10.033 FRP BOAT
Approval Date: 20 May 1998
Reviewed on : 23 October 2007 Version: 1
Equipment Specification: FRP BOAT Version 1 10.033-1/6
Purpose
The FRP (Fibre Reinforced Plastic) boat will be used to execute hydrological measurements
in rivers, canals and reservoirs. Many of the measurements will be made in very shallow
water.
Conditions & Requirements
• The FRP boat shall be of such a design that it operates reliably and safely under the
prevailing environmental and hydraulic conditions.
• The boat shall be capable to operate in shallow water where repeatedly the hull may
impact with rock or sediment.
• All materials on the boat exterior and on wet spots inside the boat shall be non-
corrosive.
• The boat shall be very sturdy, unsinkable and shall have an adequate stability.
• The boat shall be easy to operate and maintain.
• The boat shall have an expected technical lifetime of not less than 10 years.
• The boat and the outboard engines shall be capable to operate for at least 6 months
without any major servicing.
• The boat shall have floatation chambers filled with closed cell foam.
• The boat shall be provided with appropriate fenders.
• The boat shall have a cabin to accommodate equipment and staff.
• At port and starboard side the cabin shall have sitting benches, incorporated in the hull.
• The cabin shall have windows and a lockable door.
• On deck adequate workspace (at least 2.3 x 3 m2
) should be provided to carry out
hydrological measurements.
• The rear deck shall be provided with an awning.
• The boat shall be supplied with the accessories as needed for effective deployment.
• The boat shall be fitted with two outboard engines (see 10.036).
• The outboard engines shall be operated by a remote control system, located at the stern
side bulkhead of the cabin.
• The control system shall have a starting switch, gear switch and a throttle system for each
engine and a steering wheel and emergency stop switch for simultaneous operation of the
engines.
• The control system shall match the outboard engines.
• A break water arrangement shall be provided in the front.
• Guard-rail and stanchions with detachable chain will be rigged out around the deck-
opening. Suitable guard-rails shall also be provided around the deck.
• Bollards and fairleads are to be provided on the deck for mooring purpose.
• A maintenance manual, related to the type and model of the FRP boat, shall be part of
the delivery.
Specifications
1. Boat
length approx. 7 m
width approx. 2.5 m
Equipment Specification: FRP BOAT Version 1 10.033-2/6
draft approx. 0.5 m
free board approx. 0.6 m
bottom shape flat or slightly catamaran
propulsion 2 Nos. of 30 kW (40 HP) outboard engines
carrying capacity 1000 kg
2. Cabin
length approx. 2 m
height ample sitting height
door lockable
door width >0.8 m
windows glass, possibility to open, closed water tight
3. Boat outfit
anchor matching boat, fitted with 5 chain and rope for water depth of 20
m and current velocity of 5 m/s
echo-sounder indicator type, fitted in the boat
compass magnetic type, fitted in the boat
fenders 4 of Coir type
paddles 4 for rowing
life-jacket for each person on board, also for guests
life-buoy 8 pieces with at least 50 m line, readily available on board
fire extinguisher >5 kg
The fire extinguisher shall be readily accessible in the motor compartment (if any) and in the
cabin
Remarks
For the installation of winches, fitting of survey echo-sounder transducers etc. some local
reinforcements and/or supports may be required. Arrangements shall exist for mounting the
boat outfit (Bracket) and for dropping of the anchor to keep the boat stationary, during flow
measurements. These can only be specified after selection of the survey instruments and other
relevant equipment.
Arrangements shall be made for safe working on the boat.
For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing.
For international bidders the design and drawing shall be approved by a national agency in their
country authorised for the purpose and acceptable to the purchaser.
Option
Optionally, the boat may be fitted with an instrument-well for acoustical and other transducers.
Basically, there are two ways to install acoustical transducers, such as echo-sounder and
ADCP on a boat, viz.:
1. Transducers attached to a bracket at the boat exterior
This method can be used virtually on any available boat. However, the bracket and
transducer are relatively vulnerable and may generate considerable drag. Further, being at
a distance from the boat's centre, external transducers experience all the pitch and roll
movements.
2. Transducers in a well inside the boat
Transducers in the well are in direct contact with the water and can execute the acoustic
measurements but are not exposed to the flow of water, hence much more protected.. In
particular in case the well is constructed in or close to the boat’s centre, then the
transducer will experience little effect of pitch and roll movements. This increases accuracy
Equipment Specification: FRP BOAT Version 1 10.033-3/6
and data quality. The well has to be tailor made and adds to the boat cost. Being inside the
boat and for safety reasons it should be of a sound construction.
To construct a well, a FRP pipe with ID of about 0.4 m could be installed in the centre of the
boat. The well top should be at about board level. The well bottom should be soundly fixed to
the boat bottom. It shall be possible to close the top of the well.
The location and exact size of the well will be specified after selection of the measuring
equipment.
The purchaser may execute his judicious discretion in the choice of configuration and
