecManual radiator thermostat -Aeotec
Manual radiator thermostat -Aeotec
Domotica daVinci
 
ME401 Experimental Design Lab Report
ME401 Experimental Design Lab ReportME401 Experimental Design Lab Report
ME401 Experimental Design Lab ReportKristopher Saladin
 
HEL-ZW-THERM-FL2 Manual
HEL-ZW-THERM-FL2 ManualHEL-ZW-THERM-FL2 Manual
HEL-ZW-THERM-FL2 Manual
Domotica daVinci
 

Similar to Hci scanrio-exercise (20)

e3-chap-05-nuclear.ppt
e3-chap-05-nuclear.ppte3-chap-05-nuclear.ppt
e3-chap-05-nuclear.ppt
 
Fire & Gas manual Operation Training.pptx
Fire & Gas manual Operation Training.pptxFire & Gas manual Operation Training.pptx
Fire & Gas manual Operation Training.pptx
 
Medidor digital de presion 680 UserManual.pdf
Medidor digital de presion 680 UserManual.pdfMedidor digital de presion 680 UserManual.pdf
Medidor digital de presion 680 UserManual.pdf
 
Erbe icc-80-50-icc-service-manual
Erbe icc-80-50-icc-service-manualErbe icc-80-50-icc-service-manual
Erbe icc-80-50-icc-service-manual
 
Fadal Power On-Off Operator Manual.pdf
Fadal Power On-Off Operator Manual.pdfFadal Power On-Off Operator Manual.pdf
Fadal Power On-Off Operator Manual.pdf
 
Fadal Operator's Manual
Fadal Operator's ManualFadal Operator's Manual
Fadal Operator's Manual
 
Philio_pan08_manual
Philio_pan08_manualPhilio_pan08_manual
Philio_pan08_manual
 
TFL5785 LA County with audio
TFL5785 LA County with audioTFL5785 LA County with audio
TFL5785 LA County with audio
 
Aeotec Multisensor 7 Manual
Aeotec Multisensor 7 ManualAeotec Multisensor 7 Manual
Aeotec Multisensor 7 Manual
 
Manual SEC_SCS317 secure
Manual SEC_SCS317 secureManual SEC_SCS317 secure
Manual SEC_SCS317 secure
 
Wall Controller 4 Buttons rechargeable Remote Z-Wave Plus - Hank manual
Wall Controller	4 Buttons rechargeable Remote Z-Wave Plus - Hank manualWall Controller	4 Buttons rechargeable Remote Z-Wave Plus - Hank manual
Wall Controller 4 Buttons rechargeable Remote Z-Wave Plus - Hank manual
 
User manual of advanced controller
User manual of advanced controllerUser manual of advanced controller
User manual of advanced controller
 
Display saune-finlandese-eng
Display saune-finlandese-engDisplay saune-finlandese-eng
Display saune-finlandese-eng
 
95 an 8c
95 an 8c95 an 8c
95 an 8c
 
الهندسيه الميكانيكيه الشامله hvac 1
الهندسيه   الميكانيكيه  الشامله  hvac  1الهندسيه   الميكانيكيه  الشامله  hvac  1
الهندسيه الميكانيكيه الشامله hvac 1
 
الهندسيه الميكانيكيه الشامله hvac 1
الهندسيه   الميكانيكيه  الشامله  hvac  1الهندسيه   الميكانيكيه  الشامله  hvac  1
الهندسيه الميكانيكيه الشامله hvac 1
 
Mh7 eu um v.02
Mh7 eu um v.02Mh7 eu um v.02
Mh7 eu um v.02
 
Manual radiator thermostat -Aeotec
Manual radiator thermostat -AeotecManual radiator thermostat -Aeotec
Manual radiator thermostat -Aeotec
 
ME401 Experimental Design Lab Report
ME401 Experimental Design Lab ReportME401 Experimental Design Lab Report
ME401 Experimental Design Lab Report
 
