FIRST COURSE
SPREADSHEET
Objectives
• Understand the use of spreadsheets and
Excel
• Learn the parts of the Excel window
•Scroll through a worksheet and navigate
between worksheets
• Create and save a workbook file
•Enter text, numbers, and dates into a
worksheet
Objectives
•Resize, insert, and remove columns and
rows
•Select and move cell ranges
•Insert formulas and functions
•Insert, delete, move, and rename
worksheets
•Work with editing tools
•Preview and print a workbook
Chapter 1:
Introduction to Spreadsheet
Introduction to Spreadsheet
A spreadsheet is a computer application with tools
that increase the user's productivity in capturing,
analysing, and sharing tabular data sets.
It displays multiple cells usually in a two-
dimensional matrix or grid consisting of rows and
columns (in other words, a table, hence "tabular").
Each cell contains alphanumeric text, numeric
values, or formulas.
A formula defines how the content of that cell is to
be calculated from the contents of any other cell
(or combination of cells) each time any cell is
updated.
Spreadsheets developed as computerized
simulations of paper accounting worksheets.
They boost productivity because of their ability to
re-calculate the entire sheet automatically after a
change to a single cell is made.
A modern spreadsheet file consists of multiple
worksheets (sheets) that make up one workbook.
A cell on one sheet is capable of referencing cells
on other, different sheets, whether within the same
workbook or even in different workbooks.
Spreadsheets are often imported into databases to
become tables within them.
Visicalc was the first electronic spreadsheet on a
microcomputer.
Lotus 1-2-3 was the leading spreadsheet when
DOS was the dominant operating system.
Excel now has the largest market share on the
Windows and Macintosh platforms.
A list of current spreadsheet software are:
Microsoft Excel, IBM Lotus Symphony, Corel
Quattro Pro (WordPerfect Office), KSpread,
Kingsoft Spreadsheets, ZCubes-Calci, Resolver
One, and GNU Oleo.
Introducing Excel
This course shall be based on Microsoft
Excel 2016 for Windows. No exceptions.
•Microsoft Office Excel 2016 (or Excel) is
a computer program used to enter,
analyze, and present quantitative data
•Excel is the world’s most widely-used and
popular spreadsheet program.
•It is part of the Microsoft Office suite and
has become the world standard.
• Often used in business for budgeting, inventory
management, and decision making
Excel commands
Excel 2016 features a brand new “menu-less”
user interface.
In place of a menu system, Excel uses a
context-sensitive Ribbon system.
The words along the top (such as Home,
Insert, Page Layout, and so on) are known as
tabs.
When you click a tab, the Ribbon displays the
commands for the selected tab.
Each command has a name, which is (usually)
displayed next to or below the icon.
The commands are arranged in groups, and
the group name appears at the bottom of the
Ribbon.
The five major parts of Excel are:
1. Workbooks and Worksheets
Workbooks are a collection of worksheets.
Worksheets allow users to enter, calculate,
manipulate, and analyse data
2. Graphics, diagrams, and charts
Use Shapes and the new SmartArt to create
professional-looking diagrams and create a
wide variety of highly customizable charts.
3. Tables
Tables organize and store data within
worksheets.
4. Web Support
Web support allows users to save Excel
worksheets or parts of a worksheet in HTML
format, so a user can view and manipulate the
worksheet using a browser.
5. Automating complex tasks
Perform a tedious task with a single mouse
click with Excel’s macro capabilities.
Mouse Conventions
Some mouse-related terms:
Mouse pointer: The small graphic figure that
moves on-screen when you move your mouse.
Point: Move the mouse so that the mouse
pointer is on a specific item.
Press: Press the left mouse button once and
keep it pressed. Normally, this is used when
dragging.
Click: Press the left mouse button once and
release it immediately.
Double-click: Press the left mouse button
twice in rapid succession.
Right-click: Press the right mouse button
once and release it immediately. The right
mouse button is used in Excel to pop up
shortcut menus that are appropriate for
whatever is currently selected.
