Enterprise Resources Planning
November 18, 2023
Presentation on Procurement of
1) IFMIS
2) RMS &
3) PM Consultancy
Key
Parameters
RMS IFMIS
Project
Duration
4.5 Years
Implementation -1.5 Yr,
Support Extension 3 Yrs.)
5 Years
Implementation -2 Yrs,
Support Extension 3 Yrs.
Geographical
Coverage
20-25 Locations
(Kathmandu and nearby)
All offices of NEA
Functional
Coverage
IFMIS
• Financial Management
• Asset Management
• Inventory Management
• Payroll
• Project Accounting
• Employee Claims &
Retirement Benefits
IFMIS and RMS
• Financial Management
• Asset Management
• Inventory Management
• Payroll
• Human Resource
Management System
• Project Accounting
• Metering
• Billing and Collection
• Energy Audit
2
Scope of Work (RMS & IFMIS)
3
RMS: Scope of Work
 Supply, delivery, design, customization, integration,
implementation, testing, commissioning of Hardware/ software of
the RMS with FMS, including Data Migration & Change
Management and Capacity Building.
 COTS database, Middleware, Network and customer care
equipment and other software in conformance to Industry
standards and installation & maintenance of necessary
infrastructure (at DC &DR).
 Total period of contract is 4.5 years (1.5yrs for Implementation &
FMS and 3yrs for support.) During the FMS period, the SI shall
provide manpower &technical support services.
4
RMS: Key Considerations
 Software License for 6 million consumers. (5.08m, 8%,3%,3%,3%)
 Annual Technical Services (ATS) are computed @ 22% of the RMS
License Cost per year.
 Hardware Infrastructure requirements for DC and DRC
 Annual Maintenance Cost (AMC) @ 10% of HW Cost per year.
 Capacity Building : 700 RMS Users, 14 Executive Users (Abroad).
 FMS: Man-month Rate : Same till Go-Live, 10% Y-o-Y thereafter.
5
RMS: Modules
Major Modules FRS Count
1. Metering 21
2. Billing 55
3. Collection 18
4. New Connection, Disconnection & Reconnection 50
5. Energy Audit 7
Supporting Modules
6 Management information System (MIS) 12
7. Document Management System (DMS) 13
8. Customer Relationship Management (CRM) 48
9. Web Portal and Mobile Application 19
10. Customer Care Centre (CCC)
6
RMS: Project Timeline
Project Activities M01 M02 M03 M04 M05 M06 M07 M08 M09 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19
Project Initiation
Business Blueprinting
Design & Customization
Data Migration
IT infra setup for DC , DRC & CCC
Pilot Rollout
Training and Change Management
Enterprise wide roll out
Stabilization Support
FMS 3 Yrs
7
RMS: Eligibility Qualification Criteria
Scoring Matrix
SI’s Strength Product OEM’s Strength
RMS Implementation 60 15
Team Composition 10
Approach and Methodology 15
Totals 85 15
Technical Qualifying Score = 60%
Weight for the Bid Price as specified in BDS = 40%
Weight of the Bid Technical score = 60%
Compliance to the Functional Requirement Specifications (FRS) mentioned in the RFP for major modules as
standard is 85% . Less than 85% shall be termed as non-responsive.
8
IFMIS: Scope of work
 Supply, delivery, design, customization, integration,
implementation, testing, commissioning of Hardware/ software of
the IFMIS with FMS, including Data Migration & Change
Management and Capacity Building.
 COTS database, Middleware, Network and customer care
equipment and other software in conformance to Industry
standards and installation & maintenance of necessary
infrastructure (at DC &DR).
 Total period of contract is 5 years (2yrs for Implementation &
FMS and 3yrs for support.) During the FMS period, the SI shall
provide manpower & technical support services.
9
IFMIS: Key Considerations
 Software License for 1600 full enterprise users. Additional 400.
 Annual Technical Services (ATS) are computed @ 22% of the
