GENERAL INFORMATION
Size: 108,889 square kilometers (Km2)
Guatemala
Climate: Tropical
Inhabitants: 14.4 million
PIB/ head: 7400 USD
Economic data:One of the largest regional economies
Growth outlook is further driven by remittance
inflows
and export revenues from the U.S.
Currency: Quetzal (Q7.80/US$1.00)
Capital: Guatemala City
Borders: Mexico, El Salvador, Honduras and Belize
ENERGY SECTOR
Net generation (CNEE 2012):
• Water: 4434.92 Gwh
• Geothermal: 245.63 Gwh
• Biomass: 1003.02 Gwh
• Coal: 1237.92 Gwh
• Bunker: 1772.46 Gwh
• Diesel 9.61 Gwh
Annual consumption: 8703.57 Gwh
Increase of consumption: 3.44%
Electrification rate: 85.60%
ENERGY SECTOR
Important stakeholders:
MEM Energy and Mines Ministry, policy maker
CNEE Electric Energy National Commission, regulator
INDE Instituto Nacional de Electrificacion, former utility
EEGSA/EPM and Energuate/Actis, distribution companies
AMM Wholesale Market Administrator, market and system operator
HIGHLIGHTS OF ACTUAL ENERGY
POLICY:
The main objective of the 2013-2027 Energy Policy is to contribute to
the sustainable energy development of Guatemala, with social equity
and responsibility to the environment. The strategic actions to
achieve such objective include:
1. To secure the energy supply at competitive prices
2. To secure the fuel supply at competitive prices
3. To pursue exploration and exploitation of the oil reserves
towards achieving self sufficiency
4. To promote energy efficiency
5. To reduce firewood consumption
ELECTRIC ENERGY GENERATION
CURRENT GEOTHERMAL
DEVELOPMENT
Stakeholders:
MEM Energy and Mines Ministry, policy maker
CNEE Electric Energy National Commission, regulator
INDE Instituto Nacional de Electrificacion, former utility
Ormat, Orzunil and Ortitlan Projects
Geothermal projects in operation:
Orzunil
Ortitlan
IDENTIFIED RENEWABLE ENERGY
POTENTIAL
TECHNOLOGY
POTENTIAL
MW
USED %
HYDROPOWER 6,000 15.00%
GEOTHERMAL 1,000 4.90%
Geothermal projects at feasibility and pre-feasibility stages in
Guatemala
• Studies were initiated in 1972 in the Moyuta area
• The most promising areas were identified
• In 1981 l INDE and BRGM of Francia, with local resources and a
grant from OLADE, carried out exploration studies in 13 sites
STUDIES AREAS
AREAS WITH STUDIES
AREAS WITH GEOTERMICAL SIGNS
An study of the International Geothermal Development Agency in
2003, indicated that the geothermal resources in country can be
estimated to be between 800 and 4000 megawats of capacity.
GEOTHERMAL POTENTIAL
CLASSIFICATION
TEMPORARY AUTORIZATIONS > 5
MW
No.Project Entity Autorization date
1 Geotec-Sur Geotec, S.A. 4/ 04/ 2000
2 Valorsa Valores y Servicios, S.A. 3/ 16/ 2004
3 Cerro Blanco Geotermia Oriental de Guatemala, S.A. 12/ 11/ 2008
4 San Marcos Brightstar Renewable Energy Guatemala, S.A. 12/ 16/ 2009
5 Zunil II Brightstar Renewable Energy Guatemala, S.A. 1/ 30/ 2009
6 Ambar Recursos del Golfo, S.A.
7 La Chinita Recursos del Golfo, S.A.
8 Clare Recursos del Golfo, S.A.
9 Gloria Recursos del Golfo, S.A.
10 Proyecto Geotèrmico Joaquina Centrales Geoeléctricas, S.A.
11 Proyecto Geotérmico Atitlán Centrales Geoeléctricas, S.A.
12 San Michkael San Michkael, S.A.
13 La Fumarola Recursos del Golfo, S.A.
In process
year 2009
year 2008
year 2000
year 2004
INTERESTED PLAYERS-NEAST
STUDIES
Project Localization Capacity (MW) Res. CNEE Op. Date
Geotermica El Ceibillo Amatitlan, Guatemala 25 133-2009 2014
Geotermica Moyuta Moyuta, Jutiapa 44 175-2009 2018
Tecuamburro Ortemala 1 San Vicente Pacaya, Escuintla 50 200-2009 2014
