This document provides a curriculum vitae for Samir Ali Mohamed Eid, an Egyptian engineer with 35 years of experience. It includes details on his education, skills, experience, objectives and recent projects. Some of his qualifications and experience include a bachelor's degree in civil engineering, project management certification, and roles as a business development director, project manager, construction manager and senior supervisor on various housing, infrastructure and industrial projects throughout Egypt, Libya, Algeria and Oman.
1. CV Eng. Samir EidPage1
Curriculum Vita
Samir Ali Mohamed Eid.
+20122 00 33 246, +20100 733 66 90
Email: Samireid3@gmail.com
Skype: samirconsult1
:Personal data-1.A
Experience: 35 years. Year graduation: 1979.
, Gender: Male1956.Julyth
8Birth day:
Religion: Moslem. Nationality: Egyptian
Membership:
- Egyptian Engineering Association, http://www.eea.org.eg
131/ 7 Civil Branch list at October 1979.
2753/ 1 Consultant engineers list at July 1998.
- Project Manager Institute (PMI) at USA. http://www.pmi.org
Languages: English (read – write – listen) Fluent
French (read – write – listen) little
Arabic (read – write – listen) Mother tongue
Skills:ersonalInterp–2.A
Team oriented, reliable, and proactive and self-motivated, Team oriented, Leadership, Decision
maker, Problems solving & Conflict management, analytical, excellent negotiator, hard worker &
can work under Pressure, legislation and regulation knowledge. Social skills and interpersonal
skills, Ability to think abstract, analytically and diagnostically,
:Experience Background-A.3
1. Prepare pre -published documents (drawings – bedding & BOQ –schedule time - specifications –
technical & general conditions- all required documents for publishing).
2. Excellent experience for precast concrete construction (housing – large span structures)
- Projects Planning from Mobilization to Demobilization.
3. Cost Control and Value Engineering.
4. Good knowledge for Financial Systems for Projects Accounting
5. Good knowledge of FEDIC (Contract Management)
6. Quality Control and Quality Assurance.
7. Site Safety Management.
8. Construction Management.
9. Leading large Customer, Partner Meetings and Risk Identification and mitigation.
10. PM P certificate and CONSULTANT degree from Engineering Association
11. Military culture back ground. X- Position was an Officer Engineer ranked COLONEL.
:Education-B
B.1. Bachelor of Science in Civil Engineering, Branch (Structures) July 1979 grad good.
Project: Reinforced Concrete Structure. Grade: very good.
B.2. Bachelor of Military Science Arts, July 1979. Grade: very good.
:Collage–C
Military Technical Collage.
2. CV Eng. Samir EidPage2
ion:Farther educat-D
1. “P M P Project Manager Professional at “American university in Cairo” on May 2009.
2. “Risk of Construction Projects” at German consultant office at Tripoli Libya on October 2008.
3. “Projects management’s primavera course” at Cairo University on February 2007.
4. “AutoCAD” on February 2002.
5. "Internal Inspection for Quality Management” at American university in Cairo on July 1998.
6. "Projects Management Course” at Arab contractors institute in Cairo on February 1995.
7. "Quality control of building material and structures" American university / Cairo /March 1992.
8. "General Program for Buildings " at Arab contractors institute in Cairo on December 1992.
9. “Pre cast Concrete Structures CASTING for buildings “at Engineering Organization /
Ministry of Defense at Cairo on January 1985.
10. All technical and administration courses required for promotion in career as officer engineer at
Ministry of Defense (June 1979 to June 1997).
11. (Implement and Auditing of Quality Management System ISO 9001: 2008) by LARSN –
M Consultant Office at Nov.2011 Cairo.
Objective:–E
- Projects Manager Engineer for Construction Company.
- Development Director for Business & Investment Organization.
- Resident Consultant Engineer CM/CS for Consultant Organization.
:Experiences–F
owN–3201July
Position : Business Development Director
Company : Private Consultant Office
My responsibilities:
1- Study the mega governmental projects map which need financial support and arrange the proper
foreign or local organizations to submit financial and technical offers which satisfy governmental
requirements and coordinate between them .