options.
10.033 FRP BOAT
As per HP-I
Approval Date: 20 May 1998 Version: 1
Equipment Specification: FRP BOAT Version 1 10.033-4/6
Purpose
The FRP (Fibre Reinforced Plastic) boat will be used to execute hydrological measurements
in rivers, canals and reservoirs. Many of the measurements will be made in very shallow
water.
Conditions & Requirements
• The FRP boat shall be of such a design that it operates reliably and safely under the
prevailing environmental and hydraulic conditions.
• The boat shall be capable to operate in shallow water where repeatedly the hull may
impact with rock or sediment.
• All materials on the boat exterior and on wet spots inside the boat shall be non-
corrosive.
• The boat shall be very sturdy, unsinkable and shall have an adequate stability.
• The boat shall be easy to operate and maintain.
• The boat shall have an expected technical lifetime of not less than 10 years.
• The boat and the outboard engines shall be capable to operate for at least 6 months
without any major servicing.
• The boat shall have floatation chambers filled with closed cell foam.
• The boat shall be provided with appropriate fenders.
• The boat shall have a cabin to accommodate equipment and staff.
• At port and starboard side the cabin shall have sitting benches, incorporated in the hull.
• The cabin shall have windows and a lockable door.
• On deck adequate workspace (at least 2.3 x 3 m2
) should be provided to carry out
hydrological measurements.
• The rear deck shall be provided with an awning.
• The boat shall be supplied with the accessories as needed for effective deployment.
• The boat shall be fitted with two outboard engines (see 10.036).
• The outboard engines shall be operated by a remote control system, located at the stern
side bulkhead of the cabin.
• The control system shall have a starting switch, gear switch and a throttle system for each
engine and a steering wheel and emergency stop switch for simultaneous operation of the
engines.
• The control system shall match the outboard engines.
• A break water arrangement shall be provided in the front.
• Guard-rail and stanchions with detachable chain will be rigged out around the deck-
opening. Suitable guard-rails shall also be provided around the deck.
• Bollards and fairleads are to be provided on the deck for mooring purpose.
• A maintenance manual, related to the type and model of the FRP boat, shall be part of
the delivery.
Specifications
4. Boat
length approx. 7 m
width approx. 2.5 m
draft approx. 0.5 m
free board approx. 0.6 m
Equipment Specification: FRP BOAT Version 1 10.033-5/6
bottom shape flat or slightly catamaran
propulsion 2 Nos. of 30 kW (40 HP) outboard engines
carrying capacity 1000 kg
5. Cabin
length approx. 2 m
height ample sitting height
door lockable
door width >0.8 m
windows glass, possibility to open, closed water tight
6. Boat outfit
anchor matching boat, fitted with 5 chain and rope for water depth of 20
m and current velocity of 5 m/s
echo-sounder indicator type, fitted in the boat
compass magnetic type, fitted in the boat
fenders 4 of Coir type
paddles 4 for rowing
life-jacket for each person on board, also for guests
life-buoy 8 pieces with at least 50 m line, readily available on board
fire extinguisher >5 kg
The fire extinguisher shall be readily accessible in the motor compartment (if any) and in the
cabin
Remarks
For the installation of winches, fitting of survey echo-sounder transducers etc. some local
reinforcements and/or supports may be required. Arrangements shall exist for mounting the
boat outfit (Bracket) and for dropping of the anchor to keep the boat stationary, during flow
measurements. These can only be specified after selection of the survey instruments and other
relevant equipment.
Arrangements shall be made for safe working on the boat.
For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing.
For international bidders the design and drawing shall be approved by a national agency in their
country authorised for the purpose and acceptable to the purchaser.
Option
Optionally, the boat may be fitted with an instrument-well for acoustical and other transducers.
Basically, there are two ways to install acoustical transducers, such as echo-sounder and
ADCP on a boat, viz.:
3. Transducers attached to a bracket at the boat exterior
This method can be used virtually on any available boat. However, the bracket and
transducer are relatively vulnerable and may generate considerable drag. Further, being at
a distance from the boat's centre, external transducers experience all the pitch and roll
movements.
4. Transducers in a well inside the boat
Transducers in the well are in direct contact with the water and can execute the acoustic
measurements but are not exposed to the flow of water, hence much more protected.. In
particular in case the well is constructed in or close to the boat’s centre, then the
transducer will experience little effect of pitch and roll movements. This increases accuracy
and data quality. The well has to be tailor made and adds to the boat cost. Being inside the
boat and for safety reasons it should be of a sound construction.
Equipment Specification: FRP BOAT Version 1 10.033-6/6
To construct a well, a FRP pipe with ID of about 0.4 m could be installed in the centre of the
boat. The well top should be at about board level. The well bottom should be soundly fixed to
the boat bottom. It shall be possible to close the top of the well.
The location and exact size of the well will be specified after selection of the measuring
equipment.
The purchaser may execute his judicious discretion in the choice of configuration and
options.

