SlideShare a Scribd company logo
CURRICULUM VITAE
MOHAMMADZISHAN KHAN
MECHANICALENGINEER
Add: - ManzoorManzil Ganesh Nagar School
Approach Road Bilaspur, Chhattisgarh – 495004
Email: zishankhan1920@gmail.com
Contact: +91-9691344431/7587330580
CAREER OBJECTIVES:-
To perform with such an industry this willgive me the opportunity to workin the plant with
leading role by applying various capabilities, technical knowledgeand experience considering
satisfaction & profit of the industry as well as mine.
PROFESSIONALEXPERIENCE :-
4.7 years Experience of Thermal Power Plant 600MW & Refinery Project.
 Since 28-April-2015 (Still Working)
Indian Oil Corporation Limited – Paradeep Orissa
Mechanical EquipmentEngineer – Punj LloydLimited (PLL).
About the Organization:-
 Government of India (Maharatna Company)
Key Responsibility:-
 Commissioned all types of equipment either rotary or static by using standard maintenance
procedure.
 Commissioned verticalpumps & overhauling fire hydrant verticalpumps.
 Technical issues discuss to our Projectmanager with client related to maintenance or material
difficultiesalso discuss related to modificationor rectification workin site.
 Discussion about the SMP and making good criteria for doing each and every defectand any
emergency jobs withsmooth or effectively jobdone.
 Participating with our seniors on daily basis formaking each and every preventive maintenance
and defectprotocols.
 Daily discussed with the client regarding next day breakdown jobs and preventive maintenance.
 Daily prepared checksheet of every preventive maintenance job as per condition based
monitoring report.
 17-April-2014 to 17-April-2015(1.0 Year)
2x600MWKorbaWest PowerCompanyLimited(KWPCL).
Mechanical Engineer – PowerMechProjectsLimited (PMPL).
(TG/BOPMaintenanceDepartment) Chhote Bhandar Raigarh.
About the Organization:-
 2x600 MW PFBCThermal PowerPlant.
 Made by BHEL (Complete BHEL Design).
Key Responsibility: -
 Analyzing Technical Deviation and attending the defects, breakdown, new inventory as well as
any Preventivemaintenance as per schedule.
 Daily discussion withour department and give suggestions regarding safety.
 Discussion about the SMP and making good criteria for doing each and every defector any
emergency jobs withsmoothly or efficiently done. Routine inspection of plant equipments &
accessories also maintaining performance monitoring foreach and every rotary equipments &
machines
 Make daily Planning forthe next day breakdown jobs or defects.
 Daily report of manpower availability and distribution as well as separately job distribution to
our site manager also HODif required, also maintain daily defects checklist report with permit &
protocols.
 05-FEB-2013 to 13-MARCH- 2014 (1.1 Year)
4x300MWSKS PowerGenerationChhattisgarh Limited(SPGCL).
Mechanical Engineer -Cethar Limited (EPCContractor)
(TG ErectionPlanningDepartment) Darramuda Kharsia Raigarh.
About the Organization:-
 4 x 300 MW Coal based independent thermal power plant.
 4 X 300 MWMulti Stages, Multi Extraction Cum Condensing TG set make HEC Steam Turbine.
Key Responsibilities:-
 Analyzing Technical Detail Drawings & Specifications of various Erection equipments for
procurement as per requirement, clearing TechnicalDeviations, Material Inspection and Material
Handling, Erection and Commissioning.
 Preparing daily shift report including Manpower, Material planning, Erection planning &
updating the completion status formanagement.
 Attending Technical discussion and Preparing MOM for weekly & monthly review meetings plan
and develop new methods to improve the station Working Method, efficiency and reliability.
