SlideShare a Scribd company logo
10.034 FRP CATAMARAN
Approval Date: 20 May 1998
Reviewed on : 23 October 2007 Version: 1
Equipment Specification: FRP CATAMARAN Version 1 10.034-1/6
Purpose
The FRP (Fibre Reinforced Plastic) catamaran will be used to execute hydrological
measurements in rivers, canals and reservoirs. Many of the measurements will be made in
very shallow water.
Conditions & Requirements
• The FRP catamaran shall be of such a design that it operates reliably and safely under the
prevailing environmental and hydraulic conditions.
• The boat shall be capable to operate in shallow water where repeatedly the hull may
impact with rock or sediment.
• All materials on the boat exterior and on wet spots inside the boat shall be non-
corrosive.
• The boat shall be very sturdy, unsinkable and shall have an adequate stability.
• The boat shall be easy to operate and maintain.
• The boat shall have an expected technical lifetime of not less than 10 years.
• The boat and the outboard engines shall be capable to operate for at least 6 months
without any major servicing.
• The boat shall have floatation chambers filled with closed cell foam.
• The boat shall be provided with appropriate fenders.
• The boat shall have a cabin to accommodate equipment and staff.
• At port and starboard site the cabin shall have sitting benches with an in-built store cum
board provided underneath.
• The cabin shall have windows and a lockable door.
• An opening of at least 3 x 3 m2
should be provided on deck to carry out hydrological
measurements.
• Access openings are to be provided in each compartment by flush manholes.
• The rear deck shall be provided with an awning.
• The boat shall be supplied with the accessories as needed for effective deployment.
• The boat shall be fitted with two outboard engines (see 10.036).
• The outboard engines shall be operated by a remote control system, located at the stern
side bulkhead of the cabin.
• The control system shall have a starting switch, gear switch and a throttle system for each
engine and a steering wheel and emergency stop switch for simultaneous operation of the
engines.
• The control system shall match the outboard engines.
• Guard-rail and stanchions with detachable chain will be rigged out around the deck-
opening. Suitable guard-rails shall also be provided around the deck.
• Bollards and fairleads are to be provided on the deck for mooring purpose.
• An overhead beam and a winch will be suitably positioned to lower and hoist the
measuring equipment.
• A maintenance manual, related to the type and model of the FRP catamaran, shall be
part of the delivery.
Equipment Specification: FRP CATAMARAN Version 1 10.034-2/6
Specifications
1. Boat
length approx. 8 m
width approx. 3.75 m
draft approx. 0.5 m
free board approx. 0.7 m
bottom shape catamaran
propulsion 2 Nos. of 30 kW (40 HP) outboard engines
carrying capacity 2000 kg
required speed 5 m/s
2. Cabin
length approx. 3 m
height ample sitting height
door lockable
door width >0.8 m
windows glass, possibility to open, closed water tight
3. Boat outfit
anchor matching boat, fitted with 5 chain and rope for water depth of 20
m and current velocity of 5 m/s
echo-sounder indicator type, fitted in the boat
compass magnetic type, fitted in the boat
fenders 4 of Coir type
paddles 4 for rowing
life-jacket for each person on board, also for guests
life-buoy 8 pieces with at least 50 m line, readily available on board
fire extinguisher >5 kg
The fire extinguisher shall be readily accessible in the motor compartment (if any) and in the
cabin
Remarks
For the installation of winches, fitting of survey echo-sounder transducers etc. some local
reinforcements and/or supports may be required. Arrangements shall exist for mounting the
boat outfit (Bracket) and for dropping of the anchor to keep the boat stationary, during flow
measurements. These can only be specified after selection of the survey instruments and other
relevant equipment.
Arrangements shall be made for safe working on the boat.
For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing.
For international bidders the design and drawing shall be approved by a national agency in their
country authorised for the purpose and acceptable to the purchaser.
Option
Optionally, the boat may be fitted with an instrument-well for acoustical and other transducers.
Basically, there are two ways to install acoustical transducers, such as echo-sounder and
ADCP, on a boat, viz.:
1. Transducers attached to a bracket at the boat exterior
This method can be used virtually on any available boat. However, the bracket and
transducer are relatively vulnerable and may generate considerable drag. Further, being at
a distance from the boat’s centre, external transducers experience all the pitch and roll
Equipment Specification: FRP CATAMARAN Version 1 10.034-3/6
movements.
2. Transducers in a well inside the boat
Transducers in the well are in direct contact with the water and can execute the acoustic
measurements but are not exposed to the flow of water, hence much more protected. In
particular in case the well is constructed in or close to the boat’s centre, then the transducer
will experience little effect of pitch and roll movements. This increases accuracy and data
quality. The well has to be tailor made and adds to the boat cost. Being inside the boat and
for safety reasons it should be of a sound construction.
To construct a well, a FRP pipe with ID of about 0.4 m could be installed in the centre of the
boat. The well top should be at about board level. The well bottom should be soundly fixed to
the boat bottom. It shall be possible to close the top of the well.
The location and exact size of the well will be specified after selection of the measuring
equipment.
The purchaser may execute his judicious discretion in the choice of configuration and