More Related Content

What's hot

Tecline Diving Equipment available from Atlantic Scuba in the UK
Tecline Diving Equipment available from Atlantic Scuba in the UKTecline Diving Equipment available from Atlantic Scuba in the UK
Tecline Diving Equipment available from Atlantic Scuba in the UKAtlantic Scuba
 
Royal IHC corporate presentation
Royal IHC corporate presentationRoyal IHC corporate presentation
Royal IHC corporate presentationRoyal IHC
 
What should i expect from a marine survey
What should i expect from  a marine surveyWhat should i expect from  a marine survey
What should i expect from a marine surveyDonald Mccann
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004David Seow
 
Webnews Deepwater Asia Congress 2011 Presentation
Webnews Deepwater Asia Congress 2011 PresentationWebnews Deepwater Asia Congress 2011 Presentation
Webnews Deepwater Asia Congress 2011 PresentationBOURBON
 
Casing Head Spools, Oilfield Casing Spools - WOM Group
Casing Head Spools, Oilfield Casing Spools - WOM GroupCasing Head Spools, Oilfield Casing Spools - WOM Group
Casing Head Spools, Oilfield Casing Spools - WOM Groupwomgroup
 
Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEAmir Rafati
 
Single buoy mooring system
Single buoy mooring systemSingle buoy mooring system
Single buoy mooring systemJoy william
 
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.womgroup
 
WY Offshore segments
WY Offshore segmentsWY Offshore segments
WY Offshore segmentsAlfred Hong
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)coderweb
 
Landing Overruns
Landing OverrunsLanding Overruns
Landing Overrunsszentgyuri
 
Oguk fpso network side shell repairs on-station.
Oguk fpso network   side shell repairs on-station.Oguk fpso network   side shell repairs on-station.
Oguk fpso network side shell repairs on-station.Danny O'Connor
 

What's hot (19)

Tecline Diving Equipment available from Atlantic Scuba in the UK
Tecline Diving Equipment available from Atlantic Scuba in the UKTecline Diving Equipment available from Atlantic Scuba in the UK
Tecline Diving Equipment available from Atlantic Scuba in the UK
 
Royal IHC corporate presentation
Royal IHC corporate presentationRoyal IHC corporate presentation
Royal IHC corporate presentation
 
