Personal Data :
Name : Mohamed Helal Mohamed El-Balkemy
Date of Birth : 12/12/1977
Place of Birth : Quwesna- Menoufiya Governorate
Nationality : Egyptian
Gender : Male
Address : Khalf handaset Elraii, Quwesna- Menoufiya
Marital Status : Married
Computer Skills : excellent (AutoCAD & sap &word & Microsoft office)
&windows 7)
Tel. No. : +2/ 01 00 4770608 +2/048 257 12 12
+2/ 01 20 30 46691 +2/048 257 36 33
Passport No. : 830746
Driving License : have a private driving license
Education:
University Degree : B.Sc. Engineering (May 2001)
University : Menoufiya University
Faculty : Engineering
Department : Civil Engineering
Graduation Project : (QUALITY CONTROL) & Materials Resistance
and Testing
Project Grade : Excellent
Languages : * Arabic: Mother tongue * English: Very Good
Previous training:
-Trained at TOSHIBA EL-ARABY buildings (refrigerator factory. steel
&concrete structure , pavement ) summer 1999
-Trained at Eshraka Co. for construction ( Elkhadra school ) summer
2000 (foundations<,isolation, backfilling > ,first floor structure).
Work Experience:
FRO M 25/05/2008 till present (6.00 YEARS)
FROM 01/8/2015 till present
http://www.turnerconstruction.com/
Project : City Gate, EGYPT
Company: construction (An American`s Management
Company)
Position: civil Superintendent
Owner (developer): QatariDiar
Contractors: CRC, ACC, MMC, Hill
Consultants: ECG, ehafe, rmc, perkin, …
Responsibilities:
– Overseeing and making decisions related to the performance of work related to
scheduling, delivery, logistics, quality control and trade employee staffing
levels.
– Overseeing work among assigned trades to promote a coordinated project
operation.
– Resolving local area problems regarding procedures, precedence, design
clarifications, adequate labor and equipment, schedule and all other appropriate
matters.
– Managing the overall site safety program as required and ensuring
subcontractor compliance with Turner standards and all applicable safety codes
and regulations.
– Supervising and developing Assistant Superintendents, Field Engineers and/or
interns, as assigned, including providing input on or completing performance
appraisals.
– Creating schedules and determining sequencing of work. Developing and
implementing recovery strategies to maintain project schedule.
– Communicating with owners and architects/engineers in connection with field
issues. Investigating and resolving such issues.
– Managing the billing process as it relates to work in place and overseeing the
monthly estimate of work completed, payrolls, material invoices and
subcontractor payment applications.
– Managing the work to ensure that it is installed in compliance with and
conforms to the approved contract documents
–
FRO M 25/05/2008 till present (6.00 YEARS)
FROM 01/09/2014 till 1/8/2015 (12 MONTHS)
GS Engineering & Construction Corp
WWW.GSCONST.CO.KR
Project : ERC Refinery Project , EGYPT
Company: GS Engineering & Construction Corp (EPC Company)
Budget : 3.7 billion $
Position: Assistant manager
Project management (Consultant): Worley Parsons
Owner: ERC Egyptian Refining Company
Responsibilities:
-Assistant manager in building package.(5 buildings)
-Performing duties under direction of (Discipline) Superintendent.
-Checking and evaluating subcontractor's current status within his work area.
-Checking the work progress status of responsible area and assure that the work conforms
to all technical requirements.
-Coordinating work execution in my area with other concerned supervisor(s).
-Prepare and direct daily log, weekly construction schedule, and monthly construction
schedule within the area assigned.
-Review and keep subcontractor's daily work report.
-Determine detailed work method.
-Expedite the delivery of the material which was scheduled to be supplied by company
and subcontractor.
-Preparing documents necessary for regular meetings, for both construction plan review
and progress review.
-Performing the inspection of items, if required and preparing inspection/ test reports.
-Issuing Change Order, Extra Work Order, and Work Memorandum.
