This document provides a budget breakdown for a 3-day film production. It includes costs for camera and lighting equipment at £300 per day, location audio equipment at £31.20 per day, filming at £1200 for half days on location, insurance at £750, props and costumes at £10, and still images production with a camera at £26.40 per day. The total estimated budget is £4000 with a 10% contingency of £273.20, bringing the overall estimated costs to £3,105.20.