SlideShare a Scribd company logo
1 of 2
Nitto G. Torrefranca
94-1183 Kahuahale Street
Waipahu,Hawaii, 96797
(808) 781-4682
Summary of Professional Work Experiences: Over 45 years
Standard Sheetmetal & Mechanical Inc. Honolulu, Hawaii JAN.25,2012-PRESENT
Responsible in providing HVAC, Flashing and Sheetmetal bid estimates to various general
contractors as well as private , federal, state, city and county projects .Noteworthy projects as
apparent low bidder and successfully contracted: $52Million.
HSI MECHANICAL INC, Honolulu, Hawaii ( JAN. 02 – JAN.12)
Assigned as Senior Estimator and Project Manager of special projects. Provided mechanical bid
estimates and cost proposals independently. Prepared HVAC ,Sheetmetal ,Plumbing and piping
take-offs. Solicited subcontractor bids and vendor quotes especially on prime bids..Cost controlled
and scheduled projects to ensure job productivity in order to complete the project on time and
within the budget. Noteworthy projects estimated, negotiated and successfully contracted :$45M
CONTINENTAL MECH’L. OF THE PACIFIC, Honolulu, Hawaii (May, 01 – January,02)
Assigned as Project Manager of HVAC ,Sheetmetal .Plumbing ,and FireSprinkler works.
Responsible in preparing bid estimates, scheduling of projects, cost control,
equipment / material procurement , contractor quality control and project management.
Projects estimated as apparent low bid and managed during construction totaled $5 Million.
AIR ENGINEERING COMPANY, INC., Honolulu, Hawaii (1984- 2001)
Provided mechanical bid estimates and cost proposals involving residential, institutional,
commercial and industrial projects as well as mechanical plant retrofits. Responsible in
Preparing submittals for approval, purchase orders, scheduled projects using Primavera’s CPM,
change order proposals, wrote RFI’s, assisted field superintendent on solving field problems and
contract coordination ,submitted progress billings and contract closing documents.
Projects estimated as apparent low bid, negotiated and contracted $100 Million.
Other Construction Companies previously worked : (1969-1984)
Au’s Plumbing and Sheetmetal , Mechanical Contractors
A-1 Hydro Mechanics Corp.,Mechanical Contractors
Hood Corporation, Lihue,Kauai, Pipeline General Contractors
Hawaiian Dredging and Construction Co.General Contractor;Power and Industrial Division
Durant Irvine Company Limited. ,Mechanical Contractors
EE Black Limited.,General Contractors
Oahu Plumbing and Air Conditioning Co Ltd. Mechanical Contractors
SONEDCO Sugar Manufacturing Plant
1
Other previous experiences were as Project Engineer during construction of Sewage and
Wastewater Treatment Plants and Engineer in Trainee during the construction of the 4000 tons per
day sugar manufacturing plant, involving the installation ,erection of Steam Boilers,Conveyor
systems,Deaerator,Demineralizer feedwater ,250 HP Boiler Feedpumps,Forced Draft Fans @
4,240 CFM;Induced Draft Fans @ 144,720 CFM, steam piping, process piping , fuel oil piping
systems and pneumatic temperature instrumentation and controls. After the plant construction, I
was promoted as Boiler Operating Engineer responsible of operating and maintaining Steam
Boilers at 420 psig operating pressure providing steam to Centrifugal Clarifiers,Steam Turbine
Generators thus providing power to entire manufacturing plant in lieu of the 600 KW Diesel
Engine Generating standby units.(1969 – 1984).
Major Projects involved as Project Engineer:
Sand Island Sewage Treatment Plant (1976-1977) HDCC : $50,000,000.
SONEDCO SUGAR MANUFACTURING PLANT : PROJECT COST: 100MIL (1969-1973)
SKILLS:
Computer – literate in Microsoft Softwares , Primavera’s Suretrak Project Scheduling (CPM) ,
Quickpen Mechanical AutoBid and Sheetmetal AutoBid Computerized Estimating.
PROFESSIONAL AFFILIATION:
AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR CONDITIONING
ENGINEERS, . MEMBER
EDUCATION:
BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING –1968-UNIVERSITY OF
SANTO TOMAS , website:http://www.usteaa.org/
THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA ESTIMATING
SEMINARS, LAS VEGAS ,NEVADA,MARCH 8,9 and 10 2008.
QUICKPEN MECHANICAL AUTOBID AND SHEETMETAL AUTOBID,2002, COLORADO
CONSTRUCTION QUALITY MANAGEMENT FOR CONTRACTORS – CERTIFIED
UNITED STATES ARMY CORPS OF ENGINEERS (1997 – 2002), HONOLULU
SUCCESS COMMUNICATION SERIES / TOASTMASTER INTERNATIONAL, 1997
AUTO – CAD SEMINARS , 1997
CPM, PERT AND CONSTRUCTION PROJECT MANAGEMENT SEMINAR, 1995
LEADERSHIP AND MOTIVATION TRAINING SEMINAR, 1988
CARRIER OPERATING AND MAINTENANCE TRAINING COURSE
TRANE AIR CONDITIONING CLINICS
2