Drag: Press the left mouse button and keep it
pressed while you move the mouse. Dragging
is often used to select a range of cells or to
change the size of an object.
Starting Excel
• Click the Start button on the Windows Vista or
Windows 7 taskbar to display the Start menu.
• Click All Programs at the bottom of left pane on the
Start menu to display the All Programs list.
• Click Microsoft Office in the All Programs list to
display the Microsoft Office list.
• Click Microsoft Office Excel 2013 to start Excel
• Double-click Excel 2013 icon on desktop, if one is
present
The Excel Workbook
• Excel documents are known as workbooks
• By default, Excel 2016 workbooks use an .xlsx
(Extensible Markup Language) file extension.
This format requires less storage space and makes
the spreadsheet more “shareable” with others
• Each workbook is comprised of one or more
worksheets.
• Excel opens a new workbook with one
worksheet.
• Each worksheet is made up of individual cells.
• Each cell contains a value, a formula, or text.
• A worksheet also has an invisible draw layer,
which holds charts, images, and diagrams.
• Each worksheet in a workbook is accessible by
clicking the tab at the bottom of the workbook
window.
Figure 1–2: The Workbook
The Worksheet
• The worksheet is organized into a
rectangular grid containing vertical
columns and horizontal rows.
• A column letter above the grid, also called
the column heading, identifies each
column.
• A row number on the left side of the grid,
also called the row heading, identifies
each row.
In older versions of Excel (well, except for really old
versions), each worksheet used a grid with 65,536
rows and 256 columns.
• Excel numbers rows starting with 1 and assigns
letters to columns starting with A.
• Excel 2007 increases the number of rows and
columns in a single worksheet significantly.
Every worksheet consists of rows (numbered 1
through 1,048,576) and columns (labelled A
through XFD – 16,384 columns).
• The intersection of a row and a column is
called a cell.
• At any given time, one cell is the active cell.
• You can identify the active cell by its darker
border (cell B4), as shown in Figure 1-3.
• Its address (its column letter and row
number) appears in the Name box.
• The upper-left cell in a worksheet is called
A1 and the cell down at the bottom right is
called XFD1048576.
Navigating a Worksheet
• Excel provides several ways to navigate a worksheet
26
Contextual Tabs
In addition to the standard tabs, Excel 2016 also includes
contextual tabs. Whenever an object (such as a chart, a
table, or a SmartArt diagram) is selected, specific tools for
working with that object are made available in the Ribbon.
Accessing the Ribbon using your keyboard
Ribbon is very keyboard friendly.
The trick is to press the Alt key to display the pop-up
keytips.
Each Ribbon control has a letter (or series of letters)
that you type to issue the command.
Using the shortcut menus
In addition to the Ribbon, Excel features a slew of
shortcut menus, which you access by right-clicking
just about anything within Excel.
The box at the
right shortcut
menu is known as
the Mini toolbar
Creating Excel Worksheet
The process of developing a worksheet that communicates
specific information requires careful analysis and planning.
As a starting point, establish why the worksheet is needed.
Once the purpose is determined, analyse the intended
users of the worksheet and their unique needs.
Then, gather information about the topic and decide what
to include in the worksheet.
Finally, determine the worksheet design and style that will
be most successful at delivering the message.
Project Planning Guidelines
Project - Worksheet with an Inserted Chart
The project here follows proper design
guidelines and uses Excel to create the
worksheet shown in next two slide.
The worksheet contains sales data for Asare
Ventures. The company sells its products in
several malls throughout Ghana.
Page 13
REQUEST FOR NEW WORKBOOK
Date Submitted: February 15, 2016
Submitted By: Mr. Obeng
Worksheet Title: Asare Consortium Second Quarter Sales
Needs:
An easy-to-read worksheet that shows Asare Consortium’ second quarter sales for
each of our sales regions in which we operate (Upper East, Ashanti, Eastern, Northern,
Western, Greater Accra). The worksheet also should include total sales for each
region, total sales for each product type, and total company sales for the second
quarter.
