HAZEM MOHAMED ABD EL MONEEM
MOBILE EGYPT: +2 01008775188
E-mail:Hazem_eng_84@hotmail.com
H.mohamed@nascom-eg.com
_____________________________________________________
CAREER OBJECTIVE
Seeking a suitable job position in a well reputable firm that has a space for development and
growth and provides a challenging & promising career where technical expertise, hard work and
interpersonal skills can be applied and utilized
__________________________________________________________________________________________________________
PERSONAL ATTRIBUTES
Positive attitude, Team player ambitious, good communicator with others, team leader and good
negotiator.
__________________________________________________________________________________________________________
EDUCATION
B.SC. IN ARCHITECTURAL ENGINEERING, 6OCTOBER UNIVERSITY, JUNE 2006
Project Grade: Good
_______________________________________________________________________________
WORK EXPERIENCE
Procter & gamble Egypt
EGYPTIAN CO. FOR SUPPLIES & CONTRACTING (NASCOM) 1 / 2012 - PRESENT
 PROJECT MANGER IN PROCTER AND GAMBLE (CAIRO PLANT )
Responsibilities:
1. Managing the tendering documents.
2. Preparing of (BOQ, Cost estimation and Time schedules).
3. Reviewing the design drawings and shop drawings.
4. Construction management and site works of (Civil, Pluming, Lighting, Firefighting,
Compressed Air and HVAC).
5. Quantity survey and financial issues.
6. Inspection and approval of all submittals.
7. Insuring&documenting quality control files.
8. Achieving the project time schedule for fabrication and delivery.
9. Ensuring that all site operations are carried out in a safe manner free of risk to all of the
workforce and sub-contractors
1
Some Projects:
Training center & mosque project :
Project value ( 8 million L.E ) project duration (7 months)
Project area 850 m2
Project description: a new building 3 floors, 135 ton of steel structure, certain wall elevations
consists of mosque first floor and training center with movable partitions in second and third floor
with modern finishes interiors
• BABY CARE DEPARTMENT:
 NEW DIAPPER LINE EXTENSION:
Project Value (17 million L.E), Project duration (Nine Months)
Project area 3800 m2
Project description (Fare face foundations, steel hunger for the production floor, 2 floor utility
building slab on metal deck, catwalk, SOG with mechanical trawling and floor waxing).
 OFFICES:
Project Value (9 million L.E), Project duration (Six Months)
Project area 325 m2
Project description (Turn key job civil work including furnishing works, also EM works including
lighting, central air condition and firefighting network).
• FEAM CARE DEPARTMENT:
 ALWAYS LINE EXTENSION:
Project Value (5 million L.E), Project duration (Four Months).
Project area 450 m2.
Project description (Steel structure extension for the production floor, relocation of the cable trays
and firefighting headers, also self leveling epoxy painting for the floor).
Dish care entrance and dick
Project value (1.5 million L.E) project duration (three monthes)
Project area 180 m2
Project discreption (dismantling exicting entrance and replace it with steel structure and all finishing
works )
Eola wall removal
2
Project value ( 850000 L.E) project duration (three months)
Project area 460 m2
Project description (make a lot of civil modifications in the packing area during machines work
without shutdown )
SMASH CONTRACTING COMPANY 09/2009 – 12/2011
Executive & Quality Engineer
Some projects
A Project fields Shooting, cafeteria and toilets to the armed forces
situated in the Yellow Mountain.
Project value ( 4.5 million L.E) project duration (seven months)
Responsibilities and Duties:
• study the project and see comparable projects to the armed forces
• Start in graphic designs needed for the fields and the cafeteria and layout
• Work retina budget for the necessary land taking elevations
• Supervising the excavation and backfill, levels and compaction and flakiness soil
• Supervise all the works of concretes of normal bases and militant, columns, ceilings and
beams
• Implementation a special concrete bases for archery equipment according to international
laws and the required specifications
• Supervise all finishing items of insulation and buildings and whites turbinate and paint and
ceramic flooring and walls.