More Related Content

What's hot

Brandon liaw individual
Brandon liaw individualBrandon liaw individual
Brandon liaw individualbrandonliaw97
 
Bruce LaCour's Resume
Bruce  LaCour's ResumeBruce  LaCour's Resume
Bruce LaCour's ResumeBruce LaCour
 
hassan gad cv
hassan gad cv hassan gad cv
hassan gad cv Hassan Gad
 
gas pipe line project report.
gas pipe line project report.gas pipe line project report.
gas pipe line project report.Hagi Sahib
 
Venkatesh planning cv
Venkatesh  planning cv Venkatesh  planning cv
Venkatesh planning cv Venkatesh -
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years expsameh todary
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightPatrice Gagnon
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...Angeline KH
 
LinkedIn Profile Sumit Deb Nath
LinkedIn Profile Sumit Deb NathLinkedIn Profile Sumit Deb Nath
LinkedIn Profile Sumit Deb NathSumit Debnath
 
Hanin qreis 2018 cv
Hanin qreis 2018 cvHanin qreis 2018 cv
Hanin qreis 2018 cvHanin Qreis
 

What's hot (20)

Brandon liaw individual
Brandon liaw individualBrandon liaw individual
Brandon liaw individual
 
Bruce LaCour's Resume
Bruce  LaCour's ResumeBruce  LaCour's Resume
Bruce LaCour's Resume
 
CV
CVCV
CV
 
CV -BOSE
CV -BOSECV -BOSE
CV -BOSE
 
C.V for M.ZAKI
C.V  for M.ZAKIC.V  for M.ZAKI
C.V for M.ZAKI
 
hassan gad cv
hassan gad cv hassan gad cv
hassan gad cv
 
gas pipe line project report.
gas pipe line project report.gas pipe line project report.
gas pipe line project report.
 
aldarat
aldarataldarat
aldarat
 
Mep contractors in abu dhabi
Mep contractors in abu dhabiMep contractors in abu dhabi
Mep contractors in abu dhabi
 
new 5 tanmay_CV
new 5 tanmay_CV new 5 tanmay_CV
new 5 tanmay_CV
 
Venkatesh planning cv
Venkatesh  planning cv Venkatesh  planning cv
Venkatesh planning cv
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exp
 
Lincoln Larramendi Res
Lincoln Larramendi ResLincoln Larramendi Res
Lincoln Larramendi Res
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 light
 
NEMER- CV - 16
NEMER- CV - 16NEMER- CV - 16
NEMER- CV - 16
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
 
LinkedIn Profile Sumit Deb Nath
LinkedIn Profile Sumit Deb NathLinkedIn Profile Sumit Deb Nath
LinkedIn Profile Sumit Deb Nath
 
RANJI -CV
RANJI -CVRANJI -CV
RANJI -CV
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
Hanin qreis 2018 cv
Hanin qreis 2018 cvHanin qreis 2018 cv
Hanin qreis 2018 cv
 

Viewers also liked

Viewers also liked (13)

Rainey tisdale - poetry of objects
Rainey tisdale -   poetry of objectsRainey tisdale -   poetry of objects
Rainey tisdale - poetry of objects
 
Premio (2)
Premio (2)Premio (2)
Premio (2)
 
Una mirada deslumbrante. Estudio SRC El Gasto en Maquillaje 2013
Una mirada deslumbrante. Estudio SRC El Gasto en Maquillaje 2013Una mirada deslumbrante. Estudio SRC El Gasto en Maquillaje 2013
Una mirada deslumbrante. Estudio SRC El Gasto en Maquillaje 2013
 
Kwanrudee.
Kwanrudee.Kwanrudee.
Kwanrudee.
 