-Assessing progress measurements and prepare a document for progress payment request.
-Keeping progress photos and site history.
-Overseeing subcontractor's manpower control status.
-Supervising the labor to assure that safety regulation is observed and that safety
equipment is available and ready for use.
-Assisting in Material Controller's performance.
-Performing unpacking and receiving inspection of material & equipment.
-Preparing documents requested by Construction Superintendent or Field Engineer.
--------------------------------------------
FROM 01/09/2014 till 01 (6.00 YEARS)
From : 02/12/2012 till 01/09/2014 (22 months)
Project : Grand Egyptian Museum
Company:
Budget : 800 000 000 $
Position: (construction manager)
Project management (Consultant):
Owner: The Government of the Arab Republic of Egypt represented
by the Ministry of State for Antiquities/Supreme
Council of Antiquities
The project in brief
• Museum & Conference Centre.. roofs consists of reinforced concrete
structure resting at top of west walls while east wall supports the other
side via steel posts;
– Glass between steel post provides light to halls;
– DS walls are resting on continuous strip footings;
– Bands A to D: reinforced concrete;
– Band E: pre-stressed concrete;
• Steel roof with similar geometry is used for Entrance Courtyard, Food
Court, Solar Boat Enclosure and Temple Garden
• Tunnel connecting Main Building via Nilometer to Conservation
Centre;
• Café Dune
• Ticketing and security buildings A & B
• Water irrigation tank
• Multi-storey car park
• Coach park
Responsibilities:
#• Responsible for all operations on site (my area) from the commencing
date up to ensure that the project is completed on time, budget and maintains
all the standard procedures.
#• Daily coordination with warehouses and equipments to get materials and
equipment required for work .
#• To specify the required technical and normal manpower who are required
to implement works.
#• Technical in coordination and supervision of construction at site, Dealing
with contractors, monitoring progress of works and regular reporting.
#•Assisting in keeping and following of the Project’s Occupational Health &
Safety Plan, to ensure a safe & secure implementation on site without
accidents, perils or threats .
#• Implementing the Project’s Quality Control / Quality Assurance Plan, to
ensure quality implementation on site.(code used Aci,Bs )
#•Assisting in maintaining Archiving system, Daily Log, Weekly Progress
Report and Monthly Status Reports.
#•I control 2senior engs. +10 junior engineers
☺☺☺☺☺☺☺☺☺☺☺☺☺☺☺☺
_________________________
From : 02/11/2010 till 02/12/2012 (25 months)
Project : El-Merk project. Central Processing Facility (lot1)
And Telecommunication (lot7) _Algeria
Company: Construction and
Industries as a subcontractor.
, as a main contractor
Budget : 260 000 000 $ for Orascom scope only
Position: Senior site engineer, (deputy construction manager)
Owner : Sonatrach & Anadarko
Consultant: QC petrofac &QC Anadarko
The project in brief: civil works include pipe rack foundation, turbines
foundations, control building, lab. building , steel structure racks , all
underground piping works ( oily, potable water, sewage water, hot oil
drained, fire fighting water lines, instrument air lines,… ) ,steel building
with cladding and landscape works .
Responsibilities:
#• Responsible for all operations on site (my area) from the commencing
date up to ensure that the project is completed on time, budget and maintains
all the standard procedures.
#• Daily coordination with warehouses and equipments to get materials and
equipment required for work .
#• To specify the required technical and normal manpower who are required
to implement works.
#• Technical in coordination and supervision of construction at site, Dealing
with contractors, monitoring progress of works and regular reporting.
#•Assisting in keeping and following of the Project’s Occupational Health &
Safety Plan, to ensure a safe & secure implementation on site without
accidents, perils or threats .
#• Implementing the Project’s Quality Control / Quality Assurance Plan, to
ensure quality implementation on site.(code used Aci,Bs )
#•Assisting in maintaining Archiving system, Daily Log, Weekly Progress
Report and Monthly Status Reports.
