Cannon Place, London, UK
Laing O'Rourke Crossrail
Projects (C502 C422 & C520),
Projects update
2
Make your main title for each page in
the body of the text – 24pt Arial bold
• Second level copy runs from this point, please type over this paragraph to create text on your pages
• Third level – Use the guides on this page for lining up copy and pictures
• Fourth level
• Fifth level
© Laing O’Rourke 2012, all rights reserved
3
Make your main title for each page in
the body of the text – 24pt Arial bold
• Second level copy runs from this point, please type over this paragraph to create text on your pages
• Third level – Use the guides on this page for lining up copy and pictures
• Fourth level
• Fifth level
© Laing O’Rourke 2012, all rights reserved
44 © Laing O’Rourke 2012, all rights reserved
So what are the Laing O’Rourke Crossrail Opportunities?
55 © Laing O’Rourke 2012, all rights reserved
The Projects:
C502 Liverpool Street
C422 Tottenham Court Road
C520 Custom House
66
‘Three Projects. One Team.’
Supply Chain opportunities within the one team model.
© Laing O’Rourke 2012, all rights reserved
Projects
C422 C502 C520
2013
Noise & Vibration Monitoring
Precast Concrete Works
Substructure Works
Reinforcement
Superstructure Works
2014
Cladding
Structural Steelwork
Metal Doors
Glazed Canopy
M & E Works
2015
Drylining
FF&E Works
Decoration
Landscaping
Commissioning
77
C502 – Liverpool Street Station
© Laing O’Rourke 2012, all rights reserved
88
Broadgate Ticket Hall including
the Link Passageway AP8
Moorgate work includes:
• Moorgate Ticket Hall
• Highwalk access at Moorfields
• Completion of Moor House Draft relief ventilation shaft
Blomfield Box
Moorgate Shaft work includes:
• Moorgate Shaft internal structure
• Stabilisation and monitoring of 8 Moorfield & 87
Moorgate
Finsbury work includes:
• Finsbury Circus access shaft
• Finsbury Circus Gardens
Tunnel work includes:
• Internal Structure
• Fit-out, test and commissioning
Project Overview
99
C502 – Liverpool Street Station
Construction Programme
© Laing O’Rourke 2012, all rights reserved
Year Construction Programme
2012
Project Start Up
30.04.12 Start Date
OCI Design & Validation
Aug 12 Commence first work site – BBX ventilation shaft
2013
Design & Procurement
Blomfield box piling and substructures
Dec 2013 start Broadgate worksite
Arup design stage F
Procurement phase (most packages let in 2013)
2014
Substructures / structures
Blomfield box substructures
Broadgate piling and substructures
August 2014 - Moorgate ticket hall works commence – Demolition / structures
Dec Tunnel works site starts
2015
Structures & Envelope
Blomfield box structures complete / Envelope and fit out starts
Broadgate Ticket hall structures complete / waterproofing
Moorgate Ticket hall – structures
July – Moorgate shaft worksite starts
Tunnel structures & fit out starts
2016
Fit Out
Services & fit out underway to all worksites
2017
Complete fit and commission
Fit out completed to all worksites by mid 2017
Testing & Commissioning phase
2018
Integrated commissioning & pre operation activities
System wide commissioning
Operational readiness
Handover activities
Aug 2018 completion
1010
C422 – Tottenham Court Road
© Laing O’Rourke 2012, all rights reserved
1111
Project overview
© Laing O’Rourke 2012, all rights reserved
Western Ticket Hall
(WTH)
Dean Street Box Centre Point
Central Line
Goslett Yard
Box (GYB)
Eastbound
CRL Tunnel
Westbound
CRL Tunnel
Northern Line
1212
C422 – Tottenham Court Road
Construction Programme
© Laing O’Rourke 2012, all rights reserved
Year Construction Programme
2012
Project Start Up
16.07.12 Start date
OCI Design & Validation
2013
Design & Procurement
WSP design stage F
Procurement phase
2014
Substructures / structures
Completion of WSP Design / Design Acceptances/ Gate 3 Sign Offs
Conclusion of Package Procurement
Western Ticket Hall (WTH) Structures
Commence Goslett Yard Box (GYB) Structures
July - Tunnel site works starts
2015
Structures & Envelope
WTH & GYB Envelope Works
WTH Fitout
WTH and GYB systemwide installation to vent shafts
GYB Fitout
