SlideShare a Scribd company logo
1 of 16
ERECTION AND
COMMISSIONING OF THE NEW
GAS COMPRESSOR PACKAGE
PRESENTED BY:
JOGANI DHRUVIKKUMAR ASHOKBHAI (OIL ID : 204588)
SENIOR OFFICER ON PROBATION
GAS MANAGEMENT SERVICES DEPARTMENT
MENTOR:
MR. TASRIQUE HAQUE,
DEPUTY CHIEF ENGINEER
GAS MANAGEMENT SERVICES DEPARTMENT
Fourth Quarterly Assessment
NEW GAS COMPRESSOR PACKAGE
SPECIFICATION
MODEL WAUKESHA
F3514
DISPLACEMENT
VOLUME
3520
BHP 493
COMPRESSION
RATIO
8:1
BORE AND
STROKE
9.375” & 8.5”
IGNITION Turbo Charged
Intercool
NO. OF
CYLINDER
6
RATED RPM 900
ENGINE
MODEL 8” & 4.7
5” x 6HOS2-2
NO. OF THROW 2
CYLINDER TYPE HOS
SERVICE Gas Lift
TOTAL
COMPRESSION
BHP
287 KW
NO. OF STAGE 2
RATED
DISCHARGE
PRESSURE
1450 PSIG
COMPRESSOR
MODEL 60F4
FAN DIAMETER 60 inch
DIRVE ENGINE
DRIVE
FAN
ORIENTATION
VERTICAL
TOTAL NOS. FAN 4
AERIAL COOLER
FOUNDATION PREPARATION
Anti Vibration
Pads
TYPES OF FOUNDATION
CC METRESS GRAVEL PACK
Construction Old Compressor Package
Replacement job
Material Cement and Concrete
Anti Vibration
Pad
YES
Job
Completion
Time
10-11 days + 5-6 days + 35-40
days +
20 – 25 days = 70-75 days
Construction New Compressor Package
Installation job
Material Gavel Pack(15mm gravel+75 mm
Gravel + Brick Soil)
Anti Vibration
Pad
NO
Job
Completion
Time
35-40 days + 20 – 25 days = 60-62
days
Compressor Skid
Placement On The
Foundation
• Compressor skid placed on the
foundation
• Alignment of compressor skid on
the foundation
Compressor Skid
ENGINE
PLACEMENT ON
SKID AND
ALINGNMENT
• Engine placement behind
the compressor
• Rough alignment
• Coupling Fitting
• Final alignment
F-3514 Engine
Engine Placement On
Erection of the Aerial
Cooler Assembly
• Dimension verification of
the Aerial cooler assembly
foundation
• Proper Alignment between
engine shaft and aerial
cooler
Aerial Cooler Assembly
Foundation
Placement of Aerial Cooler Assembly
Upliftment of Aerial
Cooler
INSTALLATION
OF CYLINDER
ASSEMBLY AND
PULSATION
BOTTLE
• Shaft alignment of Engine
and Compressor
• Installation of the cylinder
assembly on both side
• Installation of pulsation bottle
on the both cylinder .
• Head end and Crank End
clearance measurement in
both stages cylinder.
Crank-Frame without
Cylinder
Cylinder Bottle
Crank-Frame with
Cylinder
FIRST
PRE-LUBE OF
ENGINE
- Checking of the clean Engine
oil filter
- Filling of the lube oil in Engine
oil filter
- Level check of lube oil engine
sump
- Instrument air connection to
Pre-lube pump
- Start of pre-lube pump and
verification lube oil circulation
in rocker arm.
Rocker Arm Filling of Lube Oil
Pre-Lube Pump
Erection of Cooling
System Tank And
Silencer Assembly
• Foundation marking for
the both assembly on the
ground
• Preparation of the
foundation
Silencer Erection Foundation Marking
Engine Jacket and Auxiliary water expansion
Tank
PIPE
CONNECTION &
MAIN LINE HOOK
UP
• Pipe connection between the
compressor cooling system
and engine cooling system
to the Aerial Cooler.
• Fuel line, Suction and
Discharge Line connection,
Blowdown line, Instrument
air, Drain Line and Starting
Air Line connection to
respective main header line.
• Last stage grounting Flange
leakage check
Main Line Header
PRECONDITIONING
OF CONTROL
PANEL
• 230 V A.C. to 24 V D.C.
• Cold loop test
• MCB Check
• Software installation
• Trip test
Control Panel
Configuration
Float Cum Booster Panel
COMISSIONING OF THE NEW GAS
COMPRESSOR PACKAGE
• Mechanical Run Test
- Starting Air Line And Fuel Line
Flushed Out
- Removal Of Discharge Valve Cover
- Removal Of Spark Plug With Ignition Coil
- Manual Pre-lube Of Compressor
Discharge Valve Cover
Removed
Dry Cranking
Spark Plug Removed
Cylinder
LOAD AND
UNLOAD
TEST • 2 Hour Unload Run Test Without Gas Charge
• 2 Hour Load Run Test With Gas Charge
• Hot Alignment Of Engine And Compressor Shaft
• Final 72 Hour Full Load Run Test
Hot Alignment Process And Equipment
Monitoring Of
Crucial Parameters
• Suction & Discharge pressure
of both stages.
• Suction & Discharge
temperature of both stages.
• Compressor and Engine Lube
Oil pressure
• Exhaust Manifold Temperature
• Engine RPM
Control Panel Screen
THANK YOU!