#•I control 3 junior engineers, 1 senior engineer, 5 supervisor, 120 labors
and subcontractors.
Activities: I was responsible for,
………..control building (concrete, finishes works).building area 2700 m2
.ground floor .all concrete works. all kinds of finishes (((((suspended ceiling
, marble cladding , ceramic cladding, MDF cladding , posters cladding ,
gypsum cladding , raised floors , HDF floors , marble floors , carpet tiles
floors , ceramic floors , epoxy painted floor , gypsum partitions , glass wall
partitions , curtain walls))))).
………. And all civil works related to underground piping coordinating
with mechanical team.
--------------------------------------------
☺☺☺☺☺☺☺☺☺☺☺☺☺☺☺☺☺☺
From : 25/05/2008 till 01/11/2010 (30 months)
Project : New LNG Skikda train project (Liquefy Natural Gas)
Algeria
Company: for Construction and Industries a
subcontractor, II as a main contractor.
Consultant: QC KBR&QC Sonatrach
Budget : 280 000 000 $ for Orascom scope only
Position : Senior site engineer.
Owner : Sonatrach
The project in brief: All civil works include pipe racks foundations,
turbines foundations, control building, lab. Building, substation 1, 2, 3,4,5,7
and LNG, PROPANE and BUTANE tanks (concrete tanks).
Responsibilities: #• Responsible for all operations on site from the
commencing date up to ensure that the project is completed on time, budget
and maintains all the standard procedures.(tanks)
#• Technical in coordination and supervision of construction at site, Dealing
with contractors, monitoring progress of works and regular reporting.
#•Assisting in keeping and following of the Project’s Occupational Health &
Safety Plan, to ensure a safe & secure implementation on site without
accidents, perils or threats .
#• Implementing the Project’s Quality Control / Quality Assurance Plan, to
ensure quality implementation on site. .(code used Aci,Bs )
#•Assisting in maintaining Archiving system, Daily Log, Weekly Progress
Report and Monthly Status Reports.
#•I had controlled 1 junior engineers, 4 supervisor, 100 labors and
subcontractors.
--------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------
--------------------------------------------
FROM 30/05/2005 TILL 25/05/2008 (3YEARS)
From : 31/06/2006 till 25/05/2008 (23 months)
Project : Cairo Regional Processing Center.
In smart village .Giza, Egypt
Company: Main contractor: consortium of (siac) Industrial
construction
Engineering company & (Siemens)
Main consultant: Archimid architects.
Project manager: EGYCAN
Budget : 65 000 000 $
Position : Senior site engineer.
Owner : (HSBC) bank.
Brief about the project: All civil works from A to Z . Project area 8000 m2
include building with area 5000 m2 .consist of two basements & ground
floor and 4 floors. using prestressed concrete system (post tensions) in the
slabs and beams & there were a lot of kinds of finishes (((((suspended
ceiling , marble cladding , ceramic cladding, MDF cladding , posters
cladding , gypsum cladding , raised floors , HDF floors , marble floors ,
carpet tiles floors , ceramic floors , epoxy painted floor , gypsum partitions ,
glass wall partitions , curtain walls , all kinds of elevations finishes ,
landscape works (fountains ,green areas , manholes ,hand holes, piping
works, irrigation works) ,have the experience for the special conditions and
requirements for the banks,,,,,,,,,,,,,,,,,,,,,,,,,,,,,)))))
Responsibilities:
#• Studying drawing and specifications which are required to achieve the
elements of the project.
#• Receiving drawing from construction manager.
#• Daily walk through and completely supervision on all belonged
activities.
#• Daily coordination with warehouses and equipments to get materials and
equipment required for work .
#• To specify the required technical and normal manpower who are required
to implement works.
#• Responsible for all operations on site from the commencing date up to
ensure that the project is completed on time, budget and maintains all the
standard procedures.