2016
Fit Out
Services & fit out underway to all worksites
Systemwide access to equipment rooms
2017
Complete fit and commission
Fit out complete to all WTH and GYB by early 2017
Testing & Commissioning phase
2018
Integrated commissioning & pre operation activities
Fit out complete to all platforms and tunnels by early 2018
System wide commissioning
Operational readiness
Handover activities
Aug 2018 completion
1313
C520 Custom House
© Laing O’Rourke 2012, all rights reserved
1414
Project overview
© Laing O’Rourke 2012, all rights reserved
1515
C520 – Custom House
Procurement Programme
© Laing O’Rourke 2012, all rights reserved
Year Construction Programme
2012
Project Start Up
28th September 2012 Start date
OCI Design & Validation
2013
Design, Procurement Substructure & Superstructure
All design works
March 2013 – Piling works
June 2013 – Substructure
September 2013 – Superstructure
Ramboll design stage F
Procurement phase (majority of packages let in 2013)
2014
Superstructure, Fit-out and M&E works
April 2014 – ExCeL bridge installation
August 2014 – Commence station entrance
Dec Tunnel works site starts
2015
Internal Finishes works
April 2015 – DLR Bridge works
April 2015 – Commission Station Entrance
May 2015 – Remove temporary bridge
May 2015 – Hand Over
2016
Crossrail works
Station Wide Services
2017 No Laing O’Rourke works
2018 Integrated commissioning on permanent services
1616 © Laing O’Rourke 2012, all rights reserved
LO’R
Crossrail
Preferred
Supply Chain
Partner
Financial
Appraisal (D&B
Report)
Financial
Capacity
Checks
Health & Safety
Checks (SSIP
& Building
Confidence)
Past
Performance
Data
Subcontractor
Questionnaire
Compete For
How to become a LO’R Crossrail supply chain partner?
1717 © Laing O’Rourke 2012, all rights reserved
✓
X
Supplier Turnover (£) Total Package Value April 13 - March 14 % of t/o April 14 - March 15 % of t/o April 15 - March 16 % of t/o
£ 12,654,248.00 £ 2,271,202.30 £245,535.38 2% £1,104,909.23 9% £920,757.69 7%
£ 3,133,000.00 £ 2,271,202.30 £245,535.38 8% £1,104,909.23 35% £920,757.69 29%
£ 2,479,595.00 £ 2,271,202.30 £245,535.38 10% £1,104,909.23 45% £920,757.69 37%
£ 955,188.00 £ 2,271,202.30 £245,535.38 26% £1,104,909.23 116% £920,757.69 96%
£ 8,859,045.00 £ 2,271,202.30 £245,535.38 3% £1,104,909.23 12% £920,757.69 10%
1818 © Laing O’Rourke 2012, all rights reserved
“Our mission is to act as an umbrella organisation to
facilitate mutual recognition between health and safety pre-
qualification schemes wherever it is practicable to do so"
Within SSIP there are:
• 39 Registered Members
• 7 Affiliate Members
• 3 Co-opted Members
Delivering trusted, meaningful connections
Achilles BuildingConfidence is and online accreditation standard used
by 19 buyer organisations and over 1,500 suppliers in the UK
construction sector.
1919
Past Performance
© Laing O’Rourke 2012, all rights reserved
SubContractor Questionnaire
2020 © Laing O’Rourke 2012, all rights reserved
Question: Please confirm if you were to sub-contract any works specifically for this scheme,
that you would comply with the Crossrail requirements to source potential subcontractors
through CompeteFor
Project
Title
Valued Opportunities on
Compete For
C502 £ 20,930,758.92
C422 £ 5,215,021.00
C520 £ 2,751,326.00
2121 © Laing O’Rourke 2012, all rights reserved
Compete For
• Compete For Tailored Questionnaire
• Answers Scored
• Anonymous Long list turned Top Eight Shortlist
Potential Tender
Schedule
• Compete For Shortlist
• LO’R Tiered Supply Chain
• Past Performance, SSIP, Building Confidence, DNBi, Capacity Modelling
Approved Tender
List
• Approved Tender List issued to Crossrail
2222
Unique Position
Three Projects. One Team
Significant Opportunities
Compete For
© Laing O’Rourke 2012, all rights reserved
© Laing O’Rourke 2012, all rights reserved.
No part of this presentation may be reproduced, stored on a retrieval system, disclosed or transmitted, in any form or by any
means, electronic, mechanical, photocopying, recording or otherwise, without prior permission of the copyright owner.
Thank You