options.
10.034 FRP CATAMARAN
As per HP-I
Approval Date: 20 May 1998 Version: 1
Equipment Specification: FRP CATAMARAN Version 1 10.034-4/6
Purpose
The FRP (Fibre Reinforced Plastic) catamaran will be used to execute hydrological
measurements in rivers, canals and reservoirs. Many of the measurements will be made in
very shallow water.
Conditions & Requirements
• The FRP catamaran shall be of such a design that it operates reliably and safely under the
prevailing environmental and hydraulic conditions.
• The boat shall be capable to operate in shallow water where repeatedly the hull may
impact with rock or sediment.
• All materials on the boat exterior and on wet spots inside the boat shall be non-
corrosive.
• The boat shall be very sturdy, unsinkable and shall have an adequate stability.
• The boat shall be easy to operate and maintain.
• The boat shall have an expected technical lifetime of not less than 10 years.
• The boat and the outboard engines shall be capable to operate for at least 6 months
without any major servicing.
• The boat shall have floatation chambers filled with closed cell foam.
• The boat shall be provided with appropriate fenders.
• The boat shall have a cabin to accommodate equipment and staff.
• At port and starboard site the cabin shall have sitting benches with an in-built store cum
board provided underneath.
• The cabin shall have windows and a lockable door.
• An opening of at least 3 x 3 m2
should be provided on deck to carry out hydrological
measurements.
• Access openings are to be provided in each compartment by flush manholes.
• The rear deck shall be provided with an awning.
• The boat shall be supplied with the accessories as needed for effective deployment.
• The boat shall be fitted with two outboard engines (see 10.036).
• The outboard engines shall be operated by a remote control system, located at the stern
side bulkhead of the cabin.
• The control system shall have a starting switch, gear switch and a throttle system for each
engine and a steering wheel and emergency stop switch for simultaneous operation of the
engines.
• The control system shall match the outboard engines.
• Guard-rail and stanchions with detachable chain will be rigged out around the deck-
opening. Suitable guard-rails shall also be provided around the deck.
• Bollards and fairleads are to be provided on the deck for mooring purpose.
• An overhead beam and a winch will be suitably positioned to lower and hoist the
measuring equipment.
• A maintenance manual, related to the type and model of the FRP catamaran, shall be
part of the delivery.
Equipment Specification: FRP CATAMARAN Version 1 10.034-5/6
Specifications
4. Boat
length approx. 8 m
width approx. 3.75 m
draft approx. 0.5 m
free board approx. 0.7 m
bottom shape catamaran
propulsion 2 Nos. of 30 kW (40 HP) outboard engines
carrying capacity 2000 kg
required speed 5 m/s
5. Cabin
length approx. 3 m
height ample sitting height
door lockable
door width >0.8 m
windows glass, possibility to open, closed water tight
6. Boat outfit
anchor matching boat, fitted with 5 chain and rope for water depth of 20
m and current velocity of 5 m/s
echo-sounder indicator type, fitted in the boat
compass magnetic type, fitted in the boat
fenders 4 of Coir type
paddles 4 for rowing
life-jacket for each person on board, also for guests
life-buoy 8 pieces with at least 50 m line, readily available on board
fire extinguisher >5 kg
The fire extinguisher shall be readily accessible in the motor compartment (if any) and in the
cabin
Remarks
For the installation of winches, fitting of survey echo-sounder transducers etc. some local
reinforcements and/or supports may be required. Arrangements shall exist for mounting the
boat outfit (Bracket) and for dropping of the anchor to keep the boat stationary, during flow
measurements. These can only be specified after selection of the survey instruments and other
relevant equipment.
Arrangements shall be made for safe working on the boat.
For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing.
For international bidders the design and drawing shall be approved by a national agency in their
country authorised for the purpose and acceptable to the purchaser.
Option
Optionally, the boat may be fitted with an instrument-well for acoustical and other transducers.
Basically, there are two ways to install acoustical transducers, such as echo-sounder and
ADCP, on a boat, viz.:
3. Transducers attached to a bracket at the boat exterior
This method can be used virtually on any available boat. However, the bracket and
transducer are relatively vulnerable and may generate considerable drag. Further, being at
a distance from the boat’s centre, external transducers experience all the pitch and roll
Equipment Specification: FRP CATAMARAN Version 1 10.034-6/6
movements.
4. Transducers in a well inside the boat
Transducers in the well are in direct contact with the water and can execute the acoustic
measurements but are not exposed to the flow of water, hence much more protected. In
particular in case the well is constructed in or close to the boat’s centre, then the transducer
will experience little effect of pitch and roll movements. This increases accuracy and data
quality. The well has to be tailor made and adds to the boat cost. Being inside the boat and
for safety reasons it should be of a sound construction.
To construct a well, a FRP pipe with ID of about 0.4 m could be installed in the centre of the
boat. The well top should be at about board level. The well bottom should be soundly fixed to
the boat bottom. It shall be possible to close the top of the well.
The location and exact size of the well will be specified after selection of the measuring
equipment.
The purchaser may execute his judicious discretion in the choice of configuration and
options.