Source of Data:
The data for the worksheet is available for the end of the second quarter from the
chief financial officer (CFO) of Asare Consortium.
Calculations:
The following calculations must be made for the worksheet: (a) total second quarter
sales for each of the five regions; (b) total second quarter sales for each of the five
product types; and (c) total second quarter sales for the company.
Chart Requirements: Below the data in the worksheet, construct a 3-D Clustered Column chart that
compares the total sales for each region within each type of product.
Approvals
Approval Status: X Approved
Rejected
Approved By:
Date: March 20, 2016
Assigned To: K. Oppong, Spreadsheet Specialist
Pick a piece of paper and show how your
worksheet will look like after arranging the data.
Asare Ventures’ first quarter sales for each of our
sales regions in which we operate (Ashanti,
Eastern, Northern, Western, Central).
The worksheet also should include total sales for
each region, total sales for each of the 5 product
types, and total company sales for the first quarter.
Creating Your First Excel Worksheet
To create a new, blank workbook:
1. Click the File Menu
2. Select New.
3. Click Create. A new, blank workbook
appears in the window
Other way
Press Ctrl+N.
Selecting a Cell
The easiest way to select a cell (make it
active) is to use the mouse to move the block
plus sign mouse pointer to the cell and then
click.
An alternative method is to use the arrow
keys that are located just to the right of the
typewriter keys on the keyboard.
Use the Name Box to select a cell
Auto Fill Handle
Correcting Errors
You can correct errors on a worksheet
using one of several methods.
• Correcting Errors while You Are Typing
Data into a Cell
• Correcting Errors after Entering Data
into a Cell
Checking Spelling
Excel has a spell checker you can use to check the worksheet for
spelling errors.
To Check Spelling on the Worksheet
1. Click cell A3 and then type Stcok to misspell the word Stock.
2. Click cell A1.
3. Click the Review tab on the Ribbon.
4. Click the Spelling button on the Ribbon to run the spell checker
and display the misspelled word, Stcok, in the Spelling dialog box.
5. With the word Stock highlighted and the Suggestions list, click
the Change button to change the misspelled word, Stcok, to the
correct word, Stock.
6. If the Microsoft Office Excel dialog box is displayed, click the OK
button.
7. Select any cell.
AutoCorrect
AutoCorrect makes three types of corrections for
you:
• Corrects two initial capital letters by changing
the second letter to lowercase.
• Capitalizes the first letter in the names of days.
• Replaces commonly misspelled words with their
correct spelling.
The Find and Replace Commands
• You display the Find & Select menu by
clicking the Find & Select button on the
Home tab.
• The Find command on the Find & Select
menu is used to locate a string.
• The Replace command on the Find &
Select menu is used to locate one string
and then replace it with another string.
Entering Numbers
A number can contain only the following
characters: 0 1 2 3 4 5 6 7 8 9 + - ( ) , / . $ % E
e
If a cell entry contains any other keyboard
character (including spaces), Excel interprets
the entry as text and treats it accordingly.
Fractions
• The forward slash (/) has multiple uses. For
example, dates often are entered using the
slash.
• In formulas, the slash represents division.
• To enter a fraction, such as ½, type .5 or 0.5
(i.e., type zero, followed by a space,
followed by the number 1, followed by a
slash, followed by the number 2).
• If you type without the preceding zero,
Excel will store the value in the cell as the
date January 2.
Numeric Limitations
In Excel, a number can be between
approximately –1 x 10308 and 1 x 10308, that is,
between a negative 1 followed by 308 zeros
and a positive 1 followed by 308 zeros.
To enter a number such as
6,000,000,000,000,000, you can type
6,000,000,000,000,000, or you can type 6E15,
which stands for 6 x 1015.
Cell Pointer and Auto Fill
Copying cells
• As in other Windows programs, you can
also use "cut", "copy" and "paste" in Excel.
• You can copy a cell and paste the contents
into another cell.