HEL-ZW-THERM-FL2 Manual
HEL-ZW-THERM-FL2 ManualHEL-ZW-THERM-FL2 Manual
HEL-ZW-THERM-FL2 Manual
 

More from Anwal Mirza

Training & development
Training & developmentTraining & development
Training & development
Anwal Mirza
 
Training and dev
Training and devTraining and dev
Training and dev
Anwal Mirza
 
Testing and selection
Testing and selectionTesting and selection
Testing and selection
Anwal Mirza
 
Strategic planning
Strategic planningStrategic planning
Strategic planning
Anwal Mirza
 
Recruitment
RecruitmentRecruitment
Recruitment
Anwal Mirza
 
Job analysis
Job analysisJob analysis
Job analysis
Anwal Mirza
 
Interviewing
Interviewing Interviewing
Interviewing
Anwal Mirza
 
Hrm ppt ch. 01
Hrm ppt ch. 01Hrm ppt ch. 01
Hrm ppt ch. 01
Anwal Mirza
 
Hrm challenges
Hrm challengesHrm challenges
Hrm challenges
Anwal Mirza
 
Firstpage
FirstpageFirstpage
Firstpage
Anwal Mirza
 
Hci user interface-design principals
Hci user interface-design principalsHci user interface-design principals
Hci user interface-design principals
Anwal Mirza
 
Hci user interface-design principals lec 7
Hci user interface-design principals lec 7Hci user interface-design principals lec 7
Hci user interface-design principals lec 7
Anwal Mirza
 
Hci user centered design 11
Hci user centered design 11Hci user centered design 11
Hci user centered design 11
Anwal Mirza
 
Hci lec 5,6
Hci lec 5,6Hci lec 5,6
Hci lec 5,6
Anwal Mirza
 
Hci lec 4
Hci lec 4Hci lec 4
Hci lec 4
Anwal Mirza
 
Hci lec 1 & 2
Hci lec 1 & 2Hci lec 1 & 2
Hci lec 1 & 2
Anwal Mirza
 
Hci interace affects the user lec 8
Hci interace affects the user lec 8Hci interace affects the user lec 8
Hci interace affects the user lec 8
Anwal Mirza
 
Hci evaluationa frame work lec 14
Hci evaluationa frame work lec 14Hci evaluationa frame work lec 14
Hci evaluationa frame work lec 14
Anwal Mirza
 
Hci design collaboration lec 9 10
Hci  design collaboration lec 9 10Hci  design collaboration lec 9 10
Hci design collaboration lec 9 10
Anwal Mirza
 
P np & np completeness
P np & np completenessP np & np completeness
P np & np completeness
Anwal Mirza
 

More from Anwal Mirza (20)

Training & development
Training & developmentTraining & development
Training & development
 
Training and dev
Training and devTraining and dev
Training and dev
 
Testing and selection
Testing and selectionTesting and selection
Testing and selection
 
Strategic planning
Strategic planningStrategic planning
Strategic planning
 
Recruitment
RecruitmentRecruitment
Recruitment
 
Job analysis
Job analysisJob analysis
Job analysis
 
Interviewing
Interviewing Interviewing
Interviewing
 
Hrm ppt ch. 01
Hrm ppt ch. 01Hrm ppt ch. 01
Hrm ppt ch. 01
 
Hrm challenges
Hrm challengesHrm challenges
Hrm challenges
 
Firstpage
FirstpageFirstpage
Firstpage
 
Hci user interface-design principals
Hci user interface-design principalsHci user interface-design principals
Hci user interface-design principals
 
Hci user interface-design principals lec 7
Hci user interface-design principals lec 7Hci user interface-design principals lec 7
Hci user interface-design principals lec 7
 
Hci user centered design 11
Hci user centered design 11Hci user centered design 11
Hci user centered design 11
 