IFMIS License Cost per year.
 Hardware Infrastructure requirements for DC and DRC
 Annual Maintenance Cost (AMC) @ 10% of HW Cost per year.
 Capacity Building : 2000 Users, 15 Executive Users (Abroad).
 FMS: Man-month Rate : Same till Go-Live, 10% Y-o-Y thereafter.
10
IFMIS: Project Timeline
Project Activities M01 M02 M03 M04 M05 M06 M07 M08 M09 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25
Project Initiation
Business Blueprinting
Design & Customization
Data Migration
IT infra setup for DC , DRC & CCC
Pilot Rollout
Training and Change Management
Enterprise wide roll out
Stabilization Support
FMS 3 Yrs
11
Recommendation
• The extension cost initial quoted, Final
revised and EY estimated = 1.66
• Recommendation from EY to float the RFP
with 3 years extension.
• Extension of 3 years has been considered
with a perception to take over the FMS by
NEA IT team.
12
IFMIS: Modules
Major Modules FRS Count
1. Financial Management 697
2. Material Management 259
3. Human Resource Management 496
4. Project Management 227
5. Maintenance Management 515
6. Production Planning 96
Supporting Modules
6 Linear Asset Management 11
7. Document and File Management 90
8. BI & BW 35
9. Mobile Application 80
10.
Employee Self Services (ESS) & Manager Self Services
(MSS)
87
13
Project Management Consultant
 Expression of Interest (EoI) and Terms of Reference (ToR)
published
 Fourteen International Firms submitted the EoI
 Committee Shortlisted 6 Firms
 RFP to be finalized and submitted to ADB
 Budget approved was 1 million USD and approved was 0.8
million USD excluding applicable taxes and VAT in Nepal.
14
Recommendations Expected–1
 Team Composition:
RMS: Provincial Managers - Bachelor Degree in Electrical/ Electronics/ IT/
Computer Science or related fields and 5 years of experience on RMS
implementation.
IFMIS: Assistant Project Manager - Bachelor Degree in Electrical/ Electronics/ IT/
Computer Science or related fields and 5 years of experience on IFMIS
implementation.
Provincial Managers and Assistant Project Managers are to be deputed from in-
house.
 Evaluation of CVs
RMS: Evaluation of CVs of Project Manager and Provincial Managers only.
IFMIS: Evaluation of Project Manager and Assistant Project Managers only.
CVs of the Key Experts are to be evaluated.
 PQ: The proposed product should be of latest version and the OEM should have a future
Roadmap - for IFMIS required for the next 10 (ten) years and for RMS required for the
15
Recommendations Expected–2
 Technical Score QCBS Requirement :
Minimum Technical Score Required: 60% (IFMIS and RMS)
IFMIS: 60% –30%
RMS: 70% –30%
 ERP Professional User License Requirement
NEA’s License Requirement = 1600
Requirement in PQ/TQ: 300
Bring Down it in PQ/TQ to 200
 Confirmation on Extension period to be considered
16
Recommendations Expected–3
 Potential bidders pool is same for all the three procurements.
 Bidders from the Consultants category such as PwC, Deloitte
and KPMG also fulfill the PQ and TQ criteria set for SIs of
both the procurements.
 All the bidders will be allowed to participate in all the three
tenders.
 Selection of the top three PMC consultants will be done.
 If the bidder selected for consultant also gets selected as SI in
either or both of the procurements, then the bidder has to
work as the SI for NEA.
 This condition is to be included in the RFP for PMC.
17
Recommendations Expected–4
 ToR clearly stating the Scope of Work of the Consultant EY
 Deputed by ADB upon request from NEA
 Need the support from the consultant in bid process
management
 Approach and Methodology evaluation required expert
recommendation
18
Thank You