• Calculate a required quantities (sand and gravel, cement and Steel and bricks for all items
• account all quantities and doing abstracts for all contractors
Pyramids Gardens Club Project value ( 12 million L.E) project duration (eleven months)
Responsibilities and Duties:
• Develop drawings by using AutoCAD
• Materials quantity analysis for each stage
• Develop and finalize contactors accounts
• Receiving correspondence from contractor
• Work in abstracts and private accounts for contractors
• Work in abstracts and private accounts for owner
• Receiving, login all incoming contractor Submittals
• Interview contactors and set contact agreement
3
• Select the material thru samples from contactor for quality acceptance
• Execute project plan on site (Layout, Landscape, Finishing stages, etc)
• Supervisor contactors hands on site
• Review actual plan against initial plans
• Review all finishing stages
• Perform quality audits on each stage
• Perform quality control/assurance for the materials used
• Handing over all finishing items for the consultant
• Responsible for finishing swimming pools
3 villas project in el Sheikh Zayed Project value ( 6 million L.E) project duration (nine
monthes)
Dorra group 01/2007 – 08/2009
Executive engineer
Project: (Dreamland Project(
Responsibilities and Duties:
• Execute project plan on site (Layout, Landscape, Finishing stages, etc)
• Supervisor contactors hands on site
• Review actual plan against initial plans
• Review all finishing stages
• Perform quality audits on each stage
• Perform quality control/assurance for the materials used
• Handing over all finishing items for the consultant
_______________________________________________________________________________
Skills and Achievements
COMPUTER SKILLS:
 AutoCAD 2D.
 Sketch up professional
 Microsoft project & Primavera.
 Microsoft Office (Excel, word, power point & Access ,MS project)
 Internet: Expert User with excellent ability of research.
LANGUAGES:
 English: V.Good.
 Arabic: Mother tongue.
4
HOBBIES:
Football, Traveling, Ping-Pong, Bodybuilding and Swimming.
__________________________________________________________________________________________________________
PERSONAL INFORMATION
NAME Hazem Mohamed Abd El Moneem
GENDER Male
MARITAL STATUS Married
NATIONALITY Egyptian
DATE OF BIRTH 9 August, 1984
Military Service Exempted
 References are available upon request.
5
HOBBIES:
Football, Traveling, Ping-Pong, Bodybuilding and Swimming.
__________________________________________________________________________________________________________
PERSONAL INFORMATION
NAME Hazem Mohamed Abd El Moneem
GENDER Male
MARITAL STATUS Married
NATIONALITY Egyptian
DATE OF BIRTH 9 August, 1984
Military Service Exempted
 References are available upon request.
5

hazem mohamed cv - Copy

  • 1.
    HAZEM MOHAMED ABDEL MONEEM MOBILE EGYPT: +2 01008775188 E-mail:Hazem_eng_84@hotmail.com H.mohamed@nascom-eg.com _____________________________________________________ CAREER OBJECTIVE Seeking a suitable job position in a well reputable firm that has a space for development and growth and provides a challenging & promising career where technical expertise, hard work and interpersonal skills can be applied and utilized __________________________________________________________________________________________________________ PERSONAL ATTRIBUTES Positive attitude, Team player ambitious, good communicator with others, team leader and good negotiator. __________________________________________________________________________________________________________ EDUCATION B.SC. IN ARCHITECTURAL ENGINEERING, 6OCTOBER UNIVERSITY, JUNE 2006 Project Grade: Good _______________________________________________________________________________ WORK EXPERIENCE Procter & gamble Egypt EGYPTIAN CO. FOR SUPPLIES & CONTRACTING (NASCOM) 1 / 2012 - PRESENT  PROJECT MANGER IN PROCTER AND GAMBLE (CAIRO PLANT ) Responsibilities: 1. Managing the tendering documents. 2. Preparing of (BOQ, Cost estimation and Time schedules). 3. Reviewing the design drawings and shop drawings. 4. Construction management and site works of (Civil, Pluming, Lighting, Firefighting, Compressed Air and HVAC). 5. Quantity survey and financial issues. 6. Inspection and approval of all submittals. 7. Insuring&documenting quality control files. 8. Achieving the project time schedule for fabrication and delivery. 9. Ensuring that all site operations are carried out in a safe manner free of risk to all of the workforce and sub-contractors 1
  • 2.