2- Identifies trendsetter ideas by researching industry and related events, publications, and
announcements; tracking individual contributors and their accomplishments.
3- Locates or proposes potential business deals by contacting potential partners; discovering and
exploring opportunities.
4- Screens potential business deals by analyzing market strategies, deal requirements, potential, and
financials; evaluating options; resolving internal priorities; recommending equity investments.
5- Develops negotiating strategies and positions by studying integration of new venture with
company strategies and operations; examining risks and potentials; estimating partners' needs
and goals.
6- Closes new business deals by coordinating requirements; developing and negotiating contracts;
integrating contract requirements with business operations.
7- Protects organization's value by keeping information confidential.
8- Updates job knowledge by participating in educational opportunities; reading professional
publications; maintaining personal networks; participating in professional organizations.
9- Enhances organization reputation by accepting ownership for accomplishing new and different
requests; exploring opportunities to add value to job accomplishments.
3. CV Eng. Samir EidPage3
3June 201–September 2012
Position : Libya Branch Director
Company : El Mahmoudia General Contracting & Real Estate Investments
www.mahmoudia.com
My responsibilities:
1- (Routinely) oversee production and activity at jobsites.
2- Maintain schedule of contract and daily rental production on weekly basis.
3- Assure contract production is timely and within the constraints of the bid estimate
4- .Determine equipment needs for production.
5- Request purchase of material needs as determined.
6- Direct activities of shop to assure appropriate fleet levels, a well-maintained shop and yard that
complies with Safety and Environmental conditions and procedures, and adequate personnel
scheduling for truck loading and unloading.
7- Schedule work hours for operations crews to assure compliance with DOT rules and regulations
and minimize overtime.
8- Maintain system of reporting production to accounting for billing purposes.
9- Maintain Weekly Revenue Forecast Report on a weekly basis.
10- Maintain or oversee maintenance of schedule board.
11- Hire personnel.
September 2012–Feb. 2011
Position : Projects Manager Engineer
Project name: SAMA ASWAN Construction of 10 housing towers
المصريه االوقاف هيئهClient : www.hyatelwqaf-eg.org
Construction Company: El Mahmoudia General Contracting & Real Estate Investments:
www.mahmoudia.com , address: 1 Essam El-Daly Street, Dokki, Egypt.
Consultant office: DIAA COUNSULT, address: 103 Nile Street, Dokki. Egypt
Tel: (+202) 25936282 - 37483904. Fax: (+202) 25885278.
Budget of the project: 200 million Egyptian Pound
Project Description:
Construction of 10 housing towers, Print Foot area 5000 m2. Each Consists of bad room + basement +
mezzanine + 10 repeated floors. The under base structure is raft foundation constructed upon 1400
bearing piles each diameter 60 cm & depths 14 meters. The foundation is submerged under the level of
water table. All buildings are turnkey finish work .It contains also the infrastructure like Potable water
pipe lines, sewage lines with manholes, fire protection system, low tension cables, medium tension
cables and land escape.
My responsibilities:
1- Manage, integrate and monitor the project based on O- chart and project methodologies.
2- Follow up the provision of project's cadre and resources.
3- Release the project documents and coordinate the drawings with consultant office & owner.
4- Communicate the owner, consultant office and key persons in my company. Report progress
of work and problems weekly, monthly and periodical meeting.
5- Supervise the submission of all project deliverables
6- Follow up quality assurance and quality control.
4. CV Eng. Samir EidPage4
7- Supervise and organize the update of project data for the different disciplines and perform
project documentation control.
8- Responsible for site compliance with Health and Safety to ensure best practice identifying
any opportunities for improvements throughout the construction process.
9- Assign the subcontractor for all activates and follow up their progress of work and payments.
10- Follow up progress of I R s, R F I, change orders and Procurement plan.
December 2009 – Feb.2011
Position : Senior Supervisor Resident Engineer
Project name: Design and Construction of 5300 housing units.
Jabal Gharbi, Tripoli, Libya.