More Related Content

Similar to Crossrail Suppy Chain Engagement Seminar 2013 - Simon Poulter, Laing O'Rourke - Crossrail Projects

PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2
HAIDER YOUNIS
 
Offshore Engineering Corporate Presentation-June-2016
Offshore Engineering Corporate Presentation-June-2016Offshore Engineering Corporate Presentation-June-2016
Offshore Engineering Corporate Presentation-June-2016
Offshore Engineering
 
Datoba Presentation 2015 22-04-15 REV 4 Eng
Datoba Presentation 2015 22-04-15 REV 4 EngDatoba Presentation 2015 22-04-15 REV 4 Eng
Datoba Presentation 2015 22-04-15 REV 4 Eng
Arman Mussin
 
Woodbar Corporate Brochure
Woodbar Corporate BrochureWoodbar Corporate Brochure
Woodbar Corporate Brochure
Barry Robinson
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE Navy
Mike Bisland
 
Elcord Capability Statement Rev 11 July 2015
Elcord Capability Statement Rev 11 July 2015Elcord Capability Statement Rev 11 July 2015
Elcord Capability Statement Rev 11 July 2015
Sam Morrison
 
GARYCV_2015_Dec_complete
GARYCV_2015_Dec_completeGARYCV_2015_Dec_complete
GARYCV_2015_Dec_complete
Gary Randall
 
01 CV 2016 Simon Barkley (1)
01 CV  2016 Simon Barkley  (1)01 CV  2016 Simon Barkley  (1)
01 CV 2016 Simon Barkley (1)
Simon Barkley
 

Similar to Crossrail Suppy Chain Engagement Seminar 2013 - Simon Poulter, Laing O'Rourke - Crossrail Projects (20)

PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2
 
Logistics 2013: Stephen Carr
Logistics 2013: Stephen Carr Logistics 2013: Stephen Carr
Logistics 2013: Stephen Carr
 
body Intern Anteneh.pdf
body Intern Anteneh.pdfbody Intern Anteneh.pdf
body Intern Anteneh.pdf
 
Able construction pte ltd company profile
Able construction pte ltd   company profileAble construction pte ltd   company profile
Able construction pte ltd company profile
 
RWE Mynydd y Gwair Supply Chain Event - Tim James / Kirsty Curry
RWE Mynydd y Gwair Supply Chain Event - Tim James / Kirsty CurryRWE Mynydd y Gwair Supply Chain Event - Tim James / Kirsty Curry
RWE Mynydd y Gwair Supply Chain Event - Tim James / Kirsty Curry
 
How to Prepare your SOP for Real Estate Developer & Contractor
How to Prepare your SOP for Real Estate Developer & ContractorHow to Prepare your SOP for Real Estate Developer & Contractor
How to Prepare your SOP for Real Estate Developer & Contractor
 
HOW TO PREPARE YOUR REAL ESTATE DEVELOPMENT & CONSTRUCTION STANDARD OPERATING...
HOW TO PREPARE YOUR REAL ESTATE DEVELOPMENT & CONSTRUCTION STANDARD OPERATING...HOW TO PREPARE YOUR REAL ESTATE DEVELOPMENT & CONSTRUCTION STANDARD OPERATING...
HOW TO PREPARE YOUR REAL ESTATE DEVELOPMENT & CONSTRUCTION STANDARD OPERATING...
 
