4. Mission
GEHS Corp. is dedicated to provide services of excellence related to Health,
Safety and Environmental in the construction field. We focus on bringing
construction companies to obtain the highest level of compliance with laws,
regulations, ordinances and court, both state and federal agencies.
Our professional staff is committed to perform inspection duties in the projects
to ensure compliance with environmental laws, regulations and safety at work.
5. Vision
GEHS Corp. vision is to be the premier consultancy,
working with its clients to manage their most challenging
environmental, health and safety issues and attain their
sustainability goals.
6. Services
Preparation and filling Environmental Permits required by
state and federal agencies jurisdiction.
Advisement in environmental regulations and documentation.
Best practices to effectively control the erosion and
sedimentation.
Formal training and capacitating all personnel in safety, health
and environmental aspects.
Field inspections; Environmental Management, Health
Management, Safety and monitoring of endangered species.
7. Health and Safety
We Offer a full time:
Daily inspections of work areas to identify and correct unsafe
conditions.
Educate supervisors and employees on safety responsibilities.
Implement the safety program of your company to educate
your employees.
Develop and implement safety regulations.
Perform daily equipment inspections.
8. Health and Safety Cont…
Conduct investigations in each accident to determine the cause
and prevention
Conduct daily safety orientations to employees
Keeping records of training, periodic inspections, corrective
actions, investigations as required by law.
Participate in meetings related to the project.
Check and/or managed crane certificates and record keeping.
Prepare and/or implement programs such as: Confined spaces,
Fall Protection, prevention and others.
9. Environmental
We offer a full time:
Implement erosion and sedimentation controls adopted by
the agencies in their jurisdiction and ensure proper
installation.
Conduct daily inspections and monitoring to ensure the
effectiveness of control installed. / Make immediate
corrections if necessary. / Perform daily reports.
Perform daily rain gauge readings in accordance with the
“Store Water Pollution Prevention Plan” / EPA.
10. Environmental cont…
Conduct monitoring of water, air and noise, to ensure your
company meets the required standards in the agencies
jurisdiction.
Educate supervisors and employees on the importance of the
installation of erosion and sedimentation controls and the
responsibility to comply with the “Storm Water Pollution
Prevention Plan”. This training will be done before starting
construction activities on all new staff during the course of the
project.
Participate in project meetings.
Conduct SWPPP reports, as in the NPDES for the Project.
11. .
Environmental Permits
Consolidated Permit Preparation and filing
Consolidated Permits for
Preparation and filing
others works
Includes the following services:
Monthly visits to the project for inspections and monitoring of
Erosion, and Sedimentation erosion and sedimentation controls.
Control Plans Inform of conflicting signals, if applicable.
Preparation and filing of the initial and monthly reports of the
Erosion, and Sedimentation Control Plan.
General Permit for Preparation and filing
Used Oil Storage Facilities Preparation of the SPCC Plan
Operation Plan
Permits for Septic Tanks Preparation and filing
General Permit for
Preparation and filing
Electricity Generators
Extraction Permits
Earth Crust
Preparation and filing
(Department of Natural and
Environmental Resources)
Storm Water Pollution Preparation of the document
Prevention Plan (This document is required for the National Pollutant Discharge
(SWPPP) Elimination System Permit - NPDES)
12. Environmental Permits
Spill Prevention, Control
and Countermeasure Plans Preparation of Document
(SPCC)
Cutting Permit, Pruning,
Planting Trees, and Project Evaluation is required
Transplantation
Categorical Exclusion Project Evaluation is required
Environmental Assessment
Project Evaluation is required
(EA)
Environmental Impact
Project Evaluation is required
(DIA)
Consolidated Permit Preparation and filing
Consolidated Permits for
Preparation and filing
others works
13. Environmental Permits
Includes the following services:
Monthly visits to the project for inspections and monitoring of erosion and
Erosion, and Sedimentation sedimentation controls.
Control Plans Inform of conflicting signals, if applicable.
Preparation and filing of the initial and monthly reports of the Erosion, and
Sedimentation Control Plan.
Preparation and filing
General Permit for
Preparation of the SPCC Plan
Used Oil Storage Facilities
Operation Plan
Permits for Septic Tanks Preparation and filing
General Permit for Electricity
Preparation and filing
Generators
Extraction Permits
Earth Crust
Preparation and filing
(Department of Natural and
Environmental Resources)
Storm Water Pollution Preparation of the document
Prevention Plan (This document is required for the National Pollutant Discharge
(SWPPP) Elimination System Permit - NPDES)
Also permits related with the following agencies: Corps of Engineering and
Fish and Wildlife
14. Environmental Permits
Spill Prevention, Control
and Countermeasure Plans Preparation of Document
(SPCC)
Cutting Permit, Pruning,
Planting Trees, and Project Evaluation is required
Transplantation
Categorical Exclusion Project Evaluation is required
Environmental Assessment
Project Evaluation is required
(EA)
Environmental Impact
Project Evaluation is required
(DIA)
Also permits related with the following agencies: Corps of Engineering and Fish and Wildlife.
17. Flood Control Project – La Plata River, Dorado, PR
Service: Environmental and Safety Management
Installation of silt fence Sediment trap in channels to protect La Plata River
18. VA Caribbean Healthcare System San Juan, PR
Project: Asbestos Cement Water Loop Replacement
Service: Environmental
Silt Fence Construction exit with gravel
19. Ft. Buchanan, Guaynabo, PR
Project: Renovate Softball Field Antilles High School
Service: Environmental
Inlet protection
20. Militar Base Ramey, Aguadilla, PR
Project: Repair Drainage and Improve Parking at Ramey School
Service: Environmental
Silt Fence Construction exit with gravel
21. If you are interesting in receiving more information about the
services that GEHS CORP can offer you, do not hesitate to
communicate and we’ll be glad to coordinate a telephone or
personal interview.
Recommendations and Resumes are available upon request