More Related Content

Similar to ERP for Power Sector Utility - an approach.pptx

Resume_RamVerma
Resume_RamVermaResume_RamVerma
Resume_RamVermaRam Verma
 
U2 chap1 itsm service design
U2 chap1 itsm service designU2 chap1 itsm service design
U2 chap1 itsm service designMusTufa Nullwala
 
Saravanan_Sambantham_TPM
Saravanan_Sambantham_TPMSaravanan_Sambantham_TPM
Saravanan_Sambantham_TPMshravansam
 
Prolifics Managed Services Offering
Prolifics Managed Services OfferingProlifics Managed Services Offering
Prolifics Managed Services Offeringvenkata burra
 
Career Snapshot
Career SnapshotCareer Snapshot
Career SnapshotAyan Kar
 
Strategic Partnership for Rail IT Engagement
Strategic Partnership for Rail IT EngagementStrategic Partnership for Rail IT Engagement
Strategic Partnership for Rail IT EngagementTim Groenwals
 
Service North 2018 - ABB's SIAM journey
Service North 2018 - ABB's SIAM journeyService North 2018 - ABB's SIAM journey
Service North 2018 - ABB's SIAM journeyScopism
 
Agile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal Maan
Agile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal MaanAgile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal Maan
Agile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal MaanAgileNetwork
 
Making the Business Case for Remote Service Capabilities
Making the Business Case for Remote Service CapabilitiesMaking the Business Case for Remote Service Capabilities
Making the Business Case for Remote Service CapabilitiesPTC
 
Capacity and Demand Management
Capacity and Demand ManagementCapacity and Demand Management
Capacity and Demand ManagementVishwanath Ramdas
 
KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6keith inman
 
XYNTECH SOLUTIONS (P) LIMITED
XYNTECH SOLUTIONS (P) LIMITEDXYNTECH SOLUTIONS (P) LIMITED
XYNTECH SOLUTIONS (P) LIMITEDGautam Vadnere
 

Similar to ERP for Power Sector Utility - an approach.pptx (20)

Rendering Enterprise Content Management Strategies Operational
Rendering Enterprise Content Management Strategies OperationalRendering Enterprise Content Management Strategies Operational
Rendering Enterprise Content Management Strategies Operational
 
Resume_RamVerma
Resume_RamVermaResume_RamVerma
Resume_RamVerma
 
U2 chap1 itsm service design
U2 chap1 itsm service designU2 chap1 itsm service design
U2 chap1 itsm service design
 
Darshana D Patil
Darshana D PatilDarshana D Patil
Darshana D Patil
 
Saravanan_Sambantham_TPM
Saravanan_Sambantham_TPMSaravanan_Sambantham_TPM
Saravanan_Sambantham_TPM
 
Al Mateus Oct2010 2
Al Mateus Oct2010 2Al Mateus Oct2010 2
Al Mateus Oct2010 2
 
T. Kiran
T. KiranT. Kiran
T. Kiran
 
Prolifics Managed Services Offering
Prolifics Managed Services OfferingProlifics Managed Services Offering
Prolifics Managed Services Offering
 
Ayan Kar
Ayan KarAyan Kar
Ayan Kar
 
Career Snapshot
Career SnapshotCareer Snapshot
Career Snapshot
 
Strategic Partnership for Rail IT Engagement
Strategic Partnership for Rail IT EngagementStrategic Partnership for Rail IT Engagement
Strategic Partnership for Rail IT Engagement
 
TPG CV_update 04042016
TPG CV_update 04042016TPG CV_update 04042016
TPG CV_update 04042016
 
Service North 2018 - ABB's SIAM journey
Service North 2018 - ABB's SIAM journeyService North 2018 - ABB's SIAM journey
Service North 2018 - ABB's SIAM journey
 
Agile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal Maan
Agile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal MaanAgile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal Maan
Agile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal Maan
 
Making the Business Case for Remote Service Capabilities
Making the Business Case for Remote Service CapabilitiesMaking the Business Case for Remote Service Capabilities
Making the Business Case for Remote Service Capabilities
 
Capacity and Demand Management
Capacity and Demand ManagementCapacity and Demand Management
Capacity and Demand Management
 