#•Assisting in keeping and following of the Project’s Occupational Health &
Safety Plan, to ensure a safe & secure implementation on site without
accidents, perils or threats .
#• Implementing the Project’s Quality Control / Quality Assurance Plan, to
ensure quality implementation on site. .(code used Bs )
#•I had controlled 1 junior engineers, 3 supervisor, 75 labors and
subcontractors.
--------------------------------------------
--------------------------------------------
From : 03/05/2005 till 30/06/2006 (13 months)
Project : Egyptian museum (second stage)
Giza, Egypt
Company: Main contractor consortium of (siac) Industrial
construction
Engineering company & .
Main consultant: ACG
Budget : 85 000 000 $
Position : Junior site engineer.
Owner : Egyptian governorate.
Brief about the project: All civil works. Project area 10000 m2 include
building with area 7000 m2 .consist of two floors. All walls are reinforced
concrete with 08.00 M height using DOKA shuttering.
Responsibilities:
#• Receiving drawing from construction manager.
#• Daily walk through and completely supervision on all belonged
activities.
#• Achieving quality &aspects and all activities.
#• Achieving HSSE requirements.
--------------------------------------------
--------------------------------------------
------ Had a private engineering office was called (Master) from 1/9/2003
till 01/05/2005 working in designing and supervising.
-I have supervised about 10 factories with total cost 150 million e.l ….
-I have designed and supervised about 50 of ordinary buildings with total
cost 25 million e.l
-I have designed about 5 towers13 floors with total cost 65 million e.l & 15
large factories with total cost 150 million e.l and I have supervised them
from A to Z (R.C,P.C,block works, finishes works, landscape works )
--------------------------------------------
01/08/2001 till 30/08/2003 (2 years)
--------------------------------------------
From : 01/08/2001 till 30/09/2002 (13 months)
Project : quesna sanitary station (quesna)
Company: (ELNASR BUILDING&CONSTRUCTON COMPANY) EGYCO
Budget : 5 000 000 e.l
Position : junior site engineer.
Brief about the project: three buildings, landscape …(area 2000 m2)
--------------------------------------------
--------------------------------------------
From : 01/10/2002 till 30/08/2003 (11 months)
Project : Students Housing& Sport club (El-Menofia university)
Company: (ELNASR BUILDING&CONSTRUCTON COMPANY) EGYCO
Budget : 25 000 000 e.l
Position : junior site engineer.
Owner : (El-Menofia University)
Brief about the project: students housing include 80 rooms (concrete and
civil) &swimming pool, landscape and three administration buildings…
Qualifications:
 Have good experience in cost &time management.
 I finished P.M.P exam preparation (35hours) from egycham center
 Have good experience in supervision .
 Excellent in drawing by AutoCAD 2010.
 Have a specials training in safety rules by KBR such as (fall
prevention, TSTI total safety tasks instructions, TSTO total safety
tasks observations, confined spaces, deep foundations)
 Have a special training in safety (OSHA) Occupational Safety &
Health Administration (I have the certificate)
 -Have a course in Shaping Accident Free Environment S.A.F.E
 Good in dealing with primavera.
 Good in SAP.
 Good experience in Leadership, Communication, Co-ordinating,
Implementing ,Controlling and Monitoring.
 know how to prevent before deal with problems.
 Have high standards of accuracy and concerned with quality and the
correct completion of tasks.
 Extremely punctual and able to meet deadlines and work under
pressure.
Objectives:
-To apply my experience and educational backgrounds to a civil engineering
Position in a pioneer company whereby my skills can be further used and
developed
-Perform effectively both as an autonomous, self-motivated individual and
as an active member of a decision-making team.
-Adept in grasping new materials and modalities and interested in improving
efficiency on assigned tasks.
--------------------------------------------
--------------------------------------------
Availability : I'm able to start work immediately
I can work in : All over the world
Mohamed_HELAL961@YAHOO.COM
Thank you for reading my C.V., I hope to join you soon, As I hope
the more and more success for your Great Company.