Offshore Engineering Corporate Presentation-June-2016
Offshore Engineering Corporate Presentation-June-2016Offshore Engineering Corporate Presentation-June-2016
Offshore Engineering Corporate Presentation-June-2016
 
Corporate member event September 2015, BIM and Soft Landings
Corporate member event September 2015, BIM and Soft LandingsCorporate member event September 2015, BIM and Soft Landings
Corporate member event September 2015, BIM and Soft Landings
 
Datoba Presentation 2015 22-04-15 REV 4 Eng
Datoba Presentation 2015 22-04-15 REV 4 EngDatoba Presentation 2015 22-04-15 REV 4 Eng
Datoba Presentation 2015 22-04-15 REV 4 Eng
 
Woodbar Corporate Brochure
Woodbar Corporate BrochureWoodbar Corporate Brochure
Woodbar Corporate Brochure
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE Navy
 
Baytree Dagenham Brochure
Baytree Dagenham BrochureBaytree Dagenham Brochure
Baytree Dagenham Brochure
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13
 
Architectural Aluminium Ltd. Company Update Spring 2018
Architectural Aluminium Ltd. Company Update Spring 2018Architectural Aluminium Ltd. Company Update Spring 2018
Architectural Aluminium Ltd. Company Update Spring 2018
 
Elcord Capability Statement Rev 11 July 2015
Elcord Capability Statement Rev 11 July 2015Elcord Capability Statement Rev 11 July 2015
Elcord Capability Statement Rev 11 July 2015
 
GRUG 12 April 2013 opening presentation 20130423
GRUG 12 April 2013 opening presentation 20130423GRUG 12 April 2013 opening presentation 20130423
GRUG 12 April 2013 opening presentation 20130423
 
GARYCV_2015_Dec_complete
GARYCV_2015_Dec_completeGARYCV_2015_Dec_complete
GARYCV_2015_Dec_complete
 
01 CV 2016 Simon Barkley (1)
01 CV  2016 Simon Barkley  (1)01 CV  2016 Simon Barkley  (1)
01 CV 2016 Simon Barkley (1)
 
Tekla Global BIM Awards 2012
Tekla Global BIM Awards 2012Tekla Global BIM Awards 2012
Tekla Global BIM Awards 2012
 

More from Invest Northern Ireland

More from Invest Northern Ireland (20)

Grant writing masterclass 16 August 2019
Grant writing masterclass 16 August 2019Grant writing masterclass 16 August 2019
Grant writing masterclass 16 August 2019
 
Horizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & ManufacturingHorizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & Manufacturing
 
Horizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & ManufacturingHorizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & Manufacturing
 
Horizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & ManufacturingHorizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & Manufacturing
 
Horizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & ManufacturingHorizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & Manufacturing
 
Horizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & ManufacturingHorizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & Manufacturing
 
Horizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & ManufacturingHorizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & Manufacturing
 
Funding for Innovation in ICT 21 May 2019
Funding for Innovation in ICT 21 May 2019Funding for Innovation in ICT 21 May 2019
Funding for Innovation in ICT 21 May 2019
 
Innovate UK funding application answer guide slides
Innovate UK funding application answer guide slidesInnovate UK funding application answer guide slides
Innovate UK funding application answer guide slides
 
Finance Options in a Dynamic Environment
Finance Options in a Dynamic EnvironmentFinance Options in a Dynamic Environment
Finance Options in a Dynamic Environment
 
Invest NI Brexit Information Workshop - February 2019
Invest NI Brexit Information Workshop - February 2019Invest NI Brexit Information Workshop - February 2019
Invest NI Brexit Information Workshop - February 2019
 
Design for Export
Design for ExportDesign for Export
Design for Export
 
Design for Export
Design for ExportDesign for Export
Design for Export
 
Design for Export
Design for ExportDesign for Export
Design for Export
 
Presentation - Funding for Innovation in Life & Health Sciences
Presentation - Funding for Innovation in Life & Health SciencesPresentation - Funding for Innovation in Life & Health Sciences
Presentation - Funding for Innovation in Life & Health Sciences
 
Stephen McComb - Masterclass - Funding for Innovation in Life & Health Sciences
Stephen McComb - Masterclass - Funding for Innovation in Life & Health SciencesStephen McComb - Masterclass - Funding for Innovation in Life & Health Sciences
Stephen McComb - Masterclass - Funding for Innovation in Life & Health Sciences
 
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
 
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
 
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
 
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
 

Recently uploaded

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
 

Recently uploaded (20)

Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 

Crossrail Suppy Chain Engagement Seminar 2013 - Simon Poulter, Laing O'Rourke - Crossrail Projects