    Some Projects: Training center& mosque project : Project value ( 8 million L.E ) project duration (7 months) Project area 850 m2 Project description: a new building 3 floors, 135 ton of steel structure, certain wall elevations consists of mosque first floor and training center with movable partitions in second and third floor with modern finishes interiors • BABY CARE DEPARTMENT:  NEW DIAPPER LINE EXTENSION: Project Value (17 million L.E), Project duration (Nine Months) Project area 3800 m2 Project description (Fare face foundations, steel hunger for the production floor, 2 floor utility building slab on metal deck, catwalk, SOG with mechanical trawling and floor waxing).  OFFICES: Project Value (9 million L.E), Project duration (Six Months) Project area 325 m2 Project description (Turn key job civil work including furnishing works, also EM works including lighting, central air condition and firefighting network). • FEAM CARE DEPARTMENT:  ALWAYS LINE EXTENSION: Project Value (5 million L.E), Project duration (Four Months). Project area 450 m2. Project description (Steel structure extension for the production floor, relocation of the cable trays and firefighting headers, also self leveling epoxy painting for the floor). Dish care entrance and dick Project value (1.5 million L.E) project duration (three monthes) Project area 180 m2 Project discreption (dismantling exicting entrance and replace it with steel structure and all finishing works ) Eola wall removal 2
  • 3.
    Project value (850000 L.E) project duration (three months) Project area 460 m2 Project description (make a lot of civil modifications in the packing area during machines work without shutdown ) SMASH CONTRACTING COMPANY 09/2009 – 12/2011 Executive & Quality Engineer Some projects A Project fields Shooting, cafeteria and toilets to the armed forces situated in the Yellow Mountain. Project value ( 4.5 million L.E) project duration (seven months) Responsibilities and Duties: • study the project and see comparable projects to the armed forces • Start in graphic designs needed for the fields and the cafeteria and layout • Work retina budget for the necessary land taking elevations • Supervising the excavation and backfill, levels and compaction and flakiness soil • Supervise all the works of concretes of normal bases and militant, columns, ceilings and beams • Implementation a special concrete bases for archery equipment according to international laws and the required specifications • Supervise all finishing items of insulation and buildings and whites turbinate and paint and ceramic flooring and walls. • Calculate a required quantities (sand and gravel, cement and Steel and bricks for all items • account all quantities and doing abstracts for all contractors Pyramids Gardens Club Project value ( 12 million L.E) project duration (eleven months) Responsibilities and Duties: • Develop drawings by using AutoCAD • Materials quantity analysis for each stage • Develop and finalize contactors accounts • Receiving correspondence from contractor • Work in abstracts and private accounts for contractors • Work in abstracts and private accounts for owner • Receiving, login all incoming contractor Submittals • Interview contactors and set contact agreement 3
  • 4.
    • Select thematerial thru samples from contactor for quality acceptance • Execute project plan on site (Layout, Landscape, Finishing stages, etc) • Supervisor contactors hands on site • Review actual plan against initial plans • Review all finishing stages • Perform quality audits on each stage • Perform quality control/assurance for the materials used • Handing over all finishing items for the consultant • Responsible for finishing swimming pools 3 villas project in el Sheikh Zayed Project value ( 6 million L.E) project duration (nine monthes) Dorra group 01/2007 – 08/2009 Executive engineer Project: (Dreamland Project( Responsibilities and Duties: • Execute project plan on site (Layout, Landscape, Finishing stages, etc) • Supervisor contactors hands on site • Review actual plan against initial plans • Review all finishing stages • Perform quality audits on each stage • Perform quality control/assurance for the materials used • Handing over all finishing items for the consultant _______________________________________________________________________________ Skills and Achievements COMPUTER SKILLS:  AutoCAD 2D.  Sketch up professional  Microsoft project & Primavera.  Microsoft Office (Excel, word, power point & Access ,MS project)  Internet: Expert User with excellent ability of research. LANGUAGES:  English: V.Good.  Arabic: Mother tongue. 4
  • 5.
    HOBBIES: Football, Traveling, Ping-Pong,Bodybuilding and Swimming. __________________________________________________________________________________________________________ PERSONAL INFORMATION NAME Hazem Mohamed Abd El Moneem GENDER Male MARITAL STATUS Married NATIONALITY Egyptian DATE OF BIRTH 9 August, 1984 Military Service Exempted  References are available upon request. 5
  • 6.
    HOBBIES: Football, Traveling, Ping-Pong,Bodybuilding and Swimming. __________________________________________________________________________________________________________ PERSONAL INFORMATION NAME Hazem Mohamed Abd El Moneem GENDER Male MARITAL STATUS Married NATIONALITY Egyptian DATE OF BIRTH 9 August, 1984 Military Service Exempted  References are available upon request. 5