Geotermico Tecuamburro Pueblo Nuevo Vinas, Santa Rosa 44 35-2008 2017
Central Geotermica Cerro Blanco Asuncion Mita, Jutiapa 50 134-2011 2013
Geotermico Tecuamburro INDE Pueblo Nuevo Vinas, Santa Rosa 50 271-2011 2016
Geotermico San Marcos INDE San Cristobal Cucho, San Marcos 24 270-2011 2016
Geotermico Moyuta INDE Moyuta, Jutiapa 20 2569-2011 2015
TOTAL CAPACITY TO INSTALL 307
FISCAL INCENTIVES RENEWABLE
ENERGY LAW
 Decree number 52-2003
Incentives Law for the Development of RE projects
 Government Decree No. 211-2005
RE Incentives Law Bylaws
 Fiscal Incentives
a) Preoperative and Construction phases
• Import Duties
• VAT
b) Commercial-Operational Phase
• Income Revenue Tax (ISR)
CURRENT REGULATIONS
Article 16. (RLGE) Geothermal Plants
 Require Authorization (Over 5 MW)
Authorizations
 Temporary:
 For Studies
 Max surface 10,000 square kilometers (Km2 )
 Definitive:
 For exploration and commercial explotation
 Max surface 100 square kilometers (Km2).
 Only one geothermal reservoir
Several interested parties can request authorization over the same
area.
CURRENT REGULATIONS
Use of Geothermal Resources The definitive authorization in a specific
area must
 Have a signed Authorization contract;
 Exploration plan and programs;
 Development and explotation plan;
 Areas granted through definitve authorization shall not overlap.
When the player is no longer interested in the resource, MEM cancell
the authorization.
The lack of activity is equivalent to given up on the authorization and
quitting on rights over the area.
DEFINITIVE AUTHORIZATION
REQUIREMENTS
Definitive Authorization (Art. 4 RLGE)
 Project description
 Project plans (prefeasibility and investment profiles)
 Environmental Impact Study (EIA) approved by MARN
 Electrical studies prepared according to NEAST norms
 Detail of the property to be used
 Authorized permits and rights of way (in contracts)
 Work Schedule
 Project Budget
ACTIONS TO INCENTIVIZE
GEOTHERMAL INVESTMENTS
High quality Medium quality
small size (<5 MW)
Exploration: 400 - 800
Geothermal field: 100 - 200
Geothermal power plant: 1,100 - 1,300
Total: 1,600 - 2,300
Exploration: 400 - 1,000
Geothermal field: 300 - 600
Geothermal power plant: 1,100 - 1,400
Total: 1,800 - 3,000
medium size (5-30 MW)
Exploration: 250 - 400
Geothermal field: 200 - 500
Geothermal power plant: 850 - 1,200
Total: 1,300 - 2,100
Exploration: 250 - 600
Geothermal field: 400 - 700
Geothermal power plant: 950 - 1,200
Total: 1,600 - 2,500
large size (>30 MW)
Exploration: 100 - 200
Geothermal field: 300 - 450
Geothermal power plant: 750 - 1,100
Total: 1,150 - 1,750
Exploration: 100 - 400
Geothermal field: 400 - 700
Geothermal power plant: 850 - 1,100
Total: 1,350 - 2,200
Investment US$/ Kw
Steam resource
Geothermal power
plant size
EXPLORATION COST
Parameter Data
In-Depht average 1,500 meters
Bottom temperature 280° C
Average power 5 Mwe
Average cost 4 millons US$
Orientation vertical o derivated
Valves similar to an oil well
Diameter telescopic 26" - 8 "
GOG POLICY ACTIONS
INDE to fulfill its obligations:
 Rational use of natural resources
 Support to the Exploration of Geothermal Resources
Energy and Mines Ministry:
 Geothermal Master Plan with Japan´s Support
 Financial cooperation from Japan for well drilling
 Human Resources Training at the “Instituto Regional de Geotermia” (El Salvador)
 Launch in 2014 a bidding process for a geothermal power generation project
Use of PPP Framework
Potential JV with INDE
CONTACT
Carlos Alberto Avalos Ortíz
avaloso@gmail.com