  • 1. Cannon Place, London, UK Laing O'Rourke Crossrail Projects (C502 C422 & C520), Projects update
  • 2. 2 Make your main title for each page in the body of the text – 24pt Arial bold • Second level copy runs from this point, please type over this paragraph to create text on your pages • Third level – Use the guides on this page for lining up copy and pictures • Fourth level • Fifth level © Laing O’Rourke 2012, all rights reserved
  • 3. 3 Make your main title for each page in the body of the text – 24pt Arial bold • Second level copy runs from this point, please type over this paragraph to create text on your pages • Third level – Use the guides on this page for lining up copy and pictures • Fourth level • Fifth level © Laing O’Rourke 2012, all rights reserved
  • 4. 44 © Laing O’Rourke 2012, all rights reserved So what are the Laing O’Rourke Crossrail Opportunities?
  • 5. 55 © Laing O’Rourke 2012, all rights reserved The Projects: C502 Liverpool Street C422 Tottenham Court Road C520 Custom House
  • 6. 66 ‘Three Projects. One Team.’ Supply Chain opportunities within the one team model. © Laing O’Rourke 2012, all rights reserved Projects C422 C502 C520 2013 Noise & Vibration Monitoring Precast Concrete Works Substructure Works Reinforcement Superstructure Works 2014 Cladding Structural Steelwork Metal Doors Glazed Canopy M & E Works 2015 Drylining FF&E Works Decoration Landscaping Commissioning
  • 7. 77 C502 – Liverpool Street Station © Laing O’Rourke 2012, all rights reserved
  • 8. 88 Broadgate Ticket Hall including the Link Passageway AP8 Moorgate work includes: • Moorgate Ticket Hall • Highwalk access at Moorfields • Completion of Moor House Draft relief ventilation shaft Blomfield Box Moorgate Shaft work includes: • Moorgate Shaft internal structure • Stabilisation and monitoring of 8 Moorfield & 87 Moorgate Finsbury work includes: • Finsbury Circus access shaft • Finsbury Circus Gardens Tunnel work includes: • Internal Structure • Fit-out, test and commissioning Project Overview
  • 9. 99 C502 – Liverpool Street Station Construction Programme © Laing O’Rourke 2012, all rights reserved Year Construction Programme 2012 Project Start Up 30.04.12 Start Date OCI Design & Validation Aug 12 Commence first work site – BBX ventilation shaft 2013 Design & Procurement Blomfield box piling and substructures Dec 2013 start Broadgate worksite Arup design stage F Procurement phase (most packages let in 2013) 2014 Substructures / structures Blomfield box substructures Broadgate piling and substructures August 2014 - Moorgate ticket hall works commence – Demolition / structures Dec Tunnel works site starts 2015 Structures & Envelope Blomfield box structures complete / Envelope and fit out starts Broadgate Ticket hall structures complete / waterproofing Moorgate Ticket hall – structures July – Moorgate shaft worksite starts Tunnel structures & fit out starts 2016 Fit Out Services & fit out underway to all worksites 2017 Complete fit and commission Fit out completed to all worksites by mid 2017 Testing & Commissioning phase 2018 Integrated commissioning & pre operation activities System wide commissioning Operational readiness Handover activities Aug 2018 completion
  • 10. 1010 C422 – Tottenham Court Road © Laing O’Rourke 2012, all rights reserved
  • 11. 1111 Project overview © Laing O’Rourke 2012, all rights reserved Western Ticket Hall (WTH) Dean Street Box Centre Point Central Line Goslett Yard Box (GYB) Eastbound CRL Tunnel Westbound CRL Tunnel Northern Line
  • 12. 1212 C422 – Tottenham Court Road Construction Programme © Laing O’Rourke 2012, all rights reserved Year Construction Programme 2012 Project Start Up 16.07.12 Start date OCI Design & Validation 2013 Design & Procurement WSP design stage F Procurement phase 2014 Substructures / structures Completion of WSP Design / Design Acceptances/ Gate 3 Sign Offs Conclusion of Package Procurement Western Ticket Hall (WTH) Structures Commence Goslett Yard Box (GYB) Structures July - Tunnel site works starts 2015 Structures & Envelope WTH & GYB Envelope Works WTH Fitout WTH and GYB systemwide installation to vent shafts GYB Fitout 2016 Fit Out Services & fit out underway to all worksites Systemwide access to equipment rooms 2017 Complete fit and commission Fit out complete to all WTH and GYB by early 2017 Testing & Commissioning phase 2018 Integrated commissioning & pre operation activities Fit out complete to all platforms and tunnels by early 2018 System wide commissioning Operational readiness Handover activities Aug 2018 completion