New_Sandeep_Kumar
New_Sandeep_KumarNew_Sandeep_Kumar
New_Sandeep_Kumar
 
Chandrashekhar resume
Chandrashekhar resumeChandrashekhar resume
Chandrashekhar resume
 
KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6KI_res_24_yrs_exp_big_6
KI_res_24_yrs_exp_big_6
 
XYNTECH SOLUTIONS (P) LIMITED
XYNTECH SOLUTIONS (P) LIMITEDXYNTECH SOLUTIONS (P) LIMITED
XYNTECH SOLUTIONS (P) LIMITED
 

More from Roshni814224

Emerging Global Trends in Internet of Things.pptx
Emerging Global Trends in Internet of Things.pptxEmerging Global Trends in Internet of Things.pptx
Emerging Global Trends in Internet of Things.pptxRoshni814224
 
Emerging IT Trends and Innovation Concepts.pptx
Emerging IT Trends and Innovation Concepts.pptxEmerging IT Trends and Innovation Concepts.pptx
Emerging IT Trends and Innovation Concepts.pptxRoshni814224
 
Introduction to E-Commerce and Components.pptx
Introduction to E-Commerce and Components.pptxIntroduction to E-Commerce and Components.pptx
Introduction to E-Commerce and Components.pptxRoshni814224
 
Business Information Systems in firms.pptx
Business Information Systems in firms.pptxBusiness Information Systems in firms.pptx
Business Information Systems in firms.pptxRoshni814224
 
Strategic Information System in Business Firm.ppt
Strategic Information System in Business Firm.pptStrategic Information System in Business Firm.ppt
Strategic Information System in Business Firm.pptRoshni814224
 
Management Information System Applications.pptx
Management Information System Applications.pptxManagement Information System Applications.pptx
Management Information System Applications.pptxRoshni814224
 
The Concepts of Internet and Networking.pptx
The Concepts of Internet and Networking.pptxThe Concepts of Internet and Networking.pptx
The Concepts of Internet and Networking.pptxRoshni814224
 
Integrity Constraints in Database Management System.ppt
Integrity Constraints in Database Management System.pptIntegrity Constraints in Database Management System.ppt
Integrity Constraints in Database Management System.pptRoshni814224
 
Data models in Database Management Systems.ppt
Data models in Database Management Systems.pptData models in Database Management Systems.ppt
Data models in Database Management Systems.pptRoshni814224
 
Transaction Management, Recovery and Query Processing.pptx
Transaction Management, Recovery and Query Processing.pptxTransaction Management, Recovery and Query Processing.pptx
Transaction Management, Recovery and Query Processing.pptxRoshni814224
 
Computer System Software Component Details.pptx
Computer System Software Component Details.pptxComputer System Software Component Details.pptx
Computer System Software Component Details.pptxRoshni814224
 
Social Engineering and Identity Theft.pptx
Social Engineering and Identity Theft.pptxSocial Engineering and Identity Theft.pptx
Social Engineering and Identity Theft.pptxRoshni814224
 
Cyber Security and Data Privacy in Information Systems.pptx
Cyber Security and Data Privacy in Information Systems.pptxCyber Security and Data Privacy in Information Systems.pptx
Cyber Security and Data Privacy in Information Systems.pptxRoshni814224
 
Information Systems, Organizations and Strategy.pptx
Information Systems, Organizations and Strategy.pptxInformation Systems, Organizations and Strategy.pptx
Information Systems, Organizations and Strategy.pptxRoshni814224
 
Information Systems in Global Business Today.pptx
Information Systems in Global Business Today.pptxInformation Systems in Global Business Today.pptx
Information Systems in Global Business Today.pptxRoshni814224
 
Applications of Management Information System.pptx
Applications of Management Information System.pptxApplications of Management Information System.pptx
Applications of Management Information System.pptxRoshni814224
 