 Every month ending, I clear all our subcontractors working RA Bills as per their workorder
(LOI).
 17’AUG’2011 – 22’JAN’2013 (1.5 Year)
MahendraSponge&PowerLimited
GraduateEngineer Trainee– MSPL 8.2 MWCFBC Thermal PowerPlant
(TG OperationDepartment) Industrial Growth Centre Siltara Raipur.
About the Organization:
 8.2 MW CFBC CVL Boiler and 2x2 MWWHRB Boilers
Key Responsibilities:-
 Responsible forfield & DCS operation of steam turbine operation confidently & continuously
Monitor Turbine parameters of desk operation by using YokagawaPLC.
 Daily Manpower distribution & Material planning Inventory control, Indenting and planning for
breakdown and shut down.
 Boiler & turbine operation, hot & cold start up of boiler & turbine.
PROFILE:-
Professional Credential:-
 BachelorofEngineeringinIndustrial andProduction(Mechanical) 2007-2011Instituteof
Technology Guru Ghasidas VishwavidyalayaBilaspur, First Class.
Academic Credential:-
 HigherSecondarySchool CertificateExamination(12th)2006-2007
S.E.C.Rly.Mixed Hr.Sec.School Bilaspur (C.G.) C.G.B.S.E Board.
 HighSchool Certificate Examination(10th)2004-2005
S.E.C.Rly.Mixed Hr.Sec.School Bilaspur (C.G.) C.G.B.S.E Board.
MAJORSUBJECT KNOWLEDGE:-
PowerPlant Engineer (PPE),ProductionPlanning& Control (PPC), Industrial Engineering (IE),
Machine Design (MD),Welding Engineering (WE),Material Handling & Material Management
(MM).
ComputerProficiency:-
Known Software: Expertin PRIMAVERA,Basic Auto-Cad. WindowsXP/98/2007/2010.
OfficePackage : Expertin MS PROJECT,MS-Word,MS-Excel-10,MS-PowerPoint.
TrainingAttended:-
 Steel Authority of India Ltd. (SAIL) Bhilai. (VocationalTraining)
 Bajarang Conveyors Sirgitti Bilaspur. (ProjectTraining)
Extra-CurricularActivities/Strength:-
 Always try to make good atmosphere and put my best forthe organization by keep all the
equipment available and free from defects. And also try to complete all the tasks within the given
period of time withzero injury.
 Having leadership activity to do the task either individual or with team members, Hard work,
Positiveattitude, Creativity skills.
 Motivate to all the subordinates to maintain the workingculture of the organization discipline.
ProjectUndertaken:-
 MultipurposeAgricultural Machine (WorkingModel)
Function-It separate the husk from the rice paddy withthe help of Huller Machine & Separate it by
the action of wind energy that is Blower, Generation of electricity withStorage system should be
achieved with the help of Alternator by rotating at 900 rpm that is directly coupled on main shaft,
Pumping of water with the help of Reciprocating Pump, Grinding of agricultural tools with the help
of Grinder.
PERSONALPROFILE:-
Name : Mohammad Zishan Khan
Father’s name : Shri. M.S.Khan
Mother’s name : Smt. Nusrat Khan
Date of birth : 13-Aug-1990
Sex : Male
Marital Status : Single
Nationality : Indian
Current CTC : 4.8 Lacs + Free Accommodation
Expected CTC : 6 Lacs
Relocation : Ready to relocate anywhere in India.
Notice Period : 1 Month
Passport No- : M6914514
Interested : Permanent
Strength : Good Communication and Problem solving skills,
Leadership and Professional Team Player,Initiatives,
Creativity, PositiveAttitude.
Permanent Address : Manzoor Manzil Ganesh Nagar School Approach Road
Bilaspur Chhattisgarh, PinCode-495004.
Hobbies : Playing Cricket, Badminton and Singing.
Languages Known : English, Hindi and Urdu.
Alternate Contact No. : +919691344431/+917587330580
Disclaimer:
Above furnished details are authentic to the best of my knowledge and having satisfied good exposure in
all the above zones mentioned. I anticipate my experience will be considered for yourkind perusal.
Date:-28/01/2016
Place:- Paradeep Signature