More Related Content

Similar to Erection and commissioning of the new compressor package.pptx

Kc-5 gas turbine auraiya pata
Kc-5 gas turbine auraiya pataKc-5 gas turbine auraiya pata
Kc-5 gas turbine auraiya pataRahul Yadav
 
Ps families
Ps familiesPs families
Ps familiestsalas47
 
ICE_22_Chapter 4.v2.ppt
ICE_22_Chapter 4.v2.pptICE_22_Chapter 4.v2.ppt
ICE_22_Chapter 4.v2.pptishi67
 
Summer Internship final reports
Summer Internship final reportsSummer Internship final reports
Summer Internship final reportsvivek srivastava
 
Engine Introduction.pptx
Engine Introduction.pptxEngine Introduction.pptx
Engine Introduction.pptxSujit Regmi
 
Engine Introduction.pptx
Engine Introduction.pptxEngine Introduction.pptx
Engine Introduction.pptxSujit Regmi
 
Diesel common rail basic
Diesel common rail basicDiesel common rail basic
Diesel common rail basicMas Tress
 
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdfVolvo L330C Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdff8iosedkdm3e
 
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdfVolvo L330C Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdffijsekkkdmdm3e
 
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdfVolvo L330C Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdffapanhe306271
 
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdfVolvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdffijsekkkdmdm3e
 
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdfVolvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdff8iosedkdm3e
 
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdfVolvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdffapanhe306271
 
Inplant training report
Inplant training reportInplant training report
Inplant training reportapplesam8
 
4_5857344967990577973222222222222233.pdf
4_5857344967990577973222222222222233.pdf4_5857344967990577973222222222222233.pdf
4_5857344967990577973222222222222233.pdfamirph70
 
Y2 PUMPS TRAINING FOR OIL AND GAS OPERATION.ppt
Y2 PUMPS TRAINING FOR OIL AND GAS OPERATION.pptY2 PUMPS TRAINING FOR OIL AND GAS OPERATION.ppt
Y2 PUMPS TRAINING FOR OIL AND GAS OPERATION.pptssuser2ec709
 

Similar to Erection and commissioning of the new compressor package.pptx (20)

2004 6.0 l f error de arranque
2004 6.0 l f error de arranque2004 6.0 l f error de arranque
2004 6.0 l f error de arranque
 
Kc-5 gas turbine auraiya pata
Kc-5 gas turbine auraiya pataKc-5 gas turbine auraiya pata
Kc-5 gas turbine auraiya pata
 
Ps families
Ps familiesPs families
Ps families
 
ICE_22_Chapter 4.v2.ppt
ICE_22_Chapter 4.v2.pptICE_22_Chapter 4.v2.ppt
ICE_22_Chapter 4.v2.ppt
 
Summer Internship final reports
Summer Internship final reportsSummer Internship final reports
Summer Internship final reports
 
Engine Introduction.pptx
Engine Introduction.pptxEngine Introduction.pptx
Engine Introduction.pptx
 
