The guidelines for commercial buildings in India with regards to Fire Safety and Fire ... to a complete bum-out and in preventing the rapid spread of fire along with hvac ,plumbing and electrical safety
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Fitoutguide blogspot-com-pdf
1. Fit Out Guidelines Of
Commercial Office
At least 7 killed in knife attack in northeastern China 12/27/2020
2 brothers were separated in one of Saddam's jails. Now one believes he's found the other. 12/27/2020
How disheartening to see that President Trump still has support in Congress 12/27/2020
Was Lizzie Borden a notorious killer or wrongly accused? 12/27/2020
Letters to the Editor: Why the Republican Party is worth saving without Donald Trump 12/27/2020
Saturday, August 8, 2020
Fit Out Guidelines Of Commercial Office
TENANT'S GUIDELINES FOR FIT OUT WORKS
In this manual the following expressions are used:
1) Building name: It is situated on its successors and assigns.
2)"Lesse/Occupant": The Tenant shall mean Company/ person been allocated a place / unit in the
building.
3) "Consultant/Contractor/Vendor": Means an agency /group appointed by the occupant/lesseee
for the design of interior fitouts and facilities.
4). Guidelines : A document that provides the instructions for the work to be carried out for fit out
works within the building.
5).Managing Agents: Means an authorized officer/officer's who manages O&M for coordination of
the premises on behalf of.
Discover How to Work at Home
Cash in Hand Every Day
1000's of Online Data Entry Companies...
Admob3
Techguru
View my complete profile
About Me
▼ 2020 (1)
▼ August (1)
Fit Out Guidelines Of Commercial Office
Blog Archive
More Create Blog Sign In
2. 1000's of Online Data Entry Companies...
Need YOU Today!
"WorkAtHome Job Seekers Required
RIGHT NOW for Highly Paid Positions!"
Write For A Living (TM)
Attention writers, bloggers, authors, freelancers, and home job seekers
“Discover the Three Critical Mistakes Stopping You From Earning Money From Your Writing And
The Simple Secret for Fixing Them...”
250 Work at Home Ass…
General Instructions
Fit out guidelines for sublease/vendor/contractors :
We
are happy that you have chosen our building for your office premises and the various stages of fit
out process are
1). Submissions of coordinated plan and drawings.
2). Submissions of all electrical load and calculations.
3).Under normal conditions the managing authorized officer can visit your place and can seek
clarification for fit out places.
4).No rubbish/debris packaging materials should not be stored.
5). Construction material and equipment should be stored in the floor and weight should not be
more than 15 kn/sqm.
Electrical:
1) Service meter will be provided for construction power and no other power should be taken from
floor.
2). Electrical gadgets/fitting s/cables should be ISI marked and fire retardant.
3). Electricalu load should be balanced.
4).No cable joints permitted in between terminals.
5).All Electrical tools/ appliance should be connected with flexible cables and would be free of
joints should be used with plugs and socket's.
6).All Electrical tools/ machinery should be properly earthed and would be checked by O&M
building personal.
Plumbing:
1).Any changes in the plumbing working line not permitted.
2).All the service ducts/shafts should be accessible at all times for repair and maintenance.
3). Leftover item's scrap to be dispensed off from the floor immediately.
Discover How To Pull In Extra Cash
“Assembling Products at Home