Copying with Auto fill feature
Simple Copying
Using Drag and Drop to Move or Copy Cells
Copying with Auto fill feature
Series
A series is a range of values that are linked.
One example is the weekdays.
• Series with Numbers
• Series with Numbers
Copying a Cell’s Format Using the Format
Painter Button
Using the Paste Options Menu
Changing Document Properties
Protecting Worksheet and Workbook
Printing a Worksheet
Saving Spreadsheets
Formatting the Worksheet
• Formatting the Worksheet
• Changing Workbook Theme
• Changing Column Width and Row Height
• Inserting Row and Column
• Adding a Worksheet to a Workbook
• Aligning Cell Content
• Rotating Text
• Wrapping Text
• Changing Background Colour and Applying
a Box Border to the Worksheet Title and
Subtitle
• Numeric Display Formats
• Applying Currency Style Format with a
Floating Dollar Sign Using the Format Cells
Dialog Box
• Font Type, Style, Size, and Colour
• Changing Cell Style
Applying Currency Style Format
Protecting Worksheet and Workbook
Protecting a Worksheet
1. Select the cell or range you want to unlock.
2. In the Font group on the Home tab, click the Dialog Box
Launcher
3. In the Format Cells dialog box, click the Protection tab, click
the Locked check box to remove the check mark, and then click
the OK button
4. In the Changes group on the Review tab, click the Protect Sheet
button
5. Enter a password (optional)
6. Select all of the actions you want to allow users to take when
the worksheet is protected
7. Click the OK button
Protecting Worksheet and Workbook
Protecting a Workbook from modification
1. In the Changes group on the Review tab, click the Protect
Workbook button
2. Click the check boxes to indicate whether you want to
protect the workbook’s structure, windows, or both (with
this new sheet cannot be added, existing sheets cannot
be deleted, renamed, etc.)
3. Enter a password (optional)
4. Click the OK button
Changing the Worksheet Names
E-Mailing a Workbook from within Excel
Excel Help
END

Excel CH 01 Introduction to Spreadsheet.ppt

  • 1.
  • 2.
    Objectives • Understand theuse of spreadsheets and Excel • Learn the parts of the Excel window •Scroll through a worksheet and navigate between worksheets • Create and save a workbook file •Enter text, numbers, and dates into a worksheet
  • 3.
    Objectives •Resize, insert, andremove columns and rows •Select and move cell ranges •Insert formulas and functions •Insert, delete, move, and rename worksheets •Work with editing tools •Preview and print a workbook
  • 4.
  • 5.
    Introduction to Spreadsheet Aspreadsheet is a computer application with tools that increase the user's productivity in capturing, analysing, and sharing tabular data sets. It displays multiple cells usually in a two- dimensional matrix or grid consisting of rows and columns (in other words, a table, hence "tabular"). Each cell contains alphanumeric text, numeric values, or formulas.
  • 6.
    A formula defineshow the content of that cell is to be calculated from the contents of any other cell (or combination of cells) each time any cell is updated. Spreadsheets developed as computerized simulations of paper accounting worksheets. They boost productivity because of their ability to re-calculate the entire sheet automatically after a change to a single cell is made.
  • 7.
    A modern spreadsheetfile consists of multiple worksheets (sheets) that make up one workbook. A cell on one sheet is capable of referencing cells on other, different sheets, whether within the same workbook or even in different workbooks. Spreadsheets are often imported into databases to become tables within them.
  • 8.
    Visicalc was thefirst electronic spreadsheet on a microcomputer. Lotus 1-2-3 was the leading spreadsheet when DOS was the dominant operating system. Excel now has the largest market share on the Windows and Macintosh platforms. A list of current spreadsheet software are: Microsoft Excel, IBM Lotus Symphony, Corel Quattro Pro (WordPerfect Office), KSpread, Kingsoft Spreadsheets, ZCubes-Calci, Resolver One, and GNU Oleo.
  • 9.
    Introducing Excel This courseshall be based on Microsoft Excel 2016 for Windows. No exceptions.
