Go Beyond Digital: Elevate Your UX with Service Design Thinking
This document outlines the principles and importance of service design thinking in enhancing user experience (UX), emphasizing the need for a user-centered approach and understanding the entire customer journey. It discusses a case study of a clean energy program that transitioned to a digital experience, highlighting the significance of recognizing customer preferences and improving service delivery processes. The document also provides practical steps and resources for integrating service design into UX practice.
Chi Pham
User ExperienceDesigner
BIOGRAPHY
UX Designer by day.
Trail hiking and pie eating
enthusiast by… all other times.
Current gig:
User Experience Designer
at Effective, an experience
agency that embraces
digital complexity through
a measurable, human-
centered design approach.
Based in Denver, CO!
Service design (noun)
Servicedesign is the activity of planning and
organizing people, infrastructure, communication and
material components of a service in order to improve
its quality and the interaction between the service
provider and its customers.
https://www.service-design-network.org/manifesto
7.
User
experience
Customer
experience
Servicedesign
UX v. CX v. SD
Product interactions
Experience perception
System approach
Users interact with product and the experience they receive
from that interaction.
CX is the design, implementation, and management of
interactions across the entire customer journey.
Service Design also focuses on the design of entire customer journey,
but it also designs the behind-the-scenes activities that enable those
experiences to be delivered as planned.
8.
Principles of servicedesign
1
USER-CENTERED
Put the user at the center of the design….
(always).
4
EVIDENCING
Find ways for inherently intangible services
to be visualized in ‘physical elements’ that
users can remember and hold on to.
2
CO-CREATIVE
Lean on and utilize perspectives of
stakeholders from all facets of the business,
as well as the users. 5
HOLISTIC
Design for the environment the users
operate in and consider all touchpoints.
Nothing exists in a vacuum.
3
SEQUENCING
Understand how the entire service works as
a dynamic process over a period of time,
and who the interactions take place with.
http://thisisservicedesignthinking.com/
How it parallelsUX
USER CENTERED DESIGN
Every research activity, design, and line of
code should be built around & for the user.
USER FLOWS AND JOURNEYS
UX makes sure that the entire user flow is
accounted for, step by step, over time.
CO-CREATIVE
In order to design truly great product,
collaboration is key.
COMMUNICATING DESIGN SOLUTIONS
Visualizing and documenting complex
design solutions for implementation.
11.
How it expandsbeyond UX
OMNI-CHANNEL TOUCHPOINTS
Services encompass products. They can
include a product in its cycle, but the
product is not the centerpiece.
CONSISTENT EXPERIENCE
Service design ensures that users have a
consistent experience across all
touchpoints with the brand or company.
EVIDENCING
Beyond the digital touchpoints, services
should be evidenced physically for the user.
BACK STAGE DESIGNS
Service design also considers and designs
the back stage processes that occur in
order to provide the best user experience.
“When you havetwo coffee shops right
next to each other, and each sells the
exact same coffee at the exact same
price, service design is what makes
you walk into one and not the other.
—31 Volts Service Design, 2008
14.
What drives success?
INTHE PAST
High-quality products drive
profit and engagement.
IN THE PRESENT
High-quality touchpoints
drive better experiences.
Significant emphasis on:
• Product development
• Product value
• Customer service
Significant emphasis on:
• Multiple touchpoints
• Social media campaigns
• Internal business processes
Shifting the
center ofthe
universe
Your website isn’t the center of your
universe. Your Facebook page isn’t
the center of your universe. Your
mobile app isn’t the center of your
universe. The customer is the center
of your universe.
— Bruce Ernst,
Business 2 Community
“
Location
HQ: WASHINGTON DC
115615th St NW STE 840,
Washington, DC 20005
AREA OF OPERATION:
MID-ATLANTIC REGION
DC, VA, MD, PA
with some work in NY, DE
22.
2015
THE GOAL
Allow theprogram to scale with limited staff capacity
by transforming the company’s digital experience
and moving resources and processes online.
The move to
digital
23.
Here’s what Idid
DEFINE BUSINESS GOALS
Interviewed Energy Program manager
to clearly define business goals and
key metrics for success
JANUARY 2015
BEGIN USER RESEARCH
Interviews + surveys of past participants
and folks in the community
24.
REDESIGN WEBSITE
Worked withIT and Tech Coordinator to
design and build new website based on
research insights.
Heavy emphasis: FAQ page
REDESIGN MARKETING PIPELINE
Worked with Marketing manager to
redesign marketing workflow pipeline
and to rewrite email content.
TEST WEBSITE
Ran A/B tests with users to determine most
successful version, using Google Analytics,
heat maps, and several other tools
25.
APRIL 2015
LAUNCH BOTHDIGITAL PRODUCTS!!!
Ready to go!
TEST MARKETING PIPELINE
Ran A/B tests with users to determine most
successful version, using Google Analytics,
heat maps, and several other tools
WE IGNORED OURDEMOGRAPHIC
“I just don’t like doing this stuff online.
I just wanted to give someone a call so
you can walk me through it. That way
I know I’m making the right decisions.
28.
“You’ve got tostart with the customer
experience and work back toward the
technology, not the other way around.
—Steve Jobs
What we learned
DEMOGRAPHICIS KING
There’s a huge difference between
designing who you think you are helping
and who you are ACTUALLY helping.