Consultant Office (CM/CS):
Chemonics Egypt Consultant Office, as sub consultant office of AECOM
www.chemonicsegypt.com
Client: Housing and Infrastructure Board, Libya .H I P.
Construction Company: China Gazhouba Group Company, Ltd (CGGC), www.gzbgj.com.
Budget of the project: 725 million Libyan Dinars
Reason of leaving: the interior war at Libya
Project Description:
site atst
1:as givennd infrastructureDesign &construction 5300 housing units plus their utilities a
1800site:ADUsite at Jnd
2hectare.site: 1500 housing units with total area 150HADWAGADYW
total areaunits'site 2000 housingEAR AYAD:site at Brd
housing units at with total area 180 hectare. 3
200 hectare. the buildings are villa models as 1 or 2 floors plus public buildings like schools, hospital ,
mosques , clink centers, social club, police station, , culture center ,shopping center.
The projects also contain interior and exterior roads, elevated tanks, sewage line, Potable water line, gas
lines, electric tension network, telephone network, landscape and so on.
My responsibilities:
1- Have a signature for all in going communications and maintains an effective relation with other
functional departments, client with the field activities.
2- Execute the works in compliance with management and supervision the contract specifications,
project design and QA/QC procedures as well as within the project schedule.
3- Responsible for ensuring development and execution of Project Management Plan (PMP), safety
plan, site survey plan, non-manual staffing plan, subcontracting plan, Construction Execution
Plan, procurement plan and job-site work rules.
4- Implements Zero Accident Philosophy, security, housekeeping, and fire protection on the site.
5- Ensures the field organization is composed of qualified and knowledgeable personnel, and
ensures effective personnel utilization.
6- Coordinate and manage construction requirements, schedules, material and equipment.
7- Coordinate and monitor compliance of Construction regarding permits and relevant laws.
8- Responsible for implementation of effective community relations plan for sites.
9- Coordinates with contractor to identify, where possible, the construction solutions,
methodologies or alternative time schedule.
10- Approve the monthly bill of works of the contractor.
11- Report progress of work and problems weekly, monthly and periodical meeting with all parties.
5. CV Eng. Samir EidPage5
December 2009–September 2007
Position : Construction Manager Engineer
Project name: Design and Construction 2000 housing villa.
Company: SMI – HYUNDAI constructing company, Libya.
www.smi-hyundai.com
Owner: Organization of Development and Administration Centers ODAC
Consultant office of the owner: El Mada consultant office.
Budget of the project: 500 million Libyan Dinars.
Project Description:
Design &construction 2000 housing villa, mosques , schools, hospital , clink centers, social club,
police station , culture center ,shopping center, landscape for area 470 hectare .
It contain also interior and exterior roads, 4 elevated tanks, sewage line, Potable water line, gas lines,
electric tension network, telephone network, landscape and so on.
My responsibilities:
1. Manage, integrate and monitor the project activities based on organization chart and project
methodologies. Follow up the provision of project's cadre and resources.
2. Release the project documents and coordinate the drawings with each other’s and POQ .to
reappear change orders.
3. Communicate the owner, consultant office and key persons in my company.
4. Supervise the submission of all project deliverables
5. Follow up quality assurance approval by the owner representative and the resident engineer.
6. Report progress of work and problems weekly, monthly and periodical meeting.
7. Participate in knowledge sharing and provide support / awareness sessions.
8. Supervise and organize the update of project data for the different disciplines and perform project
documentation control.
9. Responsible for site compliance with Health and Safety to ensure best practice identifying any
opportunities for improvements throughout the construction process.
2007July–July 2006
Position : Deputy Project Manager Engineer
Project name: Design, construction and Supply 160 k m. run pipe line
Company: Kou . G. C. ALGERIA
Consultant office of the owner: Stukii Consultant Office, (Swaziland)
.Consultant office of the contractor: STUDII (Tunisia) + ENEED (Swaziland)
Project Description:
Design, construction, Supplying and operating of Potable Water pipe line from Kodiet Rosfa barrage
to 17 cities at Tesemsilt welaya with value 150 million EURO as: ( 160 k m. run pipe lines ductile steel
diameters (80 – 800) m - 5 pump stations (civil works + electro mechanical works - 8 water tanks each
capacity is 4000 m³)
My responsibilities:
1- Preview consultant office in design works, correction action of it and approval from owner.
