SlideShare a Scribd company logo
WEEKLY HSE UPDATES
09TH JAN 2023 TO 14TH JAN 2022
ESSOBIGI ENGINEER
KEY PERFORMANCE INDICATORS
Fatality
100%
Key Summary
Description Weekly
Cumulati
ve
No. of Safe
work days 06 89
No. of Safe
Man hours 272 6098
No. of Loss
time injury
cases (LTI) 000 00
LTIFR (loss
time injury
frequency
rate) 00 00
TIR (Total
incident
rate) 00 00
No. of BOS
_
Irreversible
Lost-Time
Medical Treatment
First Aid
Lagging
Indicators
Leading
Indicators
Fatality
Total
Incidents
Drivers
Recordable
Injuries
&
Illnesses
0
0
00
0
0
00
00
YTD (2022)
WTD’20 90 05 12 12 06 26 0 09 01 0 0
1410 135 261 261 93 426 07 115 01 02 0
WTD, 09th JAN to 14th JAN 2023
KEY PERFORMANCE INDICATORS
Fatality
100%
Contractors Details
Contractors
Man
Days
Weekly
Hours
TOTAL SAFE MANHOURS W/O
LTI
ESSOBIGI
ENGINEERING PVT
LTD.
06 48 6098
Leading Indicators
Weekly
Name of
Vendor
Cumulative
HSE Induction
completed
00 ESSOBIGI 07
Total permit issued
(General Work)
11 ESSOBIGI 156
Total high risk permit
issued
15 ESSOBIGI 225
Safety training man
hours
12 ESSOBIGI 261
Job related training
attendees
12 ESSOBIGI 261
TBT nos. 06 ESSOBIGI 93
Vehicle Inspection 01 ESSOBIGI 02
Power tools and
Equipment inspection
09 ESSOBIGI 115
Near Miss 00 ESSOBIGI 0
BOS 90 ESSOBIGI 1410
Unsafe Condition/Act 05 ESSOBIGI 135
Environment Factor
Weekly
Consumption Cumulative
Consumption of Drinking
Water
180 3765
TOOL BOX TALK AND SAFETY TRAINING WITH PHOTOS
S.NO TBT TOPICS
01 MANUAL HANDLING
02 ELECTRICAL SAFETY
03 GENERAL SAFETY RULES
04 FIRE WATCHER RESPONSIBILITY
05 HEIGHT WORK SAFETY
06 ROAD SAFETY AWARENESS
WEEKLY ONGOING & UPCOMING WEEK ACTIVITIES IN RESPECTIVE AREA
ON GOING
ACTIVITIES
Upcoming
activities
• C& C AREA SHUT DOWN WORK IN PROGRESS
• HYDRANT PIPE CONNECTION WORK IN 15.9 MTR LEVEL
• WRAPPING COATING WORK
• HOSE BOX SUPPORT FABRICATION WORK
• HOSE BOX SUPPORT FABRICATION WORK, WRAPPING &
COATING WORK
• PIPE PAINTING ,WRAPPING COATING WORK
• WRAPPING COATING WORK .
•
•HYDRANT PIPE SUPPORT ERECTION WORK.
•PIPE PAINTING WORK.
•SHUT DOWN WORK FOR HYDRANT LINE.
•SHUT DOWN WORK FOR HYDRANT LINE.
•SHUTDOWN WORK FOR SPRINKLER LINE ML-05 LINE.
•PIPE PAINTING ,WRAPPING COATING WORK.
•WRAPPING COATING WORK.
ACTIVITIES COMPLETED
Sprinkler header pipe & branch pipe fabrication completed
Sprinkler header grooving work completed
3 Inch pipe painting work completed.
Tie rod cutting work completed.
Pipe painting work completed.
Hydrant riser pipe fabrication completed.
Hose reel erection , connection work, fire extinguisher fixing mock up work.
Hydrant support erection work.
Wrapping coating work.
Shut down connection piece fabrication work
7mtr,11mtr,15.9mtr area sprinkler line paint touch up work
Pipe painting ,wrapping coating work.
Wrapping coating work
Vendor park
New building C3
TRANSFORMATION OF YOUR RESPECTIVE AREA PICS (BEFORE & AFTER)
BEFORE AFTER
POWER TOOLS AND TACKLES INSPECTION
MASS HOUSEKEEPING
ROAD SAFETY AWARENESS