Securing Management Information Systems.ppt
Securing Management Information Systems.pptSecuring Management Information Systems.ppt
Securing Management Information Systems.pptRoshni814224
 
relational model in Database Management.ppt.ppt
relational model in Database Management.ppt.pptrelational model in Database Management.ppt.ppt
relational model in Database Management.ppt.pptRoshni814224
 
Database Management System Security.pptx
Database Management System  Security.pptxDatabase Management System  Security.pptx
Database Management System Security.pptxRoshni814224
 
Normalization in Database Management System.pptx
Normalization in Database Management System.pptxNormalization in Database Management System.pptx
Normalization in Database Management System.pptxRoshni814224
 

More from Roshni814224 (20)

Emerging Global Trends in Internet of Things.pptx
Emerging Global Trends in Internet of Things.pptxEmerging Global Trends in Internet of Things.pptx
Emerging Global Trends in Internet of Things.pptx
 
Emerging IT Trends and Innovation Concepts.pptx
Emerging IT Trends and Innovation Concepts.pptxEmerging IT Trends and Innovation Concepts.pptx
Emerging IT Trends and Innovation Concepts.pptx
 
Introduction to E-Commerce and Components.pptx
Introduction to E-Commerce and Components.pptxIntroduction to E-Commerce and Components.pptx
Introduction to E-Commerce and Components.pptx
 
Business Information Systems in firms.pptx
Business Information Systems in firms.pptxBusiness Information Systems in firms.pptx
Business Information Systems in firms.pptx
 
Strategic Information System in Business Firm.ppt
Strategic Information System in Business Firm.pptStrategic Information System in Business Firm.ppt
Strategic Information System in Business Firm.ppt
 
Management Information System Applications.pptx
Management Information System Applications.pptxManagement Information System Applications.pptx
Management Information System Applications.pptx
 
The Concepts of Internet and Networking.pptx
The Concepts of Internet and Networking.pptxThe Concepts of Internet and Networking.pptx
The Concepts of Internet and Networking.pptx
 
Integrity Constraints in Database Management System.ppt
Integrity Constraints in Database Management System.pptIntegrity Constraints in Database Management System.ppt
Integrity Constraints in Database Management System.ppt
 
Data models in Database Management Systems.ppt
Data models in Database Management Systems.pptData models in Database Management Systems.ppt
Data models in Database Management Systems.ppt
 
Transaction Management, Recovery and Query Processing.pptx
Transaction Management, Recovery and Query Processing.pptxTransaction Management, Recovery and Query Processing.pptx
Transaction Management, Recovery and Query Processing.pptx
 
Computer System Software Component Details.pptx
Computer System Software Component Details.pptxComputer System Software Component Details.pptx
Computer System Software Component Details.pptx
 
Social Engineering and Identity Theft.pptx
Social Engineering and Identity Theft.pptxSocial Engineering and Identity Theft.pptx
Social Engineering and Identity Theft.pptx
 
Cyber Security and Data Privacy in Information Systems.pptx
Cyber Security and Data Privacy in Information Systems.pptxCyber Security and Data Privacy in Information Systems.pptx
Cyber Security and Data Privacy in Information Systems.pptx
 
Information Systems, Organizations and Strategy.pptx
Information Systems, Organizations and Strategy.pptxInformation Systems, Organizations and Strategy.pptx
Information Systems, Organizations and Strategy.pptx
 
Information Systems in Global Business Today.pptx
Information Systems in Global Business Today.pptxInformation Systems in Global Business Today.pptx
Information Systems in Global Business Today.pptx
 
Applications of Management Information System.pptx
Applications of Management Information System.pptxApplications of Management Information System.pptx
Applications of Management Information System.pptx
 
Securing Management Information Systems.ppt
Securing Management Information Systems.pptSecuring Management Information Systems.ppt
Securing Management Information Systems.ppt
 
relational model in Database Management.ppt.ppt
relational model in Database Management.ppt.pptrelational model in Database Management.ppt.ppt
relational model in Database Management.ppt.ppt
 