What should i expect from a marine survey
What should i expect from  a marine surveyWhat should i expect from  a marine survey
What should i expect from a marine survey
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004
 
Ship handling
Ship handlingShip handling
Ship handling
 
Boat outfit
Boat outfitBoat outfit
Boat outfit
 
Webnews Deepwater Asia Congress 2011 Presentation
Webnews Deepwater Asia Congress 2011 PresentationWebnews Deepwater Asia Congress 2011 Presentation
Webnews Deepwater Asia Congress 2011 Presentation
 
Casing Head Spools, Oilfield Casing Spools - WOM Group
Casing Head Spools, Oilfield Casing Spools - WOM GroupCasing Head Spools, Oilfield Casing Spools - WOM Group
Casing Head Spools, Oilfield Casing Spools - WOM Group
 
wellservicer_wbb
wellservicer_wbbwellservicer_wbb
wellservicer_wbb
 
Anchor Handling Stability
Anchor Handling StabilityAnchor Handling Stability
Anchor Handling Stability
 
Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACE
 
Cargo747 BOBL Nose Ramp
Cargo747 BOBL Nose RampCargo747 BOBL Nose Ramp
Cargo747 BOBL Nose Ramp
 
Single buoy mooring system
Single buoy mooring systemSingle buoy mooring system
Single buoy mooring system
 
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
 
WY Offshore segments
WY Offshore segmentsWY Offshore segments
WY Offshore segments
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
Landing Overruns
Landing OverrunsLanding Overruns
Landing Overruns
 
Cargo 747 Air-Mech v9.0
Cargo 747 Air-Mech v9.0Cargo 747 Air-Mech v9.0
Cargo 747 Air-Mech v9.0
 
Oguk fpso network side shell repairs on-station.
Oguk fpso network   side shell repairs on-station.Oguk fpso network   side shell repairs on-station.
Oguk fpso network side shell repairs on-station.
 

Viewers also liked

Download-manuals-surface water-software-estimationofdischargebyarea-slopemethod
 Download-manuals-surface water-software-estimationofdischargebyarea-slopemethod Download-manuals-surface water-software-estimationofdischargebyarea-slopemethod
Download-manuals-surface water-software-estimationofdischargebyarea-slopemethodhydrologyproject0
 
Std fordischargeofenvpollutants
Std fordischargeofenvpollutantsStd fordischargeofenvpollutants
Std fordischargeofenvpollutantshydrologyproject0
 
Download-manuals-water quality-wq-manuals-28majorionsinwater
 Download-manuals-water quality-wq-manuals-28majorionsinwater Download-manuals-water quality-wq-manuals-28majorionsinwater
Download-manuals-water quality-wq-manuals-28majorionsinwaterhydrologyproject0
 
Proforma for infrastructure development
Proforma for infrastructure developmentProforma for infrastructure development
Proforma for infrastructure developmenthydrologyproject0
 
Download-manuals-water quality-wq-training-38measurementofammoniaandorganicn...
 Download-manuals-water quality-wq-training-38measurementofammoniaandorganicn... Download-manuals-water quality-wq-training-38measurementofammoniaandorganicn...
Download-manuals-water quality-wq-training-38measurementofammoniaandorganicn...hydrologyproject0
 
Background noteonreviewofwaterpolicy
Background noteonreviewofwaterpolicyBackground noteonreviewofwaterpolicy
Background noteonreviewofwaterpolicyhydrologyproject0
 
Download-manuals-water quality-wq-training-25oxygenbalanceinsurfacewaters
 Download-manuals-water quality-wq-training-25oxygenbalanceinsurfacewaters Download-manuals-water quality-wq-training-25oxygenbalanceinsurfacewaters
Download-manuals-water quality-wq-training-25oxygenbalanceinsurfacewatershydrologyproject0
 

Viewers also liked (15)

Dwlr, bubbler type (sw)
Dwlr, bubbler type (sw)Dwlr, bubbler type (sw)
Dwlr, bubbler type (sw)
 
Current meter, cup type
Current meter, cup typeCurrent meter, cup type
Current meter, cup type
 