  • 10.
    •Microsoft Office Excel2016 (or Excel) is a computer program used to enter, analyze, and present quantitative data •Excel is the world’s most widely-used and popular spreadsheet program. •It is part of the Microsoft Office suite and has become the world standard. • Often used in business for budgeting, inventory management, and decision making
  • 11.
    Excel commands Excel 2016features a brand new “menu-less” user interface. In place of a menu system, Excel uses a context-sensitive Ribbon system. The words along the top (such as Home, Insert, Page Layout, and so on) are known as tabs.
  • 12.
    When you clicka tab, the Ribbon displays the commands for the selected tab. Each command has a name, which is (usually) displayed next to or below the icon. The commands are arranged in groups, and the group name appears at the bottom of the Ribbon.
  • 13.
    The five majorparts of Excel are: 1. Workbooks and Worksheets Workbooks are a collection of worksheets. Worksheets allow users to enter, calculate, manipulate, and analyse data
  • 14.
    2. Graphics, diagrams,and charts Use Shapes and the new SmartArt to create professional-looking diagrams and create a wide variety of highly customizable charts. 3. Tables Tables organize and store data within worksheets.
  • 15.
    4. Web Support Websupport allows users to save Excel worksheets or parts of a worksheet in HTML format, so a user can view and manipulate the worksheet using a browser. 5. Automating complex tasks Perform a tedious task with a single mouse click with Excel’s macro capabilities.
  • 16.
    Mouse Conventions Some mouse-relatedterms: Mouse pointer: The small graphic figure that moves on-screen when you move your mouse. Point: Move the mouse so that the mouse pointer is on a specific item.
  • 17.
    Press: Press theleft mouse button once and keep it pressed. Normally, this is used when dragging. Click: Press the left mouse button once and release it immediately. Double-click: Press the left mouse button twice in rapid succession.
  • 18.
    Right-click: Press theright mouse button once and release it immediately. The right mouse button is used in Excel to pop up shortcut menus that are appropriate for whatever is currently selected. Drag: Press the left mouse button and keep it pressed while you move the mouse. Dragging is often used to select a range of cells or to change the size of an object.
  • 19.
    Starting Excel • Clickthe Start button on the Windows Vista or Windows 7 taskbar to display the Start menu. • Click All Programs at the bottom of left pane on the Start menu to display the All Programs list. • Click Microsoft Office in the All Programs list to display the Microsoft Office list. • Click Microsoft Office Excel 2013 to start Excel • Double-click Excel 2013 icon on desktop, if one is present
  • 20.
    The Excel Workbook •Excel documents are known as workbooks • By default, Excel 2016 workbooks use an .xlsx (Extensible Markup Language) file extension. This format requires less storage space and makes the spreadsheet more “shareable” with others • Each workbook is comprised of one or more worksheets.
  • 21.
    • Excel opensa new workbook with one worksheet. • Each worksheet is made up of individual cells. • Each cell contains a value, a formula, or text. • A worksheet also has an invisible draw layer, which holds charts, images, and diagrams. • Each worksheet in a workbook is accessible by clicking the tab at the bottom of the workbook window.
  • 22.
  • 23.
    The Worksheet • Theworksheet is organized into a rectangular grid containing vertical columns and horizontal rows. • A column letter above the grid, also called the column heading, identifies each column. • A row number on the left side of the grid, also called the row heading, identifies each row.
  • 24.
    In older versionsof Excel (well, except for really old versions), each worksheet used a grid with 65,536 rows and 256 columns. • Excel numbers rows starting with 1 and assigns letters to columns starting with A. • Excel 2007 increases the number of rows and columns in a single worksheet significantly. Every worksheet consists of rows (numbered 1 through 1,048,576) and columns (labelled A through XFD – 16,384 columns).
  • 25.
    • The intersectionof a row and a column is called a cell. • At any given time, one cell is the active cell. • You can identify the active cell by its darker border (cell B4), as shown in Figure 1-3. • Its address (its column letter and row number) appears in the Name box. • The upper-left cell in a worksheet is called A1 and the cell down at the bottom right is called XFD1048576.