Database Management System Security.pptx
Database Management System  Security.pptxDatabase Management System  Security.pptx
Database Management System Security.pptx
 
Normalization in Database Management System.pptx
Normalization in Database Management System.pptxNormalization in Database Management System.pptx
Normalization in Database Management System.pptx
 

Recently uploaded

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterMateoGardella
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 

Recently uploaded (20)

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 

ERP for Power Sector Utility - an approach.pptx

  • 1. 1 Enterprise Resources Planning November 18, 2023 Presentation on Procurement of 1) IFMIS 2) RMS & 3) PM Consultancy
  • 2. Key Parameters RMS IFMIS Project Duration 4.5 Years Implementation -1.5 Yr, Support Extension 3 Yrs.) 5 Years Implementation -2 Yrs, Support Extension 3 Yrs. Geographical Coverage 20-25 Locations (Kathmandu and nearby) All offices of NEA Functional Coverage IFMIS • Financial Management • Asset Management • Inventory Management • Payroll • Project Accounting • Employee Claims & Retirement Benefits IFMIS and RMS • Financial Management • Asset Management • Inventory Management • Payroll • Human Resource Management System • Project Accounting • Metering • Billing and Collection • Energy Audit 2 Scope of Work (RMS & IFMIS)
  • 3. 3 RMS: Scope of Work  Supply, delivery, design, customization, integration, implementation, testing, commissioning of Hardware/ software of the RMS with FMS, including Data Migration & Change Management and Capacity Building.  COTS database, Middleware, Network and customer care equipment and other software in conformance to Industry standards and installation & maintenance of necessary infrastructure (at DC &DR).  Total period of contract is 4.5 years (1.5yrs for Implementation & FMS and 3yrs for support.) During the FMS period, the SI shall provide manpower &technical support services.
  • 4. 4 RMS: Key Considerations  Software License for 6 million consumers. (5.08m, 8%,3%,3%,3%)  Annual Technical Services (ATS) are computed @ 22% of the RMS License Cost per year.  Hardware Infrastructure requirements for DC and DRC  Annual Maintenance Cost (AMC) @ 10% of HW Cost per year.  Capacity Building : 700 RMS Users, 14 Executive Users (Abroad).  FMS: Man-month Rate : Same till Go-Live, 10% Y-o-Y thereafter.
  • 5. 5 RMS: Modules Major Modules FRS Count 1. Metering 21 2. Billing 55 3. Collection 18 4. New Connection, Disconnection & Reconnection 50 5. Energy Audit 7 Supporting Modules 6 Management information System (MIS) 12 7. Document Management System (DMS) 13 8. Customer Relationship Management (CRM) 48 9. Web Portal and Mobile Application 19 10. Customer Care Centre (CCC)
  • 6. 6 RMS: Project Timeline Project Activities M01 M02 M03 M04 M05 M06 M07 M08 M09 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 Project Initiation Business Blueprinting Design & Customization Data Migration IT infra setup for DC , DRC & CCC Pilot Rollout Training and Change Management Enterprise wide roll out Stabilization Support FMS 3 Yrs
  • 7. 7 RMS: Eligibility Qualification Criteria Scoring Matrix SI’s Strength Product OEM’s Strength RMS Implementation 60 15 Team Composition 10 Approach and Methodology 15 Totals 85 15 Technical Qualifying Score = 60% Weight for the Bid Price as specified in BDS = 40% Weight of the Bid Technical score = 60% Compliance to the Functional Requirement Specifications (FRS) mentioned in the RFP for major modules as standard is 85% . Less than 85% shall be termed as non-responsive.
  • 8. 8 IFMIS: Scope of work  Supply, delivery, design, customization, integration, implementation, testing, commissioning of Hardware/ software of the IFMIS with FMS, including Data Migration & Change Management and Capacity Building.  COTS database, Middleware, Network and customer care equipment and other software in conformance to Industry standards and installation & maintenance of necessary infrastructure (at DC &DR).  Total period of contract is 5 years (2yrs for Implementation & FMS and 3yrs for support.) During the FMS period, the SI shall provide manpower & technical support services.
