The document summarizes a pre-feasibility study for the Yanahuanca Gold Project located in La Libertad, Peru at an elevation of 4000m. Key details include an open pit mine plan to extract 293 million tonnes of ore grading 1.23 g/t gold over a 27 year mine life. A conventional truck and shovel operation is proposed along with a heap leach process to recover gold. Economic analysis shows an after-tax NPV of $470 million and IRR of 32.5% assuming a gold price of $1100/oz. The study recommends advancing the project to the next stage.