Engine Introduction.pptx
Engine Introduction.pptxEngine Introduction.pptx
Engine Introduction.pptx
 
vdocument.in_660-mw-turbine.ppt
vdocument.in_660-mw-turbine.pptvdocument.in_660-mw-turbine.ppt
vdocument.in_660-mw-turbine.ppt
 
Diesel common rail basic
Diesel common rail basicDiesel common rail basic
Diesel common rail basic
 
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdfVolvo L330C Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdf
 
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdfVolvo L330C Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdf
 
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdfVolvo L330C Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C Wheel Loader Service Repair Manual Instant Download.pdf
 
Hy bgc presentation for 2017 swpsc
Hy bgc presentation for 2017 swpscHy bgc presentation for 2017 swpsc
Hy bgc presentation for 2017 swpsc
 
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdfVolvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdf
 
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdfVolvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdf
 
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdfVolvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdf
Volvo L330C LL (L330CLL) Wheel Loader Service Repair Manual Instant Download.pdf
 
Gas turbine
Gas turbine Gas turbine
Gas turbine
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
 
4_5857344967990577973222222222222233.pdf
4_5857344967990577973222222222222233.pdf4_5857344967990577973222222222222233.pdf
4_5857344967990577973222222222222233.pdf
 
Y2 PUMPS TRAINING FOR OIL AND GAS OPERATION.ppt
Y2 PUMPS TRAINING FOR OIL AND GAS OPERATION.pptY2 PUMPS TRAINING FOR OIL AND GAS OPERATION.ppt
Y2 PUMPS TRAINING FOR OIL AND GAS OPERATION.ppt
 

Recently uploaded

Event-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingEvent-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingScyllaDB
 
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider  Progress from Awareness to Implementation.pptxTales from a Passkey Provider  Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider Progress from Awareness to Implementation.pptxFIDO Alliance
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe中 央社
 
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdfHow Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdfFIDO Alliance
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...panagenda
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...ScyllaDB
 
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...FIDO Alliance
 
2024 May Patch Tuesday
2024 May Patch Tuesday2024 May Patch Tuesday
2024 May Patch TuesdayIvanti
 
Design Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxDesign Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxFIDO Alliance
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Skynet Technologies
 
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimaginedpanagenda
 
WebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM PerformanceWebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM PerformanceSamy Fodil
 
Oauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftOauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftshyamraj55
 
WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024Lorenzo Miniero
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGDSC PJATK
 
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfWhere to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfFIDO Alliance
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxFIDO Alliance
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Patrick Viafore
 
Working together SRE & Platform Engineering
Working together SRE & Platform EngineeringWorking together SRE & Platform Engineering
Working together SRE & Platform EngineeringMarcus Vechiato
 

Recently uploaded (20)

Event-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingEvent-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream Processing
 
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider  Progress from Awareness to Implementation.pptxTales from a Passkey Provider  Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe
 
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdfHow Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
 
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
 
2024 May Patch Tuesday
2024 May Patch Tuesday2024 May Patch Tuesday
2024 May Patch Tuesday
 
Design Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxDesign Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptx
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
 
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
 
WebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM PerformanceWebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM Performance
 
Overview of Hyperledger Foundation
Overview of Hyperledger FoundationOverview of Hyperledger Foundation
Overview of Hyperledger Foundation
 
Oauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftOauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoft
 
WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 Warsaw
 
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfWhere to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptx
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024
 
Working together SRE & Platform Engineering
Working together SRE & Platform EngineeringWorking together SRE & Platform Engineering
Working together SRE & Platform Engineering
 