Yours Sincerely,
Eng. /Mohammed Helal
c.v M_Helal  8-2016
c.v M_Helal  8-2016
c.v M_Helal  8-2016
c.v M_Helal  8-2016
c.v M_Helal  8-2016
c.v M_Helal  8-2016
c.v M_Helal  8-2016
c.v M_Helal  8-2016
c.v M_Helal  8-2016
c.v M_Helal  8-2016
c.v M_Helal  8-2016

c.v M_Helal 8-2016

  • 1.
    Personal Data : Name: Mohamed Helal Mohamed El-Balkemy Date of Birth : 12/12/1977 Place of Birth : Quwesna- Menoufiya Governorate Nationality : Egyptian Gender : Male Address : Khalf handaset Elraii, Quwesna- Menoufiya Marital Status : Married Computer Skills : excellent (AutoCAD & sap &word & Microsoft office) &windows 7) Tel. No. : +2/ 01 00 4770608 +2/048 257 12 12 +2/ 01 20 30 46691 +2/048 257 36 33 Passport No. : 830746 Driving License : have a private driving license Education: University Degree : B.Sc. Engineering (May 2001) University : Menoufiya University Faculty : Engineering Department : Civil Engineering Graduation Project : (QUALITY CONTROL) & Materials Resistance and Testing Project Grade : Excellent Languages : * Arabic: Mother tongue * English: Very Good Previous training: -Trained at TOSHIBA EL-ARABY buildings (refrigerator factory. steel &concrete structure , pavement ) summer 1999 -Trained at Eshraka Co. for construction ( Elkhadra school ) summer 2000 (foundations<,isolation, backfilling > ,first floor structure).
  • 2.
    Work Experience: FRO M25/05/2008 till present (6.00 YEARS) FROM 01/8/2015 till present http://www.turnerconstruction.com/ Project : City Gate, EGYPT Company: construction (An American`s Management Company) Position: civil Superintendent Owner (developer): QatariDiar Contractors: CRC, ACC, MMC, Hill Consultants: ECG, ehafe, rmc, perkin, … Responsibilities: – Overseeing and making decisions related to the performance of work related to scheduling, delivery, logistics, quality control and trade employee staffing levels. – Overseeing work among assigned trades to promote a coordinated project operation. – Resolving local area problems regarding procedures, precedence, design clarifications, adequate labor and equipment, schedule and all other appropriate matters. – Managing the overall site safety program as required and ensuring subcontractor compliance with Turner standards and all applicable safety codes and regulations. – Supervising and developing Assistant Superintendents, Field Engineers and/or interns, as assigned, including providing input on or completing performance appraisals. – Creating schedules and determining sequencing of work. Developing and implementing recovery strategies to maintain project schedule. – Communicating with owners and architects/engineers in connection with field issues. Investigating and resolving such issues. – Managing the billing process as it relates to work in place and overseeing the monthly estimate of work completed, payrolls, material invoices and subcontractor payment applications. – Managing the work to ensure that it is installed in compliance with and conforms to the approved contract documents – FRO M 25/05/2008 till present (6.00 YEARS)
  • 3.
    FROM 01/09/2014 till1/8/2015 (12 MONTHS) GS Engineering & Construction Corp WWW.GSCONST.CO.KR Project : ERC Refinery Project , EGYPT Company: GS Engineering & Construction Corp (EPC Company) Budget : 3.7 billion $ Position: Assistant manager Project management (Consultant): Worley Parsons Owner: ERC Egyptian Refining Company Responsibilities: -Assistant manager in building package.(5 buildings) -Performing duties under direction of (Discipline) Superintendent. -Checking and evaluating subcontractor's current status within his work area. -Checking the work progress status of responsible area and assure that the work conforms to all technical requirements. -Coordinating work execution in my area with other concerned supervisor(s). -Prepare and direct daily log, weekly construction schedule, and monthly construction schedule within the area assigned. -Review and keep subcontractor's daily work report. -Determine detailed work method. -Expedite the delivery of the material which was scheduled to be supplied by company and subcontractor. -Preparing documents necessary for regular meetings, for both construction plan review and progress review. -Performing the inspection of items, if required and preparing inspection/ test reports. -Issuing Change Order, Extra Work Order, and Work Memorandum. -Assessing progress measurements and prepare a document for progress payment request. -Keeping progress photos and site history. -Overseeing subcontractor's manpower control status. -Supervising the labor to assure that safety regulation is observed and that safety equipment is available and ready for use. -Assisting in Material Controller's performance. -Performing unpacking and receiving inspection of material & equipment. -Preparing documents requested by Construction Superintendent or Field Engineer. --------------------------------------------
  • 4.