Download-manuals-surface water-software-estimationofdischargebyarea-slopemethod
 Download-manuals-surface water-software-estimationofdischargebyarea-slopemethod Download-manuals-surface water-software-estimationofdischargebyarea-slopemethod
Download-manuals-surface water-software-estimationofdischargebyarea-slopemethod
 
Std fordischargeofenvpollutants
Std fordischargeofenvpollutantsStd fordischargeofenvpollutants
Std fordischargeofenvpollutants
 
Dwlr, pressure type (sw)
Dwlr, pressure type (sw)Dwlr, pressure type (sw)
Dwlr, pressure type (sw)
 
34 absorption spectroscopy
34 absorption spectroscopy34 absorption spectroscopy
34 absorption spectroscopy
 
Download-manuals-water quality-wq-manuals-28majorionsinwater
 Download-manuals-water quality-wq-manuals-28majorionsinwater Download-manuals-water quality-wq-manuals-28majorionsinwater
Download-manuals-water quality-wq-manuals-28majorionsinwater
 
Cgwb
CgwbCgwb
Cgwb
 
Portable echo sounder
Portable echo sounderPortable echo sounder
Portable echo sounder
 
Bhujal news 24_2
Bhujal news 24_2Bhujal news 24_2
Bhujal news 24_2
 
Proforma for infrastructure development
Proforma for infrastructure developmentProforma for infrastructure development
Proforma for infrastructure development
 
Download-manuals-water quality-wq-training-38measurementofammoniaandorganicn...
 Download-manuals-water quality-wq-training-38measurementofammoniaandorganicn... Download-manuals-water quality-wq-training-38measurementofammoniaandorganicn...
Download-manuals-water quality-wq-training-38measurementofammoniaandorganicn...
 
Background noteonreviewofwaterpolicy
Background noteonreviewofwaterpolicyBackground noteonreviewofwaterpolicy
Background noteonreviewofwaterpolicy
 
Download-manuals-water quality-wq-training-25oxygenbalanceinsurfacewaters
 Download-manuals-water quality-wq-training-25oxygenbalanceinsurfacewaters Download-manuals-water quality-wq-training-25oxygenbalanceinsurfacewaters
Download-manuals-water quality-wq-training-25oxygenbalanceinsurfacewaters
 
Hydrographic echo sounder
Hydrographic echo sounderHydrographic echo sounder
Hydrographic echo sounder
 

Similar to Frp boat (7m)

Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Hassan Moursy
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundSigve Hamilton Aspelund
 
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New ConstructionRobert Denison
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso designChieu Nguyen
 
BOURBON's Fleet
BOURBON's FleetBOURBON's Fleet
BOURBON's FleetBOURBON
 
SEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptxSEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptxAllenDizon3
 
S1042Survey Report on Corsair
S1042Survey Report on CorsairS1042Survey Report on Corsair
S1042Survey Report on CorsairCalin Ciufudean
 
Ship dry docking
Ship dry dockingShip dry docking
Ship dry dockingJishnu Saji
 
Nautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxNautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxdevmarineacademy
 

Similar to Frp boat (7m) (20)

Motor launch
Motor launchMotor launch
Motor launch
 
Lifeboatppt
LifeboatpptLifeboatppt
Lifeboatppt
 
Outboard engine
Outboard engineOutboard engine
Outboard engine
 
Ship Construction- Bulkhead
Ship Construction- BulkheadShip Construction- Bulkhead
Ship Construction- Bulkhead
 
Coastal Research Vessel
Coastal Research VesselCoastal Research Vessel
Coastal Research Vessel
 
Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV )
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
 
Boat trailer
Boat trailerBoat trailer
Boat trailer
 
ROV Presentation
ROV PresentationROV Presentation
ROV Presentation
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
 
BOURBON's Fleet
BOURBON's FleetBOURBON's Fleet
BOURBON's Fleet
 
Dry docking operations
Dry docking operationsDry docking operations
Dry docking operations
 
SEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptxSEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptx
 