More Related Content

What's hot

Multi hull vessels
Multi hull vesselsMulti hull vessels
Multi hull vessels
Nitin Sharma
 
Transocean offshore operation 2
Transocean   offshore operation 2Transocean   offshore operation 2
Transocean offshore operation 2
Steffones K
 
Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)
Marine Study
 
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
Zaharah Kasim
 
What should i expect from a marine survey
What should i expect from  a marine surveyWhat should i expect from  a marine survey
What should i expect from a marine survey
Donald Mccann
 
apl-brochure
apl-brochureapl-brochure
apl-brochure
Yusran Ariffin
 
Ship terms
Ship termsShip terms
Ship terms
Birhane Gher
 
Motion stability and control in marine surface vessels
Motion stability and control in marine surface vesselsMotion stability and control in marine surface vessels
Motion stability and control in marine surface vessels
Parijat Sinha
 
Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV )
Hassan Moursy
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
Sigve Hamilton Aspelund
 
Piping layout/ Subsea
Piping layout/ SubseaPiping layout/ Subsea
Piping layout/ Subsea
Sigve Hamilton Aspelund
 
Rig inspection, Sigve Hamilton Aspelund
Rig inspection, Sigve Hamilton AspelundRig inspection, Sigve Hamilton Aspelund
Rig inspection, Sigve Hamilton Aspelund
Sigve Hamilton Aspelund
 
Petroleum drilling fundamentals
Petroleum drilling fundamentalsPetroleum drilling fundamentals
Petroleum drilling fundamentals
Sigve Hamilton Aspelund
 
Structural members of ship
Structural members of shipStructural members of ship
Structural members of ship
Vipin Devaraj
 
Port berthing facilities & infrastructure surveyor’s prespective
Port berthing facilities & infrastructure  surveyor’s prespectivePort berthing facilities & infrastructure  surveyor’s prespective
Port berthing facilities & infrastructure surveyor’s prespective
Thiruvali Shrinivaasan
 
212790628 fpso
212790628 fpso212790628 fpso
212790628 fpso
Prabhakar Tiwari
 
cds
 cds cds
Oguk fpso network side shell repairs on-station.
Oguk fpso network   side shell repairs on-station.Oguk fpso network   side shell repairs on-station.
Oguk fpso network side shell repairs on-station.
Danny O'Connor
 
Stern Tube and Shafting Arrangements
Stern Tube and Shafting ArrangementsStern Tube and Shafting Arrangements
Stern Tube and Shafting Arrangements
Mohammud Hanif Dewan M.Phil.
 
Anchor Handling Stability
Anchor Handling StabilityAnchor Handling Stability
Anchor Handling Stability
WAVELINK MARITIME INSTITUTE PTE LTD
 

What's hot (20)

Multi hull vessels
Multi hull vesselsMulti hull vessels
Multi hull vessels
 
Transocean offshore operation 2
Transocean   offshore operation 2Transocean   offshore operation 2
Transocean offshore operation 2
 
Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)
 
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
 
What should i expect from a marine survey
What should i expect from  a marine surveyWhat should i expect from  a marine survey
What should i expect from a marine survey
 
apl-brochure
apl-brochureapl-brochure
apl-brochure
 
Ship terms
Ship termsShip terms
Ship terms
 
Motion stability and control in marine surface vessels
Motion stability and control in marine surface vesselsMotion stability and control in marine surface vessels
Motion stability and control in marine surface vessels
 
Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV )
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
Piping layout/ Subsea
Piping layout/ SubseaPiping layout/ Subsea
Piping layout/ Subsea
 
Rig inspection, Sigve Hamilton Aspelund
Rig inspection, Sigve Hamilton AspelundRig inspection, Sigve Hamilton Aspelund
Rig inspection, Sigve Hamilton Aspelund
 
Petroleum drilling fundamentals
Petroleum drilling fundamentalsPetroleum drilling fundamentals
Petroleum drilling fundamentals
 
Structural members of ship
Structural members of shipStructural members of ship
Structural members of ship
 
Port berthing facilities & infrastructure surveyor’s prespective
Port berthing facilities & infrastructure  surveyor’s prespectivePort berthing facilities & infrastructure  surveyor’s prespective
Port berthing facilities & infrastructure surveyor’s prespective
 
212790628 fpso
212790628 fpso212790628 fpso
212790628 fpso
 
cds
 cds cds
cds
 
Oguk fpso network side shell repairs on-station.
Oguk fpso network   side shell repairs on-station.Oguk fpso network   side shell repairs on-station.
Oguk fpso network side shell repairs on-station.
 