More Related Content

Similar to ESB (09-14.01.23).pptx

Project Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioProject Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-Portfolio
Syed Arafath, PMI-SP certified
 
Gudekar Mitesh Dilipbhai
Gudekar Mitesh DilipbhaiGudekar Mitesh Dilipbhai
Gudekar Mitesh Dilipbhai
Mitesh Gudekar
 
Monthly Safety Report 2013 05_May
Monthly Safety Report 2013 05_MayMonthly Safety Report 2013 05_May
Monthly Safety Report 2013 05_May
ChinaHarbour
 
QC SUP CV
QC SUP CVQC SUP CV
QC SUP CV
Manoj dutt
 
Presntation (MNIT).pptx
Presntation (MNIT).pptxPresntation (MNIT).pptx
Presntation (MNIT).pptx
rajtashee725
 
PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2
HAIDER YOUNIS
 
Monthly Progress Report - September 2014
Monthly Progress Report - September 2014Monthly Progress Report - September 2014
Monthly Progress Report - September 2014
Sam Kendall, MSc, BSc Civil Eng., PMP®, MIEAust
 
Water pipe Lines Progress Planned Vs actual.pptx
Water pipe Lines  Progress Planned Vs actual.pptxWater pipe Lines  Progress Planned Vs actual.pptx
Water pipe Lines Progress Planned Vs actual.pptx
DILIP KUMAR M.Tech (ACT)
 
Crossrail Suppy Chain Engagement Seminar 2013 - Simon Poulter, Laing O'Rourke...
Crossrail Suppy Chain Engagement Seminar 2013 - Simon Poulter, Laing O'Rourke...Crossrail Suppy Chain Engagement Seminar 2013 - Simon Poulter, Laing O'Rourke...
Crossrail Suppy Chain Engagement Seminar 2013 - Simon Poulter, Laing O'Rourke...
Invest Northern Ireland
 
Journey to the year 2020 [Autosaved].pptx
Journey to the year 2020 [Autosaved].pptxJourney to the year 2020 [Autosaved].pptx
Journey to the year 2020 [Autosaved].pptx
NeelabhSrivastava4
 
Hussien Nasr, Resume
Hussien Nasr, ResumeHussien Nasr, Resume
Hussien Nasr, Resume
Hussien Nasr
 
Spatter Reduction by Prateek Biswas
Spatter Reduction by Prateek BiswasSpatter Reduction by Prateek Biswas
Spatter Reduction by Prateek Biswas
Prateek Biswas
 
SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........
yogeshpokharkar
 
mahadev prasad resume_feb2016
mahadev prasad resume_feb2016mahadev prasad resume_feb2016
mahadev prasad resume_feb2016
Mahadev Prasad
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
nader rizq
 
Monthly Safety Report 2013 06_Jun
Monthly Safety Report 2013 06_JunMonthly Safety Report 2013 06_Jun
Monthly Safety Report 2013 06_Jun
ChinaHarbour
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
hepemod733
 
C.V
C.VC.V
OMKAR ELECTRICALS PROFILE
OMKAR ELECTRICALS PROFILEOMKAR ELECTRICALS PROFILE
OMKAR ELECTRICALS PROFILE
JIGNESH TALATI
 
EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...
EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...
EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...
IRJET Journal
 

Similar to ESB (09-14.01.23).pptx (20)

Project Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioProject Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-Portfolio
 