  • 13. 1313 C520 Custom House © Laing O’Rourke 2012, all rights reserved
  • 14. 1414 Project overview © Laing O’Rourke 2012, all rights reserved
  • 15. 1515 C520 – Custom House Procurement Programme © Laing O’Rourke 2012, all rights reserved Year Construction Programme 2012 Project Start Up 28th September 2012 Start date OCI Design & Validation 2013 Design, Procurement Substructure & Superstructure All design works March 2013 – Piling works June 2013 – Substructure September 2013 – Superstructure Ramboll design stage F Procurement phase (majority of packages let in 2013) 2014 Superstructure, Fit-out and M&E works April 2014 – ExCeL bridge installation August 2014 – Commence station entrance Dec Tunnel works site starts 2015 Internal Finishes works April 2015 – DLR Bridge works April 2015 – Commission Station Entrance May 2015 – Remove temporary bridge May 2015 – Hand Over 2016 Crossrail works Station Wide Services 2017 No Laing O’Rourke works 2018 Integrated commissioning on permanent services
  • 16. 1616 © Laing O’Rourke 2012, all rights reserved LO’R Crossrail Preferred Supply Chain Partner Financial Appraisal (D&B Report) Financial Capacity Checks Health & Safety Checks (SSIP & Building Confidence) Past Performance Data Subcontractor Questionnaire Compete For How to become a LO’R Crossrail supply chain partner?
  • 17. 1717 © Laing O’Rourke 2012, all rights reserved ✓ X Supplier Turnover (£) Total Package Value April 13 - March 14 % of t/o April 14 - March 15 % of t/o April 15 - March 16 % of t/o £ 12,654,248.00 £ 2,271,202.30 £245,535.38 2% £1,104,909.23 9% £920,757.69 7% £ 3,133,000.00 £ 2,271,202.30 £245,535.38 8% £1,104,909.23 35% £920,757.69 29% £ 2,479,595.00 £ 2,271,202.30 £245,535.38 10% £1,104,909.23 45% £920,757.69 37% £ 955,188.00 £ 2,271,202.30 £245,535.38 26% £1,104,909.23 116% £920,757.69 96% £ 8,859,045.00 £ 2,271,202.30 £245,535.38 3% £1,104,909.23 12% £920,757.69 10%
  • 18. 1818 © Laing O’Rourke 2012, all rights reserved “Our mission is to act as an umbrella organisation to facilitate mutual recognition between health and safety pre- qualification schemes wherever it is practicable to do so" Within SSIP there are: • 39 Registered Members • 7 Affiliate Members • 3 Co-opted Members Delivering trusted, meaningful connections Achilles BuildingConfidence is and online accreditation standard used by 19 buyer organisations and over 1,500 suppliers in the UK construction sector.
  • 19. 1919 Past Performance © Laing O’Rourke 2012, all rights reserved SubContractor Questionnaire
  • 20. 2020 © Laing O’Rourke 2012, all rights reserved Question: Please confirm if you were to sub-contract any works specifically for this scheme, that you would comply with the Crossrail requirements to source potential subcontractors through CompeteFor Project Title Valued Opportunities on Compete For C502 £ 20,930,758.92 C422 £ 5,215,021.00 C520 £ 2,751,326.00
  • 21. 2121 © Laing O’Rourke 2012, all rights reserved Compete For • Compete For Tailored Questionnaire • Answers Scored • Anonymous Long list turned Top Eight Shortlist Potential Tender Schedule • Compete For Shortlist • LO’R Tiered Supply Chain • Past Performance, SSIP, Building Confidence, DNBi, Capacity Modelling Approved Tender List • Approved Tender List issued to Crossrail
  • 22. 2222 Unique Position Three Projects. One Team Significant Opportunities Compete For © Laing O’Rourke 2012, all rights reserved
  • 23. © Laing O’Rourke 2012, all rights reserved. No part of this presentation may be reproduced, stored on a retrieval system, disclosed or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without prior permission of the copyright owner. Thank You