More Related Content

Similar to Geothermal Development in Guatemala.pptx

05.09.2013 How can government be involved in the mining industry, Mr. Stewart...
05.09.2013 How can government be involved in the mining industry, Mr. Stewart...05.09.2013 How can government be involved in the mining industry, Mr. Stewart...
05.09.2013 How can government be involved in the mining industry, Mr. Stewart...
The Business Council of Mongolia
 
Full Steam Ahead For Philippine Geothermal Energy
Full Steam Ahead For Philippine Geothermal EnergyFull Steam Ahead For Philippine Geothermal Energy
Full Steam Ahead For Philippine Geothermal Energy
Fernando Penarroyo
 
Wind energy outlook in latin america
Wind energy outlook in latin americaWind energy outlook in latin america
Wind energy outlook in latin america
Business Finland
 
Geothermal energy
Geothermal energyGeothermal energy
Geothermal energy
Makati Science High School
 
Argentina s12
Argentina s12Argentina s12
Argentina s12
M. Sakhawat Hussain
 
Energy Laws and Policies Presentation.pptx
Energy Laws and Policies Presentation.pptxEnergy Laws and Policies Presentation.pptx
Energy Laws and Policies Presentation.pptx
RonniePenarroyo
 
Current US Policies and Future R&D Directions
Current US Policies and Future R&D Directions Current US Policies and Future R&D Directions
Current US Policies and Future R&D Directions
Iceland Geothermal
 
Painel 3 – Chilean Case Study: Marine Energy Roadmap
Painel 3 – Chilean Case Study: Marine Energy RoadmapPainel 3 – Chilean Case Study: Marine Energy Roadmap
Painel 3 – Chilean Case Study: Marine Energy Roadmap
UKinBrazilNetwork
 
PAS Shale Gas Exploration Planning Workshop (Nottingham & Manchester)
PAS Shale Gas Exploration Planning Workshop (Nottingham & Manchester)PAS Shale Gas Exploration Planning Workshop (Nottingham & Manchester)
PAS Shale Gas Exploration Planning Workshop (Nottingham & Manchester)
PAS_Team
 
Company_profile_public_Nov2016
Company_profile_public_Nov2016Company_profile_public_Nov2016
Company_profile_public_Nov2016
Patrik Novák
 
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
atlanticcouncil
 
Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...
SINGHZEE
 
Geothermal Energy in Egypt
Geothermal Energy in EgyptGeothermal Energy in Egypt
Geothermal Energy in Egypt
Mohamed Sabry Mohamed
 
Bhutan Country Presentation at ACEF 2014
Bhutan Country Presentation at ACEF 2014Bhutan Country Presentation at ACEF 2014
Bhutan Country Presentation at ACEF 2014
Energy for All | Asian Development Bank
 
30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu
30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu
30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu
The Business Council of Mongolia
 
Geothermal projects and district heating - Experience sharing from Iceland - ...
Geothermal projects and district heating - Experience sharing from Iceland - ...Geothermal projects and district heating - Experience sharing from Iceland - ...
Geothermal projects and district heating - Experience sharing from Iceland - ...
Cluster TWEED
 
Wind Energy in Dominican Republic Proposal
Wind Energy in Dominican Republic ProposalWind Energy in Dominican Republic Proposal
Wind Energy in Dominican Republic Proposal
Carlos Rymer
 
Penarroyo ADB Geothermal Presentation 2012
Penarroyo ADB Geothermal Presentation 2012Penarroyo ADB Geothermal Presentation 2012
Penarroyo ADB Geothermal Presentation 2012
Fernando Penarroyo
 
Geothermal Incentive Schemes in Germany, Kenya, New Zealand, Philippines and ...
Geothermal Incentive Schemes in Germany, Kenya, New Zealand, Philippines and ...Geothermal Incentive Schemes in Germany, Kenya, New Zealand, Philippines and ...
Geothermal Incentive Schemes in Germany, Kenya, New Zealand, Philippines and ...
Iceland Geothermal
 