2 -Request for information (RFI) to clear contrary between specification and POQ and contact.
3- Assignment organization required for the implement.
6. CV Eng. Samir EidPage6
4 – Follow up the executive works according the schedule plan and reporting the client.
5 – Share preparation of the procurement plan, quality plan, safety plan and risk plan.
6 – Follow up cash flow, progress claim and claims of subcontractors.
7 – Follow up the suppliers of required material according to procurement plan.
8 – Follow up survey works, site investigation, Q C / Q A works.
July 2006–June 2004
Position : Projects Manager Engineer.
Company: El Haddad for trading and construction / Oman Sultanate
Location: Oman Sultanate (Salalah – Haseq – Hima)
Consultant office of the contractor: Arab Engineering Consultant Office
My responsibilities as projects manager engineer:
1 – Study, analyses and quote the tender as technical and finance offer.
2 – Collect offers, study and contract with consultant offices, subcontractor and suppliers
3 – Plane the organization for executive and office sections.
4 - Follow up design from technical office and approval of owner.
5 - Follow up the requirements of personal, materials, equipment, money...
6 - Follow up schedule plan and modifications of it.
7 - Follow up progress claims.
8 - Follow up the suppliers of required material and subcontractors.
9 - Survey works for trace.
10 - Reports to the client and periodical meetings with others.
Project Description at this period
locationDescriptionProjectNo
Hima
City
140 km run sewage Pipe lines Ø(4" – 25")
Manholes – submerged tanks - pump stations
Supply & construct
Pipe line
1
Salalah
Saada city
Composition of 50.k.m runs P.V.C pipe lines
diameter (4 – 12) inch distance
Supply & construct
Potable water line
2
Salalah
city
Construction of mesh steel fence length. 15 km
run –secondary gates
Supply & construct
Fence of Salala air port
3
Hasqe
city
173 villa , mosque, police station, governmental
building , interior & exterior roads, water pipe
lines, sewage pipe lines, low tension electric
lines are provided with internal lightning
construction of 173
villas and its utilities
4
June 1998 – June 2004
Position : Project manager engineer.
Company: private companies
Location: Egypt (Cairo – Hurghada ,Sharm_el_Sheikh , Dahab cities.)
7. CV Eng. Samir EidPage7
Project Description:
Varies projects for many local companies. All these projects are housing, administration buildings,
hospitals, recreation projects. They contains also water tanks, swimming pools, and others. All these
projects are turn key projects .all these projects done in the planed time, cost and within the assumed
budget with the proper qualification of quality control.
My responsibilities:
1- Define the scope of the project in collaboration with senior management
2- Create a detailed work plan which identifies and sequences the activities needed to
successfully complete the project
3- Determine the resources (time, money, equipment, etc) required to complete the project
4- Develop a schedule for project completion that effectively allocates the resources to the
activities
5- Review the project schedule with senior management and all other staff that will be affected
by the project activities; revise the schedule as required
6- Determine the objectives and measures upon which the project will be evaluated at its
completion
7- In consultation with the appropriate manager, recruit, interview and select staff and/or
volunteers with appropriate skills for the project activities
8- Manage project staff and/or volunteers according to the established policies and practices of
the organization
9- Ensure that personnel files are properly maintained and kept confidential
10- Ensure that all project personnel receive an appropriate orientation to the organization and
the project
11- Contract qualified consultants to work on the project as appropriate
12- Execute the project according to the project plan
13- Develop forms and records to document project activities
14- Set up files to ensure that all project information is appropriately documented and secured
15- Monitor the progress of the project and make adjustments as necessary to ensure the
successful completion of the project
16- Establish a communication schedule to update stakeholders including appropriate staff in the
organization on the progress of the project
17- Review the quality of the work completed with the project team on a regular basis to ensure
that it meets the project standards
18- Write reports on the project for management and for funders
19- Communicate with funders as outlined in funding agreements
20- Monitor and approve all budgeted project expenditures
21- Monitor cash flow projections and report actual cash flow and variance to senior
management on a regular basis (monthly/bimonthly)
22- Manage all project funds according to established accounting policies and procedures
23- Ensure that all financial records for the project are up to date.