Erection and commissioning of the new compressor package.pptx

  • 1. ERECTION AND COMMISSIONING OF THE NEW GAS COMPRESSOR PACKAGE PRESENTED BY: JOGANI DHRUVIKKUMAR ASHOKBHAI (OIL ID : 204588) SENIOR OFFICER ON PROBATION GAS MANAGEMENT SERVICES DEPARTMENT MENTOR: MR. TASRIQUE HAQUE, DEPUTY CHIEF ENGINEER GAS MANAGEMENT SERVICES DEPARTMENT Fourth Quarterly Assessment
  • 2. NEW GAS COMPRESSOR PACKAGE SPECIFICATION MODEL WAUKESHA F3514 DISPLACEMENT VOLUME 3520 BHP 493 COMPRESSION RATIO 8:1 BORE AND STROKE 9.375” & 8.5” IGNITION Turbo Charged Intercool NO. OF CYLINDER 6 RATED RPM 900 ENGINE MODEL 8” & 4.7 5” x 6HOS2-2 NO. OF THROW 2 CYLINDER TYPE HOS SERVICE Gas Lift TOTAL COMPRESSION BHP 287 KW NO. OF STAGE 2 RATED DISCHARGE PRESSURE 1450 PSIG COMPRESSOR MODEL 60F4 FAN DIAMETER 60 inch DIRVE ENGINE DRIVE FAN ORIENTATION VERTICAL TOTAL NOS. FAN 4 AERIAL COOLER
  • 4. TYPES OF FOUNDATION CC METRESS GRAVEL PACK Construction Old Compressor Package Replacement job Material Cement and Concrete Anti Vibration Pad YES Job Completion Time 10-11 days + 5-6 days + 35-40 days + 20 – 25 days = 70-75 days Construction New Compressor Package Installation job Material Gavel Pack(15mm gravel+75 mm Gravel + Brick Soil) Anti Vibration Pad NO Job Completion Time 35-40 days + 20 – 25 days = 60-62 days
  • 5. Compressor Skid Placement On The Foundation • Compressor skid placed on the foundation • Alignment of compressor skid on the foundation Compressor Skid
  • 6. ENGINE PLACEMENT ON SKID AND ALINGNMENT • Engine placement behind the compressor • Rough alignment • Coupling Fitting • Final alignment F-3514 Engine Engine Placement On
  • 7. Erection of the Aerial Cooler Assembly • Dimension verification of the Aerial cooler assembly foundation • Proper Alignment between engine shaft and aerial cooler Aerial Cooler Assembly Foundation Placement of Aerial Cooler Assembly Upliftment of Aerial Cooler
  • 8. INSTALLATION OF CYLINDER ASSEMBLY AND PULSATION BOTTLE • Shaft alignment of Engine and Compressor • Installation of the cylinder assembly on both side • Installation of pulsation bottle on the both cylinder . • Head end and Crank End clearance measurement in both stages cylinder. Crank-Frame without Cylinder Cylinder Bottle Crank-Frame with Cylinder
  • 9. FIRST PRE-LUBE OF ENGINE - Checking of the clean Engine oil filter - Filling of the lube oil in Engine oil filter - Level check of lube oil engine sump - Instrument air connection to Pre-lube pump - Start of pre-lube pump and verification lube oil circulation in rocker arm. Rocker Arm Filling of Lube Oil Pre-Lube Pump
  • 10. Erection of Cooling System Tank And Silencer Assembly • Foundation marking for the both assembly on the ground • Preparation of the foundation Silencer Erection Foundation Marking Engine Jacket and Auxiliary water expansion Tank
  • 11. PIPE CONNECTION & MAIN LINE HOOK UP • Pipe connection between the compressor cooling system and engine cooling system to the Aerial Cooler. • Fuel line, Suction and Discharge Line connection, Blowdown line, Instrument air, Drain Line and Starting Air Line connection to respective main header line. • Last stage grounting Flange leakage check Main Line Header
  • 12. PRECONDITIONING OF CONTROL PANEL • 230 V A.C. to 24 V D.C. • Cold loop test • MCB Check • Software installation • Trip test Control Panel Configuration Float Cum Booster Panel
  • 13. COMISSIONING OF THE NEW GAS COMPRESSOR PACKAGE • Mechanical Run Test - Starting Air Line And Fuel Line Flushed Out - Removal Of Discharge Valve Cover - Removal Of Spark Plug With Ignition Coil - Manual Pre-lube Of Compressor Discharge Valve Cover Removed Dry Cranking Spark Plug Removed Cylinder
  • 14. LOAD AND UNLOAD TEST • 2 Hour Unload Run Test Without Gas Charge • 2 Hour Load Run Test With Gas Charge • Hot Alignment Of Engine And Compressor Shaft • Final 72 Hour Full Load Run Test Hot Alignment Process And Equipment
  • 15. Monitoring Of Crucial Parameters • Suction & Discharge pressure of both stages. • Suction & Discharge temperature of both stages. • Compressor and Engine Lube Oil pressure • Exhaust Manifold Temperature • Engine RPM Control Panel Screen