The document provides an economic value validation of Aerohive's controller-less wireless architecture, highlighting its benefits over traditional controller-based solutions. Key advantages include significantly lower capital expenditures (capex), reduced operational expenditures (opex), simplified installation, and increased system resiliency. The analysis is based on customer interviews and identifies how organizations can streamline operations and improve wireless connectivity by adopting this innovative technology.