AlChE-Global-CCS_Institute-Presentation-101813
AlChE-Global-CCS_Institute-Presentation-101813AlChE-Global-CCS_Institute-Presentation-101813
AlChE-Global-CCS_Institute-Presentation-101813
Global CCS Institute
 

Similar to Geothermal Development in Guatemala.pptx (20)

05.09.2013 How can government be involved in the mining industry, Mr. Stewart...
05.09.2013 How can government be involved in the mining industry, Mr. Stewart...05.09.2013 How can government be involved in the mining industry, Mr. Stewart...
05.09.2013 How can government be involved in the mining industry, Mr. Stewart...
 
Full Steam Ahead For Philippine Geothermal Energy
Full Steam Ahead For Philippine Geothermal EnergyFull Steam Ahead For Philippine Geothermal Energy
Full Steam Ahead For Philippine Geothermal Energy
 
Wind energy outlook in latin america
Wind energy outlook in latin americaWind energy outlook in latin america
Wind energy outlook in latin america
 
Geothermal energy
Geothermal energyGeothermal energy
Geothermal energy
 
Argentina s12
Argentina s12Argentina s12
Argentina s12
 
Energy Laws and Policies Presentation.pptx
Energy Laws and Policies Presentation.pptxEnergy Laws and Policies Presentation.pptx
Energy Laws and Policies Presentation.pptx
 
Current US Policies and Future R&D Directions
Current US Policies and Future R&D Directions Current US Policies and Future R&D Directions
Current US Policies and Future R&D Directions
 
Painel 3 – Chilean Case Study: Marine Energy Roadmap
Painel 3 – Chilean Case Study: Marine Energy RoadmapPainel 3 – Chilean Case Study: Marine Energy Roadmap
Painel 3 – Chilean Case Study: Marine Energy Roadmap
 
PAS Shale Gas Exploration Planning Workshop (Nottingham & Manchester)
PAS Shale Gas Exploration Planning Workshop (Nottingham & Manchester)PAS Shale Gas Exploration Planning Workshop (Nottingham & Manchester)
PAS Shale Gas Exploration Planning Workshop (Nottingham & Manchester)
 
Company_profile_public_Nov2016
Company_profile_public_Nov2016Company_profile_public_Nov2016
Company_profile_public_Nov2016
 
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
Advanced Fossil Energy Technologies: Presentation by the US Dept of Energy Of...
 
Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...
 
Geothermal Energy in Egypt
Geothermal Energy in EgyptGeothermal Energy in Egypt
Geothermal Energy in Egypt
 
Bhutan Country Presentation at ACEF 2014
Bhutan Country Presentation at ACEF 2014Bhutan Country Presentation at ACEF 2014
Bhutan Country Presentation at ACEF 2014
 
30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu
30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu
30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu
 
Geothermal projects and district heating - Experience sharing from Iceland - ...
Geothermal projects and district heating - Experience sharing from Iceland - ...Geothermal projects and district heating - Experience sharing from Iceland - ...
Geothermal projects and district heating - Experience sharing from Iceland - ...
 
Wind Energy in Dominican Republic Proposal
Wind Energy in Dominican Republic ProposalWind Energy in Dominican Republic Proposal
Wind Energy in Dominican Republic Proposal
 
Penarroyo ADB Geothermal Presentation 2012
Penarroyo ADB Geothermal Presentation 2012Penarroyo ADB Geothermal Presentation 2012
Penarroyo ADB Geothermal Presentation 2012
 
Geothermal Incentive Schemes in Germany, Kenya, New Zealand, Philippines and ...
Geothermal Incentive Schemes in Germany, Kenya, New Zealand, Philippines and ...Geothermal Incentive Schemes in Germany, Kenya, New Zealand, Philippines and ...
Geothermal Incentive Schemes in Germany, Kenya, New Zealand, Philippines and ...
 