Gudekar Mitesh Dilipbhai
Gudekar Mitesh DilipbhaiGudekar Mitesh Dilipbhai
Gudekar Mitesh Dilipbhai
 
Monthly Safety Report 2013 05_May
Monthly Safety Report 2013 05_MayMonthly Safety Report 2013 05_May
Monthly Safety Report 2013 05_May
 
QC SUP CV
QC SUP CVQC SUP CV
QC SUP CV
 
Presntation (MNIT).pptx
Presntation (MNIT).pptxPresntation (MNIT).pptx
Presntation (MNIT).pptx
 
PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2
 
Monthly Progress Report - September 2014
Monthly Progress Report - September 2014Monthly Progress Report - September 2014
Monthly Progress Report - September 2014
 
Water pipe Lines Progress Planned Vs actual.pptx
Water pipe Lines  Progress Planned Vs actual.pptxWater pipe Lines  Progress Planned Vs actual.pptx
Water pipe Lines Progress Planned Vs actual.pptx
 
Crossrail Suppy Chain Engagement Seminar 2013 - Simon Poulter, Laing O'Rourke...
Crossrail Suppy Chain Engagement Seminar 2013 - Simon Poulter, Laing O'Rourke...Crossrail Suppy Chain Engagement Seminar 2013 - Simon Poulter, Laing O'Rourke...
Crossrail Suppy Chain Engagement Seminar 2013 - Simon Poulter, Laing O'Rourke...
 
Journey to the year 2020 [Autosaved].pptx
Journey to the year 2020 [Autosaved].pptxJourney to the year 2020 [Autosaved].pptx
Journey to the year 2020 [Autosaved].pptx
 
Hussien Nasr, Resume
Hussien Nasr, ResumeHussien Nasr, Resume
Hussien Nasr, Resume
 
Spatter Reduction by Prateek Biswas
Spatter Reduction by Prateek BiswasSpatter Reduction by Prateek Biswas
Spatter Reduction by Prateek Biswas
 
SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........SIDDHITECH ENGINEERING PVT. LTD ( SEPL)  Profile.........
SIDDHITECH ENGINEERING PVT. LTD ( SEPL) Profile.........
 
mahadev prasad resume_feb2016
mahadev prasad resume_feb2016mahadev prasad resume_feb2016
mahadev prasad resume_feb2016
 
QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
 
Monthly Safety Report 2013 06_Jun
Monthly Safety Report 2013 06_JunMonthly Safety Report 2013 06_Jun
Monthly Safety Report 2013 06_Jun
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
C.V
C.VC.V
C.V
 
OMKAR ELECTRICALS PROFILE
OMKAR ELECTRICALS PROFILEOMKAR ELECTRICALS PROFILE
OMKAR ELECTRICALS PROFILE
 
EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...
EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...
EXPERIMENTAL ANALYSIS OF SEQUENCING BATCH REACTOR DESIGN AND OPERATIONAL CONS...
 

Recently uploaded

The last lesson in comic form for English art integrated project class 12
The last lesson in comic form for English art integrated project class 12The last lesson in comic form for English art integrated project class 12
The last lesson in comic form for English art integrated project class 12
YaiphabaChanam
 
美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】
美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】
美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】
jafiradnan336
 
Infineon_AURIX_HSM Revealed_Training_Slides.pdf
Infineon_AURIX_HSM Revealed_Training_Slides.pdfInfineon_AURIX_HSM Revealed_Training_Slides.pdf
Infineon_AURIX_HSM Revealed_Training_Slides.pdf
maicuongdt21
 
Kalyan chart DP boss guessing matka results
Kalyan chart DP boss guessing matka resultsKalyan chart DP boss guessing matka results
Kalyan chart DP boss guessing matka results
➑➌➋➑➒➎➑➑➊➍
 