More Related Content

What's hot

hariom gupta cv for maintenance and project
hariom gupta cv for maintenance and projecthariom gupta cv for maintenance and project
hariom gupta cv for maintenance and projecthariom gupta
 
Shoyeb resume 30.7
Shoyeb resume 30.7Shoyeb resume 30.7
Shoyeb resume 30.7
Shoyeb Sayyed
 
Recent
RecentRecent
Now Presently 02 Month working experience in Quality NEW SWAN AUTO COMP.LUDHI...
Now Presently 02 Month working experience in Quality NEW SWAN AUTO COMP.LUDHI...Now Presently 02 Month working experience in Quality NEW SWAN AUTO COMP.LUDHI...
Now Presently 02 Month working experience in Quality NEW SWAN AUTO COMP.LUDHI...gurmeet singh
 

What's hot (18)

hariom gupta cv for maintenance and project
hariom gupta cv for maintenance and projecthariom gupta cv for maintenance and project
hariom gupta cv for maintenance and project
 
dharmeshjavia(1)
dharmeshjavia(1)dharmeshjavia(1)
dharmeshjavia(1)
 
DharmikResume
DharmikResumeDharmikResume
DharmikResume
 
compleat cv
compleat cvcompleat cv
compleat cv
 
CV_Saddam Hussain_mecheng
CV_Saddam Hussain_mechengCV_Saddam Hussain_mecheng
CV_Saddam Hussain_mecheng
 
Resume
Resume Resume
Resume
 
Shoyeb resume 30.7
Shoyeb resume 30.7Shoyeb resume 30.7
Shoyeb resume 30.7
 
JAYAKUMAR GANGADHARAN CV (2)
JAYAKUMAR GANGADHARAN CV (2)JAYAKUMAR GANGADHARAN CV (2)
JAYAKUMAR GANGADHARAN CV (2)
 
Recent
RecentRecent
Recent
 
CV Bhatti
CV BhattiCV Bhatti
CV Bhatti
 
New Resume 01
New Resume 01New Resume 01
New Resume 01
 
Ramu Resume
Ramu ResumeRamu Resume
Ramu Resume
 
indrasen
indrasenindrasen
indrasen
 
RAVI KUMAR DOMATERA_original
RAVI KUMAR DOMATERA_originalRAVI KUMAR DOMATERA_original
RAVI KUMAR DOMATERA_original
 
NARAYAN DASH
NARAYAN DASH NARAYAN DASH
NARAYAN DASH
 
C V.pdf
C V.pdfC V.pdf
C V.pdf
 
Atique - Copy
Atique - CopyAtique - Copy
Atique - Copy
 
Now Presently 02 Month working experience in Quality NEW SWAN AUTO COMP.LUDHI...
Now Presently 02 Month working experience in Quality NEW SWAN AUTO COMP.LUDHI...Now Presently 02 Month working experience in Quality NEW SWAN AUTO COMP.LUDHI...
Now Presently 02 Month working experience in Quality NEW SWAN AUTO COMP.LUDHI...
 

Viewers also liked

Training 1 commonrail Lander Wauters
Training 1 commonrail Lander WautersTraining 1 commonrail Lander Wauters
Training 1 commonrail Lander Wauters
Lander Wauters
 
regional NewspaperProduction schedule
regional NewspaperProduction scheduleregional NewspaperProduction schedule
regional NewspaperProduction schedule
bdr628
 
Id 50 nasehat_untuk_wanita
Id 50 nasehat_untuk_wanitaId 50 nasehat_untuk_wanita
Id 50 nasehat_untuk_wanitaLoveofpeople
 
Tpak resistencia
Tpak resistenciaTpak resistencia
Tpak resistenciaorbe06
 
Expositores Internacionales - SUMA UTEC
Expositores Internacionales - SUMA UTEC Expositores Internacionales - SUMA UTEC
Expositores Internacionales - SUMA UTEC
Tifany Burbano
 
7.3
7.37.3
Εύδοξος οΚνίδιος
Εύδοξος οΚνίδιοςΕύδοξος οΚνίδιος
Titans Who Made Our Future
Titans Who Made Our FutureTitans Who Made Our Future
Titans Who Made Our Future
Kiran Shaw
 
Fonctions et processus du partage et de l'application des connaissances (PAC)...
Fonctions et processus du partage et de l'application des connaissances (PAC)...Fonctions et processus du partage et de l'application des connaissances (PAC)...
Fonctions et processus du partage et de l'application des connaissances (PAC)...
Equipe RENARD
 
русский язык 9 класс пичугова
русский язык 9 класс пичуговарусский язык 9 класс пичугова
русский язык 9 класс пичугова
reshyvse
 
Struktur sel (konsep sel)
Struktur sel (konsep sel)Struktur sel (konsep sel)
Struktur sel (konsep sel)
Fais Ainurrofiq
 