    FROM 01/09/2014 till01 (6.00 YEARS) From : 02/12/2012 till 01/09/2014 (22 months) Project : Grand Egyptian Museum Company: Budget : 800 000 000 $ Position: (construction manager) Project management (Consultant): Owner: The Government of the Arab Republic of Egypt represented by the Ministry of State for Antiquities/Supreme Council of Antiquities The project in brief • Museum & Conference Centre.. roofs consists of reinforced concrete structure resting at top of west walls while east wall supports the other side via steel posts; – Glass between steel post provides light to halls; – DS walls are resting on continuous strip footings; – Bands A to D: reinforced concrete; – Band E: pre-stressed concrete; • Steel roof with similar geometry is used for Entrance Courtyard, Food Court, Solar Boat Enclosure and Temple Garden • Tunnel connecting Main Building via Nilometer to Conservation Centre; • Café Dune • Ticketing and security buildings A & B • Water irrigation tank • Multi-storey car park • Coach park Responsibilities: #• Responsible for all operations on site (my area) from the commencing date up to ensure that the project is completed on time, budget and maintains all the standard procedures. #• Daily coordination with warehouses and equipments to get materials and equipment required for work . #• To specify the required technical and normal manpower who are required to implement works. #• Technical in coordination and supervision of construction at site, Dealing
  • 5.
    with contractors, monitoringprogress of works and regular reporting. #•Assisting in keeping and following of the Project’s Occupational Health & Safety Plan, to ensure a safe & secure implementation on site without accidents, perils or threats . #• Implementing the Project’s Quality Control / Quality Assurance Plan, to ensure quality implementation on site.(code used Aci,Bs ) #•Assisting in maintaining Archiving system, Daily Log, Weekly Progress Report and Monthly Status Reports. #•I control 2senior engs. +10 junior engineers ☺☺☺☺☺☺☺☺☺☺☺☺☺☺☺☺ _________________________ From : 02/11/2010 till 02/12/2012 (25 months) Project : El-Merk project. Central Processing Facility (lot1) And Telecommunication (lot7) _Algeria Company: Construction and Industries as a subcontractor. , as a main contractor Budget : 260 000 000 $ for Orascom scope only Position: Senior site engineer, (deputy construction manager) Owner : Sonatrach & Anadarko Consultant: QC petrofac &QC Anadarko The project in brief: civil works include pipe rack foundation, turbines foundations, control building, lab. building , steel structure racks , all underground piping works ( oily, potable water, sewage water, hot oil drained, fire fighting water lines, instrument air lines,… ) ,steel building with cladding and landscape works . Responsibilities: #• Responsible for all operations on site (my area) from the commencing date up to ensure that the project is completed on time, budget and maintains all the standard procedures. #• Daily coordination with warehouses and equipments to get materials and equipment required for work . #• To specify the required technical and normal manpower who are required to implement works. #• Technical in coordination and supervision of construction at site, Dealing with contractors, monitoring progress of works and regular reporting. #•Assisting in keeping and following of the Project’s Occupational Health & Safety Plan, to ensure a safe & secure implementation on site without
  • 6.