Top-Quality AC Service for Mini Cooper Optimal Cooling Performance
Top-Quality AC Service for Mini Cooper Optimal Cooling PerformanceTop-Quality AC Service for Mini Cooper Optimal Cooling Performance
Top-Quality AC Service for Mini Cooper Optimal Cooling Performance
Motor Haus
 
欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】
欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】
欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】
arcosarturo900
 
定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样
定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样
定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样
utuvvas
 
hays salary report for 2024: check out your salaries here
hays salary report for 2024: check out your salaries herehays salary report for 2024: check out your salaries here
hays salary report for 2024: check out your salaries here
johnconnor370852
 
一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理
一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理
一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理
pycfbo
 
一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理
一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理
一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理
pycfbo
 
Catalogo de bujias Denso para motores de combustión interna
Catalogo de bujias Denso para motores de combustión internaCatalogo de bujias Denso para motores de combustión interna
Catalogo de bujias Denso para motores de combustión interna
Oscar Vásquez
 
一比一原版悉尼大学毕业证(USYD毕业证书)学历如何办理
一比一原版悉尼大学毕业证(USYD毕业证书)学历如何办理一比一原版悉尼大学毕业证(USYD毕业证书)学历如何办理
一比一原版悉尼大学毕业证(USYD毕业证书)学历如何办理
cenaws
 
Kenwood DDX71/491/471/371/3108/30718/271/2071 User Manual
Kenwood DDX71/491/471/371/3108/30718/271/2071 User ManualKenwood DDX71/491/471/371/3108/30718/271/2071 User Manual
Kenwood DDX71/491/471/371/3108/30718/271/2071 User Manual
derekmelino
 
欧洲杯足彩-滚球欧洲杯足彩-欧洲杯足彩滚球平台|【​网址​🎉ac123.net🎉​】
欧洲杯足彩-滚球欧洲杯足彩-欧洲杯足彩滚球平台|【​网址​🎉ac123.net🎉​】欧洲杯足彩-滚球欧洲杯足彩-欧洲杯足彩滚球平台|【​网址​🎉ac123.net🎉​】
欧洲杯足彩-滚球欧洲杯足彩-欧洲杯足彩滚球平台|【​网址​🎉ac123.net🎉​】
rllen35178
 
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
ggany
 
欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】
欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】
欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】
ramaysha335
 
gHSM Product Introduction 2022newdocumane.pdf
gHSM Product Introduction 2022newdocumane.pdfgHSM Product Introduction 2022newdocumane.pdf
gHSM Product Introduction 2022newdocumane.pdf
maicuongdt21
 
美洲杯押注靠谱的软件-美洲杯押注靠谱的软件推荐-美洲杯押注靠谱的软件|【​网址​🎉ac123.net🎉​】
美洲杯押注靠谱的软件-美洲杯押注靠谱的软件推荐-美洲杯押注靠谱的软件|【​网址​🎉ac123.net🎉​】美洲杯押注靠谱的软件-美洲杯押注靠谱的软件推荐-美洲杯押注靠谱的软件|【​网址​🎉ac123.net🎉​】
美洲杯押注靠谱的软件-美洲杯押注靠谱的软件推荐-美洲杯押注靠谱的软件|【​网址​🎉ac123.net🎉​】
andagarcia212
 
Cargdor frontal volvo L180E para trabajar en carga de rocas.
Cargdor frontal volvo L180E para trabajar en carga de rocas.Cargdor frontal volvo L180E para trabajar en carga de rocas.
Cargdor frontal volvo L180E para trabajar en carga de rocas.
Eloy Soto Gomez
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
g1inbfro
 

Recently uploaded (20)

The last lesson in comic form for English art integrated project class 12
The last lesson in comic form for English art integrated project class 12The last lesson in comic form for English art integrated project class 12
The last lesson in comic form for English art integrated project class 12
 
美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】
美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】
美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】
 
Infineon_AURIX_HSM Revealed_Training_Slides.pdf
Infineon_AURIX_HSM Revealed_Training_Slides.pdfInfineon_AURIX_HSM Revealed_Training_Slides.pdf
Infineon_AURIX_HSM Revealed_Training_Slides.pdf
 