Viewers also liked (14)

Training 1 commonrail Lander Wauters
Training 1 commonrail Lander WautersTraining 1 commonrail Lander Wauters
Training 1 commonrail Lander Wauters
 
regional NewspaperProduction schedule
regional NewspaperProduction scheduleregional NewspaperProduction schedule
regional NewspaperProduction schedule
 
Id 50 nasehat_untuk_wanita
Id 50 nasehat_untuk_wanitaId 50 nasehat_untuk_wanita
Id 50 nasehat_untuk_wanita
 
Frases diversas
Frases diversasFrases diversas
Frases diversas
 
Carpe diem
Carpe diemCarpe diem
Carpe diem
 
Tpak resistencia
Tpak resistenciaTpak resistencia
Tpak resistencia
 
Expositores Internacionales - SUMA UTEC
Expositores Internacionales - SUMA UTEC Expositores Internacionales - SUMA UTEC
Expositores Internacionales - SUMA UTEC
 
7.3
7.37.3
7.3
 
Εύδοξος οΚνίδιος
Εύδοξος οΚνίδιοςΕύδοξος οΚνίδιος
Εύδοξος οΚνίδιος
 
Titans Who Made Our Future
Titans Who Made Our FutureTitans Who Made Our Future
Titans Who Made Our Future
 
Arabic translation
Arabic translationArabic translation
Arabic translation
 
Fonctions et processus du partage et de l'application des connaissances (PAC)...
Fonctions et processus du partage et de l'application des connaissances (PAC)...Fonctions et processus du partage et de l'application des connaissances (PAC)...
Fonctions et processus du partage et de l'application des connaissances (PAC)...
 
русский язык 9 класс пичугова
русский язык 9 класс пичуговарусский язык 9 класс пичугова
русский язык 9 класс пичугова
 
Struktur sel (konsep sel)
Struktur sel (konsep sel)Struktur sel (konsep sel)
Struktur sel (konsep sel)
 

Similar to Zishan curriculum vitae eqp

1. Ikram up date cv
1. Ikram up date cv1. Ikram up date cv
1. Ikram up date cvIkram ul haq
 
YASHVANTH RESUME main -03.09.2015
YASHVANTH RESUME main -03.09.2015YASHVANTH RESUME main -03.09.2015
YASHVANTH RESUME main -03.09.2015Yashvanth Kumar c n
 
Shoyeb resume 30.7
Shoyeb resume 30.7Shoyeb resume 30.7
Shoyeb resume 30.7
Shoyeb Sayyed
 
Cv partha
Cv parthaCv partha
Cv partha
Partha Sahoo
 
Laxmi narayan's resume
Laxmi narayan's resumeLaxmi narayan's resume
Laxmi narayan's resume
Laxmi Narayan
 
L narayan's resume
L narayan's resumeL narayan's resume
L narayan's resume
Laxmi Narayan
 
Ramesh Resume
Ramesh ResumeRamesh Resume
Ramesh ResumeRamesh K
 

Similar to Zishan curriculum vitae eqp (20)

Harsimar CV
Harsimar CVHarsimar CV
Harsimar CV
 
Resume_Dipak-linkedin
Resume_Dipak-linkedinResume_Dipak-linkedin
Resume_Dipak-linkedin
 
c.v of rana
c.v of ranac.v of rana
c.v of rana
 
1. Ikram up date cv
1. Ikram up date cv1. Ikram up date cv
1. Ikram up date cv
 
Vasu cv2017
Vasu  cv2017Vasu  cv2017
Vasu cv2017
 
akram cv
akram cvakram cv
akram cv
 
YASHVANTH RESUME main -03.09.2015
YASHVANTH RESUME main -03.09.2015YASHVANTH RESUME main -03.09.2015
YASHVANTH RESUME main -03.09.2015
 
shoyeb resume 30.7
shoyeb resume 30.7shoyeb resume 30.7
shoyeb resume 30.7
 
Shoyeb resume 30.7
Shoyeb resume 30.7Shoyeb resume 30.7
Shoyeb resume 30.7
 
Resume
ResumeResume
Resume
 
CVPradeepKumarGupta
CVPradeepKumarGuptaCVPradeepKumarGupta
CVPradeepKumarGupta
 
Resume dipen 10-2015
Resume dipen 10-2015Resume dipen 10-2015
Resume dipen 10-2015
 