  • 9. 9 IFMIS: Key Considerations  Software License for 1600 full enterprise users. Additional 400.  Annual Technical Services (ATS) are computed @ 22% of the IFMIS License Cost per year.  Hardware Infrastructure requirements for DC and DRC  Annual Maintenance Cost (AMC) @ 10% of HW Cost per year.  Capacity Building : 2000 Users, 15 Executive Users (Abroad).  FMS: Man-month Rate : Same till Go-Live, 10% Y-o-Y thereafter.
  • 10. 10 IFMIS: Project Timeline Project Activities M01 M02 M03 M04 M05 M06 M07 M08 M09 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 Project Initiation Business Blueprinting Design & Customization Data Migration IT infra setup for DC , DRC & CCC Pilot Rollout Training and Change Management Enterprise wide roll out Stabilization Support FMS 3 Yrs
  • 11. 11 Recommendation • The extension cost initial quoted, Final revised and EY estimated = 1.66 • Recommendation from EY to float the RFP with 3 years extension. • Extension of 3 years has been considered with a perception to take over the FMS by NEA IT team.
  • 12. 12 IFMIS: Modules Major Modules FRS Count 1. Financial Management 697 2. Material Management 259 3. Human Resource Management 496 4. Project Management 227 5. Maintenance Management 515 6. Production Planning 96 Supporting Modules 6 Linear Asset Management 11 7. Document and File Management 90 8. BI & BW 35 9. Mobile Application 80 10. Employee Self Services (ESS) & Manager Self Services (MSS) 87
  • 13. 13 Project Management Consultant  Expression of Interest (EoI) and Terms of Reference (ToR) published  Fourteen International Firms submitted the EoI  Committee Shortlisted 6 Firms  RFP to be finalized and submitted to ADB  Budget approved was 1 million USD and approved was 0.8 million USD excluding applicable taxes and VAT in Nepal.
  • 14. 14 Recommendations Expected–1  Team Composition: RMS: Provincial Managers - Bachelor Degree in Electrical/ Electronics/ IT/ Computer Science or related fields and 5 years of experience on RMS implementation. IFMIS: Assistant Project Manager - Bachelor Degree in Electrical/ Electronics/ IT/ Computer Science or related fields and 5 years of experience on IFMIS implementation. Provincial Managers and Assistant Project Managers are to be deputed from in- house.  Evaluation of CVs RMS: Evaluation of CVs of Project Manager and Provincial Managers only. IFMIS: Evaluation of Project Manager and Assistant Project Managers only. CVs of the Key Experts are to be evaluated.  PQ: The proposed product should be of latest version and the OEM should have a future Roadmap - for IFMIS required for the next 10 (ten) years and for RMS required for the
  • 15. 15 Recommendations Expected–2  Technical Score QCBS Requirement : Minimum Technical Score Required: 60% (IFMIS and RMS) IFMIS: 60% –30% RMS: 70% –30%  ERP Professional User License Requirement NEA’s License Requirement = 1600 Requirement in PQ/TQ: 300 Bring Down it in PQ/TQ to 200  Confirmation on Extension period to be considered
  • 16. 16 Recommendations Expected–3  Potential bidders pool is same for all the three procurements.  Bidders from the Consultants category such as PwC, Deloitte and KPMG also fulfill the PQ and TQ criteria set for SIs of both the procurements.  All the bidders will be allowed to participate in all the three tenders.  Selection of the top three PMC consultants will be done.  If the bidder selected for consultant also gets selected as SI in either or both of the procurements, then the bidder has to work as the SI for NEA.  This condition is to be included in the RFP for PMC.
  • 17. 17 Recommendations Expected–4  ToR clearly stating the Scope of Work of the Consultant EY  Deputed by ADB upon request from NEA  Need the support from the consultant in bid process management  Approach and Methodology evaluation required expert recommendation