  • 26.
    Navigating a Worksheet •Excel provides several ways to navigate a worksheet 26
  • 28.
    Contextual Tabs In additionto the standard tabs, Excel 2016 also includes contextual tabs. Whenever an object (such as a chart, a table, or a SmartArt diagram) is selected, specific tools for working with that object are made available in the Ribbon.
  • 29.
    Accessing the Ribbonusing your keyboard Ribbon is very keyboard friendly. The trick is to press the Alt key to display the pop-up keytips. Each Ribbon control has a letter (or series of letters) that you type to issue the command.
  • 30.
    Using the shortcutmenus In addition to the Ribbon, Excel features a slew of shortcut menus, which you access by right-clicking just about anything within Excel. The box at the right shortcut menu is known as the Mini toolbar
  • 31.
  • 32.
    The process ofdeveloping a worksheet that communicates specific information requires careful analysis and planning. As a starting point, establish why the worksheet is needed. Once the purpose is determined, analyse the intended users of the worksheet and their unique needs. Then, gather information about the topic and decide what to include in the worksheet. Finally, determine the worksheet design and style that will be most successful at delivering the message. Project Planning Guidelines
  • 33.
    Project - Worksheetwith an Inserted Chart The project here follows proper design guidelines and uses Excel to create the worksheet shown in next two slide. The worksheet contains sales data for Asare Ventures. The company sells its products in several malls throughout Ghana.
  • 34.
    Page 13 REQUEST FORNEW WORKBOOK Date Submitted: February 15, 2016 Submitted By: Mr. Obeng Worksheet Title: Asare Consortium Second Quarter Sales Needs: An easy-to-read worksheet that shows Asare Consortium’ second quarter sales for each of our sales regions in which we operate (Upper East, Ashanti, Eastern, Northern, Western, Greater Accra). The worksheet also should include total sales for each region, total sales for each product type, and total company sales for the second quarter. Source of Data: The data for the worksheet is available for the end of the second quarter from the chief financial officer (CFO) of Asare Consortium. Calculations: The following calculations must be made for the worksheet: (a) total second quarter sales for each of the five regions; (b) total second quarter sales for each of the five product types; and (c) total second quarter sales for the company. Chart Requirements: Below the data in the worksheet, construct a 3-D Clustered Column chart that compares the total sales for each region within each type of product. Approvals Approval Status: X Approved Rejected Approved By: Date: March 20, 2016 Assigned To: K. Oppong, Spreadsheet Specialist
  • 35.
    Pick a pieceof paper and show how your worksheet will look like after arranging the data. Asare Ventures’ first quarter sales for each of our sales regions in which we operate (Ashanti, Eastern, Northern, Western, Central). The worksheet also should include total sales for each region, total sales for each of the 5 product types, and total company sales for the first quarter.
  • 37.
    Creating Your FirstExcel Worksheet To create a new, blank workbook: 1. Click the File Menu 2. Select New. 3. Click Create. A new, blank workbook appears in the window Other way Press Ctrl+N.
  • 38.
    Selecting a Cell Theeasiest way to select a cell (make it active) is to use the mouse to move the block plus sign mouse pointer to the cell and then click. An alternative method is to use the arrow keys that are located just to the right of the typewriter keys on the keyboard. Use the Name Box to select a cell
  • 39.
  • 40.
    Correcting Errors You cancorrect errors on a worksheet using one of several methods. • Correcting Errors while You Are Typing Data into a Cell • Correcting Errors after Entering Data into a Cell
  • 41.
    Checking Spelling Excel hasa spell checker you can use to check the worksheet for spelling errors. To Check Spelling on the Worksheet 1. Click cell A3 and then type Stcok to misspell the word Stock. 2. Click cell A1. 3. Click the Review tab on the Ribbon. 4. Click the Spelling button on the Ribbon to run the spell checker and display the misspelled word, Stcok, in the Spelling dialog box. 5. With the word Stock highlighted and the Suggestions list, click the Change button to change the misspelled word, Stcok, to the correct word, Stock. 6. If the Microsoft Office Excel dialog box is displayed, click the OK button. 7. Select any cell.