8. CV Eng. Samir EidPage8
Project Description at this period
PositionProject descriptionProject
DurationN
o ToFrom
Project manager
engineer at
Amego
company.
Hotel 4 stars contain 60 rooms, swimming pole, main
building, restaurant, main hales, kitchen, diving
center, infrastructure , Potable water pipe lines ,
sewage line pump, interior roads & land escape
Construction of
AMIGO valley
at DAHAB city
Jun
.
04
June
02
1
Projects
manager
engineer at
Gabery
construction
company.
containing 120 rooms – 2 swimming pole - main
building with restaurants – disco hale – kitchen -
infrastructure – Potable water pipe lines - sewage
line pump – interior roads - land escape
Construction of
SUN SHINE
valley at Sharm
el Sheikh city
Jan
.
02.
Jan.
00
2
Hotel 4 stars containing5 floors - 100 rooms
swimming pole – restaurants- infrastructure –
Potable water pipe lines - sewage line pump –
interior roads - land escape
TORISM valley
at Hurghada city
Basement +basement + with commercial mall + 10
repeated floor + Potable water pipe lines - sewage
line pump – interior roads - land escape
Construction of
8 Towers at
Cairo
Construction of tower building 2 bed floors+
basement + 2 commercial floors + 14 repeated
floors- front curtain wall
Doctors tower /
Cairo
Design & Construction cemeteries area 60 m²
1000 Cemetery.
Cairo
3
Construction of Triangle hospital.
Construction of
hospital
Helwan Cairo
Construct new building at hospital Consists of bed
room, basement, 12 repeated floor &Turnkey project.
hospital at
BoLake el
Dakror city
Projects
manager
engineer
At
Hartmann Egypt
Finishing work of Curtain wall glass aluminum
doors, windows aluminum and sky lights.
international
hospital
at Cairo
Jun
00
Jun
98
4
Curtain wall glass aluminum, doors , windows
aluminum for bowling center at Cairo
bowling center
at Cairo
Repair of reinforced concrete floor in administration
building finishing of the building – the building area
is 2000 m². Infrastructure – Potable water pipe lines -
sewage line pump – interior roads - land escape.
5 floors
Administrative
building at Cairo
9. CV Eng. Samir EidPage9
June 1998–July 1979
Officer Engineer at Ministry of Defense / Egypt
June 1985–July 1979:od APeri
At Precast concrete structures (KESTING)
What is KESTING?
It is a German system used to produce prefab structures .The productions are PREFAB walls (interior &
exterior) and slaps. The production have been cured at the factory with hot steam to accelerate stresses to
store products at the primarily storage area by cranes. 6 hours at the line production to be ready for hung
by cranes. Curing for 3 days by spreading water at primary storage is enough to transport them to site to
erection. The trucks transport them to the site. The site constructs a strap footing to assemble the walls &
slaps on them.
Projects: Construct, transport, assemble and finishing precast concrete buildings for three projects
1- Projects 50 buildings. 2- Project 25 buildings. 3- Project 25buildings.
My responsibilities:
1. Receive the drawings and productions list to arrange the product requirements.
2. Manage and monitor the technical works for produce precast elements.
3. Follow up the boiling system to make curing concrete during production.
4. Communicate key persons to arrange the product plan , procurement plan , translation plan
5. Supervise the submission of all project deliverables.
6. Follow up quality assurance & quality control.
7. Report progress of work and problems weekly, monthly.
8. Responsible for site compliance with Health and Safety to ensure best practice identifying any
opportunities for improvements throughout the construction process.
9. Follow up the claims of the subcontractors and suppliers.
10. Follow up the schedule time for the activities.
11. Follow up sit investigation and operate of patch planet
12. Supervise and organize the update of project data for the different disciplines and perform project
documentation control.