INTEGRATED HEALTH POST CARDnew
INTEGRATED HEALTH POST CARDnewINTEGRATED HEALTH POST CARDnew
INTEGRATED HEALTH POST CARDnew
 
DD Form 214
DD Form 214DD Form 214
DD Form 214
 
Jack the ripper
Jack the ripperJack the ripper
Jack the ripper
 
"Ключ любви"
"Ключ любви""Ключ любви"
"Ключ любви"
 
Lettre de recommandation JM
Lettre de recommandation JMLettre de recommandation JM
Lettre de recommandation JM
 
"Женские детективы"
"Женские детективы""Женские детективы"
"Женские детективы"
 
El canal de Distribucion
El canal de DistribucionEl canal de Distribucion
El canal de Distribucion
 
Medición marketing
Medición marketingMedición marketing
Medición marketing
 
CQ Appointment Letter
CQ Appointment LetterCQ Appointment Letter
CQ Appointment Letter
 

Similar to Nittoresume 2

Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Ron Roof
 
BotelloR_Projects
BotelloR_ProjectsBotelloR_Projects
BotelloR_ProjectsRoy Botello
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Ron Roof
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P. Henderson
 
West.Robert.resume.2016-02
West.Robert.resume.2016-02West.Robert.resume.2016-02
West.Robert.resume.2016-02Robert West
 
Rosental Alex 19 Oct09
Rosental Alex 19 Oct09Rosental Alex 19 Oct09
Rosental Alex 19 Oct09arosental
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedAbbas Saeidi
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray ResumeRon Bray
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Randy Seperak
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resumeSteve Chu
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016Smith Joshua
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor ResumeRoy Firtha
 
Overholser, James Project Mgr E Resume
Overholser, James Project Mgr E ResumeOverholser, James Project Mgr E Resume
Overholser, James Project Mgr E Resumejimoverholser
 
LAM COVER & RESUME.
LAM COVER & RESUME.LAM COVER & RESUME.
LAM COVER & RESUME.LUISINGPR
 

Similar to Nittoresume 2 (20)

Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16
 
BotelloR_Projects
BotelloR_ProjectsBotelloR_Projects
BotelloR_Projects
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
West.Robert.resume.2016-02
West.Robert.resume.2016-02West.Robert.resume.2016-02
West.Robert.resume.2016-02
 
Rosental Alex 19 Oct09
Rosental Alex 19 Oct09Rosental Alex 19 Oct09
Rosental Alex 19 Oct09
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
Roger Berryment Resume
Roger Berryment ResumeRoger Berryment Resume
Roger Berryment Resume
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray Resume
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
 
Caro, Jose J 11 9
Caro, Jose J 11 9Caro, Jose J 11 9
Caro, Jose J 11 9
 
Bassam Shamkhi - UAE
Bassam Shamkhi - UAEBassam Shamkhi - UAE
Bassam Shamkhi - UAE
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resume
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor Resume
 
Overholser, James Project Mgr E Resume
Overholser, James Project Mgr E ResumeOverholser, James Project Mgr E Resume
Overholser, James Project Mgr E Resume
 
Stephen Vianelli CV 23 Dec 2016
Stephen Vianelli CV 23 Dec 2016Stephen Vianelli CV 23 Dec 2016
Stephen Vianelli CV 23 Dec 2016
 
davidTfritschi ResumeApdf
davidTfritschi ResumeApdfdavidTfritschi ResumeApdf
davidTfritschi ResumeApdf
 
LAM COVER & RESUME.
LAM COVER & RESUME.LAM COVER & RESUME.
LAM COVER & RESUME.
 