Hci lec 5,6
Hci lec 5,6Hci lec 5,6
Hci lec 5,6
 
Hci lec 4
Hci lec 4Hci lec 4
Hci lec 4
 
Hci lec 1 & 2
Hci lec 1 & 2Hci lec 1 & 2
Hci lec 1 & 2
 
Hci interace affects the user lec 8
Hci interace affects the user lec 8Hci interace affects the user lec 8
Hci interace affects the user lec 8
 
Hci evaluationa frame work lec 14
Hci evaluationa frame work lec 14Hci evaluationa frame work lec 14
Hci evaluationa frame work lec 14
 
Hci design collaboration lec 9 10
Hci  design collaboration lec 9 10Hci  design collaboration lec 9 10
Hci design collaboration lec 9 10
 
P np & np completeness
P np & np completenessP np & np completeness
P np & np completeness
 

Recently uploaded

Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
ameli25062005
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
ameli25062005
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
n0tivyq
 
Exploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdfExploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdf
fastfixgaragedoor
 
Top 5 Indian Style Modular Kitchen Designs
Top 5 Indian Style Modular Kitchen DesignsTop 5 Indian Style Modular Kitchen Designs
Top 5 Indian Style Modular Kitchen Designs
Finzo Kitchens
 
Portfolio.pdf
Portfolio.pdfPortfolio.pdf
Portfolio.pdf
garcese
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
Confidence Ago
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
taqyed
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
h7j5io0
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
Alan Dix
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
PlanitIsrael
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
cy0krjxt
 
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Mansi Shah
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdf
SudhanshuMandlik
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
7sd8fier
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
708pb191
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
jyz59f4j
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
h7j5io0
 

Recently uploaded (20)

Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
 
Exploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdfExploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdf
 
Top 5 Indian Style Modular Kitchen Designs
Top 5 Indian Style Modular Kitchen DesignsTop 5 Indian Style Modular Kitchen Designs
Top 5 Indian Style Modular Kitchen Designs
 
Portfolio.pdf
Portfolio.pdfPortfolio.pdf
Portfolio.pdf
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
 
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdf
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
 