Ship Construction by Jayan Pillai
Ship Construction by Jayan PillaiShip Construction by Jayan Pillai
Ship Construction by Jayan Pillai
 
S1042Survey Report on Corsair
S1042Survey Report on CorsairS1042Survey Report on Corsair
S1042Survey Report on Corsair
 
Ship dry docking
Ship dry dockingShip dry docking
Ship dry docking
 
Nautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxNautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptx
 
Aus lcu 2000-tarwater
Aus lcu 2000-tarwaterAus lcu 2000-tarwater
Aus lcu 2000-tarwater
 
Offshore platforms
Offshore platformsOffshore platforms
Offshore platforms
 

More from hydrologyproject0

More from hydrologyproject0 (20)

Specification purewater
Specification purewaterSpecification purewater
Specification purewater
 
Water purifier ion exchange resin column
Water purifier ion exchange resin columnWater purifier ion exchange resin column
Water purifier ion exchange resin column
 
Water purifier, double distillation unit
Water purifier, double distillation unitWater purifier, double distillation unit
Water purifier, double distillation unit
 
Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)
 
Water geyser (heater)
Water geyser (heater)Water geyser (heater)
Water geyser (heater)
 
Water bath, general purpose
Water bath, general purposeWater bath, general purpose
Water bath, general purpose
 
Water bath, bacteriological
Water bath, bacteriologicalWater bath, bacteriological
Water bath, bacteriological
 
Wash bottle
Wash bottleWash bottle
Wash bottle
 
Volumetric flask
Volumetric flaskVolumetric flask
Volumetric flask
 
Visual accumulation tube
Visual accumulation tubeVisual accumulation tube
Visual accumulation tube
 
Vacuum pump
Vacuum pumpVacuum pump
Vacuum pump
 
Turbidity meter (nephelometer)
Turbidity meter (nephelometer)Turbidity meter (nephelometer)
Turbidity meter (nephelometer)
 
Tool kit
Tool kitTool kit
Tool kit
 
Toc analyser, microprocessor controlled
Toc analyser, microprocessor controlledToc analyser, microprocessor controlled
Toc analyser, microprocessor controlled
 
Tissue grinder
Tissue grinderTissue grinder
Tissue grinder
 
Thermometers, set of
Thermometers, set ofThermometers, set of
Thermometers, set of
 
Test tubes
Test tubesTest tubes
Test tubes
 
Test sieves with shaker
Test sieves with shakerTest sieves with shaker
Test sieves with shaker
 
Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)
 
Sterliser, autoclave
Sterliser, autoclaveSterliser, autoclave
Sterliser, autoclave
 

Recently uploaded

8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 

Recently uploaded (20)

8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 

Frp boat (7m)