Stern Tube and Shafting Arrangements
Stern Tube and Shafting ArrangementsStern Tube and Shafting Arrangements
Stern Tube and Shafting Arrangements
 
Anchor Handling Stability
Anchor Handling StabilityAnchor Handling Stability
Anchor Handling Stability
 

Viewers also liked

Principle Parts of Our Sailboat
Principle Parts of Our SailboatPrinciple Parts of Our Sailboat
Principle Parts of Our Sailboat
Sam Young
 
ACA Level 3 River Safety and Rescue 160903
ACA Level 3 River Safety and Rescue 160903ACA Level 3 River Safety and Rescue 160903
ACA Level 3 River Safety and Rescue 160903
Sam Young
 
Catamaran Brochure
Catamaran BrochureCatamaran Brochure
Catamaran Brochure
bigdcatslr
 
Boatbuilding Manual - Chapter 2
Boatbuilding Manual - Chapter 2Boatbuilding Manual - Chapter 2
Boatbuilding Manual - Chapter 2
McGraw-Hill Professional
 
Multihulls Quarterly: Zen's Den
Multihulls Quarterly: Zen's DenMultihulls Quarterly: Zen's Den
Multihulls Quarterly: Zen's Den
Burgess Media LLC
 
Best aluminium boat plans and designs
Best aluminium boat plans and designsBest aluminium boat plans and designs
Best aluminium boat plans and designs
nansi12
 
Structural Design of 38 m Special Purpose Vessel in Aluminium Alloy
Structural Design of 38 m Special Purpose Vessel in Aluminium AlloyStructural Design of 38 m Special Purpose Vessel in Aluminium Alloy
Structural Design of 38 m Special Purpose Vessel in Aluminium Alloy
Murat TOSUN
 
Sailing after stroke
Sailing after strokeSailing after stroke
Sailing after stroke
Camilla Herrmann
 
If you have been waiting for ideal home on the water in Florida, sailboat acc...
If you have been waiting for ideal home on the water in Florida, sailboat acc...If you have been waiting for ideal home on the water in Florida, sailboat acc...
If you have been waiting for ideal home on the water in Florida, sailboat acc...
Priscilla Slemp, EMBA Candidate, BS R.T. (RM)
 
CYA Intermediate Cruising
CYA Intermediate CruisingCYA Intermediate Cruising
CYA Intermediate Cruising
Jack Dale
 
CYA Advanced Cruising
CYA  Advanced  CruisingCYA  Advanced  Cruising
CYA Advanced Cruising
Jack Dale
 
Hauling Out and Painting the Sailboat - April 2010
Hauling Out and Painting the Sailboat - April 2010Hauling Out and Painting the Sailboat - April 2010
Hauling Out and Painting the Sailboat - April 2010
guest9c1769
 
Sailing Through the Storms
Sailing Through the StormsSailing Through the Storms
Teaching Stand up PWC (jet skiing) from a Superyacht
Teaching Stand up PWC (jet skiing) from a SuperyachtTeaching Stand up PWC (jet skiing) from a Superyacht
Teaching Stand up PWC (jet skiing) from a Superyacht
Candi Abbott
 
Sailing
SailingSailing
Sailing
langalex
 
Sailing
SailingSailing
Sailing
walshps
 
The time I built a sailboat in high school
The time I built a sailboat in high schoolThe time I built a sailboat in high school
The time I built a sailboat in high school
Tyler Drown
 
Technology sailing effects
Technology sailing effectsTechnology sailing effects
Technology sailing effects
Chris Sandström
 

Viewers also liked (18)

Principle Parts of Our Sailboat
Principle Parts of Our SailboatPrinciple Parts of Our Sailboat
Principle Parts of Our Sailboat
 
ACA Level 3 River Safety and Rescue 160903
ACA Level 3 River Safety and Rescue 160903ACA Level 3 River Safety and Rescue 160903
ACA Level 3 River Safety and Rescue 160903
 
Catamaran Brochure
Catamaran BrochureCatamaran Brochure
Catamaran Brochure
 
Boatbuilding Manual - Chapter 2
Boatbuilding Manual - Chapter 2Boatbuilding Manual - Chapter 2
Boatbuilding Manual - Chapter 2
 
Multihulls Quarterly: Zen's Den
Multihulls Quarterly: Zen's DenMultihulls Quarterly: Zen's Den
Multihulls Quarterly: Zen's Den
 
Best aluminium boat plans and designs
Best aluminium boat plans and designsBest aluminium boat plans and designs
Best aluminium boat plans and designs
 
Structural Design of 38 m Special Purpose Vessel in Aluminium Alloy
Structural Design of 38 m Special Purpose Vessel in Aluminium AlloyStructural Design of 38 m Special Purpose Vessel in Aluminium Alloy
Structural Design of 38 m Special Purpose Vessel in Aluminium Alloy
 
Sailing after stroke
Sailing after strokeSailing after stroke
Sailing after stroke
 
If you have been waiting for ideal home on the water in Florida, sailboat acc...
If you have been waiting for ideal home on the water in Florida, sailboat acc...If you have been waiting for ideal home on the water in Florida, sailboat acc...
If you have been waiting for ideal home on the water in Florida, sailboat acc...
 