Hci scanrio-exercise

  • 1. 1 1 Scenario for Nuclear Power Rector Note: This does not represent any real reactor although the sorts of problems it highlights do occur in real control rooms. Figure 1 shows a sketch of the control panel of a nuclear power plant. The actual panel is very large covering the whole wall of the control room and contains many sub-panels and controls. The locations of some controls at the two ends of the panel are shown in figure CS.1, although it should be noted that the panel is much wider than the illustration. Figure CS.1 - nuclear reactor main control panel A few of the sub-panels are important for this case study: Alarm Control panel Emergency Shutdown panel Emergency Confirm panel Reactor Targets display Manual Override panel Numeric Keypad for the Manual Override panel
  • 2. 2 2 Details of the first three of these are shown in figure CS.2 and details of the last three in figure CS.3. Figure CS.2 - alarm and emergency sub-panels
  • 3. 3 3 Figure CS.3 - reactor targets display and manual override How it works Alarm State The system can be in one of three alarm states: GREEN, AMBER or RED. (i) GREEN alarm state means everything is operating normally (ii) AMBER alarm state is for when there is a minor problem with reactor operation. Workers in the reactor area are warned and take additional precautions, but no external services are involved. (iii) RED alarm state is raised when the reactor is operating outside normal parameters and there is a possibility of external contamination. The police and other emergency services are alerted. Typically AMBER state is raised once or twice a week and red state only a few times a year (so far only false alarms!). Raising a RED alarm unnecessarily causes significant inconvenience and cost both to the station staff and the external emergency services.
  • 4. 4 4 Original design of the alarm control panel When the plant was commissioned, the alarm system controls worked as follows. The current alarm state is indicated by which of the coloured lights on the Alarm Control panel is lit.. The '+' and '–' buttons on this panel increase or decrease the alarm state. Figure 4 shows a state transition network of the effects of the '+' and '–' buttons on the state as the system was initially installed. Figure CS.4 – STN for alarm state Emergency Shutdown When there is a very serious problem the operator can press the large red button labelled IMMEDIATE SHUTDOWN COMMENCE on the Emergency Shutdown panel, which initiates an emergency shutdown. This needs to be confirmed by pressing the CONFIRM button on the Emergency Confirm panel. (This is to prevent accidental shutdown of the plant.) The CONFIRM button is normally green, but glows red after the IMMEDIATE SHUTDOWN COMMENCE button has been pressed to remind the operator. Emergency shutdown causes explosive bolts to blow that drive control rods into the reactor completely stopping the nuclear reaction. Restarting the reactor after emergency shutdown may take several weeks and costs many millions of pounds in lost production and replacement of parts damaged during the shutdown procedure. Reactor targets and manual override The Reactor Targets panel shows the current target state of several reactor operating parameters. These are normally set by an automatic control system to values that ensure optimal energy production. In an extreme emergency the operator may need to control these targets. The Manual Override panel allows this.
  • 5. 5 5 Manual override is only enabled in RED alarm state. To override a particular target the operator selects the desired target (Pressure, Temperature or Flow Rate) from a dropdown menu, types in the desired value using a numeric keypad and then confirms the value using the SET button. (The SET button is necessary to prevent part- typed numbers being treated as the new value.) RevisedAlarm Control Operation Some while after the plant was running a consultant suggested changing the operation of the Alarm Control panel and the software and hardware was revised in line with his recommendations. The current design works as follows. Raising the alarm state from Green to Amber and back uses the '+' and '–' buttons as before. However now to raise the state from Amber to Red it is necessary to both press '+' and also confirm this by pressing the CONFIRM button on the Emergency Confirm panel. Figure 5 shows the state transition network of the revised system. Figure CS.5 – STN for revised alarm state Emergency Scenario Jenny, the Nuclear Power Plant operator has normal sight and no physical or perceptual impairments. Her shift started at 11pm and it is now 5am in the morning. So far the plant has been operating within normal parameters and the current alarm state is therefore green 1. Jenny notices the core reaction rate has risen very rapidly 2. she realises she must immediately change the reactor target pressure to correct this 3. she goes to the Alarm Control Panel on the far right of the main reactor control panel and presses '+' twice (as it is starting off in green state) 4. the Emergency Confirm button glows red 5. she moves across to the Manual Override panel on the far left of the main reactor control panel 6. she selects 'Pressure' from the pull down on the Manual Override panel
  • 6. 6 6 7. she types the new value '6000' using the keypad 8. she notices that the number on the Reactor Targets panel has not changed 9. she realises she forgot to press the SET button on the Manual Override panel 10. she presses the SET button 11. the value still doesn't change 12. an automatic audio warning sounds "60 seconds to core meltdown" 13. she presses the SET button repeatedly 14. still the value doesn't change 15. she starts again, selects 'Pressure' from the pulldown, types 6000 and presses SET 16. still the value doesn't change 17. the audio warning says "30 seconds to core meltdown" 18. Jenny runs across the room to the Emergency Shutdown panel 19. "20 seconds to core meltdown" 20. she presses "Immediate Emergency Commence" button 21. the emergency confirm button glows red 22. "10 seconds to core meltdown" 23. she presses the "Emergency Confirm" button 24. she hears the crash of the explosive bolts sending the control rods into the reactor 25. the audio system announces "reactor shutdown successful" Answer the following questions related to above the scenario Question1: Commentonthe userof colorin the AlarmControl,EmergencyShutdownandEmergencyConfirm panels(Figure CS.2– forfigures,see the webscenario). Question2: Commentonthe use of layoutandotherelementsinthe control panels(FiguresCS.1,CS.2and CS.3), includingthe wayinwhichvariousvisual elementssupportorhinderlogical groupingandsequence. Question3: Workingthroughthe accidentscenario,explainwhythe variousproblemsarise. Question4: Suggestpotential waysof improvingthe interface toavoidasimilarproblemrecurring.