Nittoresume 2

  • 1. Nitto G. Torrefranca 94-1183 Kahuahale Street Waipahu,Hawaii, 96797 (808) 781-4682 Summary of Professional Work Experiences: Over 45 years Standard Sheetmetal & Mechanical Inc. Honolulu, Hawaii JAN.25,2012-PRESENT Responsible in providing HVAC, Flashing and Sheetmetal bid estimates to various general contractors as well as private , federal, state, city and county projects .Noteworthy projects as apparent low bidder and successfully contracted: $52Million. HSI MECHANICAL INC, Honolulu, Hawaii ( JAN. 02 – JAN.12) Assigned as Senior Estimator and Project Manager of special projects. Provided mechanical bid estimates and cost proposals independently. Prepared HVAC ,Sheetmetal ,Plumbing and piping take-offs. Solicited subcontractor bids and vendor quotes especially on prime bids..Cost controlled and scheduled projects to ensure job productivity in order to complete the project on time and within the budget. Noteworthy projects estimated, negotiated and successfully contracted :$45M CONTINENTAL MECH’L. OF THE PACIFIC, Honolulu, Hawaii (May, 01 – January,02) Assigned as Project Manager of HVAC ,Sheetmetal .Plumbing ,and FireSprinkler works. Responsible in preparing bid estimates, scheduling of projects, cost control, equipment / material procurement , contractor quality control and project management. Projects estimated as apparent low bid and managed during construction totaled $5 Million. AIR ENGINEERING COMPANY, INC., Honolulu, Hawaii (1984- 2001) Provided mechanical bid estimates and cost proposals involving residential, institutional, commercial and industrial projects as well as mechanical plant retrofits. Responsible in Preparing submittals for approval, purchase orders, scheduled projects using Primavera’s CPM, change order proposals, wrote RFI’s, assisted field superintendent on solving field problems and contract coordination ,submitted progress billings and contract closing documents. Projects estimated as apparent low bid, negotiated and contracted $100 Million. Other Construction Companies previously worked : (1969-1984) Au’s Plumbing and Sheetmetal , Mechanical Contractors A-1 Hydro Mechanics Corp.,Mechanical Contractors Hood Corporation, Lihue,Kauai, Pipeline General Contractors Hawaiian Dredging and Construction Co.General Contractor;Power and Industrial Division Durant Irvine Company Limited. ,Mechanical Contractors EE Black Limited.,General Contractors Oahu Plumbing and Air Conditioning Co Ltd. Mechanical Contractors SONEDCO Sugar Manufacturing Plant 1
  • 2. Other previous experiences were as Project Engineer during construction of Sewage and Wastewater Treatment Plants and Engineer in Trainee during the construction of the 4000 tons per day sugar manufacturing plant, involving the installation ,erection of Steam Boilers,Conveyor systems,Deaerator,Demineralizer feedwater ,250 HP Boiler Feedpumps,Forced Draft Fans @ 4,240 CFM;Induced Draft Fans @ 144,720 CFM, steam piping, process piping , fuel oil piping systems and pneumatic temperature instrumentation and controls. After the plant construction, I was promoted as Boiler Operating Engineer responsible of operating and maintaining Steam Boilers at 420 psig operating pressure providing steam to Centrifugal Clarifiers,Steam Turbine Generators thus providing power to entire manufacturing plant in lieu of the 600 KW Diesel Engine Generating standby units.(1969 – 1984). Major Projects involved as Project Engineer: Sand Island Sewage Treatment Plant (1976-1977) HDCC : $50,000,000. SONEDCO SUGAR MANUFACTURING PLANT : PROJECT COST: 100MIL (1969-1973) SKILLS: Computer – literate in Microsoft Softwares , Primavera’s Suretrak Project Scheduling (CPM) , Quickpen Mechanical AutoBid and Sheetmetal AutoBid Computerized Estimating. PROFESSIONAL AFFILIATION: AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR CONDITIONING ENGINEERS, . MEMBER EDUCATION: BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING –1968-UNIVERSITY OF SANTO TOMAS , website:http://www.usteaa.org/ THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA ESTIMATING SEMINARS, LAS VEGAS ,NEVADA,MARCH 8,9 and 10 2008. QUICKPEN MECHANICAL AUTOBID AND SHEETMETAL AUTOBID,2002, COLORADO CONSTRUCTION QUALITY MANAGEMENT FOR CONTRACTORS – CERTIFIED UNITED STATES ARMY CORPS OF ENGINEERS (1997 – 2002), HONOLULU SUCCESS COMMUNICATION SERIES / TOASTMASTER INTERNATIONAL, 1997 AUTO – CAD SEMINARS , 1997 CPM, PERT AND CONSTRUCTION PROJECT MANAGEMENT SEMINAR, 1995 LEADERSHIP AND MOTIVATION TRAINING SEMINAR, 1988 CARRIER OPERATING AND MAINTENANCE TRAINING COURSE TRANE AIR CONDITIONING CLINICS 2