  • 42.
    AutoCorrect AutoCorrect makes threetypes of corrections for you: • Corrects two initial capital letters by changing the second letter to lowercase. • Capitalizes the first letter in the names of days. • Replaces commonly misspelled words with their correct spelling.
  • 43.
    The Find andReplace Commands • You display the Find & Select menu by clicking the Find & Select button on the Home tab. • The Find command on the Find & Select menu is used to locate a string. • The Replace command on the Find & Select menu is used to locate one string and then replace it with another string.
  • 45.
    Entering Numbers A numbercan contain only the following characters: 0 1 2 3 4 5 6 7 8 9 + - ( ) , / . $ % E e If a cell entry contains any other keyboard character (including spaces), Excel interprets the entry as text and treats it accordingly.
  • 46.
    Fractions • The forwardslash (/) has multiple uses. For example, dates often are entered using the slash. • In formulas, the slash represents division. • To enter a fraction, such as ½, type .5 or 0.5 (i.e., type zero, followed by a space, followed by the number 1, followed by a slash, followed by the number 2).
  • 47.
    • If youtype without the preceding zero, Excel will store the value in the cell as the date January 2.
  • 48.
    Numeric Limitations In Excel,a number can be between approximately –1 x 10308 and 1 x 10308, that is, between a negative 1 followed by 308 zeros and a positive 1 followed by 308 zeros. To enter a number such as 6,000,000,000,000,000, you can type 6,000,000,000,000,000, or you can type 6E15, which stands for 6 x 1015.
  • 49.
    Cell Pointer andAuto Fill Copying cells • As in other Windows programs, you can also use "cut", "copy" and "paste" in Excel. • You can copy a cell and paste the contents into another cell. Copying with Auto fill feature
  • 50.
    Simple Copying Using Dragand Drop to Move or Copy Cells Copying with Auto fill feature
  • 51.
    Series A series isa range of values that are linked. One example is the weekdays. • Series with Numbers • Series with Numbers Copying a Cell’s Format Using the Format Painter Button Using the Paste Options Menu
  • 52.
    Changing Document Properties ProtectingWorksheet and Workbook Printing a Worksheet Saving Spreadsheets
  • 53.
  • 54.
    • Formatting theWorksheet • Changing Workbook Theme • Changing Column Width and Row Height • Inserting Row and Column • Adding a Worksheet to a Workbook • Aligning Cell Content • Rotating Text • Wrapping Text
  • 55.
    • Changing BackgroundColour and Applying a Box Border to the Worksheet Title and Subtitle • Numeric Display Formats • Applying Currency Style Format with a Floating Dollar Sign Using the Format Cells Dialog Box • Font Type, Style, Size, and Colour • Changing Cell Style
  • 57.
  • 58.
    Protecting Worksheet andWorkbook Protecting a Worksheet 1. Select the cell or range you want to unlock. 2. In the Font group on the Home tab, click the Dialog Box Launcher 3. In the Format Cells dialog box, click the Protection tab, click the Locked check box to remove the check mark, and then click the OK button 4. In the Changes group on the Review tab, click the Protect Sheet button 5. Enter a password (optional) 6. Select all of the actions you want to allow users to take when the worksheet is protected 7. Click the OK button
  • 59.
    Protecting Worksheet andWorkbook Protecting a Workbook from modification 1. In the Changes group on the Review tab, click the Protect Workbook button 2. Click the check boxes to indicate whether you want to protect the workbook’s structure, windows, or both (with this new sheet cannot be added, existing sheets cannot be deleted, renamed, etc.) 3. Enter a password (optional) 4. Click the OK button
  • 60.
    Changing the WorksheetNames E-Mailing a Workbook from within Excel Excel Help
  • 61.