  • 1. 10.033 FRP BOAT Approval Date: 20 May 1998 Reviewed on : 23 October 2007 Version: 1 Equipment Specification: FRP BOAT Version 1 10.033-1/6 Purpose The FRP (Fibre Reinforced Plastic) boat will be used to execute hydrological measurements in rivers, canals and reservoirs. Many of the measurements will be made in very shallow water. Conditions & Requirements • The FRP boat shall be of such a design that it operates reliably and safely under the prevailing environmental and hydraulic conditions. • The boat shall be capable to operate in shallow water where repeatedly the hull may impact with rock or sediment. • All materials on the boat exterior and on wet spots inside the boat shall be non- corrosive. • The boat shall be very sturdy, unsinkable and shall have an adequate stability. • The boat shall be easy to operate and maintain. • The boat shall have an expected technical lifetime of not less than 10 years. • The boat and the outboard engines shall be capable to operate for at least 6 months without any major servicing. • The boat shall have floatation chambers filled with closed cell foam. • The boat shall be provided with appropriate fenders. • The boat shall have a cabin to accommodate equipment and staff. • At port and starboard side the cabin shall have sitting benches, incorporated in the hull. • The cabin shall have windows and a lockable door. • On deck adequate workspace (at least 2.3 x 3 m2 ) should be provided to carry out hydrological measurements. • The rear deck shall be provided with an awning. • The boat shall be supplied with the accessories as needed for effective deployment. • The boat shall be fitted with two outboard engines (see 10.036). • The outboard engines shall be operated by a remote control system, located at the stern side bulkhead of the cabin. • The control system shall have a starting switch, gear switch and a throttle system for each engine and a steering wheel and emergency stop switch for simultaneous operation of the engines. • The control system shall match the outboard engines. • A break water arrangement shall be provided in the front. • Guard-rail and stanchions with detachable chain will be rigged out around the deck- opening. Suitable guard-rails shall also be provided around the deck. • Bollards and fairleads are to be provided on the deck for mooring purpose. • A maintenance manual, related to the type and model of the FRP boat, shall be part of the delivery. Specifications 1. Boat length approx. 7 m width approx. 2.5 m
  • 2. Equipment Specification: FRP BOAT Version 1 10.033-2/6 draft approx. 0.5 m free board approx. 0.6 m bottom shape flat or slightly catamaran propulsion 2 Nos. of 30 kW (40 HP) outboard engines carrying capacity 1000 kg 2. Cabin length approx. 2 m height ample sitting height door lockable door width >0.8 m windows glass, possibility to open, closed water tight 3. Boat outfit anchor matching boat, fitted with 5 chain and rope for water depth of 20 m and current velocity of 5 m/s echo-sounder indicator type, fitted in the boat compass magnetic type, fitted in the boat fenders 4 of Coir type paddles 4 for rowing life-jacket for each person on board, also for guests life-buoy 8 pieces with at least 50 m line, readily available on board fire extinguisher >5 kg The fire extinguisher shall be readily accessible in the motor compartment (if any) and in the cabin Remarks For the installation of winches, fitting of survey echo-sounder transducers etc. some local reinforcements and/or supports may be required. Arrangements shall exist for mounting the boat outfit (Bracket) and for dropping of the anchor to keep the boat stationary, during flow measurements. These can only be specified after selection of the survey instruments and other relevant equipment. Arrangements shall be made for safe working on the boat. For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing. For international bidders the design and drawing shall be approved by a national agency in their country authorised for the purpose and acceptable to the purchaser. Option Optionally, the boat may be fitted with an instrument-well for acoustical and other transducers. Basically, there are two ways to install acoustical transducers, such as echo-sounder and ADCP on a boat, viz.: 1. Transducers attached to a bracket at the boat exterior This method can be used virtually on any available boat. However, the bracket and transducer are relatively vulnerable and may generate considerable drag. Further, being at a distance from the boat's centre, external transducers experience all the pitch and roll movements. 2. Transducers in a well inside the boat Transducers in the well are in direct contact with the water and can execute the acoustic measurements but are not exposed to the flow of water, hence much more protected.. In particular in case the well is constructed in or close to the boat’s centre, then the transducer will experience little effect of pitch and roll movements. This increases accuracy
  • 3. Equipment Specification: FRP BOAT Version 1 10.033-3/6 and data quality. The well has to be tailor made and adds to the boat cost. Being inside the boat and for safety reasons it should be of a sound construction. To construct a well, a FRP pipe with ID of about 0.4 m could be installed in the centre of the boat. The well top should be at about board level. The well bottom should be soundly fixed to the boat bottom. It shall be possible to close the top of the well. The location and exact size of the well will be specified after selection of the measuring equipment. The purchaser may execute his judicious discretion in the choice of configuration and options.