Cv partha
Cv parthaCv partha
Cv partha
 
Laxmi narayan's resume
Laxmi narayan's resumeLaxmi narayan's resume
Laxmi narayan's resume
 
L narayan's resume
L narayan's resumeL narayan's resume
L narayan's resume
 
Resume 15 hvac
Resume 15 hvacResume 15 hvac
Resume 15 hvac
 
AK CV
AK CVAK CV
AK CV
 
Ramesh Resume
Ramesh ResumeRamesh Resume
Ramesh Resume
 
Resume Vinoth
Resume VinothResume Vinoth
Resume Vinoth
 
Rohit Jain Resume
Rohit Jain ResumeRohit Jain Resume
Rohit Jain Resume
 

Recently uploaded

AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 

Recently uploaded (20)

AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 

Zishan curriculum vitae eqp

  • 1. CURRICULUM VITAE MOHAMMADZISHAN KHAN MECHANICALENGINEER Add: - ManzoorManzil Ganesh Nagar School Approach Road Bilaspur, Chhattisgarh – 495004 Email: zishankhan1920@gmail.com Contact: +91-9691344431/7587330580 CAREER OBJECTIVES:- To perform with such an industry this willgive me the opportunity to workin the plant with leading role by applying various capabilities, technical knowledgeand experience considering satisfaction & profit of the industry as well as mine. PROFESSIONALEXPERIENCE :- 4.7 years Experience of Thermal Power Plant 600MW & Refinery Project.  Since 28-April-2015 (Still Working) Indian Oil Corporation Limited – Paradeep Orissa Mechanical EquipmentEngineer – Punj LloydLimited (PLL). About the Organization:-  Government of India (Maharatna Company) Key Responsibility:-  Commissioned all types of equipment either rotary or static by using standard maintenance procedure.  Commissioned verticalpumps & overhauling fire hydrant verticalpumps.  Technical issues discuss to our Projectmanager with client related to maintenance or material difficultiesalso discuss related to modificationor rectification workin site.  Discussion about the SMP and making good criteria for doing each and every defectand any emergency jobs withsmooth or effectively jobdone.  Participating with our seniors on daily basis formaking each and every preventive maintenance and defectprotocols.  Daily discussed with the client regarding next day breakdown jobs and preventive maintenance.  Daily prepared checksheet of every preventive maintenance job as per condition based monitoring report.  17-April-2014 to 17-April-2015(1.0 Year) 2x600MWKorbaWest PowerCompanyLimited(KWPCL). Mechanical Engineer – PowerMechProjectsLimited (PMPL). (TG/BOPMaintenanceDepartment) Chhote Bhandar Raigarh. About the Organization:-  2x600 MW PFBCThermal PowerPlant.  Made by BHEL (Complete BHEL Design). Key Responsibility: -  Analyzing Technical Deviation and attending the defects, breakdown, new inventory as well as any Preventivemaintenance as per schedule.  Daily discussion withour department and give suggestions regarding safety.
  • 2.  Discussion about the SMP and making good criteria for doing each and every defector any emergency jobs withsmoothly or efficiently done. Routine inspection of plant equipments & accessories also maintaining performance monitoring foreach and every rotary equipments & machines  Make daily Planning forthe next day breakdown jobs or defects.  Daily report of manpower availability and distribution as well as separately job distribution to our site manager also HODif required, also maintain daily defects checklist report with permit & protocols.  05-FEB-2013 to 13-MARCH- 2014 (1.1 Year) 4x300MWSKS PowerGenerationChhattisgarh Limited(SPGCL). Mechanical Engineer -Cethar Limited (EPCContractor) (TG ErectionPlanningDepartment) Darramuda Kharsia Raigarh. About the Organization:-  4 x 300 MW Coal based independent thermal power plant.  4 X 300 MWMulti Stages, Multi Extraction Cum Condensing TG set make HEC Steam Turbine. Key Responsibilities:-  Analyzing Technical Detail Drawings & Specifications of various Erection equipments for procurement as per requirement, clearing TechnicalDeviations, Material Inspection and Material Handling, Erection and Commissioning.  