AlChE-Global-CCS_Institute-Presentation-101813
AlChE-Global-CCS_Institute-Presentation-101813AlChE-Global-CCS_Institute-Presentation-101813
AlChE-Global-CCS_Institute-Presentation-101813
 

Recently uploaded

2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
AjmalKhan50578
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 

Recently uploaded (20)

2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 

Geothermal Development in Guatemala.pptx

  • 2. GENERAL INFORMATION Size: 108,889 square kilometers (Km2) Guatemala Climate: Tropical Inhabitants: 14.4 million PIB/ head: 7400 USD Economic data:One of the largest regional economies Growth outlook is further driven by remittance inflows and export revenues from the U.S. Currency: Quetzal (Q7.80/US$1.00) Capital: Guatemala City Borders: Mexico, El Salvador, Honduras and Belize
  • 3. ENERGY SECTOR Net generation (CNEE 2012): • Water: 4434.92 Gwh • Geothermal: 245.63 Gwh • Biomass: 1003.02 Gwh • Coal: 1237.92 Gwh • Bunker: 1772.46 Gwh • Diesel 9.61 Gwh Annual consumption: 8703.57 Gwh Increase of consumption: 3.44% Electrification rate: 85.60%
  • 4. ENERGY SECTOR Important stakeholders: MEM Energy and Mines Ministry, policy maker CNEE Electric Energy National Commission, regulator INDE Instituto Nacional de Electrificacion, former utility EEGSA/EPM and Energuate/Actis, distribution companies AMM Wholesale Market Administrator, market and system operator
  • 5. HIGHLIGHTS OF ACTUAL ENERGY POLICY: The main objective of the 2013-2027 Energy Policy is to contribute to the sustainable energy development of Guatemala, with social equity and responsibility to the environment. The strategic actions to achieve such objective include: 1. To secure the energy supply at competitive prices 2. To secure the fuel supply at competitive prices 3. To pursue exploration and exploitation of the oil reserves towards achieving self sufficiency 4. To promote energy efficiency 5. To reduce firewood consumption
  • 7. CURRENT GEOTHERMAL DEVELOPMENT Stakeholders: MEM Energy and Mines Ministry, policy maker CNEE Electric Energy National Commission, regulator INDE Instituto Nacional de Electrificacion, former utility Ormat, Orzunil and Ortitlan Projects Geothermal projects in operation: Orzunil Ortitlan
  • 8.
  • 9. IDENTIFIED RENEWABLE ENERGY POTENTIAL TECHNOLOGY POTENTIAL MW USED % HYDROPOWER 6,000 15.00% GEOTHERMAL 1,000 4.90% Geothermal projects at feasibility and pre-feasibility stages in Guatemala • Studies were initiated in 1972 in the Moyuta area • The most promising areas were identified • In 1981 l INDE and BRGM of Francia, with local resources and a grant from OLADE, carried out exploration studies in 13 sites
  • 12. AREAS WITH GEOTERMICAL SIGNS An study of the International Geothermal Development Agency in 2003, indicated that the geothermal resources in country can be estimated to be between 800 and 4000 megawats of capacity.
  • 14. TEMPORARY AUTORIZATIONS > 5 MW No.Project Entity Autorization date 1 Geotec-Sur Geotec, S.A. 4/ 04/ 2000 2 Valorsa Valores y Servicios, S.A. 3/ 16/ 2004 3 Cerro Blanco Geotermia Oriental de Guatemala, S.A. 12/ 11/ 2008 4 San Marcos Brightstar Renewable Energy Guatemala, S.A. 12/ 16/ 2009 5 Zunil II Brightstar Renewable Energy Guatemala, S.A. 1/ 30/ 2009 6 Ambar Recursos del Golfo, S.A. 7 La Chinita Recursos del Golfo, S.A. 8 Clare Recursos del Golfo, S.A. 9 Gloria Recursos del Golfo, S.A. 10 Proyecto Geotèrmico Joaquina Centrales Geoeléctricas, S.A. 11 Proyecto Geotérmico Atitlán Centrales Geoeléctricas, S.A. 12 San Michkael San Michkael, S.A. 13 La Fumarola Recursos del Golfo, S.A. In process year 2009 year 2008 year 2000 year 2004