  • 4. 10.033 FRP BOAT As per HP-I Approval Date: 20 May 1998 Version: 1 Equipment Specification: FRP BOAT Version 1 10.033-4/6 Purpose The FRP (Fibre Reinforced Plastic) boat will be used to execute hydrological measurements in rivers, canals and reservoirs. Many of the measurements will be made in very shallow water. Conditions & Requirements • The FRP boat shall be of such a design that it operates reliably and safely under the prevailing environmental and hydraulic conditions. • The boat shall be capable to operate in shallow water where repeatedly the hull may impact with rock or sediment. • All materials on the boat exterior and on wet spots inside the boat shall be non- corrosive. • The boat shall be very sturdy, unsinkable and shall have an adequate stability. • The boat shall be easy to operate and maintain. • The boat shall have an expected technical lifetime of not less than 10 years. • The boat and the outboard engines shall be capable to operate for at least 6 months without any major servicing. • The boat shall have floatation chambers filled with closed cell foam. • The boat shall be provided with appropriate fenders. • The boat shall have a cabin to accommodate equipment and staff. • At port and starboard side the cabin shall have sitting benches, incorporated in the hull. • The cabin shall have windows and a lockable door. • On deck adequate workspace (at least 2.3 x 3 m2 ) should be provided to carry out hydrological measurements. • The rear deck shall be provided with an awning. • The boat shall be supplied with the accessories as needed for effective deployment. • The boat shall be fitted with two outboard engines (see 10.036). • The outboard engines shall be operated by a remote control system, located at the stern side bulkhead of the cabin. • The control system shall have a starting switch, gear switch and a throttle system for each engine and a steering wheel and emergency stop switch for simultaneous operation of the engines. • The control system shall match the outboard engines. • A break water arrangement shall be provided in the front. • Guard-rail and stanchions with detachable chain will be rigged out around the deck- opening. Suitable guard-rails shall also be provided around the deck. • Bollards and fairleads are to be provided on the deck for mooring purpose. • A maintenance manual, related to the type and model of the FRP boat, shall be part of the delivery. Specifications 4. Boat length approx. 7 m width approx. 2.5 m draft approx. 0.5 m free board approx. 0.6 m
  • 5. Equipment Specification: FRP BOAT Version 1 10.033-5/6 bottom shape flat or slightly catamaran propulsion 2 Nos. of 30 kW (40 HP) outboard engines carrying capacity 1000 kg 5. Cabin length approx. 2 m height ample sitting height door lockable door width >0.8 m windows glass, possibility to open, closed water tight 6. Boat outfit anchor matching boat, fitted with 5 chain and rope for water depth of 20 m and current velocity of 5 m/s echo-sounder indicator type, fitted in the boat compass magnetic type, fitted in the boat fenders 4 of Coir type paddles 4 for rowing life-jacket for each person on board, also for guests life-buoy 8 pieces with at least 50 m line, readily available on board fire extinguisher >5 kg The fire extinguisher shall be readily accessible in the motor compartment (if any) and in the cabin Remarks For the installation of winches, fitting of survey echo-sounder transducers etc. some local reinforcements and/or supports may be required. Arrangements shall exist for mounting the boat outfit (Bracket) and for dropping of the anchor to keep the boat stationary, during flow measurements. These can only be specified after selection of the survey instruments and other relevant equipment. Arrangements shall be made for safe working on the boat. For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing. For international bidders the design and drawing shall be approved by a national agency in their country authorised for the purpose and acceptable to the purchaser. Option Optionally, the boat may be fitted with an instrument-well for acoustical and other transducers. Basically, there are two ways to install acoustical transducers, such as echo-sounder and ADCP on a boat, viz.: 3. Transducers attached to a bracket at the boat exterior This method can be used virtually on any available boat. However, the bracket and transducer are relatively vulnerable and may generate considerable drag. Further, being at a distance from the boat's centre, external transducers experience all the pitch and roll movements. 4. Transducers in a well inside the boat Transducers in the well are in direct contact with the water and can execute the acoustic measurements but are not exposed to the flow of water, hence much more protected.. In particular in case the well is constructed in or close to the boat’s centre, then the transducer will experience little effect of pitch and roll movements. This increases accuracy and data quality. The well has to be tailor made and adds to the boat cost. Being inside the boat and for safety reasons it should be of a sound construction.
  • 6. Equipment Specification: FRP BOAT Version 1 10.033-6/6 To construct a well, a FRP pipe with ID of about 0.4 m could be installed in the centre of the boat. The well top should be at about board level. The well bottom should be soundly fixed to the boat bottom. It shall be possible to close the top of the well. The location and exact size of the well will be specified after selection of the measuring equipment. The purchaser may execute his judicious discretion in the choice of configuration and options.