CYA Intermediate Cruising
CYA Intermediate CruisingCYA Intermediate Cruising
CYA Intermediate Cruising
 
CYA Advanced Cruising
CYA  Advanced  CruisingCYA  Advanced  Cruising
CYA Advanced Cruising
 
Hauling Out and Painting the Sailboat - April 2010
Hauling Out and Painting the Sailboat - April 2010Hauling Out and Painting the Sailboat - April 2010
Hauling Out and Painting the Sailboat - April 2010
 
Sailing Through the Storms
Sailing Through the StormsSailing Through the Storms
Sailing Through the Storms
 
Teaching Stand up PWC (jet skiing) from a Superyacht
Teaching Stand up PWC (jet skiing) from a SuperyachtTeaching Stand up PWC (jet skiing) from a Superyacht
Teaching Stand up PWC (jet skiing) from a Superyacht
 
Sailing
SailingSailing
Sailing
 
Sailing
SailingSailing
Sailing
 
The time I built a sailboat in high school
The time I built a sailboat in high schoolThe time I built a sailboat in high school
The time I built a sailboat in high school
 
Technology sailing effects
Technology sailing effectsTechnology sailing effects
Technology sailing effects
 

Similar to Frp catamaran (8m)

Lifeboatppt
LifeboatpptLifeboatppt
Lifeboatppt
Palani Rajeshwar
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004
David Seow
 
Outboard engine
Outboard engineOutboard engine
Outboard engine
hydrologyproject0
 
Boat outfit
Boat outfitBoat outfit
Boat outfit
hydrologyproject0
 
STANDARD ANCHORING AND ANCHORING PROCEDURES
STANDARD ANCHORING AND ANCHORING PROCEDURESSTANDARD ANCHORING AND ANCHORING PROCEDURES
STANDARD ANCHORING AND ANCHORING PROCEDURES
ssuser81322e
 
Boat trailer
Boat trailerBoat trailer
Boat trailer
hydrologyproject0
 
SEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptxSEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptx
AllenDizon3
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
coderweb
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
Chieu Nguyen
 
Coastal Research Vessel
Coastal Research VesselCoastal Research Vessel
Coastal Research Vessel
Siva Chidambaram
 
Ship Construction by Jayan Pillai
Ship Construction by Jayan PillaiShip Construction by Jayan Pillai
Ship Construction by Jayan Pillai
Mohammud Hanif Dewan M.Phil.
 
Current meter, propeller type
Current meter, propeller typeCurrent meter, propeller type
Current meter, propeller type
hydrologyproject0
 
BOURBON's Fleet
BOURBON's FleetBOURBON's Fleet
BOURBON's Fleet
BOURBON
 
ROV Presentation
ROV PresentationROV Presentation
ROV Presentation
mnelicy mabaso
 
Marpol waste collection vessel catalogue
Marpol waste collection vessel catalogueMarpol waste collection vessel catalogue
Marpol waste collection vessel catalogue
Onat Emre Altuntop
 
FINAL PRESENTATION Final
FINAL PRESENTATION FinalFINAL PRESENTATION Final
FINAL PRESENTATION Final
Ryan Slimmon
 
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
Robert Denison
 
Nautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxNautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptx
devmarineacademy
 
Schedule 3
Schedule 3Schedule 3
sea trial.docx
sea trial.docxsea trial.docx
sea trial.docx
maneesh10
 

Similar to Frp catamaran (8m) (20)

Lifeboatppt
LifeboatpptLifeboatppt
Lifeboatppt
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004
 
Outboard engine
Outboard engineOutboard engine
Outboard engine
 
Boat outfit
Boat outfitBoat outfit
Boat outfit
 
STANDARD ANCHORING AND ANCHORING PROCEDURES
STANDARD ANCHORING AND ANCHORING PROCEDURESSTANDARD ANCHORING AND ANCHORING PROCEDURES
STANDARD ANCHORING AND ANCHORING PROCEDURES
 
Boat trailer
Boat trailerBoat trailer
Boat trailer
 
SEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptxSEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptx
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
 
Coastal Research Vessel
Coastal Research VesselCoastal Research Vessel
Coastal Research Vessel
 
Ship Construction by Jayan Pillai
Ship Construction by Jayan PillaiShip Construction by Jayan Pillai
Ship Construction by Jayan Pillai
 
Current meter, propeller type
Current meter, propeller typeCurrent meter, propeller type
Current meter, propeller type
 
BOURBON's Fleet
BOURBON's FleetBOURBON's Fleet
BOURBON's Fleet
 
ROV Presentation
ROV PresentationROV Presentation
ROV Presentation
 
Marpol waste collection vessel catalogue
Marpol waste collection vessel catalogueMarpol waste collection vessel catalogue
Marpol waste collection vessel catalogue
 
FINAL PRESENTATION Final
FINAL PRESENTATION FinalFINAL PRESENTATION Final
FINAL PRESENTATION Final
 
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
 
Nautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxNautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptx
 
Schedule 3
Schedule 3Schedule 3
Schedule 3
 
sea trial.docx
sea trial.docxsea trial.docx
sea trial.docx
 

More from hydrologyproject0

Specification purewater
Specification purewaterSpecification purewater
Specification purewater
hydrologyproject0
 