Preparing daily shift report including Manpower, Material planning, Erection planning & updating the completion status formanagement.  Attending Technical discussion and Preparing MOM for weekly & monthly review meetings plan and develop new methods to improve the station Working Method, efficiency and reliability.  Every month ending, I clear all our subcontractors working RA Bills as per their workorder (LOI).  17’AUG’2011 – 22’JAN’2013 (1.5 Year) MahendraSponge&PowerLimited GraduateEngineer Trainee– MSPL 8.2 MWCFBC Thermal PowerPlant (TG OperationDepartment) Industrial Growth Centre Siltara Raipur. About the Organization:  8.2 MW CFBC CVL Boiler and 2x2 MWWHRB Boilers Key Responsibilities:-  Responsible forfield & DCS operation of steam turbine operation confidently & continuously Monitor Turbine parameters of desk operation by using YokagawaPLC.  Daily Manpower distribution & Material planning Inventory control, Indenting and planning for breakdown and shut down.  Boiler & turbine operation, hot & cold start up of boiler & turbine. PROFILE:- Professional Credential:-  BachelorofEngineeringinIndustrial andProduction(Mechanical) 2007-2011Instituteof Technology Guru Ghasidas VishwavidyalayaBilaspur, First Class. Academic Credential:-  HigherSecondarySchool CertificateExamination(12th)2006-2007 S.E.C.Rly.Mixed Hr.Sec.School Bilaspur (C.G.) C.G.B.S.E Board.  HighSchool Certificate Examination(10th)2004-2005 S.E.C.Rly.Mixed Hr.Sec.School Bilaspur (C.G.) C.G.B.S.E Board.
  • 3. MAJORSUBJECT KNOWLEDGE:- PowerPlant Engineer (PPE),ProductionPlanning& Control (PPC), Industrial Engineering (IE), Machine Design (MD),Welding Engineering (WE),Material Handling & Material Management (MM). ComputerProficiency:- Known Software: Expertin PRIMAVERA,Basic Auto-Cad. WindowsXP/98/2007/2010. OfficePackage : Expertin MS PROJECT,MS-Word,MS-Excel-10,MS-PowerPoint. TrainingAttended:-  Steel Authority of India Ltd. (SAIL) Bhilai. (VocationalTraining)  Bajarang Conveyors Sirgitti Bilaspur. (ProjectTraining) Extra-CurricularActivities/Strength:-  Always try to make good atmosphere and put my best forthe organization by keep all the equipment available and free from defects. And also try to complete all the tasks within the given period of time withzero injury.  Having leadership activity to do the task either individual or with team members, Hard work, Positiveattitude, Creativity skills.  Motivate to all the subordinates to maintain the workingculture of the organization discipline. ProjectUndertaken:-  MultipurposeAgricultural Machine (WorkingModel) Function-It separate the husk from the rice paddy withthe help of Huller Machine & Separate it by the action of wind energy that is Blower, Generation of electricity withStorage system should be achieved with the help of Alternator by rotating at 900 rpm that is directly coupled on main shaft, Pumping of water with the help of Reciprocating Pump, Grinding of agricultural tools with the help of Grinder. PERSONALPROFILE:- Name : Mohammad Zishan Khan Father’s name : Shri. M.S.Khan Mother’s name : Smt. Nusrat Khan Date of birth : 13-Aug-1990 Sex : Male Marital Status : Single Nationality : Indian Current CTC : 4.8 Lacs + Free Accommodation Expected CTC : 6 Lacs Relocation : Ready to relocate anywhere in India. Notice Period : 1 Month Passport No- : M6914514 Interested : Permanent Strength : Good Communication and Problem solving skills, Leadership and Professional Team Player,Initiatives, Creativity, PositiveAttitude. Permanent Address : Manzoor Manzil Ganesh Nagar School Approach Road Bilaspur Chhattisgarh, PinCode-495004. Hobbies : Playing Cricket, Badminton and Singing. Languages Known : English, Hindi and Urdu. Alternate Contact No. : +919691344431/+917587330580 Disclaimer: Above furnished details are authentic to the best of my knowledge and having satisfied good exposure in all the above zones mentioned. I anticipate my experience will be considered for yourkind perusal. Date:-28/01/2016 Place:- Paradeep Signature