UTILITY BILLS ARE COMPLEX
Energy is messy and complex. It’s hard to
understand and most folks don’t want to
dedicate brain space to understanding fully.
PHONE CALLS ARE PREFERRED
When it came to switching their energy bill,
users preferred to talk through issues on
the phone call, not over email.
CLEAN ENERGY IS INTANGIBLE
The value proposition of our program was
intangible, so it was difficult to translate
into something meaningful to users.
What I did(pt. 2)
MAY 2015
REDESIGN CUSTOMER SUPPORT
In order to best serve our customers,
we needed to reevaluate our internal
systems, pipeline, and staff training.
REDESIGN WEBSITE
We went through an additional iteration
of the website, but this time making our
contact info much more findable.
33.
REDESIGN MARKETING PIPELINE
Wealso redesigned the flow of the
marketing pipeline, this time building in
space for Groundswell to call users who
were stuck in the process.
COMMUNITY LEADERS TRAINING
We realized that our community leaders
were a huge tool in communicating our
program to people. We held more training
sessions for leaders.
LAUNCH SUMMER CAMPAIGN
Whew, ready to go pt. 2!!
36.
“A customer isthe most important visitor on our
premises, they are not dependent on us. We are
dependent on them. They are not an interruption
in our work. They are the purpose of it. They are
not an outsider in our business. They are a part
of it. We are not doing a favor by serving them.
They are doing us a favor by giving us an
opportunity to do so.
—Anonymous
“Every contact wehave with a customer
influences whether or not they’ll come
back. We have to be great every time or
we’ll lose them.
—Kevin Stirtz
More Loyal Customers
40.
Why
care?
Service design matters,and
here’s why.
1
HOLISTIC AND IMPACTFUL SOLUTIONS
By seeing things at a systems level, you can design
meaningful solutions that truly address user pain
points and goals.
2
USERS WANT EXPERIENCES, NOT PRODUCTS
What brings users back over and over again don’t
have to only do with the product, but the entire
experience of being a customer of the organization.
Understand the cultureand goals of the
business, understand the pain points and POV
of users, and understand the big picture.
Exploration
STAGE 1
Stakeholder maps
Visual or physical representation of the
various groups involved in a service
Contextual inquiry
Interviewing and observing a user within
the natural context in which they interact
with your product or organization
Personas + journey maps
Telling the story of a particular customer’s
experience from initial contact through
a long-term relationship
43.
STAGE 2
Storyboards
Visual orphysical representation of the
various groups involved in a service
Explore as many mistakes as possible.
Co-create with stakeholders, collaborate
within interdisciplinary teams.
Creation
http://www.servicedesigntools.org/tools/35
Service blueprints
Visual representation of the customer
journey as well as all of the interactions that
make that journey possible.
Group sketching
Involving a diverse group of thinkers and
perspectives to sketch together and ideate
off of potential solutions.
44.
STAGE 3
Usability testing
Observingand asking users about the use
of existing or future products or services in
a situation of normal everyday life.
Experience prototypes
Simulation of the service experience that
foresees some of its performances through
the use of the specific physical
touchpoints involved.
Get your ideas in front of as many people
as you can and simulate the experience
you hope to bring to life!
Reflection + testing
http://www.servicedesigntools.org/tools/21
45.
STAGE 4
Business modelcanvas
Describes, analyzes, and designs business
models that will be necessary to implement
the new service designs.
Clearly communicate your concept and
engage with employees of all aspects of the
business to transform the designed solution
into a working service. Constantly reevaluate!
Implementation
Customer lifecycle maps
Holistic visualization of a customer’s overall
relationship w/service provider from initial
contact to stopping the service.
46.
What if Ican’t do service
design in my job?
How can I actually apply these
ideas to my current role?
47.
1 START ASKINGYOURSELF: WHAT ELSE?
Open your mind to things beyond the scope.
2
TRY TALKING TO MORE DEPARTMENTS
See what folks have to say, even if they’re not
in the digital world.
3
THINK BIG IN THE BEGINNING
If you could address the true root of the
user’s problems, how would you do it?
STEP 1
Widen
your scope
Service design starts with YOU
and YOUR mental model
48.
1 SIGN UPFOR SERVICE DESIGN NETWORK
https://www.service-design-network.org/
2 READ ONE SERVICE DESIGN ARTICLE A WEEK
Stay in the know with the latest and greatest.
3 CONNECT WITH OTHERS IN THE COMMUNITY
Pick their brains!
Learn more
about service
design
The more you know about
service design, the better you
can fit it into your current role
STEP 2
Chi Pham
User ExperienceDesigner
CONTACT INFO:
chi.pham@effectiveinc.com
LinkedIn
/anhchipham
Twitter
@achipham
Medium
@chipham_29386
54.
Resources
Part I: What’sService Design? And Why Does it Matter?
Part II: A Service Design Case Study!
Part III: How to Apply Service Design In Your Own UX
Design Workflow!
Service Design Tools
Service Design Network
Service Design Toolkit
Practical Service Design
Adaptive Path’s Guide to Service Blueprinting
This is Service Design Thinking: Basics, Tools, Cases
(HIGHLY recommend this one)
Service Design: From Insight to Implementation (I
haven’t personally read it, but have heard great recs!)