Water purifier ion exchange resin column
Water purifier ion exchange resin columnWater purifier ion exchange resin column
Water purifier ion exchange resin column
hydrologyproject0
 
Water purifier, double distillation unit
Water purifier, double distillation unitWater purifier, double distillation unit
Water purifier, double distillation unit
hydrologyproject0
 
Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)
hydrologyproject0
 
Water geyser (heater)
Water geyser (heater)Water geyser (heater)
Water geyser (heater)
hydrologyproject0
 
Water bath, general purpose
Water bath, general purposeWater bath, general purpose
Water bath, general purpose
hydrologyproject0
 
Water bath, bacteriological
Water bath, bacteriologicalWater bath, bacteriological
Water bath, bacteriological
hydrologyproject0
 
Wash bottle
Wash bottleWash bottle
Wash bottle
hydrologyproject0
 
Volumetric flask
Volumetric flaskVolumetric flask
Volumetric flask
hydrologyproject0
 
Visual accumulation tube
Visual accumulation tubeVisual accumulation tube
Visual accumulation tube
hydrologyproject0
 
Vacuum pump
Vacuum pumpVacuum pump
Vacuum pump
hydrologyproject0
 
Turbidity meter (nephelometer)
Turbidity meter (nephelometer)Turbidity meter (nephelometer)
Turbidity meter (nephelometer)
hydrologyproject0
 
Tool kit
Tool kitTool kit
Toc analyser, microprocessor controlled
Toc analyser, microprocessor controlledToc analyser, microprocessor controlled
Toc analyser, microprocessor controlled
hydrologyproject0
 
Tissue grinder
Tissue grinderTissue grinder
Tissue grinder
hydrologyproject0
 
Thermometers, set of
Thermometers, set ofThermometers, set of
Thermometers, set of
hydrologyproject0
 
Test tubes
Test tubesTest tubes
Test tubes
hydrologyproject0
 
Test sieves with shaker
Test sieves with shakerTest sieves with shaker
Test sieves with shaker
hydrologyproject0
 
Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)
hydrologyproject0
 
Sterliser, autoclave
Sterliser, autoclaveSterliser, autoclave
Sterliser, autoclave
hydrologyproject0
 

More from hydrologyproject0 (20)

Specification purewater
Specification purewaterSpecification purewater
Specification purewater
 
Water purifier ion exchange resin column
Water purifier ion exchange resin columnWater purifier ion exchange resin column
Water purifier ion exchange resin column
 
Water purifier, double distillation unit
Water purifier, double distillation unitWater purifier, double distillation unit
Water purifier, double distillation unit
 
Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)
 
Water geyser (heater)
Water geyser (heater)Water geyser (heater)
Water geyser (heater)
 
Water bath, general purpose
Water bath, general purposeWater bath, general purpose
Water bath, general purpose
 
Water bath, bacteriological
Water bath, bacteriologicalWater bath, bacteriological
Water bath, bacteriological
 
Wash bottle
Wash bottleWash bottle
Wash bottle
 
Volumetric flask
Volumetric flaskVolumetric flask
Volumetric flask
 
Visual accumulation tube
Visual accumulation tubeVisual accumulation tube
Visual accumulation tube
 
Vacuum pump
Vacuum pumpVacuum pump
Vacuum pump
 
Turbidity meter (nephelometer)
Turbidity meter (nephelometer)Turbidity meter (nephelometer)
Turbidity meter (nephelometer)
 
Tool kit
Tool kitTool kit
Tool kit
 
Toc analyser, microprocessor controlled
Toc analyser, microprocessor controlledToc analyser, microprocessor controlled
Toc analyser, microprocessor controlled
 
Tissue grinder
Tissue grinderTissue grinder
Tissue grinder
 
Thermometers, set of
Thermometers, set ofThermometers, set of
Thermometers, set of
 
Test tubes
Test tubesTest tubes
Test tubes
 
Test sieves with shaker
Test sieves with shakerTest sieves with shaker
Test sieves with shaker
 
Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)
 
Sterliser, autoclave
Sterliser, autoclaveSterliser, autoclave
Sterliser, autoclave
 

Recently uploaded

Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
Ksquare Energy Pvt. Ltd.
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 
The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
SabaaSudozai
 
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
BBPMedia1
 
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
valvereliz227
 
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium PresentationKirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Call8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessingCall8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessing
➑➌➋➑➒➎➑➑➊➍
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Stone Art Hub
 
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
taqyea
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
katiejasper96
 
Kirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper PresentationKirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip
 
TIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup IndustryTIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup Industry
timesbpobusiness
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
HajeJanKamps
 
Profiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdfProfiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdf
TTop Threads
 
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Niswey
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
thesiliconleaders
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 

Recently uploaded (20)

Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 
The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
 
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
 
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
 
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium PresentationKirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
 
Call8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessingCall8328958814 satta matka Kalyan result satta guessing
Call8328958814 satta matka Kalyan result satta guessing
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
 