  • 15. INTERESTED PLAYERS-NEAST STUDIES Project Localization Capacity (MW) Res. CNEE Op. Date Geotermica El Ceibillo Amatitlan, Guatemala 25 133-2009 2014 Geotermica Moyuta Moyuta, Jutiapa 44 175-2009 2018 Tecuamburro Ortemala 1 San Vicente Pacaya, Escuintla 50 200-2009 2014 Geotermico Tecuamburro Pueblo Nuevo Vinas, Santa Rosa 44 35-2008 2017 Central Geotermica Cerro Blanco Asuncion Mita, Jutiapa 50 134-2011 2013 Geotermico Tecuamburro INDE Pueblo Nuevo Vinas, Santa Rosa 50 271-2011 2016 Geotermico San Marcos INDE San Cristobal Cucho, San Marcos 24 270-2011 2016 Geotermico Moyuta INDE Moyuta, Jutiapa 20 2569-2011 2015 TOTAL CAPACITY TO INSTALL 307
  • 16. FISCAL INCENTIVES RENEWABLE ENERGY LAW  Decree number 52-2003 Incentives Law for the Development of RE projects  Government Decree No. 211-2005 RE Incentives Law Bylaws  Fiscal Incentives a) Preoperative and Construction phases • Import Duties • VAT b) Commercial-Operational Phase • Income Revenue Tax (ISR)
  • 17. CURRENT REGULATIONS Article 16. (RLGE) Geothermal Plants  Require Authorization (Over 5 MW) Authorizations  Temporary:  For Studies  Max surface 10,000 square kilometers (Km2 )  Definitive:  For exploration and commercial explotation  Max surface 100 square kilometers (Km2).  Only one geothermal reservoir Several interested parties can request authorization over the same area.
  • 18. CURRENT REGULATIONS Use of Geothermal Resources The definitive authorization in a specific area must  Have a signed Authorization contract;  Exploration plan and programs;  Development and explotation plan;  Areas granted through definitve authorization shall not overlap. When the player is no longer interested in the resource, MEM cancell the authorization. The lack of activity is equivalent to given up on the authorization and quitting on rights over the area.
  • 19. DEFINITIVE AUTHORIZATION REQUIREMENTS Definitive Authorization (Art. 4 RLGE)  Project description  Project plans (prefeasibility and investment profiles)  Environmental Impact Study (EIA) approved by MARN  Electrical studies prepared according to NEAST norms  Detail of the property to be used  Authorized permits and rights of way (in contracts)  Work Schedule  Project Budget
  • 20. ACTIONS TO INCENTIVIZE GEOTHERMAL INVESTMENTS High quality Medium quality small size (<5 MW) Exploration: 400 - 800 Geothermal field: 100 - 200 Geothermal power plant: 1,100 - 1,300 Total: 1,600 - 2,300 Exploration: 400 - 1,000 Geothermal field: 300 - 600 Geothermal power plant: 1,100 - 1,400 Total: 1,800 - 3,000 medium size (5-30 MW) Exploration: 250 - 400 Geothermal field: 200 - 500 Geothermal power plant: 850 - 1,200 Total: 1,300 - 2,100 Exploration: 250 - 600 Geothermal field: 400 - 700 Geothermal power plant: 950 - 1,200 Total: 1,600 - 2,500 large size (>30 MW) Exploration: 100 - 200 Geothermal field: 300 - 450 Geothermal power plant: 750 - 1,100 Total: 1,150 - 1,750 Exploration: 100 - 400 Geothermal field: 400 - 700 Geothermal power plant: 850 - 1,100 Total: 1,350 - 2,200 Investment US$/ Kw Steam resource Geothermal power plant size
  • 21. EXPLORATION COST Parameter Data In-Depht average 1,500 meters Bottom temperature 280° C Average power 5 Mwe Average cost 4 millons US$ Orientation vertical o derivated Valves similar to an oil well Diameter telescopic 26" - 8 "
  • 22. GOG POLICY ACTIONS INDE to fulfill its obligations:  Rational use of natural resources  Support to the Exploration of Geothermal Resources Energy and Mines Ministry:  Geothermal Master Plan with Japan´s Support  Financial cooperation from Japan for well drilling  Human Resources Training at the “Instituto Regional de Geotermia” (El Salvador)  Launch in 2014 a bidding process for a geothermal power generation project Use of PPP Framework Potential JV with INDE