    accidents, perils orthreats . #• Implementing the Project’s Quality Control / Quality Assurance Plan, to ensure quality implementation on site.(code used Aci,Bs ) #•Assisting in maintaining Archiving system, Daily Log, Weekly Progress Report and Monthly Status Reports. #•I control 3 junior engineers, 1 senior engineer, 5 supervisor, 120 labors and subcontractors. Activities: I was responsible for, ………..control building (concrete, finishes works).building area 2700 m2 .ground floor .all concrete works. all kinds of finishes (((((suspended ceiling , marble cladding , ceramic cladding, MDF cladding , posters cladding , gypsum cladding , raised floors , HDF floors , marble floors , carpet tiles floors , ceramic floors , epoxy painted floor , gypsum partitions , glass wall partitions , curtain walls))))). ………. And all civil works related to underground piping coordinating with mechanical team. -------------------------------------------- ☺☺☺☺☺☺☺☺☺☺☺☺☺☺☺☺☺☺ From : 25/05/2008 till 01/11/2010 (30 months) Project : New LNG Skikda train project (Liquefy Natural Gas) Algeria Company: for Construction and Industries a subcontractor, II as a main contractor. Consultant: QC KBR&QC Sonatrach Budget : 280 000 000 $ for Orascom scope only Position : Senior site engineer. Owner : Sonatrach The project in brief: All civil works include pipe racks foundations, turbines foundations, control building, lab. Building, substation 1, 2, 3,4,5,7 and LNG, PROPANE and BUTANE tanks (concrete tanks). Responsibilities: #• Responsible for all operations on site from the commencing date up to ensure that the project is completed on time, budget and maintains all the standard procedures.(tanks) #• Technical in coordination and supervision of construction at site, Dealing with contractors, monitoring progress of works and regular reporting. #•Assisting in keeping and following of the Project’s Occupational Health & Safety Plan, to ensure a safe & secure implementation on site without accidents, perils or threats . #• Implementing the Project’s Quality Control / Quality Assurance Plan, to
  • 7.
    ensure quality implementationon site. .(code used Aci,Bs ) #•Assisting in maintaining Archiving system, Daily Log, Weekly Progress Report and Monthly Status Reports. #•I had controlled 1 junior engineers, 4 supervisor, 100 labors and subcontractors. -------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------- -------------------------------------------- FROM 30/05/2005 TILL 25/05/2008 (3YEARS) From : 31/06/2006 till 25/05/2008 (23 months) Project : Cairo Regional Processing Center. In smart village .Giza, Egypt Company: Main contractor: consortium of (siac) Industrial construction Engineering company & (Siemens) Main consultant: Archimid architects. Project manager: EGYCAN Budget : 65 000 000 $ Position : Senior site engineer. Owner : (HSBC) bank. Brief about the project: All civil works from A to Z . Project area 8000 m2 include building with area 5000 m2 .consist of two basements & ground floor and 4 floors. using prestressed concrete system (post tensions) in the slabs and beams & there were a lot of kinds of finishes (((((suspended ceiling , marble cladding , ceramic cladding, MDF cladding , posters cladding , gypsum cladding , raised floors , HDF floors , marble floors , carpet tiles floors , ceramic floors , epoxy painted floor , gypsum partitions , glass wall partitions , curtain walls , all kinds of elevations finishes , landscape works (fountains ,green areas , manholes ,hand holes, piping works, irrigation works) ,have the experience for the special conditions and requirements for the banks,,,,,,,,,,,,,,,,,,,,,,,,,,,,,))))) Responsibilities: #• Studying drawing and specifications which are required to achieve the elements of the project. #• Receiving drawing from construction manager. #• Daily walk through and completely supervision on all belonged activities. #• Daily coordination with warehouses and equipments to get materials and
  • 8.