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
一比一原版(QMUE毕业证书)英国爱丁堡玛格丽特女王大学毕业证文凭如何办理
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Satta Matka
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
 
Kirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper PresentationKirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper Presentation
 
TIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup IndustryTIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup Industry
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
 
Profiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdfProfiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdf
 
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 

Frp catamaran (8m)

  • 1. 10.034 FRP CATAMARAN Approval Date: 20 May 1998 Reviewed on : 23 October 2007 Version: 1 Equipment Specification: FRP CATAMARAN Version 1 10.034-1/6 Purpose The FRP (Fibre Reinforced Plastic) catamaran will be used to execute hydrological measurements in rivers, canals and reservoirs. Many of the measurements will be made in very shallow water. Conditions & Requirements • The FRP catamaran shall be of such a design that it operates reliably and safely under the prevailing environmental and hydraulic conditions. • The boat shall be capable to operate in shallow water where repeatedly the hull may impact with rock or sediment. • All materials on the boat exterior and on wet spots inside the boat shall be non- corrosive. • The boat shall be very sturdy, unsinkable and shall have an adequate stability. • The boat shall be easy to operate and maintain. • The boat shall have an expected technical lifetime of not less than 10 years. • The boat and the outboard engines shall be capable to operate for at least 6 months without any major servicing. • The boat shall have floatation chambers filled with closed cell foam. • The boat shall be provided with appropriate fenders. • The boat shall have a cabin to accommodate equipment and staff. • At port and starboard site the cabin shall have sitting benches with an in-built store cum board provided underneath. • The cabin shall have windows and a lockable door. • An opening of at least 3 x 3 m2 should be provided on deck to carry out hydrological measurements. • Access openings are to be provided in each compartment by flush manholes. • The rear deck shall be provided with an awning. • The boat shall be supplied with the accessories as needed for effective deployment. • The boat shall be fitted with two outboard engines (see 10.036). • The outboard engines shall be operated by a remote control system, located at the stern side bulkhead of the cabin. • The control system shall have a starting switch, gear switch and a throttle system for each engine and a steering wheel and emergency stop switch for simultaneous operation of the engines. • The control system shall match the outboard engines. • Guard-rail and stanchions with detachable chain will be rigged out around the deck- opening. Suitable guard-rails shall also be provided around the deck. • Bollards and fairleads are to be provided on the deck for mooring purpose. • An overhead beam and a winch will be suitably positioned to lower and hoist the measuring equipment. • A maintenance manual, related to the type and model of the FRP catamaran, shall be part of the delivery.
  • 2. Equipment Specification: FRP CATAMARAN Version 1 10.034-2/6 Specifications 1. Boat length approx. 8 m width approx. 3.75 m draft approx. 0.5 m free board approx. 0.7 m bottom shape catamaran propulsion 2 Nos. of 30 kW (40 HP) outboard engines carrying capacity 2000 kg required speed 5 m/s 2. Cabin length approx. 3 m height ample sitting height door lockable door width >0.8 m windows glass, possibility to open, closed water tight 3. Boat outfit anchor matching boat, fitted with 5 chain and rope for water depth of 20 m and current velocity of 5 m/s echo-sounder indicator type, fitted in the boat compass magnetic type, fitted in the boat fenders 4 of Coir type paddles 4 for rowing life-jacket for each person on board, also for guests life-buoy 8 pieces with at least 50 m line, readily available on board fire extinguisher >5 kg The fire extinguisher shall be readily accessible in the motor compartment (if any) and in the cabin Remarks For the installation of winches, fitting of survey echo-sounder transducers etc. some local reinforcements and/or supports may be required. Arrangements shall exist for mounting the boat outfit (Bracket) and for dropping of the anchor to keep the boat stationary, during flow measurements. These can only be specified after selection of the survey instruments and other relevant equipment. Arrangements shall be made for safe working on the boat. For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing. For international bidders the design and drawing shall be approved by a national agency in their country authorised for the purpose and acceptable to the purchaser. Option Optionally, the boat may be fitted with an instrument-well for acoustical and other transducers. Basically, there are two ways to install acoustical transducers, such as echo-sounder and ADCP, on a boat, viz.: 1. Transducers attached to a bracket at the boat exterior This method can be used virtually on any available boat. However, the bracket and transducer are relatively vulnerable and may generate considerable drag. Further, being at a distance from the boat’s centre, external transducers experience all the pitch and roll
  • 3. Equipment Specification: FRP CATAMARAN Version 1 10.034-3/6 movements. 2. Transducers in a well inside the boat Transducers in the well are in direct contact with the water and can execute the acoustic measurements but are not exposed to the flow of water, hence much more protected. In particular in case the well is constructed in or close to the boat’s centre, then the transducer will experience little effect of pitch and roll movements. This increases accuracy and data quality. The well has to be tailor made and adds to the boat cost. Being inside the boat and for safety reasons it should be of a sound construction. To construct a well, a FRP pipe with ID of about 0.4 m could be installed in the centre of the boat. The well top should be at about board level. The well bottom should be soundly fixed to the boat bottom. It shall be possible to close the top of the well. The location and exact size of the well will be specified after selection of the measuring equipment. The purchaser may execute his judicious discretion in the choice of configuration and options.