Projects done at military of defense by (KESTING) system precast concrete.
PositionlocationDescriptions
Time
Project Tofrom
Producer
engineer
officer
Nasr city
Construction of building by Precast
concrete structure (KESTING)
system and finish them turnkey.
These projects are housing projects
and shopping center. The projects
contain all utilities like landscape,
water tank 1000 m3, interior &
exterior roads, water pipe lines,
sewage pipe lines, manholes .low
tension electric lines are provided
with internal lightning system
June
1981
June
1979
50
building
Assembling
engineer
officer
El Salam
city
June
1982
June
1981
25
building
Project
manager
engineer
Haykesteb
June
1985
June
1982
25
building
10. CV Eng. Samir EidPage11
June 1998–July 1985Period B:
/ EgyptOfficer Engineer at Ministry of Defense
For Ordinary structure system CM CS
Client, consultant office & main contractor: Engineering Organization for Armed Force.
My responsibilities:
1. Study the contract to prepare the organization chat, procurement plan, subcontractors
2. Manage, integrate and monitor the production of elements & curing system & patch planet and
resources of production.
3. Communicate key persons to arrange the product plan , procurement plan , translation plan
4. Supervise the submission of all project deliverables
5. Follow up quality assurance.
6. Report progress of work and problems weekly, monthly.
7. Responsible for site compliance with Health and Safety to ensure best practice identifying any
opportunities for improvements throughout the construction process.
8. Follow up the claims of the subcontractors and suppliers.
9. Follow up the schedule time for the activities.
10. Follow up sit investigation & QC / QA works.
11. Supervise and organize the update of project data for the different disciplines and perform project
documentation control.
Projects done at military of defense by Ordinary system structure.
PositionDetailsProject
Duration
No.
ToFrom
Constructio
n manager
officer
engineer.
Housing 50000 person- Admin
building – central kitchen restaurant
sewage line – pure lines
Construction of
military city
/Haykesteb
Jun
88
Jun
85
1
project
manager
officer
engineer
Housing 12000 person – admin
building kitchen – restaurant
Construction of
military city Pernes /
red seaJun
91
Jun
88
2
Housing 12000 person – admin
building – kitchen – restaurant –
Construction of
military city Safaga red
sea
projects
manager
officer
engineer
Main building consists of 5 floor +
auxiliary buildings + fence and
gates.
Construction of 10
schools / Egypt
Jun
98
Jun
91
3
Hall for 500 persons –
accommodation and admin.
buildings for 2000 persons –
kitchen and restaurant
Construction of
training center
accommodate - administration
buildings main kitchen and
restaurants for 500 person
Const. 5 battalion for
ministry of defense.
Ordinary buildings – technical
buildings – containers of fuel –
administration buildings
Const. of projects for
airport force
11. CV Eng. Samir EidPage11
:Visits outboard Egypt–G
HostessPurposeCountryNo
Pirelli Trafficable CompanyInspection contract no.5in pervious tableFrance1
Taleb el khorey companyVisibility studies for hollow core slab.Qatar2
Haddad Construction Company.Project manager engineerOman Sultanate3
Kou. G. C. CompanyConstruction manager engineerAlgeria4
-Smi_Hyundai Construction Company-
- Chemonics Egypt Consult. Office
- Mahmoudia Construction Company
- Construction manager engineer
- Senior Supervisor Resident Engineer
- Libya Branch Director
Libya5
Private construction officeBusiness developmentLebanon6
Private construction officeBusiness developmentTurkey7
Private construction officeBusiness developmentBenin8
:Computer skills–H
ExperienceDegree of profusionComputer skillNo.
More than 15 yearsExpertWindows1
More than 15 yearsExpertOffice2
More than 5 yearsVery goodPrimavera3
More than 5 yearsVery goodAutoCAD4
More than 2 yearsExpertACONEX5
More than 2 yearsExpertP M P6
Best Regards
Samir Eid
Consultant Engineer CM / CS
Skype: samirconsult1