    equipment required forwork . #• To specify the required technical and normal manpower who are required to implement works. #• Responsible for all operations on site from the commencing date up to ensure that the project is completed on time, budget and maintains all the standard procedures. #•Assisting in keeping and following of the Project’s Occupational Health & Safety Plan, to ensure a safe & secure implementation on site without accidents, perils or threats . #• Implementing the Project’s Quality Control / Quality Assurance Plan, to ensure quality implementation on site. .(code used Bs ) #•I had controlled 1 junior engineers, 3 supervisor, 75 labors and subcontractors. -------------------------------------------- -------------------------------------------- From : 03/05/2005 till 30/06/2006 (13 months) Project : Egyptian museum (second stage) Giza, Egypt Company: Main contractor consortium of (siac) Industrial construction Engineering company & . Main consultant: ACG Budget : 85 000 000 $ Position : Junior site engineer. Owner : Egyptian governorate. Brief about the project: All civil works. Project area 10000 m2 include building with area 7000 m2 .consist of two floors. All walls are reinforced concrete with 08.00 M height using DOKA shuttering. Responsibilities: #• Receiving drawing from construction manager. #• Daily walk through and completely supervision on all belonged activities. #• Achieving quality &aspects and all activities. #• Achieving HSSE requirements. -------------------------------------------- -------------------------------------------- ------ Had a private engineering office was called (Master) from 1/9/2003 till 01/05/2005 working in designing and supervising. -I have supervised about 10 factories with total cost 150 million e.l …. -I have designed and supervised about 50 of ordinary buildings with total
  • 9.
    cost 25 millione.l -I have designed about 5 towers13 floors with total cost 65 million e.l & 15 large factories with total cost 150 million e.l and I have supervised them from A to Z (R.C,P.C,block works, finishes works, landscape works ) -------------------------------------------- 01/08/2001 till 30/08/2003 (2 years) -------------------------------------------- From : 01/08/2001 till 30/09/2002 (13 months) Project : quesna sanitary station (quesna) Company: (ELNASR BUILDING&CONSTRUCTON COMPANY) EGYCO Budget : 5 000 000 e.l Position : junior site engineer. Brief about the project: three buildings, landscape …(area 2000 m2) -------------------------------------------- -------------------------------------------- From : 01/10/2002 till 30/08/2003 (11 months) Project : Students Housing& Sport club (El-Menofia university) Company: (ELNASR BUILDING&CONSTRUCTON COMPANY) EGYCO Budget : 25 000 000 e.l Position : junior site engineer. Owner : (El-Menofia University) Brief about the project: students housing include 80 rooms (concrete and civil) &swimming pool, landscape and three administration buildings… Qualifications:  Have good experience in cost &time management.  I finished P.M.P exam preparation (35hours) from egycham center  Have good experience in supervision .  Excellent in drawing by AutoCAD 2010.  Have a specials training in safety rules by KBR such as (fall prevention, TSTI total safety tasks instructions, TSTO total safety tasks observations, confined spaces, deep foundations)  Have a special training in safety (OSHA) Occupational Safety & Health Administration (I have the certificate)  -Have a course in Shaping Accident Free Environment S.A.F.E  Good in dealing with primavera.  Good in SAP.
  • 10.
     Good experiencein Leadership, Communication, Co-ordinating, Implementing ,Controlling and Monitoring.  know how to prevent before deal with problems.  Have high standards of accuracy and concerned with quality and the correct completion of tasks.  Extremely punctual and able to meet deadlines and work under pressure. Objectives: -To apply my experience and educational backgrounds to a civil engineering Position in a pioneer company whereby my skills can be further used and developed -Perform effectively both as an autonomous, self-motivated individual and as an active member of a decision-making team. -Adept in grasping new materials and modalities and interested in improving efficiency on assigned tasks. -------------------------------------------- -------------------------------------------- Availability : I'm able to start work immediately I can work in : All over the world Mohamed_HELAL961@YAHOO.COM Thank you for reading my C.V., I hope to join you soon, As I hope the more and more success for your Great Company. Yours Sincerely, Eng. /Mohammed Helal