  • 4. 10.034 FRP CATAMARAN As per HP-I Approval Date: 20 May 1998 Version: 1 Equipment Specification: FRP CATAMARAN Version 1 10.034-4/6 Purpose The FRP (Fibre Reinforced Plastic) catamaran will be used to execute hydrological measurements in rivers, canals and reservoirs. Many of the measurements will be made in very shallow water. Conditions & Requirements • The FRP catamaran shall be of such a design that it operates reliably and safely under the prevailing environmental and hydraulic conditions. • The boat shall be capable to operate in shallow water where repeatedly the hull may impact with rock or sediment. • All materials on the boat exterior and on wet spots inside the boat shall be non- corrosive. • The boat shall be very sturdy, unsinkable and shall have an adequate stability. • The boat shall be easy to operate and maintain. • The boat shall have an expected technical lifetime of not less than 10 years. • The boat and the outboard engines shall be capable to operate for at least 6 months without any major servicing. • The boat shall have floatation chambers filled with closed cell foam. • The boat shall be provided with appropriate fenders. • The boat shall have a cabin to accommodate equipment and staff. • At port and starboard site the cabin shall have sitting benches with an in-built store cum board provided underneath. • The cabin shall have windows and a lockable door. • An opening of at least 3 x 3 m2 should be provided on deck to carry out hydrological measurements. • Access openings are to be provided in each compartment by flush manholes. • The rear deck shall be provided with an awning. • The boat shall be supplied with the accessories as needed for effective deployment. • The boat shall be fitted with two outboard engines (see 10.036). • The outboard engines shall be operated by a remote control system, located at the stern side bulkhead of the cabin. • The control system shall have a starting switch, gear switch and a throttle system for each engine and a steering wheel and emergency stop switch for simultaneous operation of the engines. • The control system shall match the outboard engines. • Guard-rail and stanchions with detachable chain will be rigged out around the deck- opening. Suitable guard-rails shall also be provided around the deck. • Bollards and fairleads are to be provided on the deck for mooring purpose. • An overhead beam and a winch will be suitably positioned to lower and hoist the measuring equipment. • A maintenance manual, related to the type and model of the FRP catamaran, shall be part of the delivery.
  • 5. Equipment Specification: FRP CATAMARAN Version 1 10.034-5/6 Specifications 4. Boat length approx. 8 m width approx. 3.75 m draft approx. 0.5 m free board approx. 0.7 m bottom shape catamaran propulsion 2 Nos. of 30 kW (40 HP) outboard engines carrying capacity 2000 kg required speed 5 m/s 5. Cabin length approx. 3 m height ample sitting height door lockable door width >0.8 m windows glass, possibility to open, closed water tight 6. Boat outfit anchor matching boat, fitted with 5 chain and rope for water depth of 20 m and current velocity of 5 m/s echo-sounder indicator type, fitted in the boat compass magnetic type, fitted in the boat fenders 4 of Coir type paddles 4 for rowing life-jacket for each person on board, also for guests life-buoy 8 pieces with at least 50 m line, readily available on board fire extinguisher >5 kg The fire extinguisher shall be readily accessible in the motor compartment (if any) and in the cabin Remarks For the installation of winches, fitting of survey echo-sounder transducers etc. some local reinforcements and/or supports may be required. Arrangements shall exist for mounting the boat outfit (Bracket) and for dropping of the anchor to keep the boat stationary, during flow measurements. These can only be specified after selection of the survey instruments and other relevant equipment. Arrangements shall be made for safe working on the boat. For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing. For international bidders the design and drawing shall be approved by a national agency in their country authorised for the purpose and acceptable to the purchaser. Option Optionally, the boat may be fitted with an instrument-well for acoustical and other transducers. Basically, there are two ways to install acoustical transducers, such as echo-sounder and ADCP, on a boat, viz.: 3. Transducers attached to a bracket at the boat exterior This method can be used virtually on any available boat. However, the bracket and transducer are relatively vulnerable and may generate considerable drag. Further, being at a distance from the boat’s centre, external transducers experience all the pitch and roll
  • 6. Equipment Specification: FRP CATAMARAN Version 1 10.034-6/6 movements. 4. Transducers in a well inside the boat Transducers in the well are in direct contact with the water and can execute the acoustic measurements but are not exposed to the flow of water, hence much more protected. In particular in case the well is constructed in or close to the boat’s centre, then the transducer will experience little effect of pitch and roll movements. This increases accuracy and data quality. The well has to be tailor made and adds to the boat cost. Being inside the boat and for safety reasons it should be of a sound construction. To construct a well, a FRP pipe with ID of about 0.4 m could be installed in the centre of the boat. The well top should be at about board level. The well bottom should be soundly fixed to the boat bottom. It shall be possible to close the top of the well. The location and exact size of the well will be specified after selection of the measuring equipment. The purchaser may execute his judicious discretion in the choice of configuration and options.