Kalyan chart DP boss guessing matka results
Kalyan chart DP boss guessing matka resultsKalyan chart DP boss guessing matka results
Kalyan chart DP boss guessing matka results
 
Top-Quality AC Service for Mini Cooper Optimal Cooling Performance
Top-Quality AC Service for Mini Cooper Optimal Cooling PerformanceTop-Quality AC Service for Mini Cooper Optimal Cooling Performance
Top-Quality AC Service for Mini Cooper Optimal Cooling Performance
 
欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】
欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】
欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】
 
定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样
定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样
定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样
 
hays salary report for 2024: check out your salaries here
hays salary report for 2024: check out your salaries herehays salary report for 2024: check out your salaries here
hays salary report for 2024: check out your salaries here
 
一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理
一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理
一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理
 
一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理
一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理
一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理
 
Catalogo de bujias Denso para motores de combustión interna
Catalogo de bujias Denso para motores de combustión internaCatalogo de bujias Denso para motores de combustión interna
Catalogo de bujias Denso para motores de combustión interna
 
一比一原版悉尼大学毕业证(USYD毕业证书)学历如何办理
一比一原版悉尼大学毕业证(USYD毕业证书)学历如何办理一比一原版悉尼大学毕业证(USYD毕业证书)学历如何办理
一比一原版悉尼大学毕业证(USYD毕业证书)学历如何办理
 
Kenwood DDX71/491/471/371/3108/30718/271/2071 User Manual
Kenwood DDX71/491/471/371/3108/30718/271/2071 User ManualKenwood DDX71/491/471/371/3108/30718/271/2071 User Manual
Kenwood DDX71/491/471/371/3108/30718/271/2071 User Manual
 
欧洲杯足彩-滚球欧洲杯足彩-欧洲杯足彩滚球平台|【​网址​🎉ac123.net🎉​】
欧洲杯足彩-滚球欧洲杯足彩-欧洲杯足彩滚球平台|【​网址​🎉ac123.net🎉​】欧洲杯足彩-滚球欧洲杯足彩-欧洲杯足彩滚球平台|【​网址​🎉ac123.net🎉​】
欧洲杯足彩-滚球欧洲杯足彩-欧洲杯足彩滚球平台|【​网址​🎉ac123.net🎉​】
 
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
 
欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】
欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】
欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】
 
gHSM Product Introduction 2022newdocumane.pdf
gHSM Product Introduction 2022newdocumane.pdfgHSM Product Introduction 2022newdocumane.pdf
gHSM Product Introduction 2022newdocumane.pdf
 
美洲杯押注靠谱的软件-美洲杯押注靠谱的软件推荐-美洲杯押注靠谱的软件|【​网址​🎉ac123.net🎉​】
美洲杯押注靠谱的软件-美洲杯押注靠谱的软件推荐-美洲杯押注靠谱的软件|【​网址​🎉ac123.net🎉​】美洲杯押注靠谱的软件-美洲杯押注靠谱的软件推荐-美洲杯押注靠谱的软件|【​网址​🎉ac123.net🎉​】
美洲杯押注靠谱的软件-美洲杯押注靠谱的软件推荐-美洲杯押注靠谱的软件|【​网址​🎉ac123.net🎉​】
 
Cargdor frontal volvo L180E para trabajar en carga de rocas.
Cargdor frontal volvo L180E para trabajar en carga de rocas.Cargdor frontal volvo L180E para trabajar en carga de rocas.
Cargdor frontal volvo L180E para trabajar en carga de rocas.
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
 

ESB (09-14.01.23).pptx

  • 1. WEEKLY HSE UPDATES 09TH JAN 2023 TO 14TH JAN 2022 ESSOBIGI ENGINEER
  • 2. KEY PERFORMANCE INDICATORS Fatality 100% Key Summary Description Weekly Cumulati ve No. of Safe work days 06 89 No. of Safe Man hours 272 6098 No. of Loss time injury cases (LTI) 000 00 LTIFR (loss time injury frequency rate) 00 00 TIR (Total incident rate) 00 00 No. of BOS _ Irreversible Lost-Time Medical Treatment First Aid Lagging Indicators Leading Indicators Fatality Total Incidents Drivers Recordable Injuries & Illnesses 0 0 00 0 0 00 00 YTD (2022) WTD’20 90 05 12 12 06 26 0 09 01 0 0 1410 135 261 261 93 426 07 115 01 02 0 WTD, 09th JAN to 14th JAN 2023
  • 3. KEY PERFORMANCE INDICATORS Fatality 100% Contractors Details Contractors Man Days Weekly Hours TOTAL SAFE MANHOURS W/O LTI ESSOBIGI ENGINEERING PVT LTD. 06 48 6098 Leading Indicators Weekly Name of Vendor Cumulative HSE Induction completed 00 ESSOBIGI 07 Total permit issued (General Work) 11 ESSOBIGI 156 Total high risk permit issued 15 ESSOBIGI 225 Safety training man hours 12 ESSOBIGI 261 Job related training attendees 12 ESSOBIGI 261 TBT nos. 06 ESSOBIGI 93 Vehicle Inspection 01 ESSOBIGI 02 Power tools and Equipment inspection 09 ESSOBIGI 115 Near Miss 00 ESSOBIGI 0 BOS 90 ESSOBIGI 1410 Unsafe Condition/Act 05 ESSOBIGI 135 Environment Factor Weekly Consumption Cumulative Consumption of Drinking Water 180 3765
  • 4. TOOL BOX TALK AND SAFETY TRAINING WITH PHOTOS S.NO TBT TOPICS 01 MANUAL HANDLING 02 ELECTRICAL SAFETY 03 GENERAL SAFETY RULES 04 FIRE WATCHER RESPONSIBILITY 05 HEIGHT WORK SAFETY 06 ROAD SAFETY AWARENESS
  • 5. WEEKLY ONGOING & UPCOMING WEEK ACTIVITIES IN RESPECTIVE AREA ON GOING ACTIVITIES Upcoming activities • C& C AREA SHUT DOWN WORK IN PROGRESS • HYDRANT PIPE CONNECTION WORK IN 15.9 MTR LEVEL • WRAPPING COATING WORK • HOSE BOX SUPPORT FABRICATION WORK • HOSE BOX SUPPORT FABRICATION WORK, WRAPPING & COATING WORK • PIPE PAINTING ,WRAPPING COATING WORK • WRAPPING COATING WORK . • •HYDRANT PIPE SUPPORT ERECTION WORK. •PIPE PAINTING WORK. •SHUT DOWN WORK FOR HYDRANT LINE. •SHUT DOWN WORK FOR HYDRANT LINE. •SHUTDOWN WORK FOR SPRINKLER LINE ML-05 LINE. •PIPE PAINTING ,WRAPPING COATING WORK. •WRAPPING COATING WORK.
  • 6. ACTIVITIES COMPLETED Sprinkler header pipe & branch pipe fabrication completed Sprinkler header grooving work completed 3 Inch pipe painting work completed. Tie rod cutting work completed. Pipe painting work completed. Hydrant riser pipe fabrication completed. Hose reel erection , connection work, fire extinguisher fixing mock up work. Hydrant support erection work. Wrapping coating work. Shut down connection piece fabrication work 7mtr,11mtr,15.9mtr area sprinkler line paint touch up work Pipe painting ,wrapping coating work. Wrapping coating work Vendor park New building C3
  • 7. TRANSFORMATION OF YOUR RESPECTIVE AREA PICS (BEFORE & AFTER) BEFORE AFTER
  • 8. POWER